These mechanical drawings are for a High-Level Disinfection (HLD) project for the Surgical Processing Suite (SPS) at the VA facility located in San Juan, Puerto Rico. The documents (MH-001 through MH-501) detail mechanical demolition, floor plans, schedules, and technical details for renovating the mechanical systems in the administrative building, specifically Suite 4M456.
Key technical specifications include provisions for new ductwork configurations, air handling modifications, exhaust and return air systems, and installation of new mechanical equipment. The drawings specify using stainless steel ductwork for AER (Automatic Endoscope Reprocessor) exhaust, round and flexible duct installations, and include detailed requirements for volume dampers, duct hangers, and air terminal units. The project follows VA design standards, incorporates the 2018 International Building Code, and includes seismic design requirements. The mechanical work is part of a 100% Construction Document (CD) submittal dated 04/22/2024, prepared by RGD Consulting Engineers for the U.S. Department of Veterans Affairs.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABBR.
SV
CPD
CHWS
HWR
HWS
HPR
HPS
MPR
MPS
LPR
LPS
CHWR
HWR
HWS
RV
CD
MECHANICAL SYMBOLS AND ABBREVIATIONS
SYMBOL
SV
CPD
LPR
LPS
MPS
MPR
HPS
HPR
HWR
HWS
CHWS
CHWR
HWR
HWS
RV
CD
REMARKS
STEAM VENT
CONDENSATE PUMP DISCHARGE
LOW PRESSURE STEAM SUPPLY
LOW PRESSURE STEAM RETURN
MEDIUM PRESSURE STEAM SUPPLY
MEDIUM PRESSURE STEAM RETURN
HIGH PRESSURE STEAM SUPPLY
HIGH PRESSURE STEAM RETURN
HEATING HOT WATER SUPPLY
HEATING HOT WATER RETURN
CHILLED WATER SUPPLY
CHILLED WATER RETURN
HOT WATER SUPPLY
HOT WATER RETURN
CONDENSATE DRAIN
RELIEF VENT
BALL VALVE
BUTTERFLY VALVE
GATE VALVE
GLOBE VALVE
PLUG VALVE
CHECK VALVE
BALANCING VALVE
GAS COCK
PRV
VB
VB
FLOW MEASURING DEVICE
PIPE UNION OR FLANGE
STRAINER
RELIEF VALVE
PI
F THERMOMETER
PRESSURE GAGE WITH GAGE COCK
ARROW INDICATES DOWNWARD PITCH OF PIPE
PIPE CONCENTRIC REDUCER
ARROW INDICATES DIRECTION OF FLOW
PIPE ECCENTRIC REDUCER
CAPPED END
PIPE ELBOW UP
PIPE ELBOW DOWN
PIPE TEE UP
PIPE TEE DOWN
SA
FLEXIBLE CONNECTOR
EXPANSION JOINT
AUTOMATIC FLOW CONTROL VALVE
THERMOSTATIC EXPANSION VALVE
AUTOMATIC AIR VENT
MANUAL AIR VENT
OA
AUTOMATIC TWO-WAY VALVE
AUTOMATIC THREE-WAY VALVE
STEAM TRAP
CO CO
PIPE ALIGNMENT GUIDE
PIPE ANCHOR
CLEAN-OUT
24/12
24"
24X12
REL A
EA
RA
VD
AD
DSD
VOLUME DAMPER
AUTOMATIC (MOTORIZED) DAMPER
M M
DUCT MOUNTED SMOKE DETECTOR
x;S x;D
* SA
x;S x;D
* SA
* RA
* RA RETURN AIR ( * DUCT SIZE )
SUPPLY AIR ( * DUCT SIZE )
* EA
* EA
* OA
* OA
* REL A
* REL A
EXHAUST AIR ( * DUCT SIZE )
OUTSIDE AIR ( * DUCT SIZE )
RELIEF AIR ( * DUCT SIZE )
ROUND DUCT SIZE
N
E
NEW TO EXISTING DESIGNATION
EQUIPMENT DESIGNATION
( * EQUIPMENT MARK NUMBER )
REFERENCE DESIGNATION
( * NOTE NUMBER )
REFERENCE DESIGNATION
( * RISER NUMBER )
HUMIDISTAT OR HUMIDITY SENSOR
THERMOSTAT OR TEMPERATURE SENSOR
P PRESSURE SWITCH OR PRESSURE SENSOR
"TACO" BALANCING VALVE
PRESSURE REDUCING VALVE
VACUUM BREAKER
FD
FSD
SD
FSD
FD
SD
FIRE DAMPER
COMBINATION FIRE/SMOKE DAMPER
SMOKE DAMPER
TYPE
CFM
TYPE
CFM
ABBR.
