This document is a detailed technical specification for Thermoplastic Roof Membrane Repair Procedures, specifically focusing on cutting and patching techniques for topside roof repairs. The procedure provides comprehensive step-by-step instructions for repairing thermoplastic single-ply roof membranes, including required tools and supplies such as hot-work gloves, protective equipment, compatible adhesives, hot-air welders, and seam probes.

The repair process involves systematic steps including removing field coatings and debris, cutting and removing damaged membrane sections, inspecting underlying roof components, installing replacement insulation and cover boards, preparing surfaces, applying compatible membrane adhesives, and welding new membrane patches using a three-step hot-air welding method. The document emphasizes precise techniques for ensuring watertight seals, properly handling membrane materials, and addressing various roof penetrations and potential damage scenarios. Specific attention is given to maintaining proper membrane overlap, using compatible materials, and following manufacturer recommendations throughout the repair process.

View the file

Other files

File Type Posted
Sol_140R3025R0013_Amd_0007.pdf PDF
Revised_Page_B-2_0007.pdf PDF
Revised_Page_M-3_0006.pdf PDF
Revised_Section_B_0006.pdf PDF
Revised_Page_L-14_0006.pdf PDF
Sol_140R3025R0013_Amd_0006.pdf PDF
Revised_Section_B_0005.pdf PDF
Plans_0005.zip ZIP file
Sol_140R3025R0013_Amd_0005.pdf PDF
Questions_and_Answers_140R3025R0013_0005.pdf PDF
Revised_Attachment_1_-_SOW_0005.pdf PDF
52_223_23_Devation_February_2025_0004.pdf PDF
Sol_140R3025R0013_Amd_0004.pdf PDF
52_223_02_Devation_February_2025_0004.pdf PDF
Revised_Attachment_12_Wage_Determination_0004.pdf PDF
140R3025R0013_-_Site_Visit_Sign_In_Sheet_0003.pdf PDF
Sol_140R3025R0013_Amd_0003.pdf PDF
Sol_140R3025R0013_Amd_0002.pdf PDF
SF_1442_0001.pdf PDF
Sol_140R3025R0013_Amd_0001.pdf PDF
Sol_140R3025R0013.pdf PDF
Attachment_3_-_SOW_Appendix_A_1.pdf PDF
Attachment_7_-_SOW_Appendix_A_5.pdf PDF
Attachment_10_-_SOW_Appendix_D_Floor_Plan_Drawings_(For_Information_Only).pdf PDF
Attachment_8_-_SOW_Appendix_B_1292-303-60221_Vicinity_and_Location_Maps.pdf PDF
Attachment_1_-_Statement_of_Work.pdf PDF
Attachment_5_-_SOW_Appendix_A_3.pdf PDF
Attachment_9_-_SOW_Appendix_C_2010_YDP_Seismic_Strengthening_Roof_Drawings_Set_(For_Information_Only).pdf PDF
Solicitation_No__140R3023R0013.pdf PDF
Attachment_2_-_SOW_Appendix_A_YAO_-_Roof_Leak_Inspection_Report.pdf PDF
Attachment_14_-_Past_Performanc_Questionnaire.pdf PDF
Attachment_6_-_SOW_Appendix_A_4.pdf PDF
Attachment_11_-_SOW_Appendix_E_Asbestos_and_Lead_Inspection_Report.pdf PDF
Attachment_12_Wage_Determination.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

THERMOPLASTIC ROOF MEMBRANE REPAIR PROCEDURES TP2

Cutting and Patching: Topside Repair The following procedure is used in repair situations that require cutting open a thermoplastic single-ply roof membrane, replacing damaged roof system components and installing a topside patch to return the membrane to a watertight condition.

TOOLS AND SUPPLIES:

o Hot-work gloves o Solvent-resistant gloves o Eye protection o Compatible crayon or marker o Hooked blade utility knife, scissors o Push broom, brush or leaf blower o Measuring tape o Plastic pail, water, detergent, nonabrasive scrub brush or pad, rubber gloves, squeegee, rags o Compatible single-ply sheet o Compatible roof insulation o Compatible membrane adhesive o Compatible membrane cleaner o Hot-air welder, hand roller, seam probe o Compatible cut-edge sealant

1 Remove field coating, debris, incompatible materials and other contaminants, and ballast from the area of the membrane or flashing to be repaired.

Prepare a work area that extends well beyond the in-tended cut perimeter. Where the existing membrane surface is excessively contaminated or degraded, or field coating cannot be removed completely, follow TP 3—Cutting and Installing a Patch: Blindside Repair to complete the repair.

2 Cut the membrane in the problem area to expose the underlying roof system components. Cut out and remove or make a U-cut and peel back the mem-brane material, depending on the size and condition of the problem area and available patch material(s).

Round the corners in the cut.

REPAIR MANUAL for Low-slope Membrane Roof Systems—2nd Edition 199

YAO YDP - ATTACHMENT B

Alexander Silva Rectangle

3 Evaluate the type and extent of damage to un-derlying roof system components.

Where the roof deck was not adversely affected, and damage is isolated and may be addressed by replac-ing affected components with available compatible materials, follow the steps in this procedure.

Where extensive damage to the roof system or damage to the roof deck is found, note the observed damage in the service call report and document it with photos. Further evaluation beyond the scope of this manual is necessary. Follow the steps later in this procedure to install a patch and restore the membrane to a watertight condition.

4 Remove affected roof system components such as cover board and insulation fasteners. Cut and remove damaged cover board and insulation mate-rial. Remove adhesive and debris that may prevent close-fitting replacement materials from being installed correctly.

5 Prepare and install compatible replacement components. Finished replacement insulation and cover board thickness should match surrounding materials. Measure and cut close-fitting insulation and cover board material. Attach the replacement insulation and cover board materials with fasten-ers or adhesive compatible with the existing roof system.

6 Remove dirt, debris and field-applied coating from the perimeter of the cut. Where necessary, scrub the work area with a residue-free cleaner and water. Rinse thoroughly with clean water and allow the membrane to dry. A leaf blower rubber-bladed squeegee and clean, absorbent, lint-free rags may be used to facilitate drying.

Where the existing membrane surface is excessively contaminated or degraded, or field coating cannot be removed completely and as a result a watertight hot-air weld cannot be formed, follow TP 3— Cutting and Installing a Patch: Blindside Repair to complete the repair. Blindside repairs only may be practical with mechanically attached and loose-laid and ballasted membranes.

200 200REPAIR MANUAL for Low-slope Membrane Roof Systems—2nd Edition 2

7 Cut a patch from a reinforced single-ply sheet compatible with the existing roof membrane. Size the patch to extend 4 inches beyond any part of the defect. Round all corners of the patch to limit peel-ing of square corners. Round the ends of the cut in the existing membrane.

8 Wipe the area of the existing membrane to receive the patch and the underside of the patch material with a clean, absorbent, lint-free cotton cloth dampened with manufacturer-recommended membrane cleaner. Where the manufacturer cannot be identified, use a product labeled as single-ply membrane cleaner. Do not pour the cleaner direct-ly on the membrane. Wipe the area clean with the cleaner-dampened cloth. Allow the surface of the membrane and patch to air dry.

REPAIR MANUAL for Low-slope Membrane Roof Systems—2nd Edition 2013

202 202REPAIR MANUAL for Low-slope Membrane Roof Systems—2nd Edition

9 With adhered membranes, adhere the patch to the replacement insulation or cover board:

1) Apply compatible membrane adhesive to the substrate and mating area of the patch as rec-ommended by the manufacturer. Be careful to keep the adhesive off surfaces that will be hot-air welded.

