Statement of Work Summary: Audit and Accreditation Services for Mexican Correctional Facilities

This is a Statement of Work (SOW) from the Bureau of International Narcotics and Law Enforcement Affairs (INL), U.S. Department of State, establishing requirements for audit and accreditation services for Mexican correctional facilities. The contractor must conduct up to 40 prison audits annually (2 audits per week, 2-3 days each) based on American Correctional Association (ACA) International Core Standards, allocating audits between federal and state facilities. Additional requirements include performing three technical assistance visits (TAVs) per year, conducting two panel hearings annually during ACA conferences covering up to 20 facilities each, and reviewing and responding to plans of action for non-compliance standards within 10 business days. The contractor must deliver preliminary documentation for each facility visit at least 10 business days before the audit, completed written reviews and accreditation documents within 10 business days after each audit, and complete audit reports with recommendations 10 business days prior to panel hearings. All deliverables must be provided in both Spanish and English.

Auditor qualifications require at least one Spanish speaker at Level 4 (English Level 1) present at each audit, minimum five years of demonstrated correctional experience, minimum three years in ACA accreditation processes with preference for Mexico experience, knowledge of the Mexican correctional system, valid passport, and cultural sensitivity. The contract type is firm-fixed price with one base year plus three optional one-year renewals. The contractor must provide all labor, services, materials, equipment, transportation, translation into Spanish, and travel/accommodation coordination. Performance standards mandate no more than one complaint per month, with late deliverables resulting in negative Contractor Performance Assessment Reporting System (CPARS) ratings and potential contract re-tendering after three late submissions. Work location includes state and federal prisons in Mexico for audits/TAVs and U.S. conference centers or virtual participation for panel hearings. Quarterly project reports and annual Project Management Plans are mandatory deliverables distributed to the Contracting Officer and Corrections Program office.

View the file

Other files

File Type Posted
19AQMM26Q0109 A0003 QandA FINAL.pdf PDF
Attachment_2_Price_Matrix26Q0109 A0003.xlsx XLSX spreadsheet
Attachment 1_SOW 26Q0109-A0003.docx DOCX document
Attachment_2_Price_Matrix26Q0109 A0002.xlsx XLSX spreadsheet
19AQMM26Q0109 A0002 SF-30.pdf PDF
Attachment 1_SOW 26Q0109-A0001.docx DOCX document
19AQMM26Q0109 QandA FINAL.pdf PDF
19AQMM26Q0109 A0001 SF-30.pdf PDF
Attachment 3- PPR Information Form (26Q0109).docx DOCX document
Attachment_2_Price_Matrix26Q0109.xlsx XLSX spreadsheet
Attachment 4 PPIQ 19AQMM26Q0109.docx DOCX document
19AQMM26Q0109 SF-1449.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bureau of International Narcotics and Law Enforcement Affairs (INL)

U.S. Embassy México

INL | Criminal Deterrence | Corrections Program Mexico

Statement of Work

Audit and Accreditation Services for Mexican Correctional Facilities

SBU - CONTRACTING AND ACQUISITIONS

1. GENERAL

The Bureau of International Narcotics and Law Enforcement Affairs (INL) leads the Department of State’s (DOS) anticrime and counternarcotics efforts. INL’s mission is to minimize the impact of international crime and illegal drugs on the United States, its citizens, and partner nations by providing effective foreign assistance. INL supports our partner nations to stabilize and strengthen security institutions to combat drug trafficking and other transnational crimes that affect the United States. DOS, as well as other agencies, help the Mexican Penitentiary system develop mechanisms to detect and deter organized criminal activities within prisons that affect Mexican and U.S. security outside of prisons.

The Contractor shall provide all labor, services, materials, equipment, transportation, supervision, and all requirements necessary to accomplish the efforts described under this Statement of Work.

2. BACKGROUND

Organized criminal groups frequently oversee illicit activities from within Mexico’s penitentiary system, often affecting the public through the trafficking of drugs, weapons, and illicit goods, as well as extortion calls to U.S. citizens. Accreditation of prisons helps establish and improve procedures and processes by requiring the implementation of strict controls over the security of correctional facilities. This helps the Government of Mexico (GOM) establish more control within the prisons and curb activity by organized crime.

One of the Mexican Penitentiary System’s challenges is to ensure that there is significant control of correctional environments that are free from corruption, providing a safe and secure environment. To fulfill this mission, Mexico needs to correct physical conditions, develop personnel who can do their jobs effectively, apply and standardize appropriate procedures, implement treatment programs, evaluate progress, and generate feedback mechanisms for prison operations.

