Attachment 06a - Drawings 100CD-Mechanical.pdf

PDF 923 KB Posted

Attached to
Y1DA--VISN 8 MATOC - CARIBBEAN
Solicitation number
36C77624R0149
Issued by

About this file

These mechanical drawings are for a High-Level Disinfection (HLD) project for the Surgical Processing Suite (SPS) at the VA facility located in San Juan, Puerto Rico. The documents (MH-001 through MH-501) detail mechanical demolition, floor plans, schedules, and technical details for renovating the mechanical systems in the administrative building, specifically Suite 4M456.

Key technical specifications include provisions for new ductwork configurations, air handling modifications, exhaust and return air systems, and installation of new mechanical equipment. The drawings specify using stainless steel ductwork for AER (Automatic Endoscope Reprocessor) exhaust, round and flexible duct installations, and include detailed requirements for volume dampers, duct hangers, and air terminal units. The project follows VA design standards, incorporates the 2018 International Building Code, and includes seismic design requirements. The mechanical work is part of a 100% Construction Document (CD) submittal dated 04/22/2024, prepared by RGD Consulting Engineers for the U.S. Department of Veterans Affairs.

View the file

Other files

File Type Posted
Attachment 1 _ RFP 36C77624R0149 Tech Questions _ dated 7-30-25.docx DOCX document
36C77624R0149 0005.docx DOCX document
Attachment 1 _ RFP 36C77624R0149 Tech Questions _ dated 7-29-25.docx DOCX document
36C77624R0149 0004.docx DOCX document
Attachment 1 _ RFP 36C77624R0149 Tech Questions _ dated 7-25-25.docx DOCX document
36C77624R0149 0003.docx DOCX document
Attachment 1 _ RFP 36C77624R0149 Tech Questions _ dated 7-24-25.docx DOCX document
Attachment 2 - SOW Provide High Level Disinfection Room at SPS - 7-21-25.docx DOCX document
36C77624R0149 0002.docx DOCX document
Attachment 1 - Sign-In Sheet - VISN 8 MATOC Caribbean - 7-9-25.pdf PDF
36C77624R0149 0001.docx DOCX document
Attachment 06e - PCRA 672-22-810.pdf PDF
Attachment 06a - Drawings 100CD-Architect.pdf PDF
Attachment 05 - Past Performance Questionnaire.docx DOCX document
36C77624R0149_2.docx DOCX document
Attachment 06a - Drawings 100CD-Plumbing.pdf PDF
Attachment 04 - Subcontractor Information and Consent Form.docx DOCX document
Attachment 03 - Project Information Sheet for Contractors.docx DOCX document
Attachment 06c - Base Offer Cost Breakdown.xlsx XLSX spreadsheet
Attachment 06b - Seed Project Price Schedule Sheet.docx DOCX document
Attachment 06a - Drawings 100CD-Electrical.pdf PDF
Attachment 06d - Site Visit Instructions - Seed Project VISN 8 MATOC Caribbean.docx DOCX document
Attachment 06a - Specifications 100CD.pdf PDF
Attachment 06 - 672-22-810 Seed Project Notice of Task Order Request for Proposal.docx DOCX document
Attachment 02 - Limitations on Subcontracting.docx DOCX document
Attachment 01 - Technical Question Form - VISN 8 MATOC - Caribbean.xlsx XLSX spreadsheet
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABBR.

SV

CPD

CHWS

HWR

HWS

HPR

HPS

MPR

MPS

LPR

LPS

CHWR

HWR

HWS

RV

CD

MECHANICAL SYMBOLS AND ABBREVIATIONS

SYMBOL

SV

CPD

LPR

LPS

MPS

MPR

HPS

HPR

HWR

HWS

CHWS

CHWR

HWR

HWS

RV

CD

REMARKS

STEAM VENT

CONDENSATE PUMP DISCHARGE

LOW PRESSURE STEAM SUPPLY

LOW PRESSURE STEAM RETURN

MEDIUM PRESSURE STEAM SUPPLY

MEDIUM PRESSURE STEAM RETURN

HIGH PRESSURE STEAM SUPPLY

HIGH PRESSURE STEAM RETURN

HEATING HOT WATER SUPPLY

HEATING HOT WATER RETURN

CHILLED WATER SUPPLY

CHILLED WATER RETURN

HOT WATER SUPPLY

HOT WATER RETURN

CONDENSATE DRAIN

RELIEF VENT

BALL VALVE

BUTTERFLY VALVE

GATE VALVE

GLOBE VALVE

PLUG VALVE

CHECK VALVE

BALANCING VALVE

GAS COCK

PRV

VB

VB

FLOW MEASURING DEVICE

PIPE UNION OR FLANGE

STRAINER

RELIEF VALVE

PI

F THERMOMETER

PRESSURE GAGE WITH GAGE COCK

ARROW INDICATES DOWNWARD PITCH OF PIPE

PIPE CONCENTRIC REDUCER

ARROW INDICATES DIRECTION OF FLOW

PIPE ECCENTRIC REDUCER

CAPPED END

PIPE ELBOW UP

PIPE ELBOW DOWN

PIPE TEE UP

PIPE TEE DOWN

SA

FLEXIBLE CONNECTOR

EXPANSION JOINT

AUTOMATIC FLOW CONTROL VALVE

THERMOSTATIC EXPANSION VALVE

AUTOMATIC AIR VENT

MANUAL AIR VENT

OA

AUTOMATIC TWO-WAY VALVE

AUTOMATIC THREE-WAY VALVE

STEAM TRAP

CO CO

PIPE ALIGNMENT GUIDE

PIPE ANCHOR

CLEAN-OUT

24/12

24"

