Attachment_1_-_Bid_Form.xlsx

XLSX spreadsheet 117 KB Posted

Attached to
EROSION CONTROL COUNTERMEASURES WITHIN THE LITTLE WEKIVA RIVER BETWEEN SR 436 AND SR 434 (HURRICANE IAN EWP EROSION CONTROL PROJECT)
Solicitation number
ITB-25-056-FH
Issued by
Seminole County, Florida

About this file

The file "Attachment_1_-_Bid_Form.xlsx" is a bid form related to a state and local contract opportunity issued by the City of Altamonte Springs, Florida, for the Hurricane Ian Emergency Watershed Protection (EWP) Erosion Control Project. The project involves comprehensive river bank stabilization within the Little Wekiva River between State Road 436 and Montgomery Road, spanning approximately 1,500 linear feet. Contractors will be responsible for constructing or repairing articulated concrete block mats, gabion mattresses, gabion baskets, rip-rap rubble stream placement, sheet piling, and associated infrastructure repairs across four distinct project areas. The bid submission deadline is Wednesday, July 30, 2025, at 11:00 a.m., with a non-mandatory site visit scheduled for Tuesday, July 1, 2025, at 9:00 a.m. at the San Sebastian Trailhead. The anticipated contract award is in August/September 2025, with a contract duration of 210 calendar days from the notice to proceed.

The project is partially funded by the U.S. Department of Agriculture Natural Resources Conservation Service (NRCS) under Agreement No. NR234209XXXXC006. Bidders must be registered with E-Verify, have at least five years in business, and not appear on state or federal prohibited companies lists. There are no specific set-aside designations for disadvantaged enterprises. Contractors are required to provide comprehensive insurance coverage, including $1,000,000 in commercial general liability and $5,000,000 in umbrella/excess liability. A bid bond of 5% of the total bid price is mandatory, and performance and payment bonds will be required. Bidders must submit a Project Experience Form, Conflict of Interest Form, and Non-Collusion/Lobbying Certification. While no specific budget range is provided, the extensive scope of work suggests a significant investment in infrastructure rehabilitation and environmental protection.

View the file

Other files

File Type Posted
9-19-25_Approved_Commission_Memo.pdf PDF
ITB-25-056-FH_Add_5.pdf PDF
ITB-25-056-FH_Add4.pdf PDF
ITB-25-056-FH_Add_3.pdf PDF
ITB-25-056-FH_Add_2.pdf PDF
ITB-25-056-FH_Add_1.pdf PDF
Attachment_1_-_Bid_Form.xlsx XLSX spreadsheet
EXHIBIT_A-DRAWINGS.pdf PDF
ITB-25-056-FH__Erosion_Control_Wekiva_River.pdf PDF
VendorLink_Online_Submittal_Instructions_(as_of_03-30-2020).pdf PDF
EXHIBIT_B-GEOTECH_REPORT.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Total Bid

ITB-25-056-FH - ITEMIZED BID FORM FOR

CONSTRUCTION OF

EROSION CONTROL & COUNTERMEASURES WITHIN THE LITTLE WEKIVA RIVER BETWEEN SR 436 AND MONTGOMERY ROAD - HURRICANE IAN EWP EROSION CONTROL PROJECTS Total Bid (Combination of All Four Project Areas)

