These architectural drawings detail a high-level disinfection room renovation project for the VA Caribbean Healthcare System located in San Juan, Puerto Rico. The project scope involves 378 gross square feet of renovation in the Sterile Processing Services (SPS) department, specifically focusing on creating a new high-level disinfection (HLD) processing area and sterile storage space. The primary objectives are to improve scope processing and reduce cross-contamination risks by separating decontamination and sterile storage areas.
Key technical details include a Type IB fully sprinklered construction, an Institutional Group I-2 occupancy classification, and renovations that involve demolishing existing walls, installing new partitions, replacing ceiling systems, and adding new equipment like Advanced Endoscope Reprocessing (AER) units. The project includes creating a new scope processing area (Room 101), a sterile storage area (Room 100), and modifying adjacent spaces. The design emphasizes infection control measures, such as maintaining negative air pressure during construction, using temporary barriers, and implementing strict construction access protocols. The contract number is 36C24822C0087, with design services project number 672-22-810, and the documents are dated 04/22/2024.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REVISIONS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
FMS
Project and
Section
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CD(100%CD-ISSUE FOR BID) SUBMITTAL - 04/22/2024
672-22-810VA PROVIDE HIGH LEVEL
DISINFECTION FOR SPS
10 CALLE CASIA - ADM. BLDG. SUITE
4M456 SAN JUAN, PR 00921-3201
/2
/2
:5
:3
A
M
COVER SHEET
GI-001
04/22/2024 RSM PJG
CD(100%CD-ISSUE FOR BID)
SAN JUAN, PUERTO RICO
CONTRACT NO. 36C24822C0087
DESIGN SERVICES PROJECT: 672-22-810
PROJECT LOCATION: VA CARIBBEAN HEALTHCARE SYSTEM
10 CALLE CASIA - ADM. BLDG. SUITE 4M456
SAN JUAN, PR 00921-3201
ISSUING OFFICE:
DEPARTMENT OF VETERANS AFFAIRS
NETWORK CONTRACTING OFFICE 8 (NC08)
CONSTRUCTION TEAM 2
ANA G. ALVARADO, NCO 8 CONTRACTING OFFICER
VA PROVIDE HIGH LEVEL DISINFECTION ROOM FOR
SPS AT SAN JUAN CAMPUS
NO. DESCRIPTION DATE
Drawing No. Title
GENERAL
GI-001 COVER SHEET
GI-002 SHEET INDEX, GENERAL NOTES, SYMBOLS AND ABBREVIATIONS
LS-001 LIFE SAFETY PLAN
LS-002 PROPOSED DEBRIS REMOVAL
ARCHITECTURAL
AE-101A DEMO PLAN
AE-101B PROPOSED FLOOR PLAN
AE-122A REFLECTED CEILING PLAN
AE-405 INTERIOR ELEVATIONS AND DETAILS
AE-600 PARTITION TYPES, DOOR SCHEDULE AND DETAILS
PLUMBING
PL-001 PLUMBING COVER SHEET
PL-101 FIRE PROTECTION PLANS
PL-201 PLUMBING PLANS
PL-501 PLUMBING DETAILS AND SCHEDULES
MECHANICAL
MH-001 MECHANICAL COVER SHEET
MD-101 MECHANICAL DEMOLITION PLAN
MD-102 MECHANICAL PHASING PLAN
MH-101 MECHANICAL FLOOR PLAN
MH-401 MECHANICAL SCHEDULES
MH-501 MECHANICAL DETAILS
ELECTRICAL
E-001 ELECTRICAL COVER SHEET
EP-101 ELECTRICAL FLOOR PLANS
E-501 ELECTRICAL DETAILS
E-601 PANEL SCHEDULE
REVISIONS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
FMS
Project and
Section
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CD(100%CD-ISSUE FOR BID) SUBMITTAL - 04/22/2024
672-22-810VA PROVIDE HIGH LEVEL
DISINFECTION FOR SPS
10 CALLE CASIA - ADM. BLDG. SUITE
4M456 SAN JUAN, PR 00921-3201
/2
/2
:5
:3
A
M
SHEET INDEX, GENERAL NOTES,
SYMBOLS AND ABBREVIATIONS
GI-002
04/22/2024 RSM PJG
CD(100%CD-ISSUE FOR BID)
A
A/C AIR CONDITIONING
AB ANCHOR BOLT / AIR BLENDER
ABS ACRYLONITRILE-BUTADIENE-STYRENE
AC ALTERNATING CURRENT / AIR COMPRESSOR
ACP ASBESTOS CEMENT PIPE
ACU AIR CONDITIONING UNIT
AD AREA DRAIN
ADA AMERICANS WITH DISABILITIES ACT
ADJ ADJACENT / ADJUSTABLE
ADR ACCESS DOOR
AFF ABOVE FINISH FLOOR
AHJ AUTHORITY HAVING JURISDICTION
AHU AIR HANDLING UNIT
AL ALUMINUM
ALT ALTERNATE
APC ACOUSTICAL PANEL CEILING
APPROX APPROXIMATELY
APT APARTMENT
ARCH ARCHITECT(URAL)
ASPH ASPHALT
ATB AIR TERMINAL BOX
ATC ACOUSTICAL TILE CEILING
ATD AIR TRANSFER DUCT
ATU AIR TERMINAL UNIT
AUX AUXILIARY
AVG AVERAGE
AWT ACOUSTICAL WALL TREATMENT
AZ AZIMUTH
B
BB BALLED AND BURLAPPED
BD BOARD
BDD BACK DRAFT DAMPER
BE BOTTOM ELEVATION
BL BUILDING LINE
BLDG BUILDING
BLKG BLOCKING
BM BENCH MARK / BEAM
BR BARE ROOT
BRG BEARING
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
C
C/C CENTER TO CENTER
CAB CABINET
CB CIRCUIT BREAKER / CATCH BASIN
CC COOLING UNIT
CE COVER ELEVATION
CEM CEMENT
CFM CUBIC FEET PER MINUTE
CG CORNER GUARD
CH CHILLER
CI CURB INLET / CAST IRON
CIP CAST IRON PIPE
CJ CONTROL JOINT OR CONTRACTION JOINT
CKT CIRCUIT
CL CENTER LINE
CLG CEILING
CLO CLOSET
CLR CLEAR
CM CENTIMETER
CMH CUBIC METER PER HOUR
CMP CORRUGATED METAL PIPE
CMU CONCRETE MASONRY UNIT
CO CLEANOUT / CARBON MONOXIDE
CO2 CARBON DIOXIDE
COL COLUMN
COMB COMBINATION / COMBINE
COMP COMPRESSIBLE
CONC CONCRETE
CONN CONNECTION
CONST CONSTRUCTION
CONT CONTINUOUS / CONTINUATION
CONTR CONTRACTOR
CORR CORRIDOR
CP CEMENT PIPE
ABBREVIATIONS GENERAL NOTES ARCHITECTURAL
A. PARTITION AND WALLS
1 DIMENSIONS ARE TO FINISH FACE OF PARTITIONS, FACE OF EXISTING
FINISH OR CENTER LINE OF COLUMNS UNLESS SHOWN OR NOTED
OTHERWISE. ALL EXISTING DIMENSIONS ARE BASED ON EXISTING
DRAWINGS BUT MUST BE VERIFIED IN FIELD.
2 ALL PARTITIONS SHALL EXTEND FROM FLOOR TO UNDER SIDE OF DECK
ABOVE EXCEPT WHERE NOTED OR SHOWN OTHERWISE.
3 EXTEND ALL SOUND RATED PARTITIONS TO THE UNDER SIDE OF DECK
ABOVE TO PREVENT SOUND TRANSMISSION. FURNISH 4-1/4 POUNDS
DENSITY GLASS FIBER INSULATION SHAPED TO FIT THE VOID ABOVE THE
PARTITION WHERE AIR-BORNE SOUND CAN PENETRATE SPACES.