MECHANICAL SYMBOLS AND ABBREVIATIONS
SYMBOL REMARKS
HORIZONTALLY MOUNTED EXHAUST/RETURN
AIR REGISTER/GRILLE
VERTICALLY MOUNTED EXHAUST/RETURN
AIR REGISTER/GRILLE
TYPE
CFM
TYPE
CFM
TYPE
CFM
RECTANGULAR DUCTWORK
SUPPLY/OUTSIDE AIR ELBOW UP
RECTANGULAR DUCTWORK
SUPPLY/OUTSIDE AIR ELBOW DOWN
RECTANGULAR DUCTWORK
EXHAUST/RETURN/RELIEF AIR ELBOW UP
RECTANGULAR DUCTWORK
EXHAUST/RETURN/RELIEF AIR ELBOW DOWN
ROUND DUCTWORK ELBOW UP
ROUND DUCTWORK ELBOW DOWN
FLAT-OVAL DUCTWORK ELBOW UP
FLAT-OVAL DUCTWORK ELBOW DOWN
HORIZONTALLY MOUNTED SUPPLY AIR
DIFFUSER/REGISTER/GRILLE
VERTICALLY MOUNTED SUPPLY AIR
DIFFUSER/REGISTER/GRILLE
HORIZONTALLY MOUNTED SUPPLY AIR
ROUND DIFFUSER
ABBR.
ADJ
AFD
AFF
ALT
AP
APD
AVG
BAS
BDD
BTUH
CAP
CFH
CFM
CI
CLG
COND
CONN
DB
dB
DIA
DN
DX
EAT
EFF
EMCS
ESP
EWT
EXH
EXST
F
FL
FLA
FLEX
FPM
FUT
FXTR
GAL
GPH
GPM
HG
HP
HR
HPS
HTG
HVAC
HZ
ID
IE
IN
I/O
KW
LF
LAT
LBS
LPS
LWT
MAX
MBH
MCC
MFR
MISC
MIN
MPC
MPS
MTD
NC
NO
NR
NRC
NTS
OD
O S & Y
PC
PD
PH
PLBG
VENTURI AIR VALVE
dP
CD
DIFFERENTIAL PRESSURE SENSOR
CARBON DIOXIDE SENSOR
NEW TO EXISTING
PSI
PSIA
PSIG
QTY
REQD
RH
RL
RPM
DDC
ADJUSTABLE
ADJUSTABLE FREQUENCY DRIVE
ABOVE FINISHED FLOOR
ALTERNATE
ACCESS PANEL
AIR PRESSURE DROP
AVERAGE
BUILDING AUTOMATION SYSTEM
GRAVITY BACKDRAFT DAMPER
BRITISH THERMAL UNITS PER HOUR
CAPACITY
CUBIC FEET PER HOUR
CUBIC FEET PER MINUTE
CAST IRON
CEILING, COOLING
CONDENSER, CONDENSATE
CONNECTION
DRY BULB
DIRECT DIGITAL CONTROL
DECIBEL(S)
DIAMETER
DOWN
DIRECT EXPANSION
ENTERING AIR TEMPERATURE
EFFICIENCY
ENERGY MANAGEMENT CONTROL SYSTEM
EXTERNAL STATIC PRESSURE
ENTERING WATER TEMPERATURE
EXHAUST
EXISTING
FAHRENHEIT
FLOOR
FULL LOAD AMPS
FLEXIBLE
FEET PER MINUTE
FUTURE
FIXTURE
GALLON(S)
GALLON(S) PER HOUR
GALLON(S) PER MINUTE
HOT GAS
HORSEPOWER
HIGH PRESSURE STEAM
HOUR
HEATING HOT
HEATING VENTILATING AND AIR CONDITIONING
HERTZ
INSIDE DIAMETER
INVERT ELEVATION
INCH (ES)
INPUT/OUTPUT
KILOWATT(S)
POUNDS
LEAVING AIR TEMPERATURE
POUNDS
LINEAR FOOT, LINEAR FEET
LOW PRESSURE STEAM
LEAVING WATER TEMPERATURE
MAXIMUM
THOUSANDS BTU/HR
MOTOR CONTROL CENTER
MANUFACTURER
MISCELLANEOUS
MINUTE(S), MINIMUM
MEDIUM PRESSURE CONDENSATE
MEDIUM PRESSURE STEM
MOUNTED
NORMALLY CLOSED, NOISE CRITERIA
NORMALLY OPEN, NUMBER
NOISE REDUCTION
NOISE REDUCTION COEFFICIENT
NOT TO SCALE
OUTSIDE DIAMETER
OUTSIDE SCREW AND YOKE VALVE
PUMPED CONDENSATE
PRESSURE DROP
PHASE
PLUMBING
POUND(S) PER SQUARE INCH
POUND(S) PER SQUARE INCH ABSOLUTE
POUND(S) PER SQUARE INCH GAGE
QUANTITY
REQUIRED
RELATIVE HUMIDITY
REVOLUTIONS PER MINUTE
REFRIGERANT LIQUID
REMARKS
MECHANICAL ABBREVIATIONS
RM
RS
SAT
SCFM
SHT
SIM
SP
TD
SQ
TEMP
TSP
UNO
V
VAV
VEL
VFD
VTR
W
WB
WG
WPD
ABBR.
