Attachment 04 - Subcontractor Information and Consent Form.docx

DOCX document 18 KB Posted

Attached to
Y1DA--VISN 8 MATOC - CARIBBEAN
Solicitation number
36C77624R0149
Issued by

About this file

This document is a Subcontractor Information and Consent Form for the Department of Veterans Affairs VISN 8 MATOC - Caribbean contract (Solicitation 36C77624R0149). The form requires major subcontractors and teaming partners to provide consent for the release of their past performance information to the prime contractor during the source selection process. Subcontractors must complete the form by providing detailed reference information, including three references from previous contracts where they served as a prime or subcontractor, with contact details and project descriptions. Each reference must be from an entity other than the proposing prime contractor, and the form must be signed by an authorized company representative with the legal authority to bind the company.

View the file

Other files

File Type Posted
Attachment 1 _ RFP 36C77624R0149 Tech Questions _ dated 7-30-25.docx DOCX document
36C77624R0149 0005.docx DOCX document
36C77624R0149 0004.docx DOCX document
Attachment 1 _ RFP 36C77624R0149 Tech Questions _ dated 7-29-25.docx DOCX document
Attachment 1 _ RFP 36C77624R0149 Tech Questions _ dated 7-25-25.docx DOCX document
36C77624R0149 0003.docx DOCX document
Attachment 1 _ RFP 36C77624R0149 Tech Questions _ dated 7-24-25.docx DOCX document
Attachment 2 - SOW Provide High Level Disinfection Room at SPS - 7-21-25.docx DOCX document
36C77624R0149 0002.docx DOCX document
Attachment 1 - Sign-In Sheet - VISN 8 MATOC Caribbean - 7-9-25.pdf PDF
36C77624R0149 0001.docx DOCX document
Attachment 06e - PCRA 672-22-810.pdf PDF
Attachment 06a - Drawings 100CD-Architect.pdf PDF
Attachment 05 - Past Performance Questionnaire.docx DOCX document
36C77624R0149_2.docx DOCX document
Attachment 06c - Base Offer Cost Breakdown.xlsx XLSX spreadsheet
Attachment 06b - Seed Project Price Schedule Sheet.docx DOCX document
Attachment 06a - Drawings 100CD-Electrical.pdf PDF
Attachment 06d - Site Visit Instructions - Seed Project VISN 8 MATOC Caribbean.docx DOCX document
Attachment 06a - Specifications 100CD.pdf PDF
Attachment 06a - Drawings 100CD-Mechanical.pdf PDF
Attachment 06 - 672-22-810 Seed Project Notice of Task Order Request for Proposal.docx DOCX document
Attachment 02 - Limitations on Subcontracting.docx DOCX document
Attachment 01 - Technical Question Form - VISN 8 MATOC - Caribbean.xlsx XLSX spreadsheet
Attachment 06a - Drawings 100CD-Plumbing.pdf PDF
Attachment 03 - Project Information Sheet for Contractors.docx DOCX document
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 04 Subcontractor Information and Consent Form

Subcontractor and/or Teaming Partner Consent for the Release of Past Performance Information to the Prime Contractor and Reference Information

Past performance information concerning subcontractors and teaming partners cannot be disclosed to a private party without the subcontractor’s or teaming partner’s consent. Because a prime contractor is a private party, the Government will need that consent before disclosing subcontractor/teaming partner past and present performance information to the prime during exchanges. In an effort to assist the Government in assessing your past performance relevancy we request that this consent form be completed by the major subcontractors/teaming partners identified in your proposal. The completed consent forms should be submitted to the offering contractor for submission with past performance volume.

SAMPLE FORM:

__________________________(Company name of Subcontractor or Teaming Partner) is currently planning on participating as a (Subcontractor or a Teaming Partner) with ____________________________ (prime contractor or name of entity providing proposal) for the Department of Veterans Affairs RFP Indefinite Delivery Indefinite Quantity (IDIQ) Contracts Solicitation 36C77624R0149.

We understand that the Government is placing increased emphasis on past performance in order to obtain best value in source selections. In order to facilitate the performance confidence assessment process we are signing this consent form to allow you to discuss our past and present performance information with the prime contractor during the source selection process as well as our recommended references as listed on the attachment.

(Signature) / (Date) (Title of Individual with authority to sign for and legally bind the company)

Company Name: _____________________ Telephone #____________________

Address: ___________________________________________________________

Reference List (required and not to be from proposing prime contractor):

1. Contract No. __________________________________________________ Project No. and Title: ___________________________________________ Describe your role (Prime/Sub) and work Performed __________________ _____________________________________________________________ Reference POC Name_______________________ Phone_______________ Fax____________ Email address: ________________________________

2. Contract No. __________________________________________________ Project No. and Title: ___________________________________________ Describe your role (Prime/Sub) and work Performed __________________ _____________________________________________________________ Reference POC Name_______________________ Phone_______________ Fax____________ Email address: ________________________________

3. Contract No. __________________________________________________ Project No. and Title: ___________________________________________ Describe your role (Prime/Sub) and work Performed __________________ _____________________________________________________________ Reference POC Name_______________________ Phone_______________ Fax____________ Email address: ________________________________

Each major subcontractor and or Teaming Partner must complete the “Subcontractor Information and Consent Form” to be considered. Offerors shall have major subcontractors identify at a minimum three (3) references, owners (if they were the Prime) or other Prime contractors they have worked for. References for subcontractors from the proposing offeror are not acceptable. Written references for subcontractors and 2nd tier subcontractors may be included and are encouraged.

SOURCE SELECTION SENSITIVE Page 2 of 2 Attachment 1

FAR 2.101 & 3.104-5

File details come from the government source that posted it. Updated .