4 FOR LOCATIONS OF FIRE-RATED PARTITIONS SEE LS-101 AND LS-102
5 CONTROL JOINTS SHALL BE PROVIDED ABOVE DOORS AT EACH SIDE IN
STUD AND GWB PARTITIONS.
6 EXPANSION JOINTS AT ALL FLOORS, CEILINGS AND WALLS THAT ARE
EXPOSED TO VIEW SHALL BE COVERED WITH EXPANSION JOINT COVERS
APPROPRIATE FOR FINISHED SURFACES.
7 ALL COLUMNS WITHIN FINISHED SPACES SHALL BE FINISHED WITH SAME
MATERIALS SCHEDULED AT WALLS UNLESS OTHERWISE SHOWN OR
DETAILED.
8 PROVIDE ALL WALL AND FLOOR OPENINGS FOR MECHANICAL AND
ELECTRICAL ITEMS. ALL OPENINGS MORE THAN 16 INCHES WIDE IN
MASONRY PARTITIONS SHALL HAVE LINTELS AS SCHEDULED ON THE
STRUCTURAL DRAWINGS.
9 PROVIDE CORNER GUARDS AT ALL OUTSIDE CORNERS.
10 PROVIDE MOLD-RESISTANT GWB AT BUILD-OUT, TYPICAL.
11 FOR WALL PARTITION TYPES, SEE SHEET AE-600..
B. DOORS AND FRAMES
1 PROVIDE LABELS ON DOORS AND FRAMES WHERE SCHEDULED.
2 INSTALL CONTINUOUS CAULKING AROUND METAL FRAMES UNLESS NOTED
OTHERWISE.
3 HOLLOW METAL FRAMES SHALL BE ANCHORED TO THE STRUCTURAL
FLOOR WITH A MINIMUM OF TWO (2) ANCHOR BOLTS.
4 HOLLOW METAL FRAMES IN STUD PARTITIONS SHALL BE FILLED WITH
GROUT TO THE DEPTH OF THE FRAME ANCHOR FULL HEIGHT FOR SOUND
DAMPENING BEFORE SETTING IN PLACE.
5 INSTALL CASING BEADS AND CAULK WHERE GWB ABUTS METAL FRAMES.
6 DOOR TYPES AND SIZES ARE SHOWN ON SHEET AE-600.
C. MISCELLANEOUS
1 SEE PHYSICIST'S REPORT FOR SHIELDING REQUIREMENTS INCLUDING
LOCATIONS AND MINIMUM LEAD THICKNESS FOR SURFACES.
CPT CARPET
CR CRASH RAIL
CS CONCRETE SEALER
CSF CUBIC FEET PER SECOND
CT CERAMIC TILE / COOLING TOWER
CTB CERAMIC TILE BASE
CTF CERAMIC TILE FLOOR
CTR CENTER
CTW CERAMIC TILE WALL
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CUYD CUBIC YARD
CW COLD WATER
D
D DRAIN / DIFFUSER
DA DENTAL AIR
DBL DOUBLE
DEPR DEPRESSED
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIAG DIAGONAL
DIFF DIFFUSER
DIP DUCTILE IRON PIPE
DISC DISCONNECT
DISP DISPENSER
DIST DISTRIBUTION
DK DECK
DL DEAD LOAD
DN DOWN
DO DITTO
DPR DAMPER
DR DOOR
DS DOWNSPOUT
DV DENTAL VACUUM
DWG DRAWING
DWL DOWEL
DWP DOMESTIC WATER PUMP
E
EA EACH / EXHAUST AIR
ECT ENTRY CARPET TILE
EF EACH FACE / EXHAUST FAN
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRIC(AL)
ELEV ELEVATOR
EMBED EMBEDMENT
EMD ESTIMATED MAXIMUM DEMAND
EMT ELECTRICAL METAL TUBING
ENG ENTRANCE GRATING
EP EPOXY PAINT
EQ EQUAL
EQUIP EQUIPMENT
ET EXPANSION TANK / EPOXY TERRAZZO
ETB EPOXY TERRAZZO INTEGRAL COVE BASE
EVAC MEDICAL GAS EVACUATION
EW EACH WAY
EWC ELECTRICAL WATER COOLER
EWH ELECTRICAL WATER HEATER
EXH EXHAUST
EXP EXPOSED
EXPN EXPANSION
EXST EXISTING
EXT EXTERIOR
F
F FIRE MAIN
FA FIRE ALARM
FCU FAN COIL UNIT
FD FLOOR DRAIN / FIRE DAMPER
FD / SD COMBINATION FIRE AND SMOKE DAMPER
FDC FIRE DEPARTMENT CONNECTION
FDN FOUNDATION
FDR FEEDER
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF&E FURNITURE, FIXTURE, AND EQUIPMENT
FH FIRE HYDRANT
FHC FIRE HOSE CABINET
FIN FINISH
FIX FIXTURE
FL FLOOR
FM FORCE MAIN / FACTORY MUTUAL
FP FIREPROOFING / FIRE PUMP
FPM FEET PER MINUTE
FR FIRE RATED
FRP FIBERGLASS REINFORCED PLASTIC
FS FLOW SWITCH
FT FEET
FTG FOOTING
FVC FIRE VALVE CABINET
G
G GAS / GRILLE
GA GAGE
GALV GALVANIZED
GB GRAB BAR
GBD GRAVITY BACKDRAFT DAMPER
GEN GENERATOR
GFRC GLASS FIBER REINFORCED CONCRETE
GI GALVANIZED IRON
GL GLASS
GLB GLASS BLOCK
GLP GLASS PANEL
GLT GLASS TILE
GP GLAZED PAINT
GPM GALLONS PER MINUTE
GR GRADE
GRV GRAVITY ROOF VENTILATOR
GT GROUT
GWB GYPSUM WALLBOARD
GYP GYPSUM
H
HB HOSE BIBB
HC HEATING COIL
HDNR HARDENER
HDW HARDWARE
HDWD HARDWOOD
HK1E HOOK ONE END
HK2E HOOK TWO ENDS
HM HOLLOW METAL
HNDRL HANDRAIL
HORIZ HORIZONTAL
HP HORSEPOWER
HPT HIGH POINT
HR HOUR
HS HIGH STRENGTH
HT HEIGHT
HTG HEATING
HTR HEATER
HVAC HEATING, VENTILATING AND AIR CONDITIONING
HW HOT WATER
HWC HOT WATER CIRCULATING
HZ HERTZ
I
IA INSTRUMENT AIR
IC INTERCOM
ID INSIDE DIAMETER
IE INVERT ELEVATION
IF INSIDE FACE
IN INCH
INSUL INSULATION
INT INTERIOR
J
JAN JANITOR
JB JUNCTION BOX
JP JOCKEY PUMP
JST JOIST
JT JOINT
K
KC MIL THOUSAND CIRCULAR MILS
KCJ KEYED CONSTRUCTION JOINT
KIT KITCHEN
KPA KILOPASCALS
KS KITCHEN SINK
KV KILOVOLT
KVA KILOVOLT AMPERE
KW KILOWATTS
L
L LITER
LA LABORATORY AIR
LAB LABORATORY
LAM LAMINATE
LAV LAVATORY
LBS POUNDS
LF LINEAR FEET
LIN LINEAR
LINO LINOLEUM
LL LIVE LOAD
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LMU LIGHTWEIGHT MASONRY UNITS
LONG LONGITUDINAL
LPM LITERS PER MINUTE
LT LIGHT
LT WT LIGHT WEIGHT
LTG LIGHTING
LV LABORATORY VACUUM
LVL LEVEL
LVT LUXURY VINYL TILE