2) Follow the manufacturer’s recommendation to determine when the adhesive is ready for laying in the patch material. A tack test commonly is used to make that determination. With this test, the adhesive should be tacky but should not stick or string when touched with a finger.

3) Lay in the patch and apply hand pressure or use a hand roller to bond the mating surfaces.

10 Weld the patch in place using the three-step hot-air welding method—tack weld, pre-weld and final weld. Skip the tack weld where the patch was adhered to the substrate.

1) Using a hot-air welder, tack weld the patch to the existing membrane sufficiently to hold the patch in place, taking care to not wrinkle the patch material.

2) Pre-weld the patch by inserting the welder noz-zle under the patch and forming a continuous pre-weld approximately 2 inches from the edge of the patch. This pre-weld will prevent heat leakage during the final welding and is achieved by following the welder nozzle closely with a hand roller to provide pressure to adhere the back of the weld area.

3) Final weld the outer 2 inches by concentrating the heat on the remaining unadhered outer portion of the patch until the membrane and patch have reached the welding temperature.

The hot-air welder should be moved quickly enough to avoid scorching the membrane, yet slowly enough to achieve a complete weld. Press firmly when rolling with a hand roller in front of and parallel to the nozzle opening to bond the materials. With PVC membranes, a complete weld is characterized by slight bleed-out at the edge of the weld. The additional photo shows weld bleed-out with PVC. 10

REPAIR MANUAL for Low-slope Membrane Roof Systems—2nd Edition 2035

204 204REPAIR MANUAL for Low-slope Membrane Roof Systems—2nd Edition

11 Where T-joints occur, install T-joint patches.

Follow TP 4—T-joint Patch procedure.

12 After the welded areas have cooled, check seams for voids with a rounded-tip probe such as a cotter pin extractor.

13 Where required by the manufacturer, apply compatible cut-edge sealant along the patch perimeter.

14 Where aggregate ballast or pavers have been removed, reinstall membrane protection material and redistribute the ballast after the cut-edge sealant has skinned over.

REPAIR MANUAL for Low-slope Membrane Roof Systems—2nd Edition 205

THERMOPLASTIC ROOF MEMBRANE REPAIR PROCEDURES TP21

Installation of a Penetration Pocket Installation of a penetration pocket is acceptable as a last alternative for flashing existing small roof penetrations such as electrical conduit, mechanical supply lines and guy wire anchors that do not include adequate flashings.

A break-formed membrane-coated metal pocket, pre-fabricated membrane-coated metal one- or two-piece pocket, or pre-molded thermoplastic material pocket may be used. When using a membrane-coated metal pocket, a flashing (target) sheet of unreinforced material compatible with the roof membrane should first be hot-air welded to the pocket flange and then to the roof membrane. The flashing sheet should be sized to extend approximately 3 inches onto the roof membrane on all sides of the pocket. The pocket is filled with a compatible pourable sealant.

TOOLS AND SUPPLIES:

o Hot-work gloves o Solvent-resistant gloves o Eye protection o Hooked blade utility knife, scissors o Compatible crayon or marker o Push broom, brush or leaf blower o Plastic pail, water, detergent, nonabrasive scrub brush or pad, rubber gloves, squeegee, rags o Pre-manufactured penetra-tion pocket kit or a break-formed sheet-metal pocket and compatible pourable sealant o Compatible single-ply sheet o Compatible membrane cleaner o Compatible elastomeric sealant o Hot-air welder, hand roller, seam probe

1 Remove field coating, debris, incompatible ma-terials and contaminants, and ballast from the area around the existing penetration. The area prepared should be large enough to accommodate stripping plies on all sides of the pocket.

REPAIR MANUAL for Low-slope Membrane Roof Systems—2nd Edition 285

NOTE: Where penetrations such as flexible conduit or braided lightning protection cables are found that may allow water in, it is recommended that a gooseneck flashing or conduit housing be considered.

2 Scrub the work area with a residue-free cleaner and water.

3 Rinse thoroughly with clean water and allow the membrane to dry. A rubber-bladed squeegee and clean, absorbent, lint-free rags may be used to facilitate drying.

4 Wipe the membrane around the penetration with a clean, absorbent, lint-free cotton cloth damp-ened with manufacturer-recommended membrane cleaner. Where the manufacturer cannot be identi-fied, use a product labeled as single-ply membrane cleaner. Do not pour the cleaner directly on the membrane. Allow the cleaned surfaces to air dry. For pre-molded thermoplastic pockets, also wipe the underside of the pocket flange.

5 Apply compatible elastomeric sealant around the base of the penetration to prevent pocket filler material from flowing into the roof system.

286 286REPAIR MANUAL for Low-slope Membrane Roof Systems—2nd Edition

6 Place the pocket around the penetration and close and seal the open seam by soldering, mechan-ically fastening and sealing or heat-welding, as necessary. For pre-molded thermoplastic pockets, follow the manufacturer’s instructions; tack weld the pocket to the membrane to keep from moving during heat welding of the side seams.

7 Center the pocket around the penetration. De-pending on the pocket design, set the base in butyl sealant and roll the top of the base flange with a hand roller to ensure it is well-bonded to the membrane or follow the manufacturer’s instructions for heat welding the base to the roof membrane.

REPAIR MANUAL for Low-slope Membrane Roof Systems—2nd Edition 28710

288 288REPAIR MANUAL for Low-slope Membrane Roof Systems—2nd Edition

8 If pockets were heat-welded to the roof mem-brane, check seams for voids with a rounded-tip probe such as a cotter pin extractor after the welds have cooled.

9 Thoroughly stir two-part pourable sealant, where used. Follow the manufacturer’s instructions for preparing pre-packaged one-part sealant. Pack-age contents may have separated in storage and may need to be redistributed. Fill the pocket, crowning the sealant above the top of the penetration pocket to provide drainage away from the penetration. As an option, install a rain cover and apply compatible sealant around penetrations. See construction detail PP-1 in the Architectural Metal Flashing section of The NRCA Roofing Manual: Architectural Metal Flashing and Condensation and Air Leakage Control.

THERMOPLASTIC ROOF MEMBRANE REPAIR PROCEDURES TP22

Roof Drains Where a leak is suspected at an interior roof drain, troubleshooting should proceed in this order:

1. Below-deck drainage system components

2. Drain bowl

3. Drain flashing

At each step, note the findings on the inspection report.

Once the problem is located, perform the appropriate permanent repairs. Where practical, blindside repair is the preferred method for reflashing a roof drain.

TOOLS AND SUPPLIES:

o Hot-work gloves o Solvent-resistant gloves o Eye protection o Hooked blade utility knife, scissors o Compatible crayon or marker o Push broom, brush or leaf blower o Inflatable drain plug, compression drain plug o Plastic pail, water, detergent, nonabrasive scrub brush or pad, rubber gloves, squeegee, rags o Compatible reinforced single-ply sheet o Compatible unreinforced flashing sheet o Compatible membrane cleaner o Compatible compression sealant o Compatible cut edge sealant o Hot-air welder, hand roller, seam probe

1 Ensure the drain is free-flowing. Where water is ponding at the drain, remove debris from the drain sump. Remove the strainer and remove debris visi-ble inside the drain bowl and leader opening. Where water is not draining or draining slowly, it is nec-essary to investigate below-deck drain line compo-nents for obstructions.