24X12

REL A

EA

RA

VD

AD

DSD

VOLUME DAMPER

AUTOMATIC (MOTORIZED) DAMPER

M M

DUCT MOUNTED SMOKE DETECTOR

x;S x;D

* SA

x;S x;D

* SA

* RA

* RA RETURN AIR ( * DUCT SIZE )

SUPPLY AIR ( * DUCT SIZE )

* EA

* EA

* OA

* OA

* REL A

* REL A

EXHAUST AIR ( * DUCT SIZE )

OUTSIDE AIR ( * DUCT SIZE )

RELIEF AIR ( * DUCT SIZE )

ROUND DUCT SIZE

N

E

NEW TO EXISTING DESIGNATION

EQUIPMENT DESIGNATION

( * EQUIPMENT MARK NUMBER )

REFERENCE DESIGNATION

( * NOTE NUMBER )

REFERENCE DESIGNATION

( * RISER NUMBER )

HUMIDISTAT OR HUMIDITY SENSOR

THERMOSTAT OR TEMPERATURE SENSOR

P PRESSURE SWITCH OR PRESSURE SENSOR

"TACO" BALANCING VALVE

PRESSURE REDUCING VALVE

VACUUM BREAKER

FD

FSD

SD

FSD

FD

SD

FIRE DAMPER

COMBINATION FIRE/SMOKE DAMPER

SMOKE DAMPER

TYPE

CFM

TYPE

CFM

ABBR.

MECHANICAL SYMBOLS AND ABBREVIATIONS

SYMBOL REMARKS

HORIZONTALLY MOUNTED EXHAUST/RETURN

AIR REGISTER/GRILLE

VERTICALLY MOUNTED EXHAUST/RETURN

AIR REGISTER/GRILLE

TYPE

CFM

TYPE

CFM

TYPE

CFM

RECTANGULAR DUCTWORK

SUPPLY/OUTSIDE AIR ELBOW UP

RECTANGULAR DUCTWORK

SUPPLY/OUTSIDE AIR ELBOW DOWN

RECTANGULAR DUCTWORK

EXHAUST/RETURN/RELIEF AIR ELBOW UP

RECTANGULAR DUCTWORK

EXHAUST/RETURN/RELIEF AIR ELBOW DOWN

ROUND DUCTWORK ELBOW UP

ROUND DUCTWORK ELBOW DOWN

FLAT-OVAL DUCTWORK ELBOW UP

FLAT-OVAL DUCTWORK ELBOW DOWN

HORIZONTALLY MOUNTED SUPPLY AIR

DIFFUSER/REGISTER/GRILLE

VERTICALLY MOUNTED SUPPLY AIR

DIFFUSER/REGISTER/GRILLE

HORIZONTALLY MOUNTED SUPPLY AIR

ROUND DIFFUSER

ABBR.

ADJ

AFD

AFF

ALT

AP

APD

AVG

BAS

BDD

BTUH

CAP

CFH

CFM

CI

CLG

COND

CONN

DB

dB

DIA

DN

DX

EAT

EFF

EMCS

ESP

EWT

EXH

EXST

F

FL

FLA

FLEX

FPM

FUT

FXTR

GAL

GPH

GPM

HG

HP

HR

HPS

HTG

HVAC

HZ

ID

IE

IN

I/O

KW

LF

LAT

LBS

LPS

LWT

MAX

MBH

MCC

MFR

MISC

MIN

MPC

MPS

MTD

NC

NO

NR

NRC

NTS

OD

O S & Y

PC

PD

PH

PLBG

VENTURI AIR VALVE

dP

CD

DIFFERENTIAL PRESSURE SENSOR

CARBON DIOXIDE SENSOR

NEW TO EXISTING

PSI

PSIA

PSIG

QTY

REQD

RH

RL

RPM

DDC

ADJUSTABLE

ADJUSTABLE FREQUENCY DRIVE

ABOVE FINISHED FLOOR

ALTERNATE

ACCESS PANEL

AIR PRESSURE DROP

AVERAGE

BUILDING AUTOMATION SYSTEM

GRAVITY BACKDRAFT DAMPER

BRITISH THERMAL UNITS PER HOUR

CAPACITY

CUBIC FEET PER HOUR

CUBIC FEET PER MINUTE

CAST IRON

CEILING, COOLING

CONDENSER, CONDENSATE

CONNECTION

DRY BULB

DIRECT DIGITAL CONTROL

DECIBEL(S)

DIAMETER

DOWN

DIRECT EXPANSION

ENTERING AIR TEMPERATURE

EFFICIENCY

ENERGY MANAGEMENT CONTROL SYSTEM

EXTERNAL STATIC PRESSURE

ENTERING WATER TEMPERATURE

EXHAUST

EXISTING

FAHRENHEIT

FLOOR

FULL LOAD AMPS

FLEXIBLE

FEET PER MINUTE

FUTURE

FIXTURE

GALLON(S)

GALLON(S) PER HOUR

GALLON(S) PER MINUTE

HOT GAS

HORSEPOWER

HIGH PRESSURE STEAM

HOUR

HEATING HOT

HEATING VENTILATING AND AIR CONDITIONING

HERTZ

INSIDE DIAMETER

INVERT ELEVATION

INCH (ES)