M
M METER
M2 SQUARE METER
M3 CUBIC METER
MA MEDICAL AIR
MAINT MAINTENANCE
MAR MARBLE
MAS MASONRY
MAT MATERIAL
MAX MAXIMUM
MB METAL BASE
MBH 1000 BTUH
MDO MEDIUM DENSITY OVERLAY
MECH MECHANICAL
MET METAL
MFR MANUFACTURER
MG MOTOR GENERATOR / MEDICAL GAS
MH MANHOLE
MIN MINIMUM
MLO MAIN LUGS ONLY
MM MILLIMETER
MO MASONRY OPENING
MP METAL PANEL
MT METAL TRANSITION
MTD MOUNTED
MTG MOUNTING
MULL MULLION
MV MEDICAL VACUUM
N
N NITROGEN
N2O NITROUS OXIDE
NEC NATIONAL ELECTRICAL CODE
NFPA NATIONAL FIRE PROTECTION
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
O
O/S OFFSET
OA OUTSIDE AIR
OBD OPPOSED BLADE DAMPER
OC ON CENTER
OD OUTSIDE DIAMETER
OF OUTSIDE FACE
OPNG OPENING
OPP OPPOSITE
OX OXYGEN
OZ OUNCE
P
P PAINT / PUMP / PENDANT
PA PASCAL
PART PARTITION
PAVT PAVEMENT
PC POINT OF CURVATURE / PRIVACY CURTAIN
PCF POUNDS PER CUBIC FOOT
PED PEDESTAL
PERP PERPENDICULAR
PHC PREHEAT COIL
PHVAC PLUMBING, HEATING, VENTILATING AND AIR
CONDITIONING
PI POINT OF INTERSECTION
PIV POST INDICATOR VALVE
PKG PARKING
PL PLASTIC LAMINATE / PROPERTY LINE / PLATE
PLAS PLASTER
PLBG PLUMBING
PLF POUNDS PER LINEAR FOOT
PLYWD PLYWOOD
PNL PANEL
POL CONC POLISHED CONCRETE
PR PAIR
PRF POURED RESINOUS FLOORING
PROJ PROJECTION
PRV PRESSURE REGULATING VALVE
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT POINT OF TANGENCY
PTB PORCELAIN TILE BASE
PTF PORCELAIN TILE FLOOR
PTVC POINT OF VERTICAL CURVATURE
PTW PORCELAIN TILE WALL
PVC POLYVINYL CHLORIDE
PVI POINT OF VERTICAL INTERSECTION
PVT POINT OF VERTICAL TANGENCY
Q
QTB QUARRY TILE BASE
QTF QUARRY TILE FLOOR
QZP QUARTZ POLYMER
R
R RADIUS / REGISTER
RA RETURN AIR
RAF RAISED ACCESS FLOORING
RB RESILIENT BASE
RCP REINFORCED CONCRETE PIPE
RD ROOF DRAIN
REF REFERENCE
REFL REFLECTED
REG REGISTER
REINF REINFORCED
REQD REQUIRED
REV REVERSE / REVISION
RF RETURN FAN
RGS RIGID GALVANIZED STEEL
RH ROOF HOOD / RELATIVE HUMIDITY / REHEAT
RHC REHEAT COIL
RM ROOM
RO ROUGH OPENING
ROW RIGHT OF WAY
RS RESILIENT SHEET
RT RESILIENT TILE
S
S STAIR / STAIN / SURFACE / SANITARY
SA SUPPLY AIR / SOUND ATTENUATOR
SAN SANITARY
SCH SCHEDULE
SD SMOKE DAMPER / SUB DRAIN / STORM SEWER
SECT SECTION
SF SUPPLY FAN
SHT SHEET
SIM SIMILAR
SOG SLAB-ON-GRADE
SP SUMP PUMP
SPEC SPECIFICATIONS
SQ SQUARE
SS SERVICE SINK / SANITARY SEWER
SSM SOLID SURFACE MATERIAL
SSO STORM SEWER OVERFLOW
SST STAIR TREAD
SSTL STAINLESS STEEL
STA STATION
STD STANDARD
STE STANDARD TAPERED END
STIFF STIFFENER
STIR STIRRUP
STL STEEL
STOR STORAGE
STR STRUCTURAL
SUSP SUSPENDED
SW SWITCH
SWGR SWITCHGEAR
SYM SYMMETRICAL
T
T TREAD
T&B TOP AND BOTTOM
T&G TONGUE AND GROOVE
TC TOP OF CURB
TE TOP ELEVATION
TEL TELEPHONE
TEMP TEMPERATURE
TERR TERRAZZO
TLT TOILET
TOPO TOPOGRAPHY
TOS TOP OF STEEL
TOW TOP OF WALL
TP TOP OF PAVEMENT
TRANS TRANSVERSE
TS TRANSITION STRIP
TYP TYPICAL
U
UC UNDERCUT
UG UNDERGROUND
UH UNIT HEATER
UNO UNLESS NOTED OTHERWISE
UR URINAL
UV UNIT VENTILATOR
V
V VOLT
VAV VARIABLE AIR VOLUME
VC VERTICAL CURVE
VCP VITRIFIED CLAY PIPE
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VEST VESTIBULE
VFD VARIABLE FREQUENCY DRIVE
VTR VENT THROUGH ROOF
VWC VINYL WALL COVERING
W
W WATT / WATER
W/ WITH
W/O WITHOUT
WAGD WASTE ANESTHESIA GAS DISPOSAL
WC WATER CLOSET / WALL COVERING
WD WOOD
WDB WOOD BASE
WDF WOOD FLOOR
WDP WOOD PANEL
WDW WINDOW
WDWF WINDOW FILM
WGD WALL GUARD
WH WATER HEATER / WALL HYDRANT
WP WEATHERPROOF
WPFG WATERPROOFING
WS WATER STOP
WT WEIGHT / WINDOW TREATMENT
WWF WELDED WIRE FABRIC
X
XFMR TRANSFORMER
Y
YD YARD
YH YARD HYDRANT
SHEET INDEX
CODE SUMMARY
APPLICABLE CODES
INTERNATIONAL BUILDING CODE 2021 (6TH EDITION)
INTERNATIONAL BUILDING CODE 2021, EXISTING BUILDING EDITION (6TH EDITION)
INTERNATIONAL BUILDING CODE 2021, ACCESSIBILITY (6TH EDITION)
NFPA 101 LIFE SAFETY CODE 2020 EDITION
VA FIRE PROTECTION DESIGN MANUAL, SIXTH EDITION, SEPTEMBER 2011
ASHRAE 90.1, 1999
UNIFORM FEDERAL ACCESSIBILITY STANDARDS, LATEST EDITION
* WHERE CONFLICTS EXIST BETWEEN CODES, THE CODE SPECIFIED IN THE VA FIRE PROTECTION DESIGN GUIDE SHALL BE FOLLOWED. FIRE PROTECTION FEATURES NOT ADDRESSED IN THE NATIONAL FIRE CODES SHALL BE DESIGNED TO COMPLY WITH THE 2021 IBC OR AS OTHERWISE ADDRESSED IN THE DESIGN GUIDE.CODE REFERENCES LISTED IN THE NARRATIVE ARE BASED ON THE 2020 LIFE SAFETY CODE, UNLESS NOTED OTHERWISE. CHAPTERS 43, 18, AND 19 APPLY FOR ALL EXISTING BUILDING AREAS UNDERGOING RENOVATION. WHERE AREAS ARE COMPLETELY RECONSTRUCTED, THE RECONSTRUCTION IS IN ACCORDANCE
WITH CHAPTER 18.