ROOM
REFRIGERANT SUCTION
SATURATION
STANDARD CFM
SHEET
SIMILAR
SUMP PUMP, STATIC PRESSURE
SQUARE
TEMPERATURE DIFFERENTIAL
TEMPERATURE
TOTAL STATIC PRESSURE
UNLESS NOTED OTHERWISE
VOLT(S)
VARIABLE AIR VOLUME
VELOCITY
VARIABLE FREQUENCY DRIVE
VENT THRU ROOF
WET BULB
WATT (S)
WATER GAUGE
WATER PRESSURE DROP
REMARKS
FLAT-OVAL DUCT SIZE, FIRST NUMBER
INDICATES SIZE FOR SIDE SHOWN
DETAIL OR SECTION DESIGNATION (* DETAIL
OR SECTION REFERENCE ) (* * SHEET
NUMBER DETAIL OR SECTION DRAWN ON)
RECTANGULAR DUCT SIZE, FIRST NUMBER
INDICATES SIZE FOR SIDE SHOWN
AIR TERMINAL UNIT (W/ HOT WATER
REHEAT COIL)
ISOLATION VALVE
1. UNLESS OTHERWISE NOTED, ALL MECHANICAL EQUIPMENT AND DEVICES ON
WALLS AND CEILING NOT BEING DEMOLISHED ARE EXISTING TO REMAIN UNLESS
REQUIRED BY NEW CONSTRUCTION. COORDINATE WITH VA RESIDENT ENGINEER
ANY ADDITIONAL ITEMS WHICH WILL BE SALVAGED OR ARE TO REMAIN.
2. DEMOLITION WORK IS SHOWN IN DASHED LINES AND HEAVY PENWEIGHT.
EXISTING WORK TO REMAIN IS SHOWN IN SOLID LINE AND LIGHT PENWEIGHT.
3. PROVIDE ALL MECHANICAL DEMOLITION WORK NECESSARY TO INSTALL NEW
WORK. CONTRACTOR SHALL REROUTE AND RECONNECT ANY SYSTEMS THAT
WILL REMAIN IN USE BUT INTERFERES WITH NEW CONSTRUCTION.
4. EXISTING MECHANICAL ITEMS THAT ARE BEING REMOVED AND NOT TO BE
REUSED IN THE NEW CONSTRUCTION SHALL BE DISPOSED OF AS DIRECTED.
REMOVAL AND DISPOSAL OF THE EXISTING ITEMS IS THE CONTRACTORS
RESPONSIBILITY.
5. IF THE CONTINUITY OF MECHANICAL DEVICES AND EQUIPMENT REMOVED IN THE
AREAS OUTSIDE THIS DEMOLITION WORK AREA IS INTERRUPTED, THE
CONTRACTOR SHALL INSTALL REQUIRED DUCTWORK/PIPING TO INSURE THE
CONTINUITY OF SYSTEMS TO EXISTING AREAS OUTSIDE THE DEMOLITION AREAS.
6. DRAWINGS ARE BASED ON EXISTING PLANS AND FIELD INVESTIGATION WITHOUT
DEMOLITION. CONTRACTOR SHALL VISIT EXISTING BUILDING AND FAMILIARIZE
HIM/HER-SELF WITH EXISTING CONDITIONS AND SHALL EXAMINE ALL RELATED
DRAWINGS TO AVOID CONFLICTS. ORIGINAL BUILDING DRAWINGS ARE AVAILABLE.
7. CONTRACTOR TO COORDINATE WITH ARCHITECTURE, ELECTRICAL, PLUMBING
AND OTHER TRADES FOR ALL EQUIPMENT BEING REMOVED. IT IS THE SOLE
RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE ALL MECHANICAL WORK
WITH ALL SUBCONTRACTORS, PRIME CONTRACTOR AND OTHERS WHO MAY BE
PERFORMING DEMOLITION WORK ADJACENT TO OR INTEGRAL TO THE
MECHANICAL WORK.
8. ALL EXISTING ITEMS THAT ARE TO BE REINSTALLED SHALL BE INSPECTED AND
VERIFIED FOR PROPER OPERATION. IF ANY ITEM IS NOT IN A WORKING CONDITION
OR IS DAMAGED, THE ITEM SHALL BE BROUGHT TO THE ATTENTION OF THE VA
RESIDENT ENGINEER FOR DIRECTION.
9. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CORING, CUTTING, PATCHING,
REPAIRING, REMOVAL, REPLACEMENT, DISCONNECTING, RELOCATIONS,
RECONNECTIONS OF EQUIPMENT AS REQUIRED TO ACCOMMODATE THE
INSTALLATION OF NEW WORK OR REMOVAL.
10. SCHEDULE WORK IN EXISTING BUILDING AT TIMES CONVENIENT TO VA RESIDENT
ENGINEER.
11. INFORM VA RESIDENT ENGINEER IN ADVANCE OF ANY SHUT DOWN THAT WILL
OCCUR AND GIVE ESTIMATE OF DURATION. BEGIN WORK ONLY AFTER
CONTRACTING OFFICER HAS AGREED TO SHUT DOWN.
12. THOROUGHLY INSPECT MECHANICAL SYSTEMS IN REWORKING AREAS AND BRING
TO THE ATTENTION OF THE CONTRACTING OFFICER ALL DEFECTIVE OR
UNSERVICEABLE MATERIAL NOT SCHEDULED FOR REMOVAL OR REPLACEMENT.