INPUT/OUTPUT

KILOWATT(S)

POUNDS

LEAVING AIR TEMPERATURE

POUNDS

LINEAR FOOT, LINEAR FEET

LOW PRESSURE STEAM

LEAVING WATER TEMPERATURE

MAXIMUM

THOUSANDS BTU/HR

MOTOR CONTROL CENTER

MANUFACTURER

MISCELLANEOUS

MINUTE(S), MINIMUM

MEDIUM PRESSURE CONDENSATE

MEDIUM PRESSURE STEM

MOUNTED

NORMALLY CLOSED, NOISE CRITERIA

NORMALLY OPEN, NUMBER

NOISE REDUCTION

NOISE REDUCTION COEFFICIENT

NOT TO SCALE

OUTSIDE DIAMETER

OUTSIDE SCREW AND YOKE VALVE

PUMPED CONDENSATE

PRESSURE DROP

PHASE

PLUMBING

POUND(S) PER SQUARE INCH

POUND(S) PER SQUARE INCH ABSOLUTE

POUND(S) PER SQUARE INCH GAGE

QUANTITY

REQUIRED

RELATIVE HUMIDITY

REVOLUTIONS PER MINUTE

REFRIGERANT LIQUID

REMARKS

MECHANICAL ABBREVIATIONS

RM

RS

SAT

SCFM

SHT

SIM

SP

TD

SQ

TEMP

TSP

UNO

V

VAV

VEL

VFD

VTR

W

WB

WG

WPD

ABBR.

ROOM

REFRIGERANT SUCTION

SATURATION

STANDARD CFM

SHEET

SIMILAR

SUMP PUMP, STATIC PRESSURE

SQUARE

TEMPERATURE DIFFERENTIAL

TEMPERATURE

TOTAL STATIC PRESSURE

UNLESS NOTED OTHERWISE

VOLT(S)

VARIABLE AIR VOLUME

VELOCITY

VARIABLE FREQUENCY DRIVE

VENT THRU ROOF

WET BULB

WATT (S)

WATER GAUGE

WATER PRESSURE DROP

REMARKS

FLAT-OVAL DUCT SIZE, FIRST NUMBER

INDICATES SIZE FOR SIDE SHOWN

DETAIL OR SECTION DESIGNATION (* DETAIL

OR SECTION REFERENCE ) (* * SHEET

NUMBER DETAIL OR SECTION DRAWN ON)

RECTANGULAR DUCT SIZE, FIRST NUMBER

INDICATES SIZE FOR SIDE SHOWN

AIR TERMINAL UNIT (W/ HOT WATER

REHEAT COIL)

ISOLATION VALVE

1. UNLESS OTHERWISE NOTED, ALL MECHANICAL EQUIPMENT AND DEVICES ON

WALLS AND CEILING NOT BEING DEMOLISHED ARE EXISTING TO REMAIN UNLESS

REQUIRED BY NEW CONSTRUCTION. COORDINATE WITH VA RESIDENT ENGINEER

ANY ADDITIONAL ITEMS WHICH WILL BE SALVAGED OR ARE TO REMAIN.

2. DEMOLITION WORK IS SHOWN IN DASHED LINES AND HEAVY PENWEIGHT.

EXISTING WORK TO REMAIN IS SHOWN IN SOLID LINE AND LIGHT PENWEIGHT.

3. PROVIDE ALL MECHANICAL DEMOLITION WORK NECESSARY TO INSTALL NEW

WORK. CONTRACTOR SHALL REROUTE AND RECONNECT ANY SYSTEMS THAT

WILL REMAIN IN USE BUT INTERFERES WITH NEW CONSTRUCTION.

4. EXISTING MECHANICAL ITEMS THAT ARE BEING REMOVED AND NOT TO BE

REUSED IN THE NEW CONSTRUCTION SHALL BE DISPOSED OF AS DIRECTED.

REMOVAL AND DISPOSAL OF THE EXISTING ITEMS IS THE CONTRACTORS

RESPONSIBILITY.

5. IF THE CONTINUITY OF MECHANICAL DEVICES AND EQUIPMENT REMOVED IN THE

AREAS OUTSIDE THIS DEMOLITION WORK AREA IS INTERRUPTED, THE

CONTRACTOR SHALL INSTALL REQUIRED DUCTWORK/PIPING TO INSURE THE

CONTINUITY OF SYSTEMS TO EXISTING AREAS OUTSIDE THE DEMOLITION AREAS.

6. DRAWINGS ARE BASED ON EXISTING PLANS AND FIELD INVESTIGATION WITHOUT

DEMOLITION. CONTRACTOR SHALL VISIT EXISTING BUILDING AND FAMILIARIZE

HIM/HER-SELF WITH EXISTING CONDITIONS AND SHALL EXAMINE ALL RELATED

DRAWINGS TO AVOID CONFLICTS. ORIGINAL BUILDING DRAWINGS ARE AVAILABLE.

7. CONTRACTOR TO COORDINATE WITH ARCHITECTURE, ELECTRICAL, PLUMBING

AND OTHER TRADES FOR ALL EQUIPMENT BEING REMOVED. IT IS THE SOLE

RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE ALL MECHANICAL WORK

WITH ALL SUBCONTRACTORS, PRIME CONTRACTOR AND OTHERS WHO MAY BE

PERFORMING DEMOLITION WORK ADJACENT TO OR INTEGRAL TO THE

MECHANICAL WORK.