PROJECT DATA
1. OCCUPANCY CLASSIFICATION (2021 IBC - BUILDING, SIXTH EDITION, 308.4)(NFPA 101 LIFE SAFETY CODE 2020 EDITION, 18.3.3.3)
INSTITUTIONAL GROUP I-2
2. TYPES OF CONSTRUCTION (2021 IBC - BUILDING, SIXTH EDITION, 602.2)NFPA 101 LIFE SAFETY CODE 2020 EDITION,18.3.3.3)
TYPE IB, FULLY SPRINKLERED
3. PROJECT AREA:
SCOPE OF WORK: 378 GSF
4. OVER ALL LIFE SAFETY CALCULATIONS:
5. FIRE PROTECTION SYSTEMS:
EXISTING FIRE ALARM SYSTEM
EXISTING FIRE SPRINKLERED SYSTEM.
FIRE EXTINGUISHERS: PROVIDED AT 75'-0" MAX. PATH OF TRAVEL FROM ANY POINT IN
THE SPACE.
6. INTERIOR FINISH CLASSIFICATION:
INTERIOR WALL AND CEILING FINISH REQUIREMENT FOR SPRINKLERED GROUP I-2
OCCUPANCY. IN ACCORDANCE WITH NFPA 101 SECTION 18.3.3.2 AND SECTION 18.3.3.3
1. EXIT ENCLOSURES AND EXIT PASSAGEWAYS: CLASS B
2. CORRIDORS: CLASS B
3. ROOMS AND ENCLOSED SPACES: CLASS B
COMPARTMENT OCCUPANCY
GROSS AREA ÷ LOAD FACTOR = LOAD
B-4
14,295 SF
(378 SF)
SYMB
GROSS AREA
(SCOPE OF WORK)
USE
NON
SLEEPING
USE
AREA
378 SF
LOAD
FACTOR LOAD
150 2.52 ~ 3
TOTAL
IBC 1005.3
EXISTING UNCHANGED
0.3 N/A N/A
CAPACITY FACTOR
DOOR 0.2
STAIR 0.3
REQUIRED
(IN INCHES)
PROVIDED
(IN INCHES)
GENERAL NOTES:
1. MAXIMUM ALLOWABLE SQUARE FOOTAGE OF A SMOKE COMPARTMENT IS 22,500 SQUARE FEET, PER MOST STRINGENT CODE REQUIREMENT OF NFPA 101
SECTION 19.3.7.1(1) AND IBC SECTION 407.5 FOR HOSPITALS.
2. OCCUPANT LOAD FACTOR IS DETERMINED PER MOST STRINGENT CODE REQUIREMENT OF NFPA 101 TABLE 7.3.1.2 AND IBC TABLE 1004.1.2
3. OCCUPANT LOAD IS DETERMINED PER MOST STRINGENT CODE REQUIREMENT OF NFPA 101 SECTION 19.1.7 AND IBC SECTION 1004.1.
4. EGRESS CAPACITY FACTOR IS DETERMINED PER MOST STRINGENT CODE REQUIREMENT OF NFPA 101 TABLE 7.3.3.1 AND IBC 1005.1.
5. MINIMUM CLEAR EXIT EGRESS FOR DOOR REQUIRED IS 32 INCHES, PER MOST STRINGENT CODE REQUIREMENT OF NFPA 101 SECTION 19.2.3.6 AND IBC SECTION
1010.1.1. MEANS OF EGRESS DOORS IN A GROUP I-2 OCCUPANCY USED FOR THE MOVEMENT OF BEDS SHALL PROVIDE A CLEAR WIDTH NOT LESS THAN 41 1/2" AS PER IBC SECTION 1010.1.1. IT CONFORMS BECAUSE THE MINIMUM CLEAR EXIT TO PUBLICWAY IS 72".
6. MAXIMUM TRAVEL DISTANCE FROM "THE MOST REMOTE POINT IN A ROOM" TO "AN EXIT" IS 200 FEET IN A SPRINKLERED BUILDING, PER MOST STRINGENT CODE REQUIREMENT OF NFPA 101 SECTION 19.2.6.2.2, AND IBC TABLE 1017.2, OCCUPANCY TYPE I-2. (ALLOWANCE IS ACCEPTABLE, COMPARTMENT IS FULLY
SPRINKLERED)
7. MAXIMUM TRAVEL DISTANCE FROM "ANY ROOM DOOR REQUIRED AS AN EXIT ACCESS" TO "AN EXIT" IS 150 FEET, PER MOST STRINGENT CODE REQUIREMENT OF NFPA 101 SECTION 19.2.6.2.1. (ALLOWANCE IS ACCEPTABLE, COMPARTMENT IS FULLY SPRINKLERED)
8. MAXIMUM TRAVEL DISTANCE FROM "THE MOST REMOTE POINT IN A ROOM" TO "A DOOR INTO AN ADJACENT SMOKE COMPARTMENT" IS 200 FEET, PER MOST STRINGENT CODE REQUIREMENT OF NFPA 101 SECTION 18.3.7.1(4) AND IBC SECTION 407.5 FOR HOSPITALS.
9. EXIT PASSAGEWAYS SERVING AS AN EXIT COMPONENT IN A MEANS OF EGRESS SYSTEM SHALL COMPLY WITH THE REQUIREMENTS OF NFPA 101 SECTION 7.2.6 AND IBC SECTION 1024. (EXIT PASSAGEWAYS ARE INDICATED BY EGRESS PATHWAY TAPE (LINE TYPE).)
10. WALLS AROUND SHAFT ENCLOSURES SHALL BE 2HR RATED PER IBC SECTION 713.4.
11. ALL CORRIDOR WALLS BETWEEN SUITE COMPARTMENTS SHALL GO TO UNDERSIDE OF STRUCTURE ABOVE.
12. REFER TO FIRE PROTECTION AND ELECTRICAL DRAWINGS FOR ALL LOCATIONS OF SPRINKLER HEADS, STROBES, FIRE ALARM PULL STATIONS, FIRE ALARM
CHIMES, SMOKE DETECTORS, ETC..
LIFE SAFETY KEY
FIRE EXTINGUISHER CABINET
FIRE EXTINGUISHER
SMOKE DETECTOR
2-HR FIRE RATED
CONSTRUCTION
2-HR FIRE/SMOKE BARRIER
EXIT SIGN
SCOPE OF WORK
FEC
1A
SMOKE COMPARTMENT
DESIGNATION
TRAVEL DISTANCE TO EXIT
SUITE AREA
72"
B-4
SMOKE COMPARTMENTS
EXISTING SF 21,133
EXIT CAPACITY
D
FIRE EXTINGUISHER HOSE CABINETFEHC
FIRE ALARM DEVICEF
FE
COMMON PATH OF TRAVEL TO
ADJACENT SMOKE
COMPARTMENT
COMMON PATH OF TRAVEL
0.2 44" 72"
1-HR FIRE RATED
CONSTRUCTION
1-HR FIRE/SMOKE BARRIER
EXIT ACCESS CORRIDOR WITH
SMOKE TIGHT WALLS
*SMOKE COMPARTMENT DESIGNATIONS WERE
PROVIDED BY VAMC SAN JUAN BASED ON THE
7/18/2013 BUILDING SAFETY INFORMATION PLANS.
THESE PLANS DEPICT EXISTING SMOKE
COMPARTMENTS AND EXITS. THE STRATEGY IN
AREAS OF RENOVATION IS TO MAINTAIN EXISTING
SMOKE COMPARTMENT BOUNDARIES WHEREVER
POSSIBLE.
THE RENOVATIONS WILL MAKE USE OF EXISTING
FIRE AND SMOKE BARRIERS AS INDICATED ON THE
PLANS.
