SOLICITATION #: 36C77624R0148
PROJECT NAME: VISN 8 Construction MATOC - Caribbean
TECHNICAL QUESTIONS AND VA RESPONSE TRACKING SHEET
| Item No. |
| MATOC |
| SEED PROJECT |
| QUESTION |
| GOVERNMENT RESPONSE |
| X |
| Please clarify: RFI # 122 VA to provide AER installation or RFI # 173 & 176 it now states contractor to install AER equipment |
| AER(s) supply and installation are NOT INCLUDED IN CONTRACT. Contractor shall provide all architectural/structural work and mechanical/electrical/plumbing rough-ins per provided drawings and specifications. |
| X |
| Assist VA or vender with gaining access to the site & possible floor protection during delivery to site. |
| This is a statement. |
| X |
| As VA or vendor starts to place units contractor to assist with making all MEP connections as the VA or vender places each unit in place. |
| This is a statement. |
| X |
| Assist with all MEP needs for VA or vender to complete startup & commissioning. |
| This is a statement. |
| X |
| As per RFI #176 & 177 it states contractor with Reference to drawing # AE-405 & on this page it shows the AER equipment, but no information on how installation will be performed. |
| This is a statement. |
| X |
| Have not been able to locate any contact information for the vendor supplying the AER to the VA |
| This is a statement. |
| X |
| Are the AER units assembled or will they need to be assembled onsite by contractor? |
| AER(s) supply and installation are NOT INCLUDED IN CONTRACT. Contractor shall provide all architectural/structural work and mechanical/electrical/plumbing rough-ins per provided drawings and specifications. |
| X |
| What is the contractor responsibility to install VA supplied drying cabinet? |
| AER(s) supply and installation are NOT INCLUDED IN CONTRACT. Contractor shall provide all architectural/structural work and mechanical/electrical/plumbing rough-ins per provided drawings and specifications. |
| X |
| Will contractor need to install drying cabinet? |
| AER(s) supply and installation are NOT INCLUDED IN CONTRACT. Contractor shall provide all architectural/structural work and mechanical/electrical/plumbing rough-ins per provided drawings and specifications. |
| X |
| As with the AER equipment with the lack of information it was assumed that the contractor tasks to the drying cabinet was to assist VA or vendor with project access & MEP connections. |
| This is a statement. |
| X |
| I have not been able to locate any contact information for the vendor supplying the drying cabinet to the VA. |
| This is a statement. |
| X |
| Is the drying cabinet unit assembled or will they need to be assembled onsite by contractor? |
| AER(s) supply and installation are NOT INCLUDED IN CONTRACT. Contractor shall provide all architectural/structural work and mechanical/electrical/plumbing rough-ins per provided drawings and specifications. |
| X |
| Is the contractor is only responsible for the AER equipment & drying cabinet delivery to site & installation & just MEP connections? |
| AER(s) supply and installation are NOT INCLUDED IN CONTRACT. Contractor shall provide all architectural/structural work and mechanical/electrical/plumbing rough-ins per provided drawings and specifications. |
| X |
| Is the contractor responsible for the AER equipment & drying cabinet delivery to site, installation, equipment startup, commissioning & certifying equipment for turn over to the VA? |
| AER(s) supply and installation are NOT INCLUDED IN CONTRACT. Contractor shall provide all architectural/structural work and mechanical/electrical/plumbing rough-ins per provided drawings and specifications. |