8. ALL EXISTING ITEMS THAT ARE TO BE REINSTALLED SHALL BE INSPECTED AND

VERIFIED FOR PROPER OPERATION. IF ANY ITEM IS NOT IN A WORKING CONDITION

OR IS DAMAGED, THE ITEM SHALL BE BROUGHT TO THE ATTENTION OF THE VA

RESIDENT ENGINEER FOR DIRECTION.

9. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CORING, CUTTING, PATCHING,

REPAIRING, REMOVAL, REPLACEMENT, DISCONNECTING, RELOCATIONS,

RECONNECTIONS OF EQUIPMENT AS REQUIRED TO ACCOMMODATE THE

INSTALLATION OF NEW WORK OR REMOVAL.

10. SCHEDULE WORK IN EXISTING BUILDING AT TIMES CONVENIENT TO VA RESIDENT

ENGINEER.

11. INFORM VA RESIDENT ENGINEER IN ADVANCE OF ANY SHUT DOWN THAT WILL

OCCUR AND GIVE ESTIMATE OF DURATION. BEGIN WORK ONLY AFTER

CONTRACTING OFFICER HAS AGREED TO SHUT DOWN.

12. THOROUGHLY INSPECT MECHANICAL SYSTEMS IN REWORKING AREAS AND BRING

TO THE ATTENTION OF THE CONTRACTING OFFICER ALL DEFECTIVE OR

UNSERVICEABLE MATERIAL NOT SCHEDULED FOR REMOVAL OR REPLACEMENT.

13. BEFORE REMOVAL OF EQUIPMENT TO BE RELOCATED, VERIFY PROPER

OPERATION WITH THE VA RESIDENT ENGINEER.

14. NOTIFY VA RESIDENT ENGINEER OF ANY EQUIPMENT DAMAGED OR NOT

OPERATING PROPERLY. THE CONTRACTOR IS RESPONSIBLE FOR PROPER

OPERATION AND CONDITION OF EQUIPMENT AFTER REMOVAL. ANY EQUIPMENT

DAMAGE DUE TO IMPROPER INSTALLATION SHALL BE REPLACED BY THE

CONTRACTOR.

15. REMOVE AND RELOCATE ALL MECHANICAL WORK AS REQUIRED TO PROVIDE

WORK OF OTHER TRADES. PROVIDE ALL MECHANICAL MATERIALS AND LABOR

NECESSARY TO RELOCATE MECHANICAL WORK.

16. ITEMS INDICATED TO BE RETURNED TO THE VA RESIDENT ENGINEER SHALL BE

DELIVERED TO THE LOCATION ON SITE DESIGNATED BY THE VA RESIDENT

ENGINEER.

1. ALL WORK SHALL CONFORM TO FEDERAL, STATE AND LOCAL LAWS, CODES AND

ORDINANCES.

2. THE MECHANICAL DRAWINGS ARE DIAGRAMMATIC ONLY.

3. THE CONTRACTOR IS REQUIRED TO FURNISH ALL LABOR, MATERIAL AND

EQUIPMENT TO COMPLETE THE PROJECT. PROVIDE IN THE SAME OR AS CLOSE TO

THE SAME LOCATION ALL MECHANICAL DEVICES AND EQUIPMENT REMOVED IN

THE DEMOLITION PHASE. WORK SHALL BE PERFORMED BY SKILLED WORKERS IN

THEIR RESPECTIVE TRADES FOLLOWING MANUFACTURERS RECOMMENDATIONS.

4. EXISTING WORK TO REMAIN IS SHOWN IN SOLID LINES AND LIGHT PENWEIGHT.

NEW WORK IS SHOWN IN HEAVY PENWEIGHT.

5. CONTRACTOR TO COORDINATE ARCHITECTURAL, ELECTRICAL, PLUMBING AND

OTHER TRADES FOR ALL EQUIPMENT BEING INSTALLED. IT IS THE SOLE

RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE ALL MECHANICAL WORK

WITH ALL SUBCONTRACTORS, PRIME CONTRACTOR AND OTHERS WHO MAY BE

PERFORMING INSTALLATION WORK ADJACENT TO OR INTEGRAL TO THE

MECHANICAL WORK.

6. WORK REQUIRING SHUT DOWN OF EXISTING SYSTEMS SHALL BE COORDINATED

AND PLANNED WITH THE CONTRACTING OFFICER PRIOR TO THE START OF

CONSTRUCTION.

7. CONTRACTOR SHALL PROVIDE TEST AND BALANCE OF SYSTEMS AFTER WORK IS

COMPLETED. AIRFLOW AND WATER FLOW VALUES SHALL BE RETURNED TO NEW

VALUES WHERE SHOWN ON PLANS AND TO PRE-DEMOLITION RECORDED VALUES

WHERE NEW VALUES ARE NOT SHOWN.

8. THE CONTRACTOR SHALL SEISMICALLY BRACE ALL EXISTING AND NEW NON

STRUCTURAL ELEMENTS FALLING WITHIN RENOVATION “LIMITS OF

CONSTRUCTION” AS REQUIRED BY CODE. REFER TO SPECIFICATION SECTION

130541 (SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL

COMPONENTS) FOR ADDITIONAL INSTRUCTIONS.