Pay Item No.DescriptionsUnitQty Project Area 1Qty Project Area 2Qty Project Area 3Qty Project Area 4Extended Price
101-1Mobilization and PermitsLS1111$ - 0
102-1Maintenance of TrafficLS1111$ - 0
104-10-3Staked Silt FenceLF295370215275$ - 0
104-11Floating Turbidity BarrierLF25453530$ - 0
104-12Staked Turbidity BarrierLF065030$ - 0
104-15Stabilized Construction EntranceEA1111$ - 0
104-18Inlet ProtectionEA1114$ - 0
110-2-2Selective Clearing and GrubbingSY8251,1753701,310$ - 0
110-21Tree Protection BarrierLF4535150340$ - 0
110-73Remove Existing BulkheadLF35.015.00.00.0$ - 0
120-5Channel ExcavationCY260.0275.012.0180.0$ - 0
120-6EmbankmentCY25.0150.05.0135.0$ - 0
400-4-8Concrete, Class IV, BulkheadCY13.016.00.00.0$ - 0
400-95Cofferdam and DewateringLS1.01.01.01.0$ - 0
415-1-8Reinforcing Steel, BulkheadLB1,1101,48500$ - 0
430-175-166Pipe Culvert, 66" CMPLF01200$ - 0
451-70Helical AnchorsEA9900$ - 0
455-133-3Sheet Piling Steel, F&I Permanent, Non-Vibratory Press-In Method RequiredSF1,6101,77000$ - 0
515-2-311Pedestrian/Bicycle Railing, Aluminum Only, 42" Type 1, Black Powder CoatedLF566100$ - 0
530-3-3Riprap-Rubble, Bank and ShoreTN31535900$ - 0
530-4-6Articulating Concrete Block Revetment System, Thickness 6"SY00380$ - 0
530-5-11Gabion, Mattress Less Than 1 Foot ThicknessSY000252$ - 0
530-5-13Gabion, BasketCY00086$ - 0
530-74Bedding StoneTN97111016$ - 0
550-10-220Fencing, Type B, 5.1-6.0', StandardLF324200$ - 0
550-60-211Fence Gate, Type B, Single, 0-6.0' OpeningEA0100$ - 0
570-1-2Performance Turf, SodSY5758452651,050$ - 0
999-1Property RestorationLS1111$ - 0
999-2External Coupling, 66" CMPEA0100$ - 0
999-3Internal Seal, 66" CMPEA0100$ - 0
999-4Replacement ShedEA0100$ - 0
999-5Remove Existing Gabion Mats and BasketsLS0001$ - 0
999-6Temporary Security FenceLF000700$ - 0
999-7Temporary Wayfinding SignageLS0001$ - 0
999-8River Staff GaugeEA0001$ - 0
999-9Out of Scope Work AllowanceLS1111$ - 0
0000$ - 0
0000$ - 0
0000$ - 0
0000$ - 0
0000$ - 0
0000$ - 0
0000$ - 0
0000$ - 0
0000$ - 0
Amount to Enter on the Proposal Bid FormBID TOTAL$ - 0

Project Area 1

ITB-25-056-FH - ITEMIZED BID FORM

CONSTRUCTION OF

EROSION CONTROL & COUNTERMEASURES WITHIN THE LITTLE WEKIVA RIVER BETWEEN SR 436 AND MONTGOMERY ROAD - HURRICANE IAN EWP EROSION CONTROL PROJECTS Project Area #1