3. OBJECTIVE

The overall objective of this effort is to enhance prison conditions by achieving compliance of the International Core Standards developed by American Correctional Association (ACA), which is evaluated by an audit performed by experienced auditors from ACA. An audit involves a thorough assessment of every facility in the process of accreditation or re-accreditation. The audit will determine if the facility is compliant with the series of mandatory standards involving administration and management, physical infrastructure, institutional operations and services, and inmate programs. In this audit, the auditors have the responsibility of raising issues and concerns that may influence the security of the facility. If the penitentiary facility successfully passes said audit, they will be moved to the next phase, which involves a panel hearing that will determine whether the institution will achieve accreditation or reaccreditation for three years.

Specific objectives of this project are to:

• Accredit/reaccredit up to forty (40) prisons, including central offices, per year (allocated between federal and state facilities)

• Perform three (3) technical assistance visits (TAV) per year

4. SCOPE

The scope of this project requires the contractor to perform audits to evaluate Mexican prisons that are in the process of receiving accreditation and re-accreditation by the American Correctional Association (ACA). An audit consists in the assessment of a penitentiary facility, and it will cover a variety of subjects involving, but not limited to, administration and management, institutional operations and services, the physical state of the facility, as well as security conditions for staff and inmate population. Accreditation or re-accreditation is dependent upon the successful approval of said audit. Audits shall be based on the compliance of accreditation standards developed by the ACA and the contractor will perform them. The contractor shall provide all necessary services, logistics and supplies/equipment necessary to accomplish the objectives of this contract.

5. PERFORMACE REQUIREMENTS

• Provide technical assistance in case INL requires clarification on policies and procedures related to the applicability of standards or expected practices.

• Select and assign visiting committee auditors The visiting committee auditors should fulfill, but not limited to following qualifications:

• At least one of the auditors selected for the same visit must be a Spanish speaker at a Level

4 and with English Level 1.

• Must have at least five (5) years of demonstrated experience working in correctional settings (adult, juvenile, training academy and/or central office).

• Must have at least three (3) years of experience in the ACA accreditation process (adult, juvenile, correctional training academy and/or central office). Preference must be given to auditors with previous experience with the ACA accreditation process in Mexico.

• Knowledge and understanding of the correctional system in Mexico.

• Participate in a session normally provided by ACA related to the accreditation process in

Mexico under the International Core Correctional Standards for Mexico or the most current version of the standards applicable.

• Be culturally sensitive and respectful of Mexican multicultural expressions, customs and variations within the country.

• Possess a valid passport.

• Follow and comply with all security requirements established by the US Embassy in

Mexico City regarding traveling within Mexico, especially considering the limitations or restrictions to travel to certain areas in the country. US citizens must adhere to any travel restrictions by the US Department of State.

• Conduct up to forty (40) audits per year based on a firm fixed price (claim per audit).

• Prepare visiting committee reports in both Spanish and English for each audit within ten (10) business days of visit.

• Review and respond to plan of actions for non-compliance standards within ten (10) business days of receipt.

• Conduct panel hearings for each audit.

• Conduct technical assistance and/or monitoring visits, if needed.

• Track and review annual facility reports.

• Provide translation into Spanish of all relevant documents/reports, including, but not limited to audit reports, conference materials, and other documents as necessary. INL/Mexico will not provide translation or interpretation services.

• Provide and coordinate all travel and accommodation for their personnel.

• Project Management Plan: The contractor shall provide a Project Management Plan (PMP) after award of contract or execution of year notice on an annual basis. The PMP shall include a detailed representation of tasks, and required subtasks, to be performed (cross-referenced to the requirements of this SOW and the contractor’s technical proposal) for timely completion of the project. The plan shall define in detail all project milestones and associated completion schedules.

• Quarterly Project Report: The contractor shall provide (electronically) quarterly project reports on activities completed, pending action items, and activities planned for the following week on each Tuesday during the duration of the project. The Quarterly Project Report shall follow the example given in Annex A, “Quarterly Report Template” and should be structured in such a way to permit cross-reference to the SOW and contractor’s technical proposal, and shall include at the minimum the following sections:

• Document Control Section: Shall include contract number, recipient organization, program/project/activity title and location.

• Report Details: General objective, specific objectives, activities performed, goals, performance/outcome measures, problems/success to report and follow up to be done.

• Technical Progress Section: This section shall compare actual to planned performance and indicate the progress made in accomplishing each contract task. The report shall include relevant details for assessing the status of performance, i.e., a brief, factual summary description of the technical progress made. The section shall identify any unforeseen technical difficulties, which may threaten on-time completion of the contract.

The section shall indicate the specific task that is not progressing according to plan; the reasons for the difficulty; and specific recommendations for remedial action.

