Attachment 06c - Base Offer Cost Breakdown.xlsx

XLSX spreadsheet 21 KB Posted

Attached to
Y1DA--VISN 8 MATOC - CARIBBEAN
Solicitation number
36C77624R0149
Issued by

About this file

The file is a Base Offer Cost Breakdown template for a VA construction project at the VA Caribbean Healthcare System, project number 672-22-810, titled "Provide High Level Disinfection Room at SPS Edward L Roy". The spreadsheet is designed for contractors to itemize labor and material costs across 34 construction divisions, including general requirements, electrical, HVAC, plumbing, and other infrastructure categories. The template includes sections for calculating overhead, profit, and bonding percentages, with sample entries demonstrating how to input labor rates, hours, material costs, and equipment rentals. The associated federal contract opportunity is solicitation 36C77624R0149 for the VISN 8 MATOC - Caribbean, issued by the Department of Veterans Affairs Technology Acquisition Center in Austin, indicating this is a Multiple Award Task Order Contract (MATOC) for Caribbean region construction and renovation projects.

View the file

Other files

File Type Posted
Attachment 1 _ RFP 36C77624R0149 Tech Questions _ dated 7-30-25.docx DOCX document
36C77624R0149 0005.docx DOCX document
36C77624R0149 0004.docx DOCX document
Attachment 1 _ RFP 36C77624R0149 Tech Questions _ dated 7-29-25.docx DOCX document
36C77624R0149 0003.docx DOCX document
Attachment 1 _ RFP 36C77624R0149 Tech Questions _ dated 7-25-25.docx DOCX document
Attachment 1 _ RFP 36C77624R0149 Tech Questions _ dated 7-24-25.docx DOCX document
Attachment 2 - SOW Provide High Level Disinfection Room at SPS - 7-21-25.docx DOCX document
36C77624R0149 0002.docx DOCX document
Attachment 1 - Sign-In Sheet - VISN 8 MATOC Caribbean - 7-9-25.pdf PDF
36C77624R0149 0001.docx DOCX document
Attachment 06e - PCRA 672-22-810.pdf PDF
Attachment 06a - Drawings 100CD-Architect.pdf PDF
Attachment 05 - Past Performance Questionnaire.docx DOCX document
36C77624R0149_2.docx DOCX document
Attachment 06d - Site Visit Instructions - Seed Project VISN 8 MATOC Caribbean.docx DOCX document
Attachment 06a - Specifications 100CD.pdf PDF
Attachment 06a - Drawings 100CD-Mechanical.pdf PDF
Attachment 06 - 672-22-810 Seed Project Notice of Task Order Request for Proposal.docx DOCX document
Attachment 02 - Limitations on Subcontracting.docx DOCX document
Attachment 01 - Technical Question Form - VISN 8 MATOC - Caribbean.xlsx XLSX spreadsheet
Attachment 06a - Drawings 100CD-Plumbing.pdf PDF
Attachment 04 - Subcontractor Information and Consent Form.docx DOCX document
Attachment 03 - Project Information Sheet for Contractors.docx DOCX document
Attachment 06b - Seed Project Price Schedule Sheet.docx DOCX document
Attachment 06a - Drawings 100CD-Electrical.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Offer

Base Offer Cost Breakdown

Project Number: 672-22-810 Edward L Roy: VA assigned project #

Date:
Project TitleProvide High Level Disinfection Room at SPS

Edward L Roy: VA assigned Project Title

Project LocationVA Caribbean Healthcare System
Offeror Name
Offeror Street
Offeror CityStateZip

Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division

Material Cost
Edward L Roy: Enter all Material Costs by DivisionTotal Cost

Edward L Roy: This Column is the sum of the Division's Labor and Material Costs

Division 1General Requirements$ - 0$ - 0$ - 0
Division 2Existing Conditions- 0- 0- 0
Division 3Concrete- 0- 0- 0
Division 4Masonry- 0- 0- 0
Division 5Metals- 0- 0- 0
Division 6Wood and Plastic- 0- 0- 0
Division 7Thermal & Moisture Protect- 0- 0- 0
Division 8Doors and Windows- 0- 0- 0
Division 9Finishes- 0- 0- 0
Division 10Specialties- 0- 0- 0
Division 11Equipment- 0- 0- 0
Division 12Furnishings- 0- 0- 0
Division 13Special Construction- 0- 0- 0
Division 14Conveying Equipment- 0- 0- 0
Division 21Fire Suppression- 0- 0- 0
Division 22Plumbing- 0- 0- 0
Division 23HVAC- 0- 0- 0
Division 26Electrical- 0- 0- 0
Division 27Communications- 0- 0- 0
Division 28Electronic Safety & Security- 0- 0- 0
Division 31Earthwork- 0- 0- 0
Division 32Exterior Improvements- 0- 0- 0
Division 33Utilities- 0- 0- 0
Division 34Transportation Subtotal- 0- 0- 0
Division Subtotals :$ - 0$ - 0$ - 0

Overhead % 0.00% Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).

Edward L Roy: Date Offer Prepared/Submitted

- 0
Profit %0.00%
Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38).- 0
Bond %0.00%

Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).

Edward L Roy: Enter all Labor Costs by Division

- 0
Overhead/Profit Subtotals :$ - 0

Edward L Roy: Sum of Overhead, Profit and Bond %.

Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Base Offer Cost $ - 0 $ - 0 $ - 0

Labor Detail

Sample Example
DivisionLabor CategoryLabor RateHoursTotal
1Plumber$35.00123$4,305.00
1Laborer14.7570$1,032.50
$5,337.50

Materials and Equipment Details

Sample Example
DivisionItemRateUnitsTotal
1Pipe - 150'$1.50150$225.00
190 Degree Coupling$1.105$5.50
1Pump Rental - Hour$200.006$1,200.00
$1,430.50

File details come from the government source that posted it. Updated .