*THE RENOVATION WILL MAINTAIN THE CURRENT
FACILITY EMERGENCY EVACUATION AND
RESPONSE PLAN SHALL BE MADE AVAILABLE BY
THE FACILITIES ENGINEERING DEPARTMENT.
IT IS THE PRIMARY SCOPE AND OBJECTIVE OF THIS PROJECT TO PROVIDE A HIGH-LEVEL
DISINFECTION (HLD) SCOPE ROOM. THIS HLD IS AN INTERIM MEASURE, TO BRING THE EXISTING
SPS DEPT IN COMPLIANCE WITH CURRENT VA TIL STANDARDS, THE CURRENT SCOPES
STERILIZATION PROCESS PRESENTS A HIGH PROBABILITY OF CROSS CONTAMINATION BECAUSE
THE AERS ARE IN THE GENERAL DECONTAMINATION ROOM, THEREFORE THE SCOPES ARE
POTENTIALLY EXPOSED CROSS CONTAMINATION PRIOR TO PUTTING THEM INTO THE SEPARATE
SCOPES CABINET STORAGE ROOM. THE VA HAS REQUESTED A SEPARATE SCOPE PROCESSING
AND STERILE STORAGE ROOM INDEPENDENT OF THE SPS DECONTAMINATION SPACES, THESE
SPACES WILL BE DESIGNED TO BRING THE CURRENT SPS IN COMPLIANCE WITH THE VA TIL.
FIRE RATING FOR SPECIFIC ELEMENTS
1. ROOF CONSTRUCTION = 2 HOURS
2. PRIMARY STRUCTURAL FRAME = 2 HOURS - PROTECTED
STEEL/ SELF PROTECTING CONCRETE
3. BEARING WALLS, INTERIOR AND EXTERIOR = 3 HOURS
4. FLOOR CONSTRUCTION = 2 HOURS
SCOPE OF WORK
T R
A V
E L P
A T
H
TRAVEL PATH - 106' - 0"
COMMON PATH OF EGRESS - 95' -6"
C O
M M
O N
P A
T H
O F
E G
R E
S S
B-4
B-4 B-3
B-5
B-6
B-1
B-1
B-2
10,023 SF
11,932 SF
14,925 SF21,133 SF
18,242 SF
27,524 SF
72"
72"
REVISIONS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
FMS
Project and
Section
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CD(100%CD-ISSUE FOR BID) SUBMITTAL - 04/22/2024
672-22-810VA PROVIDE HIGH LEVEL
DISINFECTION FOR SPS
10 CALLE CASIA - ADM. BLDG. SUITE
4M456 SAN JUAN, PR 00921-3201
/2
/2
:5
:3
A
M
LIFE SAFETY PLAN
LS-001
04/22/2024 RSM PJG
CD(100%CD-ISSUE FOR BID)
1" = 20'-0"1 Life Safety Plan
1. ALL AREAS OF CONSTRUCTION SHALL MAINTAIN NEGATIVE AIR
PRESSURE RELATIVE TO ADJACENT SPACES FOR THE DURATION OF
CONSTRUCTION ACTIVITIES. REFER TO THE MECHANICAL DRAWINGS
FOR ADDITIONAL INFORMATION.
2. IF CONTRACTOR SHOULD NEED TO ACCESS MECHANICAL, ELECTRICAL,
PLUMBING, ETC., FROM ANY FLOOR ABOVE OR BELOW, THE
CONTRACTOR MUST TAKE ACTION TO RESTORE ALL INFRASTRUCTURE
AND FINISH TO ORIGINAL PRE-CONSTRUCTION CONDITION.
3. CONTRACTOR SHALL COORDINATE ANY AND ALL SHUTDOWNS WITH THE
OWNER AS PER THE OWNER PROVIDED PRE-CONSTRUCTION RISK
ASSESSMENT REPORTS.
4. CONTRACTOR SHALL COORDINATE ANY DISRUPTIONS WITH OWNER AS
PER THE OWNER PROVIDED PRE-CONSTRUCTION RISK ASSESSMENT
REPORTS. IF THERE ARE ANY CONFLICTS, CONTRACTOR SHALL
CONTACT THE OWNER/ARCHITECT IMMEDIATELY AS TO NOT HOLD UP
PROJECT COMPLETION.
5. CONTRACTOR SHALL AT ALL TIMES MAINTAIN CLEAR AND
UNOBSTRUCTED ACCESS TO CORRIDORS AND STAIRS FOR EMERGENCY
EGRESS.
6. CONTRACTOR SHALL VERIFY FIELD CONDITIONS PRIOR TO BIDDING AND
CONSTRUCTION TO FAMILIARIZE THEMSELVES WITH EXISTING
CONDITIONS AND SCOPE OF WORK REQUIRED.
7. ALL WATER LINES IMPACTED BY DEMOLITION SHALL BE CAPPED WHEN
NOT IN USE. WATER LINES SHALL BE FLUSHED AFTER FINAL
INSTALLATION, REFER TO SPECIFICATIONS FOR FLUSHING
REQUIREMENTS.
GENERAL NOTES
CONSTRUCTION BARRIER PLAN NOTES
CONTRACTOR ROUTE TO CONSTRUCTION AREA
TEMPORARY CONSTRUCTION BARRIER CONSISTING OF
METAL STUD FRAMING WITH 5/8" TYPE 'X' GWB ON ONE
SIDE. TAPED WITH CAULKED SEAMS CREATING A TIGHT
SEAL ON ALL SIDES
TEMPORARY CONSTRUCTION ANTE ROOM AS
MANUFACTURED BY KONTROL KUBE OR MINTIE AND
COMPLYING WITH NFPA 701
PROJECT SCOPE
LEGEND
NEGATIVE PRESSURE DIFFERENTIAL COMPARED TO
SURROUNDING ROOMS.
POSITIVE PRESSURE DIFFERENTIAL COMPARED TO
SCANNING ROOM AND CONTROL ROOM.
1. THE CONTRACTOR IS TO UTILIZE THE PATH OF TRAVEL INDICATED ON
THESE PLANS FOR ACCESSING THE AREAS TO BE RENOVATED. NO
OTHER AREA WITHIN THE HOSPITAL IS TO BE ENTERED OR USED BY THE
CONTRACTOR WITHOUT THE WRITTEN PERMISSION OF THE HOSPITAL’S
AUTHORIZED REPRESENTATIVE.
2. THE CONTRACTOR SHALL PROVIDE A CONSTRUCTION ACCESS POINT AS
WELL AS THE PROPOSED HOURS OF OPERATION AND CONSTRUCTION
STAGING AREAS PRIOR TO THE START OF CONSTRUCTION FOR THE
REVIEW AND APPROVAL OF MOUNT SINAI MEDICAL CENTER.
3. THE CONTRACTOR IS TO COMPLY WITH THE INFECTION CONTROL
REQUIREMENTS AS DEFINED IN THESE DOCUMENTS AND AS PROVIDED
IN THE INSTRUCTIONS TO BIDDERS.
4. INSTALL TEMPORARY UPRIGHT SPRINKLERS PRIOR TO CEILING
REMOVAL TO ALLOW FOR CONTINUED SPRINKLER PROTECTION WITHIN
THE CONSTRUCTION AREA.