• Monitoring and Evaluation (M&E): The project includes a monitoring and evaluation component to measure the impact of the activities undertaken, as well as the continuous monitoring of the activities by the INL Program Office and M&E team.

The table that follows lists the specific tasks, actions, audits and reports required under this

SOW.

A quarterly report template is provided in Annex A.

Table 1

Task Description Duration/Outcome Completion/Timeframe Distribution 001 Perform up to forty

(40) facility audits per year with at least

2-3 days each 2 audits / week GOM, COR, CD one Spanish speaking auditor at a 2/2 level, available at each audit.

Corrections Program

002 Perform a total of 3 TAVs per year in state and federal facilities

1-2 days each TAVs / week GOM, COR, CD

Corrections Program

003 Deliver preliminary documentation in Spanish and English to INL for facility visits/audits including but not limited to name of both auditors, and copies of passport, ticket details, and hotel reservation information.

Required for each facility visit/audit

Deliver at least 10 business days before facility visit/audit

COR, CD

Corrections Program

004 Deliver completed written reviews of documents for each facility audited in Spanish and English

1 per audit 10 business days after completion of audit(s)

COR, CD

Corrections Program

005 Deliver completed documents and forms required for facility accreditation

1 per audit 10 business days after completion of audit(s)

COR, CD

Corrections Program

006 Produce complete audit reports with recommendations for the Commission on Accreditation for Corrections (CAC)

2 weeks prior to panel hearing

10 business days prior to panel hearing

COR, CD

Corrections Program

007 Conduct and attend panel hearings with review materials in items 004, 005, and

006. Deliver 4 accreditation certificates per facility during each hearing

2 panel hearings per year during ACA Summer or Winter Conference, covering up to 20 facilities each time

At conclusion of hearing COR, CD Corrections Program

008 Submit an annual project plan. (PMP)

1 per year Within 30 days of notice to proceed/contract signing

COR, CD

Corrections Program

009 Submit Performance Report

Quarterly Within 30 calendar days of the end of the quarter

COR

010 Submit Monitoring & Evaluation (M&E) Report

Quarterly Within 30 calendar days of the end of the quarter

COR, CD

Corrections Program

All documentation and reports shall be delivered in electronic format in Spanish and English.

All documentation and reports developed or provided by the contractor shall become property of the U.S. government.

All deliverables, including attachments, shall comply with the data right clauses incorporated in the contract. The Government will reject all deliverables containing markings contradicting said clauses.

All deliverables shall include a cover page incorporating the following information:

• Deliverable name and number

• Contract number

• Project title

• Date of submission

• INL Recipient

• Contractor’s name

Deliverables longer than five (5) pages shall include a table of contents. All attachments shall include the attachment number, deliverable name and number, and contract number.

6. PERIOD OF PERFORMANCE

The contract will have one (1) base year plus 3 option years. The Contractor shall complete all work and documentation, no later than twelve (12) months from date of contract award or the execution of the optional years.

7. PLACE OF PERFORMANCE

Audits will take place in state or federal prisons located within Mexico (audits/TAVs), and at conference centers in the U.S or virtually (panel hearings).

8. CONSIDERATIONS

Timely completion and submission of reports and audits are critical to GOM maintaining the pace and flow of its corrections standardization and improvement. Therefore, the initial contract will be for a period of one (1) year with up to three (3) one-year optional years, renewable every year. The U.S. government may or may not exercise its right to extend for any/all option years.

In addition, INL may re-tender the contract following more than three late reports or audit result submissions. Therefore, the following provisions apply to this project:

• Deliverables provided in accordance with the scheduled date or timeframe are considered acceptable under the terms of the contract and fully agreed-upon payments will be made to the contractor.

• Any deliverables submitted late will result in a negative Contractor Performance Assessment Reporting System (CPARS) rating.

• Poor performance on this contract will determine whether the government will exercise an optional year.

9. QUALITY ASSURANCE

Quality Assurance and Surveillance Plan. The Quality Assurance and Surveillance Plan (QASP) is designed to provide an effective surveillance method to promote effective Contractor performance. The QASP provides a method for the INL to monitor Contractor’s performance and advise the Contracting Officer of unsatisfactory performance. The Contractor, not the Government, is responsible for management and quality control to meet the terms of the contract.

The role of the Government is to conduct quality assurance to ensure that contract standards are achieved.

Performance Objective

Standard and Acceptable Quality Level (Maximum allowable deviation)

Incentive/ Disincentive

Calculation

Performs all services set forth in the scope of work (SOW).

All required work is properly performed and no more than one (1) complaint is received per month.

Negative Incentive:

Low rating in CPARS; appropriate action under the inspection and termination clauses of the contract.

Performance: number of valid written complaints during the month.

Deliverables and reports are high quality, complete, and timely.