REPAIR MANUAL for Low-slope Membrane Roof Systems—2nd Edition 289

NOTE: It is important that the owner be made aware that access to the underside of the roof deck is necessary for troubleshooting.

2 Determine whether below-deck plumbing components are the source of leakage. Examine the plumbing components for cracks, leaking joints and condensation.

3 Check the drain clamping ring and bolts for missing or damaged parts. Check for compromised or missing sealant at the clamping ring. Where necessary, remove the clamping ring bolts, clamping ring and existing sealant. Replace broken or miss-ing parts. Drilling and retapping of drain bolts and receivers may be necessary.

4 Apply a continuous bed of compression sealant around the drain bowl flange and replace the clamp-ing ring. Tighten the clamping ring bolts.

5 Plug the leader below the drain bowl-leader junction. Fill the drain bowl with water to a level 1 inch below the bowl-to-flashing interface and check for drain bowl leaks.

• Where a damaged drain bowl is leaking, repairs may involve replacing the drain bowl and dam-aged adjacent components such as insulation or installing a retrofit (insert) drain. The owner should be notified and the preferred corrective action determined and agreed upon with the owner.

• Where no leaks are found, proceed to Step 6.

290 290REPAIR MANUAL for Low-slope Membrane Roof Systems—2nd Edition

6 With the leader plugged below the drain bowl-leader junction, fill the drain sump with water until the flashing is completely submerged and check for leaks. Drain the water from the sump once finished testing.

• Where the drain flashing is leaking, repairs involve removing the existing flashing, replacing damaged insulation and reinstalling a new drain flashing. Proceed to Step 7.

• Where no leaks are found, the owner should be notified. Possible root causes unrelated to drain flashing include condensation on deck under-side or under-deck metal components, damaged below-deck plumbing components and compro-mised plumbing joints.

7 Remove the drain clamping ring. Place a com-pression plug inside the drain bowl to keep debris from falling into the drain. Cut and remove the existing membrane flashing. Target a section ap-proximately 4 feet by 4 feet in size, centered on the drain. With dished metal sumps, slit the existing membrane diagonally at the corners of the opening to prevent overstressing the membrane at these locations.

8 Inspect the insulation and deck for damage.

Note observed damage in the service call report and document it with photos. Where deck damage is found, further evaluation beyond the scope of this manual is necessary. Remove damaged insulation.

REPAIR MANUAL for Low-slope Membrane Roof Systems—2nd Edition 29114

292 292REPAIR MANUAL for Low-slope Membrane Roof Systems—2nd Edition

9 Remove existing compression sealant. With cast iron drains, wire brush or file the drain bowl thoroughly to remove rust and rough edges.

10 Install compatible replacement insulation to obtain a close fit consistent with the thickness and taper of the existing insulation. Attach the replace-ment insulation.

11 Prepare a new target sheet for the sump from reinforced single-ply sheet compatible with the existing roof membrane. Size the sheet to be approx-imately 6 inches wider and 6 inches longer than the opening in the existing membrane.

12 Apply water-block sealant around the drain bowl flange in a continuous bead.

13 Center the target sheet over the drain bowl.

The sheet should extend approximately 3 inches in all directions beyond the cut in the existing mem-brane. Make small slits in the sheet at clamping ring stud or bolt locations and thread the studs or bolts through the cuts to hold the sheet centered in place.

14 Cut a round drain opening centered over the drain and larger than the drain leader diameter.

15 Wipe the areas of the existing membrane and flashing sheet where welds will be made with a clean, absorbent, lint-free cotton cloth dampened with manufacturer-recommended membrane cleaner.

Where the manufacturer cannot be identified, use a product labeled as single-ply membrane cleaner.

Do not pour the cleaner directly on the membrane.

Wipe the area clean with the cleaner-dampened cloth. Allow the surface of the membrane and patch to air dry.

16 Hot-air weld the flashing sheet to the existing membrane. With mechanically attached and loose-laid ballasted membranes, follow TP 3—Cutting and Patching: Blindside Repair. With adhered membranes, follow TP 2—Cutting and Patching:

Topside Repair.

REPAIR MANUAL for Low-slope Membrane Roof Systems—2nd Edition 29316

294 294REPAIR MANUAL for Low-slope Membrane Roof Systems—2nd Edition

17 Hot-air weld patches of compatible unrein-forced flashing sheet over the corner areas. Each patch should have a diameter of approximately 8 inches or extend approximately 4 inches beyond any part of a corner diagonal cut in the membrane.

Round patch corners to limit peeling of square corners. Follow the three-step hot-air welding method—tack weld, pre-weld and final weld—as follows:

1) Using a hot-air welder, tack weld a patch to the existing membrane sufficiently to hold the sheet in place, taking care to not wrinkle the sheet.

2) Pre-weld the flashing sheet by inserting the welder nozzle under the top sheet and forming a continuous pre-weld approximately 2 inches from the cut edge of the top sheet. This pre-weld will prevent heat leakage during the final welding and is achieved by following the welder nozzle closely with a hand roller to provide pressure to adhere the back of the weld area.

3) Final weld the free 2 inches of the top sheet by concentrating the heat on the remaining un-adhered portion of the flashing sheet until the membrane and sheet have reached the welding temperature. The hot-air welder should be moved quickly enough to avoid scorching the membrane, yet slowly enough to achieve a com-plete weld. With PVC membranes, a complete weld is characterized by slight bleed-out at the edge of the weld. Press firmly when rolling with a hand roller in front of and parallel to the noz-zle opening to bond the materials.

18 After the welded area has cooled, check all seams for voids with a rounded-tip probe such as a cotter pin extractor and correct as necessary.

19 Set the clamping ring in place and tighten the bolts or nuts following a cross pattern to uniformly compress the sealant. Repeat Step 6 to check the drain flashing watertightness. If no leaks are found, remove the compression plug from the drain. Install the drain strainer.

20 Apply compatible cut-edge sealant along the cut in the existing membrane.

REPAIR MANUAL for Low-slope Membrane Roof Systems—2nd Edition 295

516 The NRCA Roofing Manual: Membrane Roof Systems—2023 Chapter 10—Construction Details 19

517The NRCA Roofing Manual: Membrane Roof Systems—2023 Chapter 10—Construction Details20

518 The NRCA Roofing Manual: Membrane Roof Systems—2023 Chapter 10—Construction Details 21

519The NRCA Roofing Manual: Membrane Roof Systems—2023 Chapter 10—Construction Details22

520 The NRCA Roofing Manual: Membrane Roof Systems—2023 Chapter 10—Construction Details 23

521The NRCA Roofing Manual: Membrane Roof Systems—2023 Chapter 10—Construction Details24

522 The NRCA Roofing Manual: Membrane Roof Systems—2023 Chapter 10—Construction Details 25

523The NRCA Roofing Manual: Membrane Roof Systems—2023 Chapter 10—Construction Details26

524 The NRCA Roofing Manual: Membrane Roof Systems—2023 Chapter 10—Construction Details 27

525The NRCA Roofing Manual: Membrane Roof Systems—2023 Chapter 10—Construction Details28

526 The NRCA Roofing Manual: Membrane Roof Systems—2023 Chapter 10—Construction Details 29

529The NRCA Roofing Manual: Membrane Roof Systems—2023 Chapter 10—Construction Details30

531The NRCA Roofing Manual: Membrane Roof Systems—2023 Chapter 10—Construction Details31

511The NRCA Roofing Manual: Membrane Roof Systems—2023 Chapter 10—Construction Details32

512 The NRCA Roofing Manual: Membrane Roof Systems—2023 Chapter 10—Construction Details 33

513The NRCA Roofing Manual: Membrane Roof Systems—2023 Chapter 10—Construction Details34

514 The NRCA Roofing Manual: Membrane Roof Systems—2023 Chapter 10—Construction Details 35

515The NRCA Roofing Manual: Membrane Roof Systems—2023 Chapter 10—Construction Details36

SUBSTRATE

INSULATION

SUBSTRATE

INSULATION

8" (2

.2 mm ) M

IN

FASTENER

HD OR HD PLUS SEAM PLATE AND ELEVATE

FASTENER @ 12" (304.8 mm) O.C. MAX. (SEE NOTE #9)

COMPRESSIBLE TUBE (SEE NOTE #3)

WOOD NAILER

(SEE NOTE #5)

NOTE:

1. REFER TO THE ELEVATE™ WEBSITE FOR

MOST CURRENT INFORMATION.