13. BEFORE REMOVAL OF EQUIPMENT TO BE RELOCATED, VERIFY PROPER
OPERATION WITH THE VA RESIDENT ENGINEER.
14. NOTIFY VA RESIDENT ENGINEER OF ANY EQUIPMENT DAMAGED OR NOT
OPERATING PROPERLY. THE CONTRACTOR IS RESPONSIBLE FOR PROPER
OPERATION AND CONDITION OF EQUIPMENT AFTER REMOVAL. ANY EQUIPMENT
DAMAGE DUE TO IMPROPER INSTALLATION SHALL BE REPLACED BY THE
CONTRACTOR.
15. REMOVE AND RELOCATE ALL MECHANICAL WORK AS REQUIRED TO PROVIDE
WORK OF OTHER TRADES. PROVIDE ALL MECHANICAL MATERIALS AND LABOR
NECESSARY TO RELOCATE MECHANICAL WORK.
16. ITEMS INDICATED TO BE RETURNED TO THE VA RESIDENT ENGINEER SHALL BE
DELIVERED TO THE LOCATION ON SITE DESIGNATED BY THE VA RESIDENT
ENGINEER.
1. ALL WORK SHALL CONFORM TO FEDERAL, STATE AND LOCAL LAWS, CODES AND
ORDINANCES.
2. THE MECHANICAL DRAWINGS ARE DIAGRAMMATIC ONLY.
3. THE CONTRACTOR IS REQUIRED TO FURNISH ALL LABOR, MATERIAL AND
EQUIPMENT TO COMPLETE THE PROJECT. PROVIDE IN THE SAME OR AS CLOSE TO
THE SAME LOCATION ALL MECHANICAL DEVICES AND EQUIPMENT REMOVED IN
THE DEMOLITION PHASE. WORK SHALL BE PERFORMED BY SKILLED WORKERS IN
THEIR RESPECTIVE TRADES FOLLOWING MANUFACTURERS RECOMMENDATIONS.
4. EXISTING WORK TO REMAIN IS SHOWN IN SOLID LINES AND LIGHT PENWEIGHT.
NEW WORK IS SHOWN IN HEAVY PENWEIGHT.
5. CONTRACTOR TO COORDINATE ARCHITECTURAL, ELECTRICAL, PLUMBING AND
OTHER TRADES FOR ALL EQUIPMENT BEING INSTALLED. IT IS THE SOLE
RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE ALL MECHANICAL WORK
WITH ALL SUBCONTRACTORS, PRIME CONTRACTOR AND OTHERS WHO MAY BE
PERFORMING INSTALLATION WORK ADJACENT TO OR INTEGRAL TO THE
MECHANICAL WORK.
6. WORK REQUIRING SHUT DOWN OF EXISTING SYSTEMS SHALL BE COORDINATED
AND PLANNED WITH THE CONTRACTING OFFICER PRIOR TO THE START OF
CONSTRUCTION.
7. CONTRACTOR SHALL PROVIDE TEST AND BALANCE OF SYSTEMS AFTER WORK IS
COMPLETED. AIRFLOW AND WATER FLOW VALUES SHALL BE RETURNED TO NEW
VALUES WHERE SHOWN ON PLANS AND TO PRE-DEMOLITION RECORDED VALUES
WHERE NEW VALUES ARE NOT SHOWN.
8. THE CONTRACTOR SHALL SEISMICALLY BRACE ALL EXISTING AND NEW NON
STRUCTURAL ELEMENTS FALLING WITHIN RENOVATION “LIMITS OF
CONSTRUCTION” AS REQUIRED BY CODE. REFER TO SPECIFICATION SECTION
130541 (SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL
COMPONENTS) FOR ADDITIONAL INSTRUCTIONS.