5. DOCUMENT THAT THE FIRE PROTECTION DURING CONSTRUCTION MUST
COMPLY WITH VA MASTER CONSTRUCTION SPECIFICATIONS. (NOTE:
SPECIFICATION SECTION 01 35 26, SAFETY REQUIREMENTS, ADDRESSES
NFPA 241, JOINT COMMISSION INTERIM LIFE SAFETY MEASURES, HOT
WORK PERMITS, ETC..)(VAFPDM SECTION 1.4)
THIS PROJECT HAS BEEN DETERMINED TO REQUIRE TYPE 'D' CLASS 'IV' HIGHEST RISK
GROUP PRECAUTIONS TO PROTECT THE INHABITANTS OF THE FACILITY DURING THE
CONSTRUCTION PROCESS. THE GENERAL CONTRACTOR, SUBCONTRACTORS AND
STAFF WILL BE REQUIRED TO COMPLY WITH THE HOSPITALS CIRTERIA AND
PROCEDURES FOR INFECTION CONTROL AND CONTAINMENT OF CONTAMINANTS
DURING THE CONSTRUCTION PROCESS. THE CONTRACTOR WILL BE PROVIDED WITH
THESE REQUIREMENTS AS PART OF THE CONTRACT DOCUMENTS AND WILL BE
REQUIRED TO PROVIDE ALL NECESSARY MATERIALS, EQUIPMENT AND LABOR AS PART
OF HIS BID TO INSURE THE REQUIREMENTS ARE ACHIEVED. THE CONTRACTOR WILL BE
REQUIRED TO UTILIZE THE METHOD OF ACCESS AND EGRESS AS INDICATED ON THE
CONSTRUCTION ACCESS PLANS. ALL CONSTRUCTION MATERIALS ARE TO BE
ENCLOSED OR CONTAINED WHILE BEING TRANSPORTED WITHIN THE HOSPITAL. THE
CONTRACTOR WILL BE REQUIRED TO THOROUGHLY CLEAN AND POLICE ALL AREAS
UTILIZED BY THE CONTRACTOR FOR DELIVERIES, STAGING, STORAGE, TRANSPORTING
AND CONSTRUCTION. NO EXTERIOR OR INTERIOR AREAS SHALL BE LEFT WITH
UNSUPERVISED CONSTRUCTION MATERIALS OR DEBRIS. THE CONTRACTOR WILL BE
REQUIRED TO PROTECT AND CLEAN ALL EXTERIOR AND INTERIOR AREAS UTILIZED
FOR THE CONSTRUCTION PROCESS IMMEDIATELY AFTER USE.
INFECTION CONTROL REQUIREMENTS
TEMPORARY CONSTRUCTION WALL
WITH ACROVYN
AE-600
ST
STERILE SCOPE
STORAGE
NEW SCOPE
PROCESS AREA
CONSTRUCTION CORRIDOR
STORAGE AREA
9'-0"
TEMPORARY CONSTRUCTION WALL
WITH ACROVYNSCOPE OF WORK
CONTRACTOR ROUTE PROPOSED
PATHWAY FOR REMOVAL OF DEBRIS
AND CONSTRUCTION ACCESS
PROPOSED STERIL SCOPE PATHWAY FROM
EXISTING AER'S TO STERILE SCOPE
CABINETS DURING CONSTRUCTION
E X
IS
T
IN
G
L O
A D
IN
G
D O
C K
N
TRUE
NORTH
REVISIONS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
FMS
Project and
Section
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CD(100%CD-ISSUE FOR BID) SUBMITTAL - 04/22/2024
672-22-810
KEY PLAN NTS
PROJECT LOCATION
VA PROVIDE HIGH LEVEL
DISINFECTION FOR SPS
10 CALLE CASIA - ADM. BLDG. SUITE
4M456 SAN JUAN, PR 00921-3201
/2
/2
:5
:4
A
M
PROPOSED DEBRIS REMOVAL
LS-002
04/22/2024 RSM PJG
CD(100%CD-ISSUE FOR BID)
3/16" = 1'-0"2
ENLARGED PLAN DURING CONSTRUCTION
NOTE: AFTER COMPLETION OF CONSTRUCTION G.C. SHALL DEMOLISH
THE CORRIDOR AND RESTORE AREA TO MATCH EXISTING STERILE STORAGE
NOTE: STAFF SHALL TRANSPORT STERILE SCOPE USING PATHWAY SHOWN IN PLAN,
ALL STERILE SCOPES TO BE TRANSPORTED USING CLEAN SCOPE TRANSPORTATION SYSTEM
NOTE: ALL ACCESS FOR CONSTRUCTION SHALL BE FROM LOADING DOCK AS SHOWN IN PLAN,
ALL CONSTRUCTION DEBRIS SHALL BE REMOVED VIA THE SAME ACCESS PATH USED FOR
CONSTRUCTION ACCESS
G.C. SHALL COORDINATE WITH COR (TYP.)
N T
R U
E N
O R
T H
1" = 20'-0"1 Proposed Debris Plan
REMOVE EXISTING
PASS THROUGHT UNIT
TEMP WALL TO BE INSTALLED BEFORE ANY
WORK IS DONE, USE NEOPRENE GASKETS AT
ALL SEALS, & COORDINATE WITH MECH FOR
NEG PRESSURE DIFERENTIAL
NEW DOOR TO BE
INSTALLED AT EXISTING
FRAMED OPENING
EXISTING
AER
EXISTING
AER
WALL MOUNTED DEVICE
TO REMAIN
WALL MOUNTED DEVICE
TO REMAIN
ACROVYN WALL FINISH
FLOOR TO CEILING (TYP)
ACROVYN FROM FLOOR
TO CEILING
TEMP WALL TO BE INSTALLED BEFORE ANY WORK IS DONE.
USE NEOPRENE GASKETS AT
ALL SEALS, & COORDINATE WITH MECH FOR NEG
PRESSURE DIFERENTIAL.
TEMP GWB & METAL STUD WALL WITH ACROVYN ON
STERILE STORAGE SIDE. SEE LS-002.
EXISITNG DECONTAMINTAION AREA
CONSTRUCTION COORIDOR
SCOPE HLD
PROCESSING AREA
SCOPE STERIL
STORAGE AREA
REAGENT WATER
GENERATION
MECHANICAL
ROOM
C-1D
SPS SOILED AREA
C-1
TEMPORARY
CORRIDOR
102 ENVIRONMENTAL
STOCK ROOM
C-5J
TEMP WALL TO BE INSTALLED BEFORE
ANY WORK IS DONE, USE NEOPRENE
GASKETS AT ALL SEALS, &
COORDINATE WITH MECH FOR
NEG PRESSURE DIFERENTIAL
REVERSE EXISTING DOOR
SWING. G.C. TO
COORDINATE.
G.C. SHALL CUT WALL
FOR CONSTRUCTION
ACCESS
INSTALL FRAMED OPENING PER
DOOR SCHEDULE. AFTER TEMP
WALL IS BUILT AND BEFORE ANY
OTHER CONCTRUCTION
CONTINUES IN AREA
DEMO TEMP WALL ONLY AFTER
COMPLETION OF NEW DIVIDING PARTION
AND INSTALLATION OF NEW AER UNITS PER
PROPOSED FLOOR PLAN
AER
DEMO EXISTING AER UNITS
COORDINATE WITH ELEC AND
MECH FOR PASSTHROUGHS
EXISITNG DECONTAMINATION AREA
CONSTRUCTION COORIDOR
WALL TO BE DEMOLISHED AFTER
CONSTRUCTION IS COMPLETE
SEE LS-002
PROPOSED POST
CONSTRUCTION
PROPOSED POST CONSTRUCTION
SEE AE-101B
AER
NEW DOOR TO BE
INSTALLED AT EXISTING
FRAMED OPENING.
SEE HARDWARE SCHEDULE.
G.C. SHALL PROVIDE 4'-0"
TEMPORARY DOOR FOR
CONSTRUCTION ACCESS.
LOCKSET BY G.C.