2. REFER TO DETAIL PUT-LS-02 OR PUT-LS-03

FOR WELD WIDTH.

3. COMPRESSIBLE TUBE (SUPPLIED BY OTHERS)

DIAMETER MUST EXCEED THE DECK OPENING

BY 50% MIN. OR DESIGNED MOVEMENT

(WHICH EVER IS GREATER).

4. FIELD MEMBRANE FORMED INTO RETAINER TO

SUPPORT FOAM ROD.

5. WOOD NAILER MUST BE INSTALLED TO MEET

APPLICABLE BUILDING CODES.

6. ELEVATE BONDING ADHESIVE REQUIRED

BETWEEN MEMBRANE AND INSULATION FOR

ADHERED SYSTEMS.

7. WHEN REINFORCEMENT OF TPO MEMBRANE

IS CUT, REFER TO UT-LS-14 FOR CUT EDGE

SEALANT APPLICATION.

8. REFER TO UT-LS-15 FOR ADDITIONAL LAP

SPLICE REQUIREMENTS

9. MAXIMUM 10" (254 mm) LONG FASTENERS

(NOTE: WOOD BLOCKING MAY BE

SUBSTITUTED FOR INSULATION TO REDUCE

FASTENER LENGTH REQUIREMENT).

WOOD NAILER

(SEE NOTE #5)

APPROPRIATE THERMOPLASTIC

MEMBRANE ADHESIVE (SEE NOTE #6)

WELDED SPLICE

(SEE NOTE #2)

.060" (1.52 MM) OR .080" (2.03 MM) APPROPRIATE THERMOPLASTIC

MEMBRANE OR THERMOPLASTIC CURB FLASHING

.060" (1.52 mm) OR .080" (2.03 mm) APPROPRIATE

THERMOPLASTIC MEMBRANE OR THERMOPLASTIC

CURB FLASHING (SEE NOTE #4)

1-1/4" (31.75 mm) HOT DIPPED GALVANIZED ROOF NAILS AT 4" (101.6 mm) O.C. MAX.

APPROPRIATE ELEVATE MEMBRANE

ADHESIVE (ADHERED SYSTEMS -

SEE NOTE #6)

.080" (2.03 MM) APPROPRIATE

THERMOPLASTIC MEMBRANE

EXPANSION JOINT (FIELD FABRICATED) WIDE WELD SPLICE

CURB TO CURB

10/10/2024 NOT TO SCALEMAXIMUM WARRANTY: 30 YEARS(800) 428-4511 www.holcimelevate.com

DETAIL NO.

PTPM-E-10ISSUE / REVISION DATE:ACCEPTABLE SYSTEMS: ALLMATERIAL: 80 MIL PLATINUM ULTRAPLYTM TPO, ELEVATE PVC KEE, ELEVATE MAX PVC

WARRANTY MEMBRANE REQUIREMENTS:

25-YEAR

TPO - 60 MIL

PVC KEE, MAX PVC - 60 MIL

30-YEAR

TPO - 80 MIL

PVC KEE, MAX PVC - 80 MIL

NOTE:

1. DO NOT MIX ELEVATE PVC/PVC KEE

AND ELEVATE MAX PVC MEMBRANE.

2. DO NOT MIX TPO AND PVC

MEMBRANES.

REPLACED DETAILS

PUT-E-05 & PKE-E-05

PREFERRED METHOD FOR EXPANSION JOINTS

SUBSTRATE SUBSTRATE

NEW WOOD NAILER

CLAMPING RING

STAINLESS STEEL STUDS, WASHERS AND NUTS

ALUMINUM DOME

INSULATION

ELEVATE FASTENER

EXISTING

DRAIN PIPE

RUBBER SEAL

1/2" (12.7 mm) MIN.

(SEE NOTE #2)

INSULATION

ALUMINUM FLANGE (18" (457.2 mm) DIAMETER)

12" (304.8 mm)

1" MAX.

(25.4 mm)

NOTE:

1. REFER TO THE ELEVATE™ WEBSITE FOR THE MOST CURRENT

INFORMATION.

2. HOLE IN MEMBRANE SHOULD EXTEND A MINIMUM OF

1/2" (12.7 mm) BEYOND CLAMPING RING AND SHOULD NOT BE

SMALLER THAN THE DIAMETER OF THE LEADER PIPE.

3. INSULATION ADJACENT TO DRAIN TO BE APPROPRIATE ELEVATE

INSULATION WITH APPROPRIATE BONDING SURFACE.

4. ELEVATE WATER BLOCK MIN 1/2 OF10 OZ. (295 ml) TUBE PER 4"

DRAIN. USE ADDITIONAL WATER BLOCK FOR LARGER DRAINS.

5. FOLLOW DRAIN INSERT INSTALLATION INSTRUCTIONS

(INCLUDED IN DRAIN INSERT PACKAGE) FOR SPECIFIC

GUIDELINES, RECOMMENDATIONS, AND REQUIREMENTS.

CONTINUOUS BEAD OF ELEVATE

WATER BLOCK (SEE NOTE #4)

APPROPRIATE MEMBRANE ADHESIVE (ADHERED SYSTEM ONLY)

SUMP AREA FIELD SEAM REQUIREMENTS.

A. IF FIELD SEAM EDGE IS WITHIN 9" (228.6 mm) OF

DRAIN COMPRESSION RING, THERMOPLASTIC

MEMBRANE TARGET PATCH REQUIRED.

B. IF FIELDS SEAM EDGE IS WITHIN 9" (228.6 MM) TO 18"

(457.2 MM) OF DRAIN COMPRESSION RING, HEAT

WELD A LAYER OF APPROPRIATE THERMOPLASTIC

FLASHING (UNSUPPORTED) CENTERED OVER SEAM

EDGE. ELEVATE MAX PVC MEMBRANE REQUIRES

THE USE OF REINFORCED MEMBRANE FLASHING.

FLASHING MUST EXTEND 3" (76.2 MM) MIN. BEYOND

EDGE OF SUMP.

DRAIN INSERT

10/10/2024 NOT TO SCALEMAXIMUM WARRANTY: 30 YEARS(800) 428-4511 www.holcimelevate.com

DETAIL NO.

