This document is a Section B Price Schedule for a federal solicitation for roof repairs at YAO (Solicitation No. 140R3024R0013) and a Pumping Station project at Topock Marsh (Solicitation No. 140R3025R0013). The price schedule includes multiple Contract Line Item Numbers (CLINs) for various roof-related services, including bonds and insurance, mobilization/preparatory work, and roof repairs/replacements for multiple buildings with warranty periods ranging from 10 to 30 years.

The solicitation offers three price schedules: a primary schedule and two optional schedules. Each schedule includes line items for bonds and insurance, preparatory work, and specific roof repair or replacement tasks for Buildings 1-4. The optional schedules provide alternative approaches with different warranty lengths. An important note indicates that performance and payment bonds are required for construction services exceeding $150,000, and a bid guarantee will be necessary. The document emphasizes that offers must complete the entire Price Schedule, and failure to do so may result in the offer being deemed incomplete or technically unacceptable.

View the file

Other files

File Type Posted
Sol_140R3025R0013_Amd_0007.pdf PDF
Revised_Page_B-2_0007.pdf PDF
Revised_Page_M-3_0006.pdf PDF
Revised_Page_L-14_0006.pdf PDF
Sol_140R3025R0013_Amd_0006.pdf PDF
Plans_0005.zip ZIP file
Sol_140R3025R0013_Amd_0005.pdf PDF
Questions_and_Answers_140R3025R0013_0005.pdf PDF
Revised_Attachment_1_-_SOW_0005.pdf PDF
Revised_Section_B_0005.pdf PDF
52_223_23_Devation_February_2025_0004.pdf PDF
Sol_140R3025R0013_Amd_0004.pdf PDF
52_223_02_Devation_February_2025_0004.pdf PDF
Revised_Attachment_12_Wage_Determination_0004.pdf PDF
140R3025R0013_-_Site_Visit_Sign_In_Sheet_0003.pdf PDF
Sol_140R3025R0013_Amd_0003.pdf PDF
Sol_140R3025R0013_Amd_0002.pdf PDF
Sol_140R3025R0013_Amd_0001.pdf PDF
SF_1442_0001.pdf PDF
Attachment_10_-_SOW_Appendix_D_Floor_Plan_Drawings_(For_Information_Only).pdf PDF
Attachment_8_-_SOW_Appendix_B_1292-303-60221_Vicinity_and_Location_Maps.pdf PDF
Attachment_1_-_Statement_of_Work.pdf PDF
Attachment_5_-_SOW_Appendix_A_3.pdf PDF
Attachment_9_-_SOW_Appendix_C_2010_YDP_Seismic_Strengthening_Roof_Drawings_Set_(For_Information_Only).pdf PDF
Solicitation_No__140R3023R0013.pdf PDF
Attachment_2_-_SOW_Appendix_A_YAO_-_Roof_Leak_Inspection_Report.pdf PDF
Attachment_14_-_Past_Performanc_Questionnaire.pdf PDF
Attachment_6_-_SOW_Appendix_A_4.pdf PDF
Attachment_11_-_SOW_Appendix_E_Asbestos_and_Lead_Inspection_Report.pdf PDF
Attachment_12_Wage_Determination.pdf PDF
Attachment_4_-_SOW_Appendix_A_2.pdf PDF
Sol_140R3025R0013.pdf PDF
Attachment_3_-_SOW_Appendix_A_1.pdf PDF
Attachment_7_-_SOW_Appendix_A_5.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Continuation of Section B – Supplies or Services and Prices/Costs

Solicitation No.

140R3024R0013

Project Title Roof Repairs at YAO

Page B-1

CONTINUATION OF SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS

B.1 THE REQUIREMENT

(a) The Contractor shall furnish the items identified in this Section, in accordance with the terms, conditions, and specifications contained in the contract.

(b) Offers will be considered for award on the following Price Schedule, but no offer will be considered for award on only part of the Price Schedule.

(c) Failure to complete Price Schedule will result in an incomplete offer that will not be considered.

(d) Offerors are cautioned to carefully review the proposal submission requirements contained in Section L. Failure to comply with these requirements may result in an offer being determined technically unacceptable.

(e) The contract will be awarded to the4 offeror as detailed in Sections L and M.

(f) Definitions:

(1) CLIN: Contract Line-Item Number

(2) LS: Lump Sum

(b) IMPORTANT NOTE: The requirement for submission of performance and payment bonds is applicable for construction services in excess of $150,000.00. A bid guarantee will be required.

Section B – Supplies or Services and Prices

Solicitation No.

140R3025R0013 / Amendment 0006

Project Title Pumping Station at Topock Marsh

Page B-2

B.2 PRICE SCHEDULE

CLIN Supplies/Services QTY Unit Unit Price

Extended Amount

0001 Bonds and Insurance 1 LS

0002 Mobilization/Preparatory Work 1 LS $

Building 1 Complete Single-Ply Membrane Roof Overlay with 3020-year Warranty

1 LS $

0004 Building 2 Specified Repairs 1 LS $

Building 3 Specified Repairs with 20-year Warranty

1 LS $

Building 4 Specified Repairs with 10-year Warranty

1 LS $

Optional: Additional Bonds and Insurance for Building 1 Roof Replacement with 30-year Warranty

1 LS $

Optional: Additional Preparatory Work for Building 1 Roof Replacement with 30-year Warranty

1 LS $

Optional: Additional Work for Building 1 Complete Single-Ply membrane Roof Replacement with 30-year Warranty

1 LS $

Total Price $

Optional Schedule 1

Unit Price

Extended Amount

0001 Bonds and Insurance 1 LS

0002 Mobilization/Preparatory Work 1 LS $

Building 1 Complete Single-Ply Membrane Roof Overlay with 20-year Warranty

1 LS $

0004 Building 2 Specified Repairs 1 LS $

Building 3 Specified Repairs with 20-year Warranty

1 LS $

Building 4 Specified Repairs with 10-year Warranty

Continuation of Section B – Supplies or Services and Prices/Costs

Solicitation No.

140R3024R0013

Project Title Roof Repairs at YAO

Page B-3

Optional Schedule 2

Unit Price

Extended Amount

0001 Bonds and Insurance 1 LS

0002 Mobilization/Preparatory Work 1 LS $

Building 1 Complete Single-Ply Membrane Roof Replacement with 30 year Warranty

1 LS $

0004 Building 2 Specified Repairs 1 LS $

Building 3 Specified Repairs with 20-year Warranty

1 LS $

Building 4 Specified Repairs with 10-year Warranty

File details come from the government source that posted it. Updated .