MECHANICAL DEMOLITION NOTES:

MECHANICAL GENERAL NOTES:

APPLICABLE CODES & MANUALS

VA SEISMIC DESIGN REQUIREMENTS H-18-8

INTERNATIONAL BUILDING CODE - 2018 (IBC) AND REFERENCED FAMILY OF

CODES (IMC, IECC, IFC AND IPC)

VA MASTER SPECIFICATIONS PG-18-1

VA DESIGN AND CONSTRUCTION PROCEDURES PG-18-3

CDC GUIDANCE FOR ENVIRONMENTA INFECTION CONTROL IN HEALTHCARE

FACILITIES (PER HICPAC)

VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY - ASHRAE STANDARD 62.1-2004

VA HVAC DESIGN MANUAL PG-18-10

N

TRUE

NORTH

REVISIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

FMS

Project and

Section

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CD(100%CD-ISSUE FOR BID) SUBMITTAL - 04/22/2024

672-22-810

KEY PLAN NTS

PROJECT LOCATION

VA PROVIDE HIGH LEVEL

DISINFECTION FOR SPS

10 CALLE CASIA - ADM. BLDG. SUITE

4M456 SAN JUAN, PR 00921-3201

/2

/2

:0

:1

A

M

MECHANICAL COVER SHEET

MH-001

04/22/2024 RSM PJG

CD(100%CD-ISSUE FOR BID)

MECHANICAL SHEET INDEX

MH-001 MECHANICAL COVER SHEET

MD-101 MECHANICAL DEMOLITION PLAN

MD-102 MECHANICAL PHASING PLAN

MH-101 MECHANICAL FLOOR PLAN

MH-401 MECHANICAL SCHEDULES

MH-501 MECHANICAL DETAILS

NO. DESCRIPTION DATE

46"x20" EA

20"x10" EA

8"ø SA

"x

E A

"x

E A

"x

S S

E A

14"x8" SA

DE02

SCOPE STORAGE

C-1A

DE04

DE04

DE02

DE02

N

TRUE

NORTH

REVISIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

FMS

Project and

Section

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CD(100%CD-ISSUE FOR BID) SUBMITTAL - 04/22/2024

672-22-810

KEY PLAN NTS

PROJECT LOCATION

VA PROVIDE HIGH LEVEL

DISINFECTION FOR SPS

10 CALLE CASIA - ADM. BLDG. SUITE

4M456 SAN JUAN, PR 00921-3201

/2

/2

:0

:1

A

M

MECHANICAL DEMOLITION PLAN

MD-101

04/22/2024 RSM PJG

CD(100%CD-ISSUE FOR BID)

1/2" = 1'-0"

Mechanical Demolition Floor Plan - HLD

SPS

KEYNOTE LEGEND

DE02 DUCTWORK TO BE CAPPED.

DE04 EXHAUST AIR GRILLE TO BE RELOCATED. REFER TO

SHEET MD-102 FOR NEW LOCATION.

TEMPORARY

CORRIDOR

SCOPE STERIL

STORAGE AREA

SCOPE HLD

PROCESSING AREA

REAGENT WATER

GENERATION

MECHANICAL

ROOM

C-1D

ENVIRONMENTAL

STOCK ROOM

C-5J

SPS SOILED AREA

C-1

"x

E A

"x

E A

46"x20" EA

20"x10" EA

8"ø SA

"x

S S

E A

EG-1

125 CFM

SD-1

150 CFM

ME01

ME04

ME01

EG-(RE)

200 CFM

ME01

SD-1

175 CFM

ME01

ME01

EG-(RG)

ME01

N

TRUE

NORTH

REVISIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

FMS

Project and

Section

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CD(100%CD-ISSUE FOR BID) SUBMITTAL - 04/22/2024

672-22-810

KEY PLAN NTS

PROJECT LOCATION

VA PROVIDE HIGH LEVEL

DISINFECTION FOR SPS

10 CALLE CASIA - ADM. BLDG. SUITE

4M456 SAN JUAN, PR 00921-3201

/2

/2

:0

:1

A

M

MECHANICAL PHASING PLAN

MD-102

04/22/2024 RSM PJG

CD(100%CD-ISSUE FOR BID)

1/2" = 1'-0"

Mechanical Demolition Phase - Floor Plan -

HLD SPS

KEYNOTE LEGEND

ME01 CONNECT TO EXISTING DUCTWORK SYSTEM.

ME04 PROVIDE PORTABLE AIR SCRUBBER DURING INTERIM

CONSTRUCTION PHASE WITH HEPA FILTER. CONNECT TO

EXHAUST SYSTEM WITH FLEXIBLE DUCT AND LOCKING

COLLAR. PROVIDE WITH CORRUGATED ALUMINUM

FLEXIBLE DUCTWORK. CAP DUCTWORK CONNECTION

POST INTERIM CONSTRUCTION PHASE. BASIS OF DESIGN

MODEL: PREDATOR PORTABLE AIR SCRUBBER

PRED1200.