MECHANICAL DEMOLITION NOTES:
MECHANICAL GENERAL NOTES:
APPLICABLE CODES & MANUALS
VA SEISMIC DESIGN REQUIREMENTS H-18-8
INTERNATIONAL BUILDING CODE - 2018 (IBC) AND REFERENCED FAMILY OF
CODES (IMC, IECC, IFC AND IPC)
VA MASTER SPECIFICATIONS PG-18-1
VA DESIGN AND CONSTRUCTION PROCEDURES PG-18-3
CDC GUIDANCE FOR ENVIRONMENTA INFECTION CONTROL IN HEALTHCARE
FACILITIES (PER HICPAC)
VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY - ASHRAE STANDARD 62.1-2004
VA HVAC DESIGN MANUAL PG-18-10
N
TRUE
NORTH
REVISIONS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
FMS
Project and
Section
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CD(100%CD-ISSUE FOR BID) SUBMITTAL - 04/22/2024
672-22-810
KEY PLAN NTS
PROJECT LOCATION
VA PROVIDE HIGH LEVEL
DISINFECTION FOR SPS
10 CALLE CASIA - ADM. BLDG. SUITE
4M456 SAN JUAN, PR 00921-3201
/2
/2
:0
:1
A
M
MECHANICAL COVER SHEET
MH-001
04/22/2024 RSM PJG
CD(100%CD-ISSUE FOR BID)
MECHANICAL SHEET INDEX
MH-001 MECHANICAL COVER SHEET
MD-101 MECHANICAL DEMOLITION PLAN
MD-102 MECHANICAL PHASING PLAN
MH-101 MECHANICAL FLOOR PLAN
MH-401 MECHANICAL SCHEDULES
MH-501 MECHANICAL DETAILS
NO. DESCRIPTION DATE
46"x20" EA
20"x10" EA
8"ø SA
"x
E A
"x
E A
"x
S S
E A
14"x8" SA
DE02
SCOPE STORAGE
C-1A
DE04
DE04
DE02
DE02
N
TRUE
NORTH
REVISIONS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
FMS
Project and
Section
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CD(100%CD-ISSUE FOR BID) SUBMITTAL - 04/22/2024
672-22-810
KEY PLAN NTS
PROJECT LOCATION
VA PROVIDE HIGH LEVEL
DISINFECTION FOR SPS
10 CALLE CASIA - ADM. BLDG. SUITE
4M456 SAN JUAN, PR 00921-3201
/2
/2
:0
:1
A
M
MECHANICAL DEMOLITION PLAN
MD-101
04/22/2024 RSM PJG
CD(100%CD-ISSUE FOR BID)
1/2" = 1'-0"
Mechanical Demolition Floor Plan - HLD
SPS
KEYNOTE LEGEND
DE02 DUCTWORK TO BE CAPPED.
DE04 EXHAUST AIR GRILLE TO BE RELOCATED. REFER TO
SHEET MD-102 FOR NEW LOCATION.
TEMPORARY
CORRIDOR
SCOPE STERIL
STORAGE AREA
SCOPE HLD
PROCESSING AREA
REAGENT WATER
GENERATION
MECHANICAL
ROOM
C-1D
ENVIRONMENTAL
STOCK ROOM
C-5J
SPS SOILED AREA
C-1
"x
E A
"x
E A
46"x20" EA
20"x10" EA
8"ø SA
"x
S S
E A
EG-1
125 CFM
SD-1
150 CFM
ME01
ME04
ME01
EG-(RE)
200 CFM
ME01
SD-1
175 CFM
ME01
ME01
EG-(RG)
ME01
N
TRUE
NORTH
REVISIONS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
FMS
Project and
Section
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CD(100%CD-ISSUE FOR BID) SUBMITTAL - 04/22/2024
672-22-810
KEY PLAN NTS
PROJECT LOCATION
VA PROVIDE HIGH LEVEL
DISINFECTION FOR SPS
10 CALLE CASIA - ADM. BLDG. SUITE
4M456 SAN JUAN, PR 00921-3201
/2
/2
:0
:1
A
M
MECHANICAL PHASING PLAN
MD-102
04/22/2024 RSM PJG
CD(100%CD-ISSUE FOR BID)
1/2" = 1'-0"
Mechanical Demolition Phase - Floor Plan -
HLD SPS
KEYNOTE LEGEND
ME01 CONNECT TO EXISTING DUCTWORK SYSTEM.
ME04 PROVIDE PORTABLE AIR SCRUBBER DURING INTERIM
CONSTRUCTION PHASE WITH HEPA FILTER. CONNECT TO
EXHAUST SYSTEM WITH FLEXIBLE DUCT AND LOCKING
COLLAR. PROVIDE WITH CORRUGATED ALUMINUM
FLEXIBLE DUCTWORK. CAP DUCTWORK CONNECTION
POST INTERIM CONSTRUCTION PHASE. BASIS OF DESIGN
MODEL: PREDATOR PORTABLE AIR SCRUBBER
PRED1200.
"x
E A
20"x10" EA
"x
E A
14"x8" SA
Scope Sterile Storage
Area
8"ø SA
EG-1
125 CFM
SD-1
150 CFM
"x
S S
E A
4"ø SS EA
4"ø SS EA
4"ø SS EA
ME02
ME02
ME02
ME01
EG-(RE)
200 CFM
Scope HLD Processing
Area
REAGENT WATER
GENERATION
MECHANICAL ROOM
C-1D
ENVIRONMENTAL
STOCK ROOM
C-5J
SPS SOILED AREA
SD-1
175 CFM
EG-(RG)
ME05
N
TRUE
NORTH
REVISIONS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
FMS
Project and
Section
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CD(100%CD-ISSUE FOR BID) SUBMITTAL - 04/22/2024
672-22-810
KEY PLAN NTS
PROJECT LOCATION
VA PROVIDE HIGH LEVEL
DISINFECTION FOR SPS
10 CALLE CASIA - ADM. BLDG. SUITE
4M456 SAN JUAN, PR 00921-3201
/2
/2
:0
:1
A
M
MECHANICAL FLOOR PLAN
MH-101
04/22/2024 RSM PJG
CD(100%CD-ISSUE FOR BID)
1/2" = 1'-0"
Mechanical Floor Plan - HLD SPS
KEYNOTE LEGEND
ME01 CONNECT TO EXISTING DUCTWORK SYSTEM.
