Attachment 1 _ RFP 36C77624R0149 Tech Questions _ dated 7-29-25.docx

DOCX document 35 KB Posted

Attached to
Y1DA--VISN 8 MATOC - CARIBBEAN
Solicitation number
36C77624R0149
Issued by

About this file

This document is a Technical Questions and VA Response Tracking Sheet for Solicitation #36C77624R0149, a VISN 8 Construction MATOC (Multiple Award Task Order Contract) project in the Caribbean. The document contains 13 technical questions and corresponding government responses addressing specific project details, including clarifications on AER machines, installation requirements, temporary wall ratings, jobsite trailer placement, electrical and plumbing specifications, and exit sign configurations. Key responses include confirmation that AER machines are VA-provided and contractor-installed, temporary walls must be ICRA Class III/IV certified, existing conduit and wiring can be reused if meeting specifications, and the bid due date was extended to 8-1-25 at 5PM ET via Amendment 0002. The project is being managed by the Department of Veterans Affairs Technology Acquisition Center Austin, with the solicitation number 36C77624R0149.

View the file

Other files

File Type Posted
Attachment 1 _ RFP 36C77624R0149 Tech Questions _ dated 7-30-25.docx DOCX document
36C77624R0149 0005.docx DOCX document
36C77624R0149 0004.docx DOCX document
36C77624R0149 0003.docx DOCX document
Attachment 1 _ RFP 36C77624R0149 Tech Questions _ dated 7-25-25.docx DOCX document
Attachment 2 - SOW Provide High Level Disinfection Room at SPS - 7-21-25.docx DOCX document
Attachment 1 _ RFP 36C77624R0149 Tech Questions _ dated 7-24-25.docx DOCX document
36C77624R0149 0002.docx DOCX document
36C77624R0149 0001.docx DOCX document
Attachment 1 - Sign-In Sheet - VISN 8 MATOC Caribbean - 7-9-25.pdf PDF
36C77624R0149_2.docx DOCX document
Attachment 06e - PCRA 672-22-810.pdf PDF
Attachment 04 - Subcontractor Information and Consent Form.docx DOCX document
Attachment 06b - Seed Project Price Schedule Sheet.docx DOCX document
Attachment 06c - Base Offer Cost Breakdown.xlsx XLSX spreadsheet
Attachment 06a - Drawings 100CD-Plumbing.pdf PDF
Attachment 06a - Drawings 100CD-Electrical.pdf PDF
Attachment 06a - Drawings 100CD-Architect.pdf PDF
Attachment 05 - Past Performance Questionnaire.docx DOCX document
Attachment 03 - Project Information Sheet for Contractors.docx DOCX document
Attachment 06 - 672-22-810 Seed Project Notice of Task Order Request for Proposal.docx DOCX document
Attachment 02 - Limitations on Subcontracting.docx DOCX document
Attachment 06a - Drawings 100CD-Mechanical.pdf PDF
Attachment 01 - Technical Question Form - VISN 8 MATOC - Caribbean.xlsx XLSX spreadsheet
Attachment 06a - Specifications 100CD.pdf PDF
Attachment 06d - Site Visit Instructions - Seed Project VISN 8 MATOC Caribbean.docx DOCX document
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION #: 36C77624R0148

PROJECT NAME: VISN 8 Construction MATOC - Caribbean

TECHNICAL QUESTIONS AND VA RESPONSE TRACKING SHEET

Item No.
MATOC
SEED PROJECT
QUESTION
GOVERNMENT RESPONSE
X
RFI Response Question 12: This response states that the AER Machines are not a part of the projects scope. Yet on Sheet AE-101B this calls for new AER Units. There is also details listed on sheet AE-405 showing these units. Please revise drawing set or confirm AER and associated work is not included with this projects scope.
AER(s) are VA provided, Contractor installed.
X
In addition to questions above. If New AER units are not required in this projects scope of work. Please confirm if new supply registers and return registers will be required.
GC to provide and install per sheet MH-401
X
Please confirm if the RFU-37 is included in the scope of work for this project.
Not in Contract, disregard item RTU-37
X
If so, please provide specifications for this unit as well as drawing with details showing installation.
NIC
X
Are temporary walls to be rated? If so please confirm rating.
No. Temporary walls must be certified for ICRA Class III/IV.
X
Please confirm partition types of new walls per plan.
Please refer to Sheet AE-600 Partition Types
X
RFI response Question 52: States we will not be able to utilize a vacant space for a field office. Please identify an area on site where contractor will be able to set up a jobsite trailer.
There is no area inside VA premises available for a field office.
X
Please confirm if contractor can use existing conduit and wiring to hook up new light fixtures.
Refer to Demolition Notes on Sheet EP-101. Existing Raceway and wiring are allowed to be reused. Provided they meet the specifications for the new system.
X
Please confirm if piping shown on PL-201 is existing or not.
All are new up to the point of connection.
X
Please
Question not clear.
X
Please confirm of any exit signs this space is to receive. Please show on plan where any exit signs are to be installed.
Exit Signs are existing to remain. Coordinate in the field if any needs to be relocated.
X
There seems to be glazing associated with the drying cabinets on sheet AE-405 detail 1. Please provide additional information on drying cabinets.
Drying Cabinet to be provided by VA.
X
Please consider extending the bid due date time to allow Prime and Subcontractors to adjust their bids accordingly upon receiving the unanswered RFI’s
The bid date was extended to 8-1-25 at 5PM ET via Amendment 0002