"x

E A

20"x10" EA

"x

E A

14"x8" SA

Scope Sterile Storage

Area

8"ø SA

EG-1

125 CFM

SD-1

150 CFM

"x

S S

E A

4"ø SS EA

4"ø SS EA

4"ø SS EA

ME02

ME02

ME02

ME01

EG-(RE)

200 CFM

Scope HLD Processing

Area

REAGENT WATER

GENERATION

MECHANICAL ROOM

C-1D

ENVIRONMENTAL

STOCK ROOM

C-5J

SPS SOILED AREA

SD-1

175 CFM

EG-(RG)

ME05

N

TRUE

NORTH

REVISIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

FMS

Project and

Section

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CD(100%CD-ISSUE FOR BID) SUBMITTAL - 04/22/2024

672-22-810

KEY PLAN NTS

PROJECT LOCATION

VA PROVIDE HIGH LEVEL

DISINFECTION FOR SPS

10 CALLE CASIA - ADM. BLDG. SUITE

4M456 SAN JUAN, PR 00921-3201

/2

/2

:0

:1

A

M

MECHANICAL FLOOR PLAN

MH-101

04/22/2024 RSM PJG

CD(100%CD-ISSUE FOR BID)

1/2" = 1'-0"

Mechanical Floor Plan - HLD SPS

KEYNOTE LEGEND

ME01 CONNECT TO EXISTING DUCTWORK SYSTEM.

ME02 PROVIDE NEW 4" ROUND DUCT TO NEW PASS-THRU AER

EQUIPMENT. SLOPE DUCTWORK TOWARDS NEW AER

EQUIPMENT. REFER TO MANUFACTURER'S INSTALLATION

GUIDELINES FOR CONNECTION INFORMATION.

ME05 PROVIDE MANUAL ROOM PRESSURE MONITOR. BASIS OF

DESIGN: AIRFLOW DIRECTION - BALL-IN-THE-WALL.

SD-1 TITUS OMNI-AA 24" X 24" PER PLANS PER PLANS LAY-IN NOTE 1 NOTE 2 N/A 1,2,3,4,5

EG-1 TITUS 350FL 24" X 24" - FIXED LAY-IN NOTE 1 NOTE 2 N/A 1,2,3

2. PROVIDE VOLUME DAMPER AT THE FLEX TAP. PROVIDE YOUNG REGULATOR FOR VOLUME DAMPERS IN INACCESSIBLE AREAS.

3. PROVIDE TITUS RAPID MOUNT FRAME FOR STANDARD 24" x 24" LAY-IN STYLE DIFFUSERS MOUNTED IN HARD CEILINGS, & FOR ALL 12" X 12" SUPPLY DIFFUSERS - REGARDLESS OF THE

MOUNTING LOCATION.

GRILLE, REGISTER, & DIFFUSER SCHEDULE

MARK MANUF. MODEL NO. FACE SIZE

NECK SIZE /

LENGTH

THROW /

SLOTS

FRAME

TYPE FINISH

VOLUME

DAMPER

FIRE

DAMPER NOTES

SPECIAL NOTES: ** ALL DIFFUSERS SELECTED WITH NC RATING < 20 **

1. COORDINATE COLOR WITH ARCHITECT

4. PROVIDE OPTIONAL R-6 MOLDED INSULATION BLANKET FOR ALL LAY-IN STYLE DIFFUSERS.

5. THROW IS ASSUMED TO BE 4-WAY UNLESS SPECIFIED OTHERWISE ON PLANS.

APPROVED ALTERNATES: PRICE, NAILOR, TUTTLE & BAILEY, KRUEGER

SUPPLY/

RETURN AIR -

FLEX DUCTS

SA

CONCEALED ABOVE

THE CEILING

(UNCONDITIONED

SPACE)

ROUND

COMPLY UL 181 CLASS 1, FACTORY FABRICATED, INSULATED, ROUND

DUCT, WITH A POLYETHYLENE FILM OUTER JACKET ENCLOSING GLASS

FIBER INSULATION (R-6) AROUND A CONTINUOUS POLYETHYLENE INNER

LINER. THE INNER LINER SHALL HAVE AN ENCAPSULATED STEEL WIRE

HELIX.

R6

SMACNA HVAC DUCT

CONSTRUCTION

STANDARDS - METAL AND

FLEXIBLE - ± 2" WG

NOTES:

SUPPLY AIR -

LOW

PRESSURE

SA

CONCEALED ABOVE

THE CEILING

(CONDITIONED

PLENUM)

SQUARE /

ROUND

GALVANIZED SHEET STEEL; LOCK- FORMING QUALITY; ASTM A653/A

653M, G90 COATING DESIGNATION; MIL-PHOSPHATIZED FINISH FOR

SURFACES OF DUCT EXPOSED TO VIEW

R4.2 EXTERNAL

SMACNA HVAC DUCT

CONSTRUCTION

STANDARDS - METAL AND

FLEXIBLE - ± 2" WG

AER EXHAUST

DUCTWORK SS

CONCEALED ABOVE

THE CEILING

(CONDITIONED

PLENUM)

SQUARE

STAINLESS SHEET MADE LIQUID TIGHT WITH CONTINUOUS EXTERNAL

WELD FOR ALL SEAMS AND JOINS. PROVIDE NEOPRENE GASKETS AT

FLANGED CONNECTIONS.

2 - HOUR RATED

ZERO CLEARANCE

FIRE WRAP

SMACNA HVAC DUCT

CONSTRUCTION

STANDARDS - METAL -

± 2" WG

5. ALL DUCT DIMENSIONS SHOWN ARE CLEAR INSIDE DIMENSIONS.

6. ALL BRANCH TAKE-OFFS TO BE PROVIDED W/ MANUAL VOLUME DAMPERS. ALL ELBOWS AND TEE'S MUST BE FURNISHED WITH TURNING VANES. PROVIDE MANUAL VOLUME DAMPERS

WITH EXTRACTOR AT ALL FLEX TAKE-OFFS.