TEMPORARY
CORRIDOR
SCOPE STERIL
STORAGE AREA
SCOPE HLD
PROCESSING AREA
REAGENT WATER
GENERATION
MECHANICAL
ROOM
C-1D
ENVIRONMENTAL
STOCK ROOM
C-5J
SPS SOILED AREA
C-1
WALL TO BE DEMOLISHED AFTER
CONSTRUCTION IS COMPLETE
SEE LS-002
+/- 1' -9"6" 3' - 4"
- EXISTING WALL
- NEW WALL
- TEMP WALL
LEGEND
- DEMOLITION
N
TRUE
NORTH
REVISIONS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
FMS
Project and
Section
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CD(100%CD-ISSUE FOR BID) SUBMITTAL - 04/22/2024
672-22-810
KEY PLAN NTS
PROJECT LOCATION
VA PROVIDE HIGH LEVEL
DISINFECTION FOR SPS
10 CALLE CASIA - ADM. BLDG. SUITE
4M456 SAN JUAN, PR 00921-3201
/2
/2
:5
:4
A
M
DEMO PLAN
AE-101A
04/22/2024 RSM PJG
CD(100%CD-ISSUE FOR BID)
DEMOLITION NOTES ARCHITECTURAL
1 REFER TO SPECIFICATION SECTION 02 41 00 FOR ITEMS TO BE REMOVED AND
SALVAGED ACCORDING TO INITIAL WALK-THRU WITH USERS.
2 HALF-TONE NOTES AND DIMENSIONS ARE PROVIDED FOR INFORMATION ONLY
3 DASHED BOLD LINES INDICATE EXTENT OF DEMOLITION INCLUDING BUT NOT
LIMITED TO THE FOLLOWING:
A. INTERIOR PARTITIONS (REMOVE TO STRUCTURE)
B. CEILING - INCLUDING CURTAIN TRACKS, I.V. TRACKS, SUSPENSION SYSTEMS,
APC SYSTEM, MISC. STEEL SUPPORTS FOR SUSPENSION EQUIPMENT, SUSPENDED
EQUIPMENT, LIGHT FIXTURES (SEE ELECTRICAL), DIFFUSERS AND GRILLES (SEE
MECHANICAL)
C. FLOOR FINISHES TO CONCRETE, INCLUDING, CARPET, VCT, SHEET VINYL,
CERAMIC TILE, ETC
D. DOORS, DOOR FRAMES, HARDWARE, INTERIOR WINDOW FRAMES AND GLAZING
E. FIRE EXTINGUISHERS
F. EQUIPMENT ITEMS (SEE MECHANICAL AND ELECTRICAL)
G. CABINETWORK, SINKS, COUNTERS AND SHELVES
H. TACKBOARDS, MARKERBOARDS AND PEGBOARDS
4 EXISTING SURFACES DISTURBED BY NEW CONSTRUCTION SHALL BE PATCHED AND
FINISHED TO MATCH ADJACENT SURFACES.
5 SCHEDULING OF WORK SHALL BE DIRECTED BY OWNER
6 THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION OF EXISTING
STRUCTURES SURROUNDING THE CONTRACT AREA. DAMAGE TO EXISTING
STRUCTURES OR EQUIPMENT SHALL BE REPAIRED AT NO ADDITIONAL COST TO
THE OWNER
7 THE CONTRACTOR SHALL VERIFY EXISTING CONDITIONS PRIOR TO
COMMENCEMENT OF WORK. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT AND
OWNER PRIOR TO REMOVAL OF MATERIAL OR EQUIPMENT NOT INDICATED ON THE
DRAWINGS TO BE REMOVED
8 THE CONTRACTOR TO CONFIRM WITH OWNER THE LOCATION OF TEMPORARY
PARTITIONS ENCLOSING THE DEMO AND CONSTRUCTION SITE
9 WHERE CHEMICALLY ABATED BY OTHERS, CONCRETE FLOOR TO BE SHOT BLASTED
FOR ADHERENCE OF FLOORING
10 DISPOSE OF ALL REMOVED MATERIALS OFF SITE IN ACCORDANCE WITH ALL
FEDERAL, STATE & MUNICIPALITY LEGAL JURISDICTIONS
11 DEMOLITION WORK CAUSING LOUD NOISE OR VIBRATION DISRUPTIVE TO FACILITY
AS DEEMED BY THE OWNER SHALL BE COORDINATED WITH THE OWNER REP
12 ALL EXISTING FLOOR OPENINGS, PIPE PENETRATIONS, ETC. CURRENTLY EXPOSED
OR UNCOVERED DURING WORK WHETHER NEW OR EXISTING ARE TO BE FILLED-IN
AS REQUIRED TO ACCEPT NEW WORK WITH CONCRETE FILL OR FIRESTOPPING
13 SEE ROOM FINISH SCHEDULE. REMOVE ALL EXISTING FINISHES IN ROOMS TO
RECEIVE NEW FINISHES
14 SEE REFLECTED CEILING PLANS AND ROOM FINSH SCHEDULE FOR EXTENT OF NEW
CEILING CONSTRUCTION OR CEILING PATCHING IN EXISTING AREAS
15 FOR ADDITIONAL DEMOLITION,SEE STRUCTURAL, MECHANICAL AND ELECTRICAL
DRAWINGS.
16 SALVAGE DOORS AS REQUIRED FOR REUSE WHERE INDICATED. VERIFY FUNCTION
AND CONDITION OF DOOR IS ACCEPTABLE FOR REUSE.
17 VERIFY EXTENT OF DEMOLITION OF FRAMING NEEDED WITH FRAMING DESIGN
PRIOR TO REMOVAL, FRAMING MAY BE ABLE TO REMAIN IN PLACE, TYPICAL ALL
HATCHED DEMO WALLS
18 G.C. SHALL FOLLOW ILSM AS PROVIDED BY COR TO INCLUDE BUT NOT LIMITED TO A
FIRE WATCH WHILE PORTION OF THE CEILING IS OPEN AND THE FIRE SPRINKLER
SYSTEM IS DISABLED.
19 CONTRACTOR SHALL FOLLOW ALL ICFA PROTOCOL AS STIPULATED BY COR.
1/2" = 1'-0"1 Demolition Phase 1
1/2" = 1'-0"2 Demolition Phase 2
AE-405
Scope HLD
Processing Area
Scope Sterile
Storage Area
8'-11 1/2"
(2) NEW SCOPE
STORAGE CABINETS
RELOCATED STERIL TABLE
New AER units
AE-4052
E L E
V A
T
IO
N D
E C
O N
T A
M
IN
A T
IO
N
S
ID
E
AE-405 4
E L E
V A
T
IO
N S
T E
R
IL
E S
ID
E
S T
E R
IL
E
S
ID
E
AE-405
5 ELEVATION
WALL
OUTSIDE
DECONTAMINATION
NEW DOOR IN
EXISTING OPENING
NO DOOR. OPEN
ACCESS TO
DECONTAMINATION
AREA.
EXISTING DECONTAMINATION AREA
WALL INFILL PLASTER AND
PATCH TO MATCH EXISTING WALL
R .O
/4
CR 1
DOOR TO BE REMOVED & WALL TO BE
PATCHED TO MATCH EXISTING
CONDITION AFTER CONSTRUCTION
ACCESS IS NO LONGER REQUIRED.
SCA
SCA
PER DIRECTOR MELINA NAVARRO-RODRIGUEZ , THIS
PASS-THRU UNIT IS REQUIRED BASED ON PROPOSED
STERILIZATION PROCESSES. NEW PASSTHROUGH
LOCATED ABOVE ACCESS PANELS.
SEE 2/AE-405
SPS SOILED AREA
/1
/1
10' - 7 15/16"
WALL MOUNTED
EYEWASH, HANDS FREE
LAVATORY
PAPER TOWEL
DISPENSER
HAND SANIZITER
DISPENSER
5' - 4 15/16"
EXPOXY WALL
FINISH (TYP.)