ME02 PROVIDE NEW 4" ROUND DUCT TO NEW PASS-THRU AER
EQUIPMENT. SLOPE DUCTWORK TOWARDS NEW AER
EQUIPMENT. REFER TO MANUFACTURER'S INSTALLATION
GUIDELINES FOR CONNECTION INFORMATION.
ME05 PROVIDE MANUAL ROOM PRESSURE MONITOR. BASIS OF
DESIGN: AIRFLOW DIRECTION - BALL-IN-THE-WALL.
SD-1 TITUS OMNI-AA 24" X 24" PER PLANS PER PLANS LAY-IN NOTE 1 NOTE 2 N/A 1,2,3,4,5
EG-1 TITUS 350FL 24" X 24" - FIXED LAY-IN NOTE 1 NOTE 2 N/A 1,2,3
2. PROVIDE VOLUME DAMPER AT THE FLEX TAP. PROVIDE YOUNG REGULATOR FOR VOLUME DAMPERS IN INACCESSIBLE AREAS.
3. PROVIDE TITUS RAPID MOUNT FRAME FOR STANDARD 24" x 24" LAY-IN STYLE DIFFUSERS MOUNTED IN HARD CEILINGS, & FOR ALL 12" X 12" SUPPLY DIFFUSERS - REGARDLESS OF THE
MOUNTING LOCATION.
GRILLE, REGISTER, & DIFFUSER SCHEDULE
MARK MANUF. MODEL NO. FACE SIZE
NECK SIZE /
LENGTH
THROW /
SLOTS
FRAME
TYPE FINISH
VOLUME
DAMPER
FIRE
DAMPER NOTES
SPECIAL NOTES: ** ALL DIFFUSERS SELECTED WITH NC RATING < 20 **
1. COORDINATE COLOR WITH ARCHITECT
4. PROVIDE OPTIONAL R-6 MOLDED INSULATION BLANKET FOR ALL LAY-IN STYLE DIFFUSERS.
5. THROW IS ASSUMED TO BE 4-WAY UNLESS SPECIFIED OTHERWISE ON PLANS.
APPROVED ALTERNATES: PRICE, NAILOR, TUTTLE & BAILEY, KRUEGER
SUPPLY/
RETURN AIR -
FLEX DUCTS
SA
CONCEALED ABOVE
THE CEILING
(UNCONDITIONED
SPACE)
ROUND
COMPLY UL 181 CLASS 1, FACTORY FABRICATED, INSULATED, ROUND
DUCT, WITH A POLYETHYLENE FILM OUTER JACKET ENCLOSING GLASS
FIBER INSULATION (R-6) AROUND A CONTINUOUS POLYETHYLENE INNER
LINER. THE INNER LINER SHALL HAVE AN ENCAPSULATED STEEL WIRE
HELIX.
R6
SMACNA HVAC DUCT
CONSTRUCTION
STANDARDS - METAL AND
FLEXIBLE - ± 2" WG
NOTES:
SUPPLY AIR -
LOW
PRESSURE
SA
CONCEALED ABOVE
THE CEILING
(CONDITIONED
PLENUM)
SQUARE /
ROUND
GALVANIZED SHEET STEEL; LOCK- FORMING QUALITY; ASTM A653/A
653M, G90 COATING DESIGNATION; MIL-PHOSPHATIZED FINISH FOR
SURFACES OF DUCT EXPOSED TO VIEW
R4.2 EXTERNAL
SMACNA HVAC DUCT
CONSTRUCTION
STANDARDS - METAL AND
FLEXIBLE - ± 2" WG
AER EXHAUST
DUCTWORK SS
CONCEALED ABOVE
THE CEILING
(CONDITIONED
PLENUM)
SQUARE
STAINLESS SHEET MADE LIQUID TIGHT WITH CONTINUOUS EXTERNAL
WELD FOR ALL SEAMS AND JOINS. PROVIDE NEOPRENE GASKETS AT
FLANGED CONNECTIONS.
2 - HOUR RATED
ZERO CLEARANCE
FIRE WRAP
SMACNA HVAC DUCT
CONSTRUCTION
STANDARDS - METAL -
± 2" WG
5. ALL DUCT DIMENSIONS SHOWN ARE CLEAR INSIDE DIMENSIONS.
6. ALL BRANCH TAKE-OFFS TO BE PROVIDED W/ MANUAL VOLUME DAMPERS. ALL ELBOWS AND TEE'S MUST BE FURNISHED WITH TURNING VANES. PROVIDE MANUAL VOLUME DAMPERS
WITH EXTRACTOR AT ALL FLEX TAKE-OFFS.