DUCT CONSTRUCTION SCHEDULE

DUCTWORK

SYSTEM

DUCTWORK SYSTEM

ABBREVIATION

DUCTWORK LOCATION

DUCTWORK

SHAPE

DUCTWORK MATERIAL

DUCTWORK

INSULATION

DUCT CONSTRUCTION

STANDARD

1. REFER TO SPECIFICATION SECTION 23 31 00.

2. ALL INSULATION WILL HAVE FIRE/SMOKE RATING LESS THAN 25/50.

3. ALL OUTSIDE AIR DUCT INTAKES SHALL BE LOCATED BEYOND 10'-0'' OF ANY VENTILATION OUTLET OR SANITARY VENT PIPE AND SHALL BE SCREENED WITH A CORROSION RESISTANT

MATERIAL NOT LARGER THAN 1/2'' MESH PER FMC 2020, 401.4 AND 401.5. ALLL OUTSIDE AIR INTAKES SHALL BE MARKED WITH A PERMANENT PLATE TITLED "INTAKE FOR UNIT NUMBER (#)"

(E.G. "INTAKE FOR AHU-1", "INTAKE FOR FCU-1-1", ETC.)

4. ALL EXHAUST AIR FANS AND VENTS SHALL BE LOCATED BEYOND 10'-0'' OF ANY OUTSIDE AIR INTAKE OR FAN. ALL EXHAUST AIR FANS SHALL BE MARKED WITH A PERMANENT PLATE TITLED

"EXHAUST FAN FOR UNIT NUMBER(#) OR AREA". (E.G. "EF-1 FOR LOCKER ROOM", "EF-1-1 FOR GRD FL TOILET", ETC.)

REVISIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

FMS

Project and

Section

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CD(100%CD-ISSUE FOR BID) SUBMITTAL - 04/22/2024

672-22-810VA PROVIDE HIGH LEVEL

DISINFECTION FOR SPS

10 CALLE CASIA - ADM. BLDG. SUITE

4M456 SAN JUAN, PR 00921-3201

/2

/2

:0

:1

A

M

MECHANICAL SCHEDULES

MH-401

04/22/2024 RSM PJG

CD(100%CD-ISSUE FOR BID)

NTS

ROUND DUCT HANGERS

2500 [1133]

1320 [598]

420 [190]ONE 1 [25] x 18 GA STRAP36 [900]

TWO 1/2 [13]∅ RODS

TWO 3/8 [10]∅. RODS

ONE 1 [25] x 16 GA STRAP

84 [2100]

60 [1500]

50 [1250] 700 [317]

ONE 1 [25] x 22 GA STRAP

QUANTITY/SIZEMAX. DUCT ∅

26 [650]

HANGER STRAPS OR RODS

MAX. LOAD

LBS. [kg]

260 [119]

MAX.

144 [3600]

IN. [mm]

SPACING

IN. [mm] IN. [mm]

144 [3600]

144 [3600]

144 [3600]

144 [3600]

NOTE:

TABULATED DATA FROM SMACNA

ALLOWS FOR DUCT REINFORCING AND

INSULATION, BUT NO EXTERNAL LOAD.

BAND

OVER 50"

[1250mm]Ø

HANGER RODS

BAND OF SAME

SIZE AS HANGER

STRAP

LOAD RATED

FASTENERS

50" [1250mm]Ø

& UNDER

NTS

FROM STRUCTURE

SAME AS DIFFUSER

INLET: 5'-0" MAX

FLEXIBLE DUCT SIZE

LENGTH.

12"

CEILING

SUPPORT SADDLE

VOLUME DAMPER W/

LOCKING QUADSADDLE

SHEET METAL

CONICAL OUTLET

BRANCH DUCT

FOR CHANGE OF

DIRECTION GREATER

USE RIGID ELBOWS

THAN 45°

FLEXIBLE AIR DUCT CONNECTOR

NTS

VOLUME DAMPER DETAIL

NTS

EXHAUST OR RETURN BRANCH DUCTWORK

MAIN EXHAUST OR RETURN

PLAN VIEW

NTS

AIR TERMINAL UNITS

ALTERNATE SUPPLY DUCT TAKEOFF -

NTS

SUPPLY DUCT TAKEOFF - AIR TERMINAL UNIT

NTS

SUPPLY DUCTWORK TAKE-OFFS

NTS

DUCTWORK RADIUS ELBOWS

VANE

VANE

NTS

DUCTWORK SQUARE VANE ELBOWS

[300mm]

SEE SPECIFICATIONS FOR CLAMPS

AND SEALANT (TYP.)

NOTE:

THE USE OF FLEXIBLE AIR DUCT CONNECTORS ARE NOT PERMITTED FOR

THE DEDICATED AHU SERVING THE SURGICAL SUITE.

TYPICAL

DIFFUSER OR

REGISTER IN

LAY-IN CLG.

THERMAL INSULATION

SEE SPECIFICATIONS

NOTE:

1.

2.

DELETE INSULATION STAND-OFF ON DUCTWORK WITHOUT EXTERIOR INSULATION.

DETAIL SHOWS SINGLE BLADE DAMPER. DAMPER INSTALLATION SHALL BE SIMILAR FOR

MULTI-BLADE DAMPERS & ROUND DAMPERS.