PTPM-D-03ISSUE / REVISION DATE:ACCEPTABLE SYSTEMS: ALL

MIN. .080" (2.03 mm) APPROPRIATE THERMOPLASTIC MEMBRANE

EXISTING

DRAIN BOWL

16" (406.4 mm)

LONG

ALUMINUM

DRAIN INSERT

TUBE (CAN BE

SHORTENED

AS REQUIRED)

REPLACED DETAILS

PUT-D-03 & PKE-D-03

WARRANTY MEMBRANE REQUIREMENTS:

25-YEAR

TPO - 60 MIL

PVC KEE, MAX PVC - 60 MIL

30-YEAR

TPO - 80 MIL

PVC KEE, MAX PVC - 80 MIL

MATERIAL: 80 MIL TPO / PVC KEE / MAX PVC

NOTE:

1. DO NOT MIX ELEVATE PVC/PVC KEE

AND ELEVATE MAX PVC MEMBRANE.

2. DO NOT MIX TPO AND PVC

MEMBRANES.

NOTE:

1. REFER TO THE ELEVATE™ WEBSITE FOR THE

MOST CURRENT INFORMATION.

2. REFER TO DETAIL PTPM-LS-01 OR PTPM-LS-02 FOR

WELD WIDTH.

3. REMOVE ALL EXISTING FLASHING, LEAD, ETC.PIPE

SURFACE MUST BE FREE OF ALL RUST, GREASE,

INSULATION, ETC.

4. PIPE MUST BE ANCHORED TO ENSURE STABILITY.

5. NO WRINKLES, FOLDS OR SECONDARY

PENETRATIONS UNDER CLAMPING RING.

6. DO NOT USE WHEN SERVICE LINE TEMP. EXCEEDS

160 °F (71 °C).

7. APPROPRIATE ELEVATE TPO BONDING ADHESIVE

REQUIRED BETWEEN MEMBRANE AND INSULATION

FOR ADHERED SYSTEMS.

8. ELEVATE FASTENER AND HD SEAM PLATE

REQUIRE FOR MAS ONLY.

9. WHEN REINFORCEMENT OF TPO MEMBRANE IS

EXPOSED, REFER TO PTPM-LS-08 FOR CUT EDGE

SEALANT APPLICATION.

10. PENETRATIONS EXCEEDING 12" (304.8 mm) IN

DIAMETER REQUIRE ADDITIONAL BASE

ATTACHMENT FOR ALL SYSTEMS.

SUBSTRATE

WIDE WELD SPLICE

(SEE NOTE #2)

1/2" - 3/4" (13 mm - 19 mm)

1/2

1" (1

2.7 m m

- 2

5.4 m m)

ROUND PENETRATION

SUBSTRATE

8" (2

.2 mm ) M

IN

APPROPRIATE ELEVATE TPO BONDING ADHESIVE

STAINLESS STEEL CLAMPING RING

CUT EDGE SEALANT

ULTRAPLY TPO FLASHING

(UNSUPPORTED) OR ULTRAPLY TPO

MEMBRANE AS FLASHING (SEE NOTE #9)

CONTINUOUS BEAD OF AP SEALANT

OR HIGH GRADE SEALANT

HD OR HD PLUS SEAM PLATE AND

ELEVATE FASTENER AT 12" (304.8 mm)

O.C. MAX. (SEE NOTE #8 & #10)

ULTRAPLY TPO FLASHING

(UNSUPPORTED)

ULTRAPLY TPO BONDING ADHESIVE

(SEE NOTE #7)

PLATINUM TPO MEMBRANE (.080 mil)

INSULATION INSULATION

CONTINUOUS BEAD OF

GP SEALANT OR HIGH

GRADE SEALANT

FIELD FABRICATED

METAL HOOD BY

OTHERS (REQUIRED)

SINGLE PENETRATION WITH ULTRAPLY TPO FLASHING

ACCEPTABLE SYSTEMS: ALL

10/10/2024 NOT TO SCALEMAXIMUM WARRANTY: 30 YEARS(800) 428-4511 www.holcimelevate.com

MATERIAL: PLATINUM ULTRAPLYTM TPO

DETAIL NO.

PTPM-P-04ISSUE / REVISION DATE:

WARRANTY MEMBRANE REQUIREMENTS:

25-YEAR

TPO - 60 MIL

30-YEAR

TPO - 80 MIL

NOTE:

USE FOR ULTRAPLY TPO

MEMBRANE SYSTEMS ONLY.

REPLACED DETAILS

PUT-P-04

INSULATION

SUBSTRATE SUBSTRATE

RO

UN

D

PE

NE

TR

AT

IO

N

FIELD SEAM

APPROPRIATE ELEVATE TPO

BONDING ADHESIVE

(ADHERED SYSTEM ONLY)

CONTINUOUS BEAD

OF ULTRAPLY TPO

AP SEALANT

STAINLESS STEEL

CLAMPING RING

(SEE NOTE #5)

CONTINUOUS BEAD OF

AP SEALANT OR HIGH

GRADE SEALANT

FIELD FABRICATED

METAL HOOD BY

OTHERS (REQUIRED)

HD OR HD PLUS SEAM PLATE AND ELEVATE FASTENER AT

12" (304.8 mm) O.C. MAX. (SEE NOTE #8)

ULTRAPLY TPO LARGE

PIPE FLASHING

ULTRAPLY TPO T-JOINT COVER

OR ULTRAPLY TPO FLASHING (UNSUPPORTED)

(4" (101.6 mm) x 4" (101.6 mm) MIN.)

CENTERED OVER INTERSECTION.

(REQUIRED ON ALL ELEVATE TPO SYSTEMS)

PLAN VIEW

PIPE FLASHING OVER

FIELD SEAM

WELDED SPLICE

2" (50.8 mm) MIN.

INSULATION

NOTE:

1. REFER TO THE ELEVATE™ WEBSITE FOR THE

MOST CURRENT INFORMATION.

2. REMOVE ALL EXISTING FLASHING, LEAD, ETC.

PIPE SURFACE MUST BE DRY AND FREE OF ALL

RUST, GREASE, INSULATION, ETC.

3. PIPE MUST BE ANCHORED / SUPPORTED TO

ENSURE STABILITY.

4. ULTRAPLY TPO LARGE PIPE FLASHING MAY BE

CUT TO TIGHTEST DIAMETER OF PENETRATION,

BUT NO LOWER THAN REINFORCING RING (NO

WRINKLES, FOLDS OR SECONDARY

PENETRATIONS UNDER CLAMPING RING).

5. APPLY AP SEALANT BETWEEN PENETRATION

AND ULTRAPLY TPO LARGE PIPE FLASHING

PRIOR TO INSTALLATION OF CLAMPING RING.

6. ULTRAPLY TPO LARGE PIPE FLASHING FITS 6"

(152.4 mm) - 8" (203.2 mm) PENETRATIONS SIZES.

7. DO NOT USE WHEN SERVICE LINE TEMP.

EXCEEDS 160 °F (71 °C).

8. ELEVATE FASTENER AND HD SEAM PLATE

REQUIRE FOR MAS ONLY.

9. CONTACT ELEVATE ROOF SOLUTIONS

DEPARTMENT FOR ALTERNATIVE PENETRATION

DETAILS.

10. WHEN REINFORCEMENT OF MEMBRANE IS

EXPOSED CUT EDGE SEALANT MUST BE USED.

CUT EDGE SEALANT

ROUND SINGLE PENETRATION WITH ULTRAPLY TPO LARGE PIPE FLASHING

ACCEPTABLE SYSTEMS: ALL

10/10/2024 NOT TO SCALEMAXIMUM WARRANTY: 30 YEARS(800) 428-4511 www.holcimelevate.com

MATERIAL: PLATINUM ULTRAPLYTM TPO

DETAIL NO.