NEW EPOXY FLOOR
FINISH WITH
BROADCAST GRIT
FINISH (TYP.) AND
INTEGRAL 6" COVE
BASE
NEW HUB DRAIN
(SEE PLUMBING)
STAINLESS STEEL
WRAP AROUND FRAME
AT FRAME OPENING,
G.C. TO COORDINATE
3' - 4"
ROUGH OPENING
CURRENT SCOPE
STORAGE
EXISTING DECONTAMINATION AREA
EXISTING PASS
THROUGH UNIT
EXISITING
FRAMED OPENING
EXISTING DOORS TO BE REMOVED
AT COMPLETION OF CONSTRUCTION
SCOPE STORAGE
C-1A
SPS SOILED AREA
C-1
EXISTING TABLE
TO BE REMOVED
EXISTING TABLE
TO BE RELOCATED
EXISTING TABLE
TO BE REMOVED
EXISTING CABINET
TO BE REMOVED
EXISTING CABINET
TO BE REMOVED
EXISTING CABINET
TO BE REMOVED
EXISTING CABINET
TO BE REMOVED
EXISTING EYE WASH
TO BE REMOVED
LEGEND
ACROVYN WALL FINISH
EXISTING WALL TO BE DEMOLISHED
EPOXY PAINT WALL FINISH
N
TRUE
NORTH
REVISIONS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
FMS
Project and
Section
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CD(100%CD-ISSUE FOR BID) SUBMITTAL - 04/22/2024
672-22-810
KEY PLAN NTS
PROJECT LOCATION
VA PROVIDE HIGH LEVEL
DISINFECTION FOR SPS
10 CALLE CASIA - ADM. BLDG. SUITE
4M456 SAN JUAN, PR 00921-3201
/2
/2
:5
:4
A
M
PROPOSED FLOOR PLAN
AE-101B
04/22/2024 RSM PJG
CD(100%CD-ISSUE FOR BID)
1/2" = 1'-0"2
PROPOSED FLOOR PLAN
1/2" = 1'-0"1
EXISTING FLOOR PLAN
GENERAL NOTES ARCHITECTURAL
A. PARTITION AND WALLS
1 DIMENSIONS ARE TO FINISH FACE OF PARTITIONS, FACE OF EXISTING
FINISH OR CENTER LINE OF COLUMNS UNLESS SHOWN OR NOTED
OTHERWISE. ALL EXISTING DIMENSIONS ARE BASED ON EXISTING
DRAWINGS BUT MUST BE VERIFIED IN FIELD.
2 ALL PARTITIONS SHALL EXTEND FROM FLOOR TO UNDER SIDE OF DECK
ABOVE EXCEPT WHERE NOTED OR SHOWN OTHERWISE.
3 EXTEND ALL SOUND RATED PARTITIONS TO THE UNDER SIDE OF DECK
ABOVE TO PREVENT SOUND TRANSMISSION. FURNISH 4-1/4 POUNDS
DENSITY GLASS FIBER INSULATION SHAPED TO FIT THE VOID ABOVE THE
PARTITION WHERE AIR-BORNE SOUND CAN PENETRATE SPACES.
4 FOR LOCATIONS OF FIRE-RATED PARTITIONS SEE LS-101 AND LS-102
5 CONTROL JOINTS SHALL BE PROVIDED ABOVE DOORS AT EACH SIDE IN
STUD AND GWB PARTITIONS.
6 EXPANSION JOINTS AT ALL FLOORS, CEILINGS AND WALLS THAT ARE
EXPOSED TO VIEW SHALL BE COVERED WITH EXPANSION JOINT COVERS
APPROPRIATE FOR FINISHED SURFACES.
7 ALL COLUMNS WITHIN FINISHED SPACES SHALL BE FINISHED WITH SAME
MATERIALS SCHEDULED AT WALLS UNLESS OTHERWISE SHOWN OR
DETAILED.
8 PROVIDE ALL WALL AND FLOOR OPENINGS FOR MECHANICAL AND
ELECTRICAL ITEMS. ALL OPENINGS MORE THAN 16 INCHES WIDE IN
MASONRY PARTITIONS SHALL HAVE LINTELS AS SCHEDULED ON THE
STRUCTURAL DRAWINGS.
9 PROVIDE CORNER GUARDS AT ALL OUTSIDE CORNERS.
10 PROVIDE MOLD-RESISTANT GWB AT BUILD-OUT, TYPICAL.
11 FOR WALL PARTITION TYPES, SEE SHEET AE-600..
B. DOORS AND FRAMES
1 PROVIDE LABELS ON DOORS AND FRAMES WHERE SCHEDULED.
2 INSTALL CONTINUOUS CAULKING AROUND METAL FRAMES UNLESS NOTED
OTHERWISE.
3 HOLLOW METAL FRAMES SHALL BE ANCHORED TO THE STRUCTURAL
FLOOR WITH A MINIMUM OF TWO (2) ANCHOR BOLTS.
4 HOLLOW METAL FRAMES IN STUD PARTITIONS SHALL BE FILLED WITH
GROUT TO THE DEPTH OF THE FRAME ANCHOR FULL HEIGHT FOR SOUND
DAMPENING BEFORE SETTING IN PLACE.
5 INSTALL CASING BEADS AND CAULK WHERE GWB ABUTS METAL FRAMES.
6 DOOR TYPES AND SIZES ARE SHOWN ON SHEET AE-600.
C. MISCELLANEOUS
1 SEE PHYSICIST'S REPORT FOR SHIELDING REQUIREMENTS INCLUDING
LOCATIONS AND MINIMUM LEAD THICKNESS FOR SURFACES.
LEGEND
NEW CEILING
DEMOLISHED CEILING
2'X2' SUPPLY REGISTER
2'X2' RETURN REGISTER
2'X4' LED LIGHT FIXTURE
SCOPE OF WORK
DEMO EXISTING CEILING
LIGHTS & ACCESS PANEL IN
PREPARATION
FOR NEW CEILING @ 8'-0" A.F.F.
COORDINATE LIGHT FIXTURE
REMOVAL W/ELECTRIC
G.C. SHALL CONSTRUCT TEMP WALL
PRIOR TO REMOVING PORTION OF
CEILING
G.C. TO DEMOLISH AND REPLACE
EXISTING ACCESS PANEL WITH
NEW GASKET TYPE ACCESS PANEL
WALL MOUNTED
DEVICE TO REMAIN
WALL MOUNTED
DEVICE TO REMAIN
SP
SP
SP
SP
5' - 10 1/8"
EXISTING
ACCESS
PANEL
EXISTING
ACCESS
PANEL
EXISTING
ACCESS
PANEL
BALL-M-WALL
PRESSURE SENSOR
EXISTING SUPPLY
DIFFUSER TO BE
DEMOLISHED. SEE
MECHANICAL
EXISTING EXHAUST GRILLE
TO BE DEMOLISHED. SEE
MECHANICAL.
THERMOSTAT TO REMAIN
T
DEMOLISH EXISTING LIGHT
FIXTURE
DEMOLISH EXISTING LIGHT
FIXTURE
/1
/4
COORDINATE DIMENSIONS
AROUND LIGHT FIXTURES
ST
SCOPE HLD
PROCESSING AREA
REAGENT WATER
GENERATION
MECHANICAL
ROOM
C-1D
SCOPE STERIL
STORAGE AREA
SPS SOILED AREA
C-1
/1
/8
/8
9' - 6"
G.C. SHALL REMOVE ENTIRE
CEILING AS INDICATED AND
REPLACE WITH NEW 5/8"
GWB CEILING.
TEMP. WALL. SEE DEMO
PLAN 2/AE-101A.
TEMP. WALL. SEE