DUCT CONSTRUCTION SCHEDULE
DUCTWORK
SYSTEM
DUCTWORK SYSTEM
ABBREVIATION
DUCTWORK LOCATION
DUCTWORK
SHAPE
DUCTWORK MATERIAL
DUCTWORK
INSULATION
DUCT CONSTRUCTION
STANDARD
1. REFER TO SPECIFICATION SECTION 23 31 00.
2. ALL INSULATION WILL HAVE FIRE/SMOKE RATING LESS THAN 25/50.
3. ALL OUTSIDE AIR DUCT INTAKES SHALL BE LOCATED BEYOND 10'-0'' OF ANY VENTILATION OUTLET OR SANITARY VENT PIPE AND SHALL BE SCREENED WITH A CORROSION RESISTANT
MATERIAL NOT LARGER THAN 1/2'' MESH PER FMC 2020, 401.4 AND 401.5. ALLL OUTSIDE AIR INTAKES SHALL BE MARKED WITH A PERMANENT PLATE TITLED "INTAKE FOR UNIT NUMBER (#)"
(E.G. "INTAKE FOR AHU-1", "INTAKE FOR FCU-1-1", ETC.)
4. ALL EXHAUST AIR FANS AND VENTS SHALL BE LOCATED BEYOND 10'-0'' OF ANY OUTSIDE AIR INTAKE OR FAN. ALL EXHAUST AIR FANS SHALL BE MARKED WITH A PERMANENT PLATE TITLED
"EXHAUST FAN FOR UNIT NUMBER(#) OR AREA". (E.G. "EF-1 FOR LOCKER ROOM", "EF-1-1 FOR GRD FL TOILET", ETC.)
REVISIONS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
FMS
Project and
Section
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CD(100%CD-ISSUE FOR BID) SUBMITTAL - 04/22/2024
672-22-810VA PROVIDE HIGH LEVEL
DISINFECTION FOR SPS
10 CALLE CASIA - ADM. BLDG. SUITE
4M456 SAN JUAN, PR 00921-3201
/2
/2
:0
:1
A
M
MECHANICAL SCHEDULES
MH-401
04/22/2024 RSM PJG
CD(100%CD-ISSUE FOR BID)
NTS
ROUND DUCT HANGERS
2500 [1133]
1320 [598]
420 [190]ONE 1 [25] x 18 GA STRAP36 [900]
TWO 1/2 [13]∅ RODS
TWO 3/8 [10]∅. RODS
ONE 1 [25] x 16 GA STRAP
84 [2100]
60 [1500]
50 [1250] 700 [317]
ONE 1 [25] x 22 GA STRAP
QUANTITY/SIZEMAX. DUCT ∅
26 [650]
HANGER STRAPS OR RODS
MAX. LOAD
LBS. [kg]
260 [119]
MAX.
144 [3600]
IN. [mm]
SPACING
IN. [mm] IN. [mm]
144 [3600]
144 [3600]
144 [3600]
144 [3600]
NOTE:
TABULATED DATA FROM SMACNA
ALLOWS FOR DUCT REINFORCING AND
INSULATION, BUT NO EXTERNAL LOAD.
BAND
OVER 50"
[1250mm]Ø
HANGER RODS
BAND OF SAME
SIZE AS HANGER
STRAP
LOAD RATED
FASTENERS
50" [1250mm]Ø
& UNDER
NTS
FROM STRUCTURE
SAME AS DIFFUSER
INLET: 5'-0" MAX
FLEXIBLE DUCT SIZE
LENGTH.
12"
CEILING
SUPPORT SADDLE
VOLUME DAMPER W/
LOCKING QUADSADDLE
SHEET METAL
CONICAL OUTLET
BRANCH DUCT
FOR CHANGE OF
DIRECTION GREATER
USE RIGID ELBOWS
THAN 45°
FLEXIBLE AIR DUCT CONNECTOR
NTS
VOLUME DAMPER DETAIL
NTS
EXHAUST OR RETURN BRANCH DUCTWORK
MAIN EXHAUST OR RETURN
PLAN VIEW
NTS
AIR TERMINAL UNITS
ALTERNATE SUPPLY DUCT TAKEOFF -
NTS
SUPPLY DUCT TAKEOFF - AIR TERMINAL UNIT
NTS
SUPPLY DUCTWORK TAKE-OFFS
NTS
DUCTWORK RADIUS ELBOWS
VANE
VANE
NTS
DUCTWORK SQUARE VANE ELBOWS
[300mm]
SEE SPECIFICATIONS FOR CLAMPS
AND SEALANT (TYP.)
NOTE:
THE USE OF FLEXIBLE AIR DUCT CONNECTORS ARE NOT PERMITTED FOR
THE DEDICATED AHU SERVING THE SURGICAL SUITE.
TYPICAL
DIFFUSER OR
REGISTER IN
LAY-IN CLG.
THERMAL INSULATION
SEE SPECIFICATIONS
NOTE:
1.
2.
DELETE INSULATION STAND-OFF ON DUCTWORK WITHOUT EXTERIOR INSULATION.
DETAIL SHOWS SINGLE BLADE DAMPER. DAMPER INSTALLATION SHALL BE SIMILAR FOR
MULTI-BLADE DAMPERS & ROUND DAMPERS.
INSULATION SEE
SPECIFICATION
DAMPER BLADE
1/8" [6mm]
CLEARANCE
ALL AROUND
OUTSIDE END BEARING
INSIDE END BEARING
HANDLE WITH
LOCKING
QUADRANT
INSULATION
STAND-OFF
1/2" [15mm] ROUND
ROD PIN
DUCT
STIFFEN BLADE
AS REQUIRED
SIDE ELEVATION SECTION
AIR
FLOW AIR
FLOW
PROVIDE VOLUME DAMPER
AT EACH BRANCH DUCT
1/4W OR 4" [100mm]
MIN.