PTPM-P-01ISSUE / REVISION DATE:

WARRANTY MEMBRANE REQUIREMENTS:

25-YEAR

TPO - 60 MIL

30-YEAR

TPO - 80 MIL

NOTE:

USE FOR ULTRAPLY TPO

MEMBRANE SYSTEMS ONLY.

PLATINUM TPO

MEMBRANE .080 MIL

REPLACED DETAILS

PUT-P-01

Elevate™ Roofing, Lining, and Wall Systems

Project Name 07 54 23 - 1 ULTRAPLY™ TPO ROOFING

ULTRAPLY™ ADHERED OR MECHANICALLY ATTACHED OR INDUCTION WELDED TPO MEMBRANE

PLATINUM ROOFING SYSTEM

This specification is provided as a courtesy on an as-is basis and is not intended to substitute for specific design services provided by an Architect, Engineer, roof Consultant, or other design professional. It is in the building Owner’s interest to consult with these professionals prior to executing the specified project. The building Owner will ultimately assume the entire risk as to results, quality and performance of the roofing system specified.

EDITOR NOTE: Text underlined and/or red in color must be addressed to complete a final specification document. It is the sole responsibility of the editor to exercise appropriate care and sound professional judgment in the execution of this task. Green and/or italicized text represents notes to the Specifier and should be removed prior to publication.

I. GENERAL

The project, Project Name located in City, ST, includes the provision of a complete Elevate UltraPly™ TPO membrane roofing system.

A. Summary

1. Furnish and install a complete TPO roofing system, including:

a) Roofing Manufacturer's requirements for the specified warranty (note that the Platinum™ warranty requires specific materials and installation details; ensure all Manufacturer’s guidelines are followed)

b) Preparation of roofing substrates

c) Wood nailers for roofing attachment

d) Vapor barrier (optional)

e) Insulation

f) Adhered or Mechanically Attached or Induction Welded TPO membrane

g) Metal roof edging and copings

h) Flashings

i) Walkway pads

j) Other roofing-related items specified or indicated on the drawings or otherwise necessary to provide a complete weatherproof roofing system

B. Disposal of demolition debris and construction waste is the responsibility of Contractor. Perform disposal in manner complying with all applicable federal, state, and local regulations.

C. Comply with the published recommendations and instructions of the roofing membrane Manufacturer, at http://www.holcimelevate.com.

D. Commencement of work by the Contractor shall constitute acknowledgement by the Contractor that this specification can be satisfactorily executed, under the project conditions and with all necessary prerequisites for warranty acceptance by roofing membrane Manufacturer. Any modification of the

Contract Sum will be made in accordance with the stipulations of the Contract Documents stated elsewhere.

E. Related Sections (as present or needed) http://www.holcimelevate.com/

Project Name 07 54 23 - 2 ULTRAPLY™ TPO ROOFING

1. Section 06 10 00 – Rough Carpentry

2. Section 07 55 63 & 64 – Vegetated Protected Membrane Roofing & Green Roof Components

3. Section 07 62 00 – Sheet Metal Flashing and Trim

4. Section 07 71 00 – Roof Specialties

5. Section 07 72 00 – Roof Accessories

6. Section 08 60 00 – Roof Windows and Skylights

7. Section 22 14 26.13 – Roof Drains

F. Definitions

1. Definitions in the current editions of ASTM D1079 and NRCA's “The NRCA Roofing Manual:

Membrane Roof Systems” apply to work of this Section.

G. Submittals

1. Product Data

a) Provide membrane Manufacturer's printed data sufficient to show that all components of roofing system, including insulation and fasteners, comply with the specified requirements and with the membrane Manufacturer's requirements and recommendations for the system type specified;

include data for each product used in conjunction with roofing membrane.

b) Where UL or FM requirements are specified, provide documentation that shows that the roofing system to be installed is UL-Classified or FM-approved, as applicable. Include data itemizing the components of the classified or approved system.

2. Installation Instructions

a) Provide Manufacturer's instructions to Installer, marked up to show exactly how all components will be installed.

b) Where instructions allow installation options, clearly indicate which option will be used.

3. Shop Drawings

a) Provide roof plan indicating orientation of steel deck (if applicable), and fastener and/or adhesive layouts.

b) Provide the roof membrane Manufacturer's standard details customized for this project for all relevant conditions, including flashings, base tie-ins, roof edges, terminations, expansion joints, penetrations, and drains.

4. Provide copy of Pre-Installation Notice to show that Manufacturer's required Pre-Installation Notice

(PIN) has been accepted and approved by the Manufacturer.

5. Submit samples of each product to be used. (optional)

6. Specimen Warranty

7. Closeout Submittals

a) Executed Warranty

b) Maintenance data

H. Quality Assurance

1. Applicator Qualifications

a) Current Elevate Master Contractor status

Project Name 07 54 23 - 3 ULTRAPLY™ TPO ROOFING

b) At least five years’ experience in installing specified system

c) Capability to provide payment and performance bond to building Owner

2. Pre-Installation Conference

a) Before start of roofing work, Contractor shall hold a meeting to discuss the proper installation of materials and requirements to achieve the warranty.

b) Require attendance with all parties directly influencing the quality of roofing work or affected by the performance of roofing work.

c) Review methods and procedures related to roofing installation, including Manufacturer's written instructions.

d) Review and finalize construction schedule, and verify availability of materials, Installer's personnel, equipment, and facilities needed to make progress and avoid delays.

e) Examine deck substrate conditions and finishes, including flatness and fastening.

f) Review structural loading limitations of roof deck during and after roofing.

g) Review base flashings, special roofing details, roof drainage, roof penetrations, equipment curbs, and condition of other construction that affects roofing system.

h) Review governing regulations and requirements for insurance and certificates if applicable.

i) Review temporary protection requirements for roofing system during and after installation.

j) Review roof observation and repair procedures after roofing installation.

k) Notify Architect well in advance of meeting.

I. Delivery, Storage and Handling

1. Deliver products in Manufacturer's original containers, dry and undamaged, with seals and labels intact and legible.

2. Discard and legally dispose of material that cannot be applied within its stated shelf life.

3. Store materials clear of ground and moisture with weather protective covering.

4. Keep combustible materials away from ignition sources.

5. Handle and store roofing materials, and place equipment in a manner to avoid permanent deflection of deck and/or structural overloading.

J. Field Conditions

1. Proceed with installation only when existing and forecasted weather conditions permit roofing system to be installed in accordance with Manufacturer's written instructions and warranty requirements.

K. Warranty

1. Provide Elevate 30-year Platinum™ Red Shield™ Roofing System Limited Warranty covering membrane, roof insulation, and system accessories. Comply with all warranty procedures required by Manufacturer, including notifications, scheduling, and inspections. Systems specified with a warranty duration of 20 years or greater or a wind speed coverage above 55 mph require additional attachment and detail considerations. Consult the Manufacturer’s design guidelines for further information. See Platinum TPO specification for 30-year systems.