INSULATION SEE

SPECIFICATION

DAMPER BLADE

1/8" [6mm]

CLEARANCE

ALL AROUND

OUTSIDE END BEARING

INSIDE END BEARING

HANDLE WITH

LOCKING

QUADRANT

INSULATION

STAND-OFF

1/2" [15mm] ROUND

ROD PIN

DUCT

STIFFEN BLADE

AS REQUIRED

SIDE ELEVATION SECTION

AIR

FLOW AIR

FLOW

PROVIDE VOLUME DAMPER

AT EACH BRANCH DUCT

1/4W OR 4" [100mm]

MIN.

BRANCH DUCT

VD

SMACNA FIGURE 4-6

45° LEED IN

RIGID DUCT TO AIR TERMINAL

UNIT.

MAIN SUPPLY

PLAN VIEW

FLOW

F L

O W

RIGID DUCT TO AIR TERMINAL

UNIT.

ROUND SHEET METAL DUCT.

MAIN SUPPLY

PLAN VIEW

DESIGNER'S NOTES:

1. THE SUPPLY REGISTER TAKE-OFF MAY BE USED FOR UP UP TO 25% OF THE MAIN DUCT CFM.

THE BRANCH DUCT TAKE-OFF MAY BE USED FOR UP TO 15% OF THE MAIN DUCT CFM ANYTIME

AND UP TO 40% WHEN THE MAIN DUCT VELOCITY IS 1000 FPM [5.1 M/S] OR LESS. THE AIR SPLIT

DUCT TAKE-OFF SHALL BE USED IN ALL OTHER CASES AND MAY BE USED AT ANYTIME.

2. SHOW ALL VOLUME DAMPERS ON FLOOR PLANS.

AIR SPLIT DUCT TAKE-OFF PLAN

VIEW

BRANCH DUCT TAKE-OFF PLAN VIEW

SUPPLY REGISTER TAKE-OFF

PLAN VIEW

AIR

FLOW

AIR

FLOW

A

IR

F L

O W

SUPPLY REGISTER

OR BRANCH DUCT

TURNING VANES

MAIN

SUPPLY

DUCT

SEE FLOOR PLAN FOR

SPLIT DIMENSION

PROVIDE VOLUME

DAMPER

PROVIDE VOLUME

DAMPER

ADJUSTABLE

METAL ROD

OR LINKAGE

TOP REGISTER

MAIN

SUPPLY

DUCT

VOLUME EXTRACTOR; ADJUSTABLE FROM

FULLY CLOSED POSITION TO CFM NOTED

ON FLOOR PLANS

AIR

FLOW

AIR

FLOW

1/4 W OR 4" [100mm] MIN.

AIR

FLOW

MAIN SUPPLY

DUCT

A

IR

F L

O W

NOTE:

1.

2.

THE INTERIOR SURFACE OF ALL RADIUS ELBOWS SHALL BE MADE ROUND.

ALL STANDARD RADIUS ELBOWS CAN BE SUBSTITUTED WITH SHORT RADIUS ELBOWS. ALL

SHORT RADIUS ELBOWS SHALL HAVE VANES. VANES SHALL BE CONSTRUCTED, SUPPORTED

AND FASTENED AS RECOMMENDED BY SMACNA.

R SHALL

EQUAL OR

BE

GREATER

THAN W.

R SHALL

EQUAL OR

BE

GREATER

THAN

1/3W.

R SHALL

EQUAL OR

BE

GREATER

THAN

1/6W.

STANDARD RADIUS OR

LONG RADIUS ELBOW

SHORT RADIUS ELBOW

WITH ONE VANE

SHORT RADIUS ELBOW

WITH TWO VANES

NOTE:

1.

2.

3.

4.

ALL VANE ELBOWS SHALL BE CONSTRUCTED AND INSTALLED AS DETAILED BY SMACNA.

WHEN W1 DOES NOT EQUAL W2, VANE SHALL BE SINGLE THICKNESS VANE TYPE

REGARDLESS OF W DIMENSION.

ALL SINGLE THICKNESS VANES SHALL HAVE A 2" [50mm] RADIUS, 1 1/2" [40mm] MAXIMUM

SPACE BETWEEN VANES AND A 3/4" [20mm] TRAILING EDGE.

WHEN W EQUALS W2 AND W1 IS GREATER THAN 20" [500mm] VANES SHALL BE DOUBLE VANE

TYPE.

W

"D

°M

A X

W

W

R

R

2/3W

/3

W

W W

1/2W

/3

W

1/6W

R

W

W1

REVISIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

FMS

Project and

Section

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CD(100%CD-ISSUE FOR BID) SUBMITTAL - 04/22/2024

672-22-810VA PROVIDE HIGH LEVEL

DISINFECTION FOR SPS

10 CALLE CASIA - ADM. BLDG. SUITE

4M456 SAN JUAN, PR 00921-3201

/2

/2

:0

:1

A

M

MECHANICAL DETAILS

MH-501

04/22/2024 RSM PJG

CD(100%CD-ISSUE FOR BID)

Sheets
MD-101 - MECHANICAL DEMOLITION PLAN
MD-102 - MECHANICAL PHASING PLAN
MH-001 - MECHANICAL COVER SHEET
MH-101 - MECHANICAL FLOOR PLAN
MH-401 - MECHANICAL SCHEDULES
MH-501 - MECHANICAL DETAILS

File details come from the government source that posted it. Updated .