Deliverables and reports are written clearly and concisely, comply with all contract requirements, and are professionally sound.

Deliverables and reports are timely distributed to all parties identified in the contract.

Negative Incentive:

Low rating in CPARS; appropriate action under the inspection or termination clauses of the contract.

Number of deliverables or reports that are either untimely or not in accordance with purchase order requirements.

Spell and grammar checks are completed on all deliverables.

No deliverables or reports are submitted late or not in accordance with contract requirements.

Surveillance. INL will receive and document all complaints from Government personnel regarding the services provided. If appropriate, INL will send the complaints to the Contracting Officer for transmittal to the Contractor for corrective action.

Standard. The performance standard is that the Government receives no more than one (1) complaint per month. INL shall notify the Contracting Officer of the complaints so that the Contracting Officer may take appropriate action to enforce the applicable inspection clause, if any of the services exceed the standard.

Procedures.

1. If personnel observe unacceptable services, either incomplete work or required services not being performed, they should immediately contact INL.

2. INL will complete appropriate documentation to record the complaint.

3. If INL determines the complaint is invalid, INL will advise the complainant. INL will retain the annotated copy of the written complaint for his/her files.

4. If INL determines the complaint is valid, INL will inform the Contracting Officer who will contact the Contractor and give the Contractor additional time to correct the defect, if additional time is available. The Contracting Officer shall determine how much time is reasonable.

5. The Contracting Officer shall, at a minimum, notify the Contractor by email of any valid complaints.

6. If the Contractor disagrees with the complaint and challenges the validity of the complaint, the Contractor shall notify the Contracting Officer. The Contracting Officer will review the matter to determine the validity of the complaint.

7. The Contracting Officer will consider complaints as resolved unless notified otherwise by the complainant.

8. Repeat complaints are not permitted for any services. If a repeat complaint is received for the same deficiency during the service period, INL will contact the Contracting Officer for appropriate action under the Inspection clause.

9. If the contractor fails to meet the performance standard, the Government reserves the right to take action under the Inspection clause, including a deduction from the invoice.

10. NONPAYMENT FOR UNAUTHORIZED WORK

No payments will be made for any unauthorized supplies or services or for any unauthorized changes to the work specified herein. This includes any services performed by the Contractor of his own volition or at the request of an individual other than a duly appointed CO. Only a duly appointed CO is authorized to change the specifications, terms, and/or conditions of this contract.

11. TYPE OF CONTRACT

This will be a firm-fixed price, one (1) base year plus up to three (3) option years. No additional amounts will be paid to the contractor based on fluctuations in prices of proposed items or incurred costs for actual work performed.

12. CONFIDENTIALITY CLAUSE

The Contractor and its employees must exercise the utmost discretion concerning all matters relating to their duties and functions. They must not communicate to any person any information known to them by reason of their performance of services under this contract, which has not been made public, except in the necessary performance of their duties or upon written authorization of the Contracting Officer.

All documents and records (including photographs) generated during the performance of work under this contract must be for sole use and become the exclusive property of the Government.

Furthermore, no article, book, pamphlet, email, recording, broadcast, speech television appearance, film or photograph concerning any aspect of work performed under this contract must be published or disseminated through any media without the prior written authorization of the Contracting Officer. These obligations do not cease upon the expiration or termination of this contract. The contractor must include the substance of this provision in all contracts of employment and in all subcontracts hereunder. The contractor must ensure care, confidentiality and correct use of the information delivered and generated during the execution of the contract, as well as elements that the GOM makes available for its execution.

Annex A: Quarterly Report Template

Narrative Quarterly Report Month-Month Year

Contract Number:

COR Name:

GTM Name:

Recipient Organization:

Program/Project/Activity Title:

Location of the Project/Activity:

REPORT for the QUARTER (please check appropriate box)

Quarter 1 Quarter 3

Quarter 2 Quarter 4

Final Evaluation Report Other (specify):

Recipient Program and Financial Reports Received Recipient Program and Financial

Reports Not Received

Provide parameters for performance monitoring to include inputs, outputs, outcomes, and performance interventions. (Performance objectives, goals, and indicators based on the Statement of Work (objectives) from the Notice of Award)

GOALS AND OBJECTIVES

General Objective:

Specific Objectives:

Activities Performed:

Goals:

Performance / Outcome Measures:

Management:

Monitoring Site Visit Conducted (Provide date and description of performance and progress and any issues/problems related to the agreement)

Telephone or Desk Audit Conducted (Provide date and description of performance and progress and any issues/problems discussed related to the agreement)

Problems/Successes to Report:

Successes:

Problems:

Follow-up to be done:

Additional Questions/Comments:

Annex A: Quarterly Report Template