- Attached to
- Planning Yard contract for operational (in-service) LPD-17, LHD-1, LHA-6, LSD-41/49, and LCC-19 class ships.
- Solicitation number
- N00024-20-R-4205
About this file
This memorandum provides updated availability planning milestones and change control policy for surface ship maintenance and modernization contracts awarded by the Naval Sea Systems Command. Key milestones include a 100% package lock date for firming maintenance requirements. Changes after this date require high-level authorization. The memorandum seeks to improve on-time delivery of ships from maintenance availabilities by enforcing advance planning and identifies risks from late identification of government furnished materials. Enclosure 1 lists the new standardized milestones for coast-wide and homeport solicitations. This direction takes effect immediately and will be incorporated into formal policy updates.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE NA VY
NAVAL SEA SYSTEMS COMMAND
1333 ISAAC HULL A VE SE
WASHINGTON NAVY YARD DC 20376,GIOI
MEMORANDUM FOR DISTRIBUTION
l.'larPl., .. ·,nru
Ser 00/
Subj: SURFACE SHIP AVAILABILITY MAINTENANCE AND MODERNIZATION
MILESTONES AND CHANGE CONTROL
Ref: (a) COMFLTFORCOMINST 4790.3 Rev. C, Joint Fleet Maintenance Manual
(b) COMNAVSURFPAC/COMNAVSURFLANTINST 3504.lD, Redlines
Encl: (1) Firm Fixed Price (FFP) A-120 Award Surface Ship Availability Milestones
1. Purpose: To promulgate a single set of updated availability planning milestones applicable to both coast-wide and homeport solicitation milestones, and to provide updated Fleet and NAVSEA policy on change management. Non-adherence to planning milestones will place maintenance and modernization items at risk of being deferred. Additionally, ship changes (SCs)and growth or new work that do not adhere to the new milestones or change policy will require Flag and SES-level authorization to continue planning and/or ordering of long lead time material (LLTM) for inclusion in the Availability Work Package (AWP).
2. Background: Adherence to planning milestones is foundational to on-time delivery of ships from availabilities. Key to on-time delivery is advance planning. The late identification of government furnished material (GFM) for critical path alterations (i.e., material not available 30 days prior to Availability Start (A-30)) impacts performance to the established plan. The ripple effect in execution is that availabilities extend, costs increase, and results in lost operational days.
3. Milestone updates: Reference (a) promulgates availability planning milestones applicable to all CONtJS Firm Fixed Price (FFP) surface ship CNO availability contract types. Enclosure (l) provides an updated single set of availability milestones applicable to surface ship coast-wide and homeport solicitations.
Enclosure (1) milestones will be used until they can be formally incorporated into reference (a).
4. Late Authorization: Changes to the AWP after the 100% package lock milestone identified in reference (a) and enclosure (1) will
DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD Contractors only. Other requests shall be referred to SEA 21.
COMNAVSURFOR
Ser N00/532 5 Aug 19
Subj: SURFACE SHIP AVAILABILITY MAINTENANCE ANO MODERNIZATION
MILESTONES AND CHANGE CONTROL
discovered during scheduled assessments, OCONUS ship checks and/or deployment.
6. Effective Date: This direction takes effect immediately for all ships and shall be promulgated by message until reference (a) is updated. Consideration for those ships inside of A-660 shall be2;:;; case ba
R. A. BROWN
VADM, USN
COMNAVSURFOR
Copy to:
. MOORE
V , USN
COMNAVSEA
COMNAVSEASYSCOM WASHINGTON DC (SEA 01, SEA 02, SEA 04, SEA 05, PMS
21I, PMS 339, PMS 407, PMS 443)
COMNAVSURFLANT NORFOLK VA
COMNAVSURFOR SAN DIEGO CA
COMNAVSORFPAC SAN DIEGO CA
MARMC NORFOLK VA
SOUTHEAST RMC MAYPORT FL
SOUTHWEST RMC SAN DIEGO CA
NAVSHIPREPFAC YOKOSUKA JP
PEO IWS WASHINGTON DC (IWS 1.0, 2.0, 3.0, 5.0, 6.0, 10.0)
PEO SHIPS WNY DC
COMNAVSEASYSCOM SEA 21/SURFMEPP PORTSMOUTH VA
COMSPAWARSYSCOM SAN DIEGO CA
COMNAVAIRSYSCOM PATUXENT RIVER MD
COMNAVIFOR SUFFOLK VA
COMUSFLTFORCOM NORFOLK VA
COMPACFLT PEARL HARBOR HI
SPAWARSYSCEN ATLANTIC CHARLESTON SC
SPAWARSYSCEN PACIFIC DET GROUP THREE SAN DIEGO CA
NAVSURFWARCENDIV PORT HUENEME CA
NAVSURFWARCENDIV PHILADELPHIA PA
NAVSORFWARCEN CARDEROCKOIV BETHESDA MD
NAVSURFWARCEN CRANE IN
NAVSURFWARCBNDIV DAHLGREN VA
NAVSUP WEAPON SYSTEMS SUPPORT MECHANICSBURG PA
PEO C4I SAN DIEGO CA
SUPSHIP BATH ME
SUPSHIP GULF COAST MS
NORFOLK NAVAL SHIPYARD VA
NAVSHIPYD AND IMF PUGET SOUND WA
DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD Contractors only. Other requests shall be referred to SEA 21.
File details come from the government source that posted it. Updated .