This file is a PowerPoint presentation detailing a Veterans Health Administration (VHA) Infection Control Risk Assessment (ICRA) Update from October 2024. The document provides critical guidance on revised requirements for Table 5, Level III Class of Precautions, specifically addressing indoor exhaust procedures when outdoor exhaust is not possible. Key requirements include using a 99.97% HEPA filter, conducting baseline and continuous air particulate sampling at least three times daily, and ensuring discharged air does not exceed background particulate levels.

The presentation outlines comprehensive alternative exhaust protocols, including using a multi-channel particle counter, monitoring potential causes of particulate level exceedances, and installing specific ductwork and monitoring devices. Additional requirements mandate directing exhaust to low-risk areas, avoiding shared HVAC systems, and continuously monitoring negative air pressure. The document references additional resources such as an ICRA FAQ document, SharePoint information, recorded training, and infection prevention guidance, which can be accessed through VA healthcare environment and facilities programs.

View the file

Other files

File Type Posted
36C77624R0131 0006.docx DOCX document
Attachment 1 - REV1 Attachment 06a - 100 Percent Specifications.pdf PDF
Attachment 2 - REV1 Attachment 06a - 100 Percent Drawings.pdf PDF
Attachment 1 - RFP 36C77624R0131 Tech Questions dated 9-29-25.xlsx XLSX spreadsheet
36C77624R0131 0005.docx DOCX document
Attachment 1 - RFP 36C77624R0131 Tech Questions dated 8-22-25.xlsx XLSX spreadsheet
36C77624R0131 0004.docx DOCX document
Attachment 1A - 52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment.pdf PDF
Attachment 2 - Viera Sign Design Intent.pdf PDF
Attachment 1G - Clinic Drawings.pdf PDF
Attachment 1B - 52.209-7 Information Regarding Responsibility Matters.pdf PDF
Attachment 1D - 52.229-11 Tax on Certain Foreign Procurements—Notice and Representation.pdf PDF
Attachment 1F - Panel LCP-1 Photo and Panel Schedule.pdf PDF
Attachment 1 - RFP 36C77624R0131 Tech Questions dated 8-21-25.xlsx XLSX spreadsheet
Attachment 1H - Underground Utilities Drawings.pdf PDF
Attachment 1J - Orlando - VHA ICRA-PCRA-1.2 updated Dec 2024.pdf PDF
Attachment 1E - Chiller Plant - 100 Drawings.pdf PDF
36C77624R0131 0003.docx DOCX document
Attachment 1C - 52.209-13 Violation of Arms Control Treaties or Agreements-Certification.pdf PDF
Attachment 1I - Panel CHB B228-1 Photo and Panel Schedule.pdf PDF
36C77624R0131 0002.pdf PDF
36C77624R0131 0001.docx DOCX document
Attachment 1 - Sign-In Sheet - VISN 8 MATOC Mainland 7-19-25.pdf PDF
Attachment 2 - Attachment 06 - 675-23-151 Seed Project Notice of Task Order Request for Proposal - Updated 7-21-25.docx DOCX document
Attachment 3 - Attachment 06f - Wage Determination FL20250196 Rev 4 7-4-25.pdf PDF
Attachment 02 - Limitations on Subcontracting.docx DOCX document
Attachment 06 - 675-23-151 Seed Project Notice of Task Order Request for Proposal.docx DOCX document
Attachment 6g - Brand Name Justification - Project 675-23-151- Address Viera Site Deficiencies -Redacted.pdf PDF
36C77624R0131_2.docx DOCX document
Attachment 06a - Spec Supplement - Orlando VAHCS Physical Security Systems Tech Specs 06-06-2025.pdf PDF
Attachment 01 - Technical Question Form - VISN 8 MATOC - Mainland.xlsx XLSX spreadsheet
Attachment 06a - 100 Percent Drawings.pdf PDF
Attachment 06a - 100 Percent Specifications.pdf PDF
Attachment 06b - Seed Project Price Schedule Sheet.docx DOCX document
Attachment 05 - Past Performance Questionnaire.docx DOCX document
Attachment 06c - Base Offer Cost Breakdown.xlsx XLSX spreadsheet
Attachment 06a - 100 Percent Narrative.pdf PDF
Attachment 04 - Subcontractor Information and Consent Form.docx DOCX document
Attachment 03 - Project Information Sheet for Contractors.docx DOCX document
Attachment 06d - Site Visit Instructions - Seed Project VISN 8 MATOC Mainland.pdf PDF
Attachment 06f - Wage Determination FL20250196 Rev 3 3-14-25.pdf PDF
Attachment 06e - PCRA-ILSM- ICRA- 675-23-151.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VHA ICRA Update – October 2024