2. Limit of Liability: No dollar limitation (NDL)

Project Name 07 54 23 - 4 ULTRAPLY™ TPO ROOFING

3. Scope of Coverage: Repair leaks in the roofing system caused by

a) Ordinary wear and tear

b) Normal exposure to the elements

c) Manufacturing defect in Elevate materials

d) Defective workmanship used to install these materials

e) Damage due to winds up to 55 or 72 or 80 or 90 or 100 mph

f) Not Covered:

(1) Damage due to winds in excess of 55 or 72 or 80 or 90 or 100 mph

(2) Damage due to hurricanes or tornadoes

(3) Hail

(4) Intentional damage

(5) Unintentional damage due to normal rooftop inspections, maintenance, or service

II. PRODUCTS

A. Manufacturers

1. Acceptable Manufacturer – Roofing System: Elevate roofing, lining, and wall systems, Nashville, TN, http://www.holcimelevate.com

a) Roofing systems manufactured by others may be acceptable provided the roofing system is completely equivalent in materials and warranty conditions and the Manufacturer meets the following qualifications:

(1) Specializing in manufacturing the roofing system to be provided

(2) Minimum ten years of experience manufacturing the roofing system to be provided

(3) Able to provide a no dollar limit, single source roof system warranty backed by corporate assets in excess of one billion dollars

(4) ISO 9001 certified

(5) Able to provide polyisocyanurate insulation produced in own facilities

2. Manufacturer of Insulation and Cover Board: Same Manufacturer as roof membrane

3. Manufacturer of Metal Roof Edging: Same Manufacturer as roof membrane

a) Metal roof edging products by other Manufacturers are not acceptable.

b) Field- or shop-fabricated metal roof edgings are not acceptable.

4. Substitution Procedures: See Instructions to Bidders

a) Submit evidence that the proposed substitution complies with the specified requirements.

B. Roofing System Description

1. Roofing System

a) Membrane: Thermoplastic polyolefin (TPO)

(1) Thickness: As specified elsewhere

(2) Membrane Attachment: Adhered or Mechanically Attached or Induction Welded

b) Slope: ¼:12 (2%) by means of tapered insulation (optional if adequate structural slope is present)

c) Comply with applicable local building code requirements.

http://www.holcimelevate.com/

Project Name 07 54 23 - 5 ULTRAPLY™ TPO ROOFING

d) Provide assembly having Underwriters Laboratories, Inc. (UL) Class A Fire Hazard

Classification

e) Provide assembly complying with Factory Mutual Corporation (FM) Roof Assembly

Classification, FM Data Sheets 1-28 and 1-29, and meeting minimum requirements of FM 1-60 or 75 or 90 wind uplift rating. (optional)

2. Vapor Barrier over deck/deck cover: (optional: the use of a vapor barrier within the roofing system is strictly the decision of the design professional)

a) Membrane: High density polyethylene sheet with SBS modified bitumen adhesive

b) Attachment: Self-adhering

3. Choose one insulation assembly, a) or b):

a) Insulation (non-composite):

(1) Total System R-Value: 25 or greater

(a) Maximum Board Thickness: 3″ (76.2 mm)

(b) Use as many layers as necessary to achieve required R-value

(c) Stagger joints in adjacent layers

(2) Base Layer: Polyisocyanurate foam board, non-composite

(a) Attachment: Mechanical fastening or Low-rise polyurethane adhesive

(3) Fill Layers: Polyisocyanurate foam board, non-composite (optional)

(a) Attachment: Mechanical fastening or Low-rise polyurethane adhesive

(4) Top Layer: Polyisocyanurate foam board, non-composite

(a) Attachment: Mechanical fastening or Low-rise polyurethane adhesive

(5) Choose one of the following cover boards, a) or b):

(a) High Density Polyisocyanurate Cover Board

(i) Thickness: ½″ (12.7 mm)

(ii) R-Value: 2.5 based on ASTM tests C158 and C177

(iii) Attachment: Mechanical fastening or Low-rise polyurethane adhesive

(b) Gypsum-Based Cover Board

(i) Thickness: 0.25″ (6.4 mm) or 0.5″ (12.7 mm) or 0.625″ (15.9 mm)

(ii) Attachment: Mechanical fastening or Low-rise polyurethane adhesive

b) Insulation (composite):

(1) Total System R-Value: 25 or greater

(2) Maximum Board Thickness: 4″ (101 mm)

(a) Use as many layers as necessary to achieve required R-value

(b) Stagger joints in adjacent layers

(3) Base Layer (optional): Polyisocyanurate foam board, non-composite

(a) Attachment: Mechanical fastening or Low-rise polyurethane adhesive

(4) Top Layer: Polyisocyanurate foam board, composite

(a) Attachment: Mechanical fastening or Low-rise polyurethane adhesive

C. TPO Membrane Materials

1. Roofing and Flashing Membrane: Flexible, heat weldable sheet composed of thermoplastic polyolefin polymer and ethylene propylene rubber; complying with ASTM D 6878, with polyester

Project Name 07 54 23 - 6 ULTRAPLY™ TPO ROOFING weft inserted reinforcement and the following additional characteristics:

a) Thickness: 0.080″ (2.03 mm)

b) Color: White or Tan or Grey

c) Reinforcement: Polyester, weft-inserted scrim

d) Sheet Width: (if adhered or induction welded) Use widest sheet practical for jobsite conditions to minimize field seams or (if mechanically fastened) Use sheet width required to meet wind uplift and/or fastener spacing requirements

e) Acceptable Product: UltraPly™ TPO Platinum™ Membrane by Elevate

2. Membrane Fasteners: Type and size as required by roof membrane Manufacturer for roofing system and warranty to be provided; use only fasteners furnished by roof membrane Manufacturer.

3. Curb and Parapet Flashing: Same material as membrane, with encapsulated edge which eliminates need for seam sealing the flashing-to-roof splice; precut to 18″ (457 mm) wide; UltraPly™ TPO 18″

Curb Flashing.

4. Formable Flashing: Non-reinforced, flexible, heat weldable sheet, composed of thermoplastic polyolefin polymer and ethylene propylene rubber, color to match roof membrane; UltraPly™ TPO

Unsupported Flashing by Elevate

5. Factory-formed Weldable Flashing Accessories: UltraPly™ TPO Flashing (various) by Elevate

6. Self-Adhering Flashing Membrane: Unsupported (non-reinforced) TPO membrane factory laminated to white seam tape; UltraPly™ TPO QuickSeam™ Flashing by Elevate

7. Factory-formed Self-Adhering Flashing Accessories: UltraPly™ TPO QuickSeam™ Flashing

(various) by Elevate

8. Bonding Adhesive: Formulated for compatibility with TPO membrane and wide variety of substrate materials; UltraPly™ Bonding Adhesive or Single Ply LVOC Bonding Adhesive or Jet Bond Spray

Adhesive by Elevate

9. Seam Edge Treatment: Clear polymer-based sealant, formulated for sealing exposed edges of membrane; UltraPly™ TPO Cut Edge Sealant or UltraPly™ TPO Cut Edge Sealant LVOC by

Elevate

10. Pourable Sealer: One part polyurethane; White One-Part Pourable Sealer by Elevate.

11. Water Block Seal: Butyl rubber sealant for use between two surfaces, not exposed; Water Block

Seal S-20 by Elevate

12. Metal Plates and Strips used for Fastening Membrane and Insulation: Steel with Galvalume coating;

corrosion-resistance meeting FM 4470 criteria

13. Coated Metal Plates for Induction Welding (if applicable): UltraPly™ TPO InvisiWeld™ Plate or

UltraPly™ TPO InvisiWeld™-S Plate by Elevate

14. Termination Bars: Aluminum bars with integral caulk ledge; 1.3″ (33 mm) wide by 0.10″ (2.5 mm) thick; Termination Bar by Elevate

15. Roof Walkway Pads: TPO pad designed to provide protection from essential rooftop services and traffic and maintain the integrity of the existing roof surface; UltraPly™ TPO Walkway Pad or X-