BRANCH DUCT
VD
SMACNA FIGURE 4-6
45° LEED IN
RIGID DUCT TO AIR TERMINAL
UNIT.
MAIN SUPPLY
PLAN VIEW
FLOW
F L
O W
RIGID DUCT TO AIR TERMINAL
UNIT.
ROUND SHEET METAL DUCT.
MAIN SUPPLY
PLAN VIEW
DESIGNER'S NOTES:
1. THE SUPPLY REGISTER TAKE-OFF MAY BE USED FOR UP UP TO 25% OF THE MAIN DUCT CFM.
THE BRANCH DUCT TAKE-OFF MAY BE USED FOR UP TO 15% OF THE MAIN DUCT CFM ANYTIME
AND UP TO 40% WHEN THE MAIN DUCT VELOCITY IS 1000 FPM [5.1 M/S] OR LESS. THE AIR SPLIT
DUCT TAKE-OFF SHALL BE USED IN ALL OTHER CASES AND MAY BE USED AT ANYTIME.
2. SHOW ALL VOLUME DAMPERS ON FLOOR PLANS.
AIR SPLIT DUCT TAKE-OFF PLAN
VIEW
BRANCH DUCT TAKE-OFF PLAN VIEW
SUPPLY REGISTER TAKE-OFF
PLAN VIEW
AIR
FLOW
AIR
FLOW
A
IR
F L
O W
SUPPLY REGISTER
OR BRANCH DUCT
TURNING VANES
MAIN
SUPPLY
DUCT
SEE FLOOR PLAN FOR
SPLIT DIMENSION
PROVIDE VOLUME
DAMPER
PROVIDE VOLUME
DAMPER
ADJUSTABLE
METAL ROD
OR LINKAGE
TOP REGISTER
MAIN
SUPPLY
DUCT
VOLUME EXTRACTOR; ADJUSTABLE FROM
FULLY CLOSED POSITION TO CFM NOTED
ON FLOOR PLANS
AIR
FLOW
AIR
FLOW
1/4 W OR 4" [100mm] MIN.
AIR
FLOW
MAIN SUPPLY
DUCT
A
IR
F L
O W
NOTE:
1.
2.
THE INTERIOR SURFACE OF ALL RADIUS ELBOWS SHALL BE MADE ROUND.
ALL STANDARD RADIUS ELBOWS CAN BE SUBSTITUTED WITH SHORT RADIUS ELBOWS. ALL
SHORT RADIUS ELBOWS SHALL HAVE VANES. VANES SHALL BE CONSTRUCTED, SUPPORTED
AND FASTENED AS RECOMMENDED BY SMACNA.
R SHALL
EQUAL OR
BE
GREATER
THAN W.
R SHALL
EQUAL OR
BE
GREATER
THAN
1/3W.
R SHALL
EQUAL OR
BE
GREATER
THAN
1/6W.
STANDARD RADIUS OR
LONG RADIUS ELBOW
SHORT RADIUS ELBOW
WITH ONE VANE
SHORT RADIUS ELBOW
WITH TWO VANES
NOTE:
1.
2.
3.
4.
ALL VANE ELBOWS SHALL BE CONSTRUCTED AND INSTALLED AS DETAILED BY SMACNA.
WHEN W1 DOES NOT EQUAL W2, VANE SHALL BE SINGLE THICKNESS VANE TYPE
REGARDLESS OF W DIMENSION.
ALL SINGLE THICKNESS VANES SHALL HAVE A 2" [50mm] RADIUS, 1 1/2" [40mm] MAXIMUM
SPACE BETWEEN VANES AND A 3/4" [20mm] TRAILING EDGE.
WHEN W EQUALS W2 AND W1 IS GREATER THAN 20" [500mm] VANES SHALL BE DOUBLE VANE
TYPE.
W
"D
°M
A X
W
W
R
R
2/3W
/3
W
W W
1/2W
/3
W
1/6W
R
W
W1
REVISIONS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
FMS
Project and
Section
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CD(100%CD-ISSUE FOR BID) SUBMITTAL - 04/22/2024
672-22-810VA PROVIDE HIGH LEVEL
DISINFECTION FOR SPS
10 CALLE CASIA - ADM. BLDG. SUITE
4M456 SAN JUAN, PR 00921-3201
/2
/2
:0
:1
A
M
MECHANICAL DETAILS
MH-501
04/22/2024 RSM PJG
CD(100%CD-ISSUE FOR BID)
| Sheets |
| MD-101 - MECHANICAL DEMOLITION PLAN |
| MD-102 - MECHANICAL PHASING PLAN |
| MH-001 - MECHANICAL COVER SHEET |
| MH-101 - MECHANICAL FLOOR PLAN |
| MH-401 - MECHANICAL SCHEDULES |
| MH-501 - MECHANICAL DETAILS |
File details come from the government source that posted it. Updated .