VETERANS HEALTH ADMINISTRATION

VHA ICRA Update A revision of the D 7715 required VHA ICRA Template form was finalized in October of 2024: VHA Infection Control Risk Assessment (ICRA) | Healthcare Environment and Facilities Programs (va.gov).

Key revision pertains to Table 5, Level III Class of Precautions, item #5 concerning directing exhaust outdoors.

If the facility is not able to exhaust to the building exterior, an alternate procedure has been identified and is contained in Appendix A of the template form.

Appendix A: Alternative To Outdoor Exhaust Requirements If exhaust is directed indoors, then the system must be HEPA filtered.

A 99.97% HEPA Filter (standard) should discharge little or no particulate at 0.3 microns or greater in size.

Prior to start of work, including assembly of the ICRA barriers, initial baseline air sampling measurements for particulate levels must be taken in the planned area of discharge.

A particle counter with multi-channel capabilities and measure down to 0.3 microns is required to determine baseline levels and levels discharged from the HEPA filtered air.

Appendix A: Alternative To Outdoor Exhaust Requirements Multi-Channel Particle Counter can be found at such retailers as Grainger: Particle Counters - Grainger Industrial Supply.

Most measure at 0.3, .5, 1.0, 2.5, 5 and 10 microns.

Appendix A: Alternative To Outdoor Exhaust Requirements Verification of not exceeding background particulate levels must continue at least three times per day (once every 8 hours), 7 days per week, during the use of the negative air machine and HEPA filter.

Any exceedance must trigger a work stoppage and an immediate response and resolution. All particulate measurements, including the baseline measurement, must be documented and retrievable.

Appendix A: Alternative To Outdoor Exhaust Requirements Potential causes exceedance of background levels:

Improper filter placement Filter braces or clips not properly installed.

Tears or damage in the filter media Worn-out or broken gaskets/clips Improper installation of filter spacers Failed Gasket or seals around the HEPA filter

Appendix A: Alternative To Outdoor Exhaust Requirements Potential causes exceedance of background levels:

Incorrectly installed HEPA Filter Dirty discharge ductwork HEPA filter at end of life

Appendix A: Alternative To Outdoor Exhaust Requirements To accommodate the sampling, the negative air pressure machine must be fitted with a 2 ft section of ridged ductwork at the discharge.

The sample port for monitoring must be in the ridged ductwork section.

Vapor generating processes must be assessed and appropriate filtration must be installed to mitigate transmission to the facility.

Appendix A: Alternative To Outdoor Exhaust Requirements HCE must do a complete flow and pressure analysis and document the area to which the air is being discharged to ensure the flow and pressure relationships in that area are not being adversely impacted by the additional flow.

Install device on exterior of work containment to continually monitor negative pressurization. To ensure proper pressure is continuously maintained, the device(s) shall have a visual pressure indicator, data collection and alarm. Same requirement as when exhausting outdoor.

Appendix A: Alternative To Outdoor Exhaust Requirements Exhaust must be directed to Low-Risk areas as defined in Table 3 of the VHA ICRA template.

Ideally this discharge must be located so as not to impinge on high traffic areas or create a nuisance with noise or excessive airflow.

NOTE: Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (e.g., bathroom exhaust) is not acceptable.

VHA ICRA Resources ICRA FAQ Document: PCRA ICRA FAQs updated October 2024 | Healthcare Environment and Facilities Programs (va.gov) HCE SharePoint under category of Construction Safety: Submitted Questions (sharepoint.com).

VHA PCRA and VHA ICRA template Recorded Training: VHA PCRA and ICRA Form Training.

Additional infection prevention and control guidance and resources: http://vaww.va.gov/InfectiousDiseases/IPC.asp.

ASHE ICRA 2.0™ Process Guide | ASHE image2.jpg image3.png image1.jpeg

File details come from the government source that posted it. Updated .