The file is a Base Offer Cost Breakdown template for a VA project (Project Number 675-23-151) located at the Viera VA Clinic. The spreadsheet provides a detailed construction cost breakdown across 34 standard construction divisions, including categories such as General Requirements, Concrete, Electrical, HVAC, and Utilities. While the template is currently unpopulated with actual costs, it includes placeholders for labor costs, material costs, overhead percentage, profit percentage, and bonding percentage. The document is associated with Solicitation Number 36C77624R0131 for the VISN 8 MATOC - Mainland contract, issued by the Department of Veterans Affairs Technology Acquisition Center Austin. A sample labor and materials section demonstrates how contractors would populate the detailed cost breakdown, with example entries showing labor rates, hours, and equipment rental costs.
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Offer
Base Offer Cost Breakdown
Project Number: 675-23-151 Edward L Roy: VA assigned project #
| Date: | |
| Project Title | Address Viera Site Deficiencies |
Edward L Roy: VA assigned Project Title
| Project Location | Viera VA Clinic | ||
| Offeror Name | |||
| Offeror Street | |||
| Offeror City | State | Zip |
Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division
| Material Cost | |
| Edward L Roy: Enter all Material Costs by Division | Total Cost |
Edward L Roy: This Column is the sum of the Division's Labor and Material Costs
| Division 1 | General Requirements | $ - 0 | $ - 0 | $ - 0 |
| Division 2 | Existing Conditions | - 0 | - 0 | - 0 |
| Division 3 | Concrete | - 0 | - 0 | - 0 |
| Division 4 | Masonry | - 0 | - 0 | - 0 |
| Division 5 | Metals | - 0 | - 0 | - 0 |
| Division 6 | Wood and Plastic | - 0 | - 0 | - 0 |
| Division 7 | Thermal & Moisture Protect | - 0 | - 0 | - 0 |
| Division 8 | Doors and Windows | - 0 | - 0 | - 0 |
| Division 9 | Finishes | - 0 | - 0 | - 0 |
| Division 10 | Specialties | - 0 | - 0 | - 0 |
| Division 11 | Equipment | - 0 | - 0 | - 0 |
| Division 12 | Furnishings | - 0 | - 0 | - 0 |
| Division 13 | Special Construction | - 0 | - 0 | - 0 |
| Division 14 | Conveying Equipment | - 0 | - 0 | - 0 |
| Division 21 | Fire Suppression | - 0 | - 0 | - 0 |
| Division 22 | Plumbing | - 0 | - 0 | - 0 |
| Division 23 | HVAC | - 0 | - 0 | - 0 |
| Division 26 | Electrical | - 0 | - 0 | - 0 |
| Division 27 | Communications | - 0 | - 0 | - 0 |
| Division 28 | Electronic Safety & Security | - 0 | - 0 | - 0 |
| Division 31 | Earthwork | - 0 | - 0 | - 0 |
| Division 32 | Exterior Improvements | - 0 | - 0 | - 0 |
| Division 33 | Utilities | - 0 | - 0 | - 0 |
| Division 34 | Transportation Subtotal | - 0 | - 0 | - 0 |
| Division Subtotals : | $ - 0 | $ - 0 | $ - 0 |
Overhead % 0.00% Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).
Edward L Roy: Date Offer Prepared/Submitted
| - 0 | |||
| Profit % | 0.00% | ||
| Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38). | - 0 | ||
| Bond % | 0.00% |
Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).
Edward L Roy: Enter all Labor Costs by Division
| - 0 | ||
| Overhead/Profit Subtotals : | $ - 0 |
Edward L Roy: Sum of Overhead, Profit and Bond %.
Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Base Offer Cost $ - 0 $ - 0 $ - 0
Labor Detail
| Sample Example | ||||
| Division | Labor Category | Labor Rate | Hours | Total |
| 1 | Plumber | $35.00 | 123 | $4,305.00 |
| 1 | Laborer | 14.75 | 70 | $1,032.50 |
| $5,337.50 |
Materials and Equipment Details
| Sample Example | ||||
| Division | Item | Rate | Units | Total |
| 1 | Pipe - 150' | $1.50 | 150 | $225.00 |
| 1 | 90 Degree Coupling | $1.10 | 5 | $5.50 |
| 1 | Pump Rental - Hour | $200.00 | 6 | $1,200.00 |
| $1,430.50 |