Pay Item No.Pay Item DescriptionsUnit TypeProject QuantityPay Item Unit PriceExtended Price
101-1Mobilization and PermitsLS1.00$ - 0
102-1Maintenance of TrafficLS1.00$ - 0
104-10-3Staked Silt FenceLF295.00$ - 0
104-11Floating Turbidity BarrierLF25.00$ - 0
104-12Staked Turbidity BarrierLF0.00$ - 0
104-15Stabilized Construction EntranceEA1.00$ - 0
104-18Inlet ProtectionEA1.00$ - 0
110-2-2Selective Clearing and GrubbingSY825.00$ - 0
110-21Tree Protection BarrierLF45.00$ - 0
110-73Remove Existing BulkheadLF35.00$ - 0
120-5Channel ExcavationCY260.00$ - 0
120-6EmbankmentCY25.00$ - 0
400-4-8Concrete, Class IV, BulkheadCY13.00$ - 0
400-95Cofferdam and DewateringLS1.00$ - 0
415-1-8Reinforcing Steel, BulkheadLB1,110.00$ - 0
430-175-166Pipe Culvert, 66" CMPLF0.00$ - 0
451-70Helical AnchorsEA9.00$ - 0
455-133-3Sheet Piling Steel, F&I Permanent, Non-Vibratory Press-In Method RequiredSF1,610.00$ - 0
515-2-311Pedestrian/Bicycle Railing, Aluminum Only, 42" Type 1, Black Powder CoatedLF56.00$ - 0
530-3-3Riprap-Rubble, Bank and ShoreTN315.00$ - 0
530-4-6Articulating Concrete Block Revetment System, Thickness 6"SY0.00$ - 0
530-5-11Gabion, Mattress Less Than 1 Foot ThicknessSY0.00$ - 0
530-5-13Gabion, BasketCY0.00$ - 0
530-74Bedding StoneTN97.00$ - 0
550-10-220Fencing, Type B, 5.1-6.0', StandardLF32.00$ - 0
550-60-211Fence Gate, Type B, Single, 0-6.0' OpeningEA0.00$ - 0
570-1-2Performance Turf, SodSY575.00$ - 0
999-1Property RestorationLS1.00$ - 0
999-2External Coupling, 66" CMPEA0.00$ - 0
999-3Internal Seal, 66" CMPEA0.00$ - 0
999-4Replacement ShedEA0.00$ - 0
999-5Remove Existing Gabion Mats and BasketsLS0.00$ - 0
999-6Temporary Security FenceLF0.00$ - 0
999-7Temporary Wayfinding SignageLS0.00$ - 0
999-8River Staff GaugeEA0.00$ - 0
999-9Out of Scope Work AllowanceLS1.00$ - 0
0.00$ - 0
0.00$ - 0
0.00$ - 0
0.00$ - 0
0.00$ - 0
0.00$ - 0
0.00$ - 0
0.00$ - 0
0.00$ - 0
PROJECT TOTAL$ - 0
NOTE:Ancillary work required to install the proposed improvements that is not explicitly called out with a pay item shall be
considered incidental to the cost of the improvements and included in the bid price including, but not limited to, dewatering,
flow diversion, demucking, shoring, tree removal, etc.

Project Area 2

ITB-25-056-FH - ITEMIZED BID FORM

CONSTRUCTION OF

EROSION CONTROL & COUNTERMEASURES WITHIN THE LITTLE WEKIVA RIVER BETWEEN SR 436 AND MONTGOMERY ROAD - HURRICANE IAN EWP EROSION CONTROL PROJECTS Project Area #2

Pay Item No.Pay Item DescriptionsUnit TypeProject QuantityPay Item Unit PriceExtended Price
101-1Mobilization and PermitsLS1.00$ - 0
102-1Maintenance of TrafficLS1.00$ - 0
104-10-3Staked Silt FenceLF370.00$ - 0
104-11Floating Turbidity BarrierLF45.00$ - 0
104-12Staked Turbidity BarrierLF65.00$ - 0
104-15Stabilized Construction EntranceEA1.00$ - 0
104-18Inlet ProtectionEA1.00$ - 0
110-2-2Selective Clearing and GrubbingSY1,175.00$ - 0
110-21Tree Protection BarrierLF35.00$ - 0
110-73Remove Existing BulkheadLF15.00$ - 0
120-5Channel ExcavationCY275.00$ - 0
120-6EmbankmentCY150.00$ - 0
400-4-8Concrete, Class IV, BulkheadCY16.00$ - 0
400-95Cofferdam and DewateringLS1.00$ - 0
415-1-8Reinforcing Steel, BulkheadLB1,485.00$ - 0
430-175-166Pipe Culvert, 66" CMPLF12.00$ - 0
451-70Helical AnchorsEA9.00$ - 0
455-133-3Sheet Piling Steel, F&I Permanent, Non-Vibratory Press-In Method RequiredSF1,770.00$ - 0
515-2-311Pedestrian/Bicycle Railing, Aluminum Only, 42" Type 1, Black Powder CoatedLF61.00$ - 0
530-3-3Riprap-Rubble, Bank and ShoreTN359.00$ - 0
530-4-6Articulating Concrete Block Revetment System, Thickness 6"SY0.00$ - 0
530-5-11Gabion, Mattress Less Than 1 Foot ThicknessSY0.00$ - 0
530-5-13Gabion, BasketCY0.00$ - 0
530-74Bedding StoneTN111.00$ - 0
550-10-220Fencing, Type B, 5.1-6.0', StandardLF42.00$ - 0
550-60-211Fence Gate, Type B, Single, 0-6.0' OpeningEA1.00$ - 0
570-1-2Performance Turf, SodSY845.00$ - 0
999-1Property RestorationLS1.00$ - 0
999-2External Coupling, 66" CMPEA1.00$ - 0
999-3Internal Seal, 66" CMPEA1.00$ - 0
999-4Replacement ShedEA1.00$ - 0
999-5Remove Existing Gabion Mats and BasketsLS0.00$ - 0
999-6Temporary Security FenceLF0.00$ - 0
999-7Temporary Wayfinding SignageLS0.00$ - 0
999-8River Staff GaugeEA0.00$ - 0
999-9Out of Scope Work AllowanceLS1.00$ - 0
0.00$ - 0
0.00$ - 0
0.00$ - 0
0.00$ - 0
0.00$ - 0
0.00$ - 0
0.00$ - 0
0.00$ - 0
0.00$ - 0
PROJECT TOTAL$ - 0
NOTE:Ancillary work required to install the proposed improvements that is not explicitly called out with a pay item shall be
considered incidental to the cost of the improvements and included in the bid price including, but not limited to, dewatering,
flow diversion, demucking, shoring, tree removal, etc.

Project Area 3

ITB-25-056-FH - ITEMIZED BID FORM

CONSTRUCTION OF

EROSION CONTROL & COUNTERMEASURES WITHIN THE LITTLE WEKIVA RIVER BETWEEN SR 436 AND MONTGOMERY ROAD - HURRICANE IAN EWP EROSION CONTROL PROJECTS Project Area #3

Pay Item No.Pay Item DescriptionsUnit TypeProject QuantityPay Item Unit PriceExtended Price
101-1Mobilization and PermitsLS1.00$ - 0
102-1Maintenance of TrafficLS1.00$ - 0
104-10-3Staked Silt FenceLF215.00$ - 0
104-11Floating Turbidity BarrierLF35.00$ - 0
104-12Staked Turbidity BarrierLF0.00$ - 0
104-15Stabilized Construction EntranceEA1.00$ - 0
104-18Inlet ProtectionEA1.00$ - 0
110-2-2Selective Clearing and GrubbingSY370.00$ - 0
110-21Tree Protection BarrierLF150.00$ - 0
110-73Remove Existing BulkheadLF0.00$ - 0
120-5Channel ExcavationCY12.00$ - 0
120-6EmbankmentCY5.00$ - 0
400-4-8Concrete, Class IV, BulkheadCY0.00$ - 0
400-95Cofferdam and DewateringLS1.00$ - 0
415-1-8Reinforcing Steel, BulkheadLB0.00$ - 0
430-175-166Pipe Culvert, 66" CMPLF0.00$ - 0
451-70Helical AnchorsEA0.00$ - 0
455-133-3Sheet Piling Steel, F&I Permanent, Non-Vibratory Press-In Method RequiredSF0.00$ - 0
515-2-311Pedestrian/Bicycle Railing, Aluminum Only, 42" Type 1, Black Powder CoatedLF0.00$ - 0
530-3-3Riprap-Rubble, Bank and ShoreTN0.00$ - 0
530-4-6Articulating Concrete Block Revetment System, Thickness 6"SY38.00$ - 0
530-5-11Gabion, Mattress Less Than 1 Foot ThicknessSY0.00$ - 0
530-5-13Gabion, BasketCY0.00$ - 0
530-74Bedding StoneTN0.00$ - 0
550-10-220Fencing, Type B, 5.1-6.0', StandardLF0.00$ - 0
550-60-211Fence Gate, Type B, Single, 0-6.0' OpeningEA0.00$ - 0
570-1-2Performance Turf, SodSY265.00$ - 0
999-1Property RestorationLS1.00$ - 0
999-2External Coupling, 66" CMPEA0.00$ - 0
999-3Internal Seal, 66" CMPEA0.00$ - 0
999-4Replacement ShedEA0.00$ - 0
999-5Remove Existing Gabion Mats and BasketsLS0.00$ - 0
999-6Temporary Security FenceLF0.00$ - 0
999-7Temporary Wayfinding SignageLS0.00$ - 0
999-8River Staff GaugeEA0.00$ - 0
999-9Out of Scope Work AllowanceLS1.00$ - 0
0.00$ - 0
0.00$ - 0
0.00$ - 0
0.00$ - 0
0.00$ - 0
0.00$ - 0
0.00$ - 0
0.00$ - 0
0.00$ - 0
PROJECT TOTAL$ - 0
NOTE:Ancillary work required to install the proposed improvements that is not explicitly called out with a pay item shall be
considered incidental to the cost of the improvements and included in the bid price including, but not limited to, dewatering,
flow diversion, demucking, shoring, tree removal, etc.

Project Area 4

ITB-25-056-FH - ITEMIZED BID FORM

CONSTRUCTION OF

EROSION CONTROL & COUNTERMEASURES WITHIN THE LITTLE WEKIVA RIVER BETWEEN SR 436 AND MONTGOMERY ROAD - HURRICANE IAN EWP EROSION CONTROL PROJECTS Project Area #4

Pay Item No.Pay Item DescriptionsUnit TypeProject QuantityPay Item Unit PriceExtended Price
101-1Mobilization and PermitsLS1.00$ - 0
102-1Maintenance of TrafficLS1.00$ - 0
104-10-3Staked Silt FenceLF275.00$ - 0
104-11Floating Turbidity BarrierLF30.00$ - 0
104-12Staked Turbidity BarrierLF30.00$ - 0
104-15Stabilized Construction EntranceEA1.00$ - 0
104-18Inlet ProtectionEA4.00$ - 0
110-2-2Selective Clearing and GrubbingSY1,310.00$ - 0
110-21Tree Protection BarrierLF340.00$ - 0
110-73Remove Existing BulkheadLF0.00$ - 0
120-5Channel ExcavationCY180.00$ - 0
120-6EmbankmentCY135.00$ - 0
400-4-8Concrete, Class IV, BulkheadCY0.00$ - 0
400-95Cofferdam and DewateringLS1.00$ - 0
415-1-8Reinforcing Steel, BulkheadLB0.00$ - 0
430-175-166Pipe Culvert, 66" CMPLF0.00$ - 0
451-70Helical AnchorsEA0.00$ - 0
455-133-3Sheet Piling Steel, F&I Permanent, Non-Vibratory Press-In Method RequiredSF0.00$ - 0
515-2-311Pedestrian/Bicycle Railing, Aluminum Only, 42" Type 1, Black Powder CoatedLF0.00$ - 0
530-3-3Riprap-Rubble, Bank and ShoreTN0.00$ - 0
530-4-6Articulating Concrete Block Revetment System, Thickness 6"SY0.00$ - 0
530-5-11Gabion, Mattress Less Than 1 Foot ThicknessSY252.00$ - 0
530-5-13Gabion, BasketCY86.00$ - 0
530-74Bedding StoneTN16.00$ - 0
550-10-220Fencing, Type B, 5.1-6.0', StandardLF0.00$ - 0
550-60-211Fence Gate, Type B, Single, 0-6.0' OpeningEA0.00$ - 0
570-1-2Performance Turf, SodSY1,050.00$ - 0
999-1Property RestorationLS1.00$ - 0
999-2External Coupling, 66" CMPEA0.00$ - 0
999-3Internal Seal, 66" CMPEA0.00$ - 0
999-4Replacement ShedEA0.00$ - 0
999-5Remove Existing Gabion Mats and BasketsLS1.00$ - 0
999-6Temporary Security FenceLF700.00$ - 0
999-7Temporary Wayfinding SignageLS1.00$ - 0
999-8River Staff GaugeEA1.00$ - 0
999-9Out of Scope Work AllowanceLS1.00$ - 0
0.00$ - 0
0.00$ - 0
0.00$ - 0
0.00$ - 0
0.00$ - 0
0.00$ - 0
0.00$ - 0
0.00$ - 0
0.00$ - 0
PROJECT TOTAL$ - 0
NOTE:Ancillary work required to install the proposed improvements that is not explicitly called out with a pay item shall be
considered incidental to the cost of the improvements and included in the bid price including, but not limited to, dewatering,
flow diversion, demucking, shoring, tree removal, etc.