Tred™ Walkway Pad (White or Grey or Yellow) by Elevate

16. Yellow Safety Strip: A 5.5″ (140 mm) by 100′ long (30 m) strip and nominal 30 mil (0.76 mm) thick yellow TPO membrane laminated to a white, cured, seam tape, compatible with TPO and EPDM;

QuickSeam™ Yellow Safety Strip by Elevate

Project Name 07 54 23 - 7 ULTRAPLY™ TPO ROOFING

D. Roof Insulation and Cover Boards

1. Polyisocyanurate Board Insulation: Closed cell polyisocyanurate foam with glass reinforced mat laminated to facers, complying with ASTM C 1289 Type II Class 1 or 2 (match with options below), with the following additional characteristics:

a) Thickness: As indicated elsewhere

b) Size: 48″ (1.22 m) by 96″ (2.44 m), nominal (if mechanically fastened) or 48″ (1.22 m) by 48″

(1.22 m), nominal (if adhered)

c) R-Value (LTTR) per inch (25 mm): min. 6.2R at 40 °F (4.4 °C) and min. 5.7R at 75 °F (23.9 °C)

d) Compressive Strength: 20 psi (138 kPa)

e) Ozone Depletion Potential: Zero; made without CFC or HCFC blowing agents

f) Acceptable Product: (class 1) ISOGARD GL polyiso board insulation or (class 2 - mold resistant facer) ISOGARD CG polyiso board insulation by Elevate

2. Composite Insulation (optional): closed cell polyiso foam core laminated to ½ʺ (13 mm) high density

ISOGARD HD board:

a) Thickness: As indicated elsewhere

b) Size: 48″ (1.22 m) by 96″ (2.44 m), nominal (if mechanically fastened) or 48″ (1.22 m) by 48″

(1.22 m), nominal (if adhered)

c) Compressive Strength: 20 psi (138 kPa) core with 80 psi (552 kPa) board

d) Ozone Depletion Potential: Zero; made without CFC or HCFC blowing agents

3. Acceptable Product: ISOGARD™ HD Composite by Elevate

4. Choose one of the following a) or b): (omit if specifying composite insulation)

a) High Density Polyisocyanurate Cover Board: Non-combustible, water-resistant high density, closed cell polyisocyanurate core with coated glass mat facers, complying with ASTM D 1623, and with the following additional characteristics:

(1) Size: 48″ (1.22 m) by 96″ (2.44 m), nominal (if mechanically fastened) or 48″ (1.22 m) by

48″ (1.22 m), nominal (if adhered)

(2) Thickness: 0.5″ (12.7 mm)

(3) R-Value: 2.5 based on ASTM tests C158 and C177

(4) Surface Water Absorption: <3%, maximum, when tested in accordance with ASTM C 209

(5) Compressive Strength: 120 psi (827 kPa), when tested in accordance with ASTM 1621

(6) Density: 5 pcf (80 kg/m3), when tested in accordance with ASTM 1622

(7) Factory Mutual approved for use with FM 1-60 and 1-90 rated roofing assemblies

(8) Mold Growth Resistance: Passed, when tested in accordance with ASTM D 3273

(9) Acceptable Product: ISOGARD HD Cover Board by Elevate

b) Gypsum-Based Cover Board: Non-combustible, water-resistant gypsum core with embedded glass mat facers, complying with ASTM C 1177/C 1177M, and with the following additional characteristics:

(1) Size: 48″ (1.22 m) by 96″ (2.44 m), nominal (if mechanically fastened) or 48″ (1.22 m) by

48″ (1.22 m), nominal (if adhered)

(2) Thickness: 0.25″ (6.4 mm) or 0.5″ (12.7 mm) or 0.625″ (15.9 mm)

(3) Surface Water Absorption: 2.5 g max., when tested in accordance with ASTM C 473

Project Name 07 54 23 - 8 ULTRAPLY™ TPO ROOFING

(4) Surface Burning Characteristics: Flame spread of 0, smoke developed of 0, when tested in accordance with ASTM E 84

(5) Combustibility: Non-combustible, when tested in accordance with ASTM E 136

(6) Factory Mutual approved for use with FM 1-60 and 1-90 rated roofing assemblies

(7) Mold Growth Resistance: Zero growth, when tested in accordance with ASTM D 3273 for minimum of 4 weeks

5. Insulation Fasteners: Type and size as required by roof membrane Manufacturer for roofing system and warranty to be provided; use only fasteners furnished by roof membrane Manufacturer.

6. Low Rise Foam Adhesive: Two-component, low-rise polyurethane adhesive designed to attach polyisocyanurate insulation to a variety of acceptable substrates; Twin Jet or I.S.O.Stick™ or I.S.O.

Twin Pack™ or I.S.O.Spray™ R by Elevate

E. Vapor Barrier (optional: the use of a vapor barrier within the roofing system is strictly the decision of the design professional)

1. Vapor Barrier Membrane: Comprised of SBS modified bitumen adhesive, factory-laminated to a tri-laminate woven, high-density polyethylene top surface. Release liner protecting adhesive. May be used as a temporary roof membrane for up to ninety (90) days.

a) Thickness: 0.0325" (0.826 mm) minimum, when tested in accordance with ASTM D 5147

b) Max Load at Break at 73 °F (23 °C): 64 lbf/in, MD (11 kN/m) 88 lbf/in, XMD (15 kN/m) when tested in accordance with ASTM D 5147

c) Low Temperature Flexibility: -30 °F (-34 °C) when tested in accordance with ASTM D 5147

d) Moisture Vapor Permeance, 0.02 Perms (0.92 Ng/Pa•s•m2) maximum, when tested in accordance with ASTM E 96

e) Air Permeability: 0.00114 ft3/min•ft2 (0.007 L/sec•m2) maximum, when tested in accordance with

ASTM E 2178

f) Acceptable Product: V-Force Vapor Barrier Membrane by Elevate.

F. Metal Accessories (include following elements as applicable to your project, eliminate others)

1. Metal Roof Edging and Fascia: Continuous metal edge member serving as termination of roof membrane and retainer for metal fascia; watertight with no exposed fasteners; mounted to roof edge nailer

a) Wind Performance:

(1) Membrane Pull-Off Resistance: 100 lbs./ft (1460 N/m), minimum, when tested in accordance with ANSI/SPRI ES-1 Test Method RE-1, current edition

(2) Fascia Pull-Off Resistance: At least the minimum required when tested in accordance with

ANSI/SPRI ES-1 Test Method RE-2, current edition

(3) Provide product listed in current Factory Mutual Research Corporation Approval Guide with at least FM 1-270 rating

b) Description: Two-piece, 45° sloped galvanized steel sheet edge member securing top and bottom edges of formed metal fascia

(1) Fascia Face Height: 5″ (127 mm)

(2) Edge Member Height Above Nailer: 1 ¼″ (31 mm)

Project Name 07 54 23 - 9 ULTRAPLY™ TPO ROOFING

(3) Fascia Material and Finish: 24-gage, 0.024″ (0.06 mm) galvanized steel with Kynar 500 finish in Manufacturer's standard color; matching concealed joint splice plates; factory-installed protective plastic film

(4) Length: minimum of 120″ (3.048 m)

(5) Functional Characteristics: Fascia retainer supports while allowing for free thermal cycling of fascia

(6) Acceptable Product: Appropriate Elevate pre-manufactured fascia system

2. Weldable Metal: Flexible non-reinforced thermoplastic polyolefin membrane factory laminated to hot-dipped galvanized steel, color to match roof membrane; UltraPly™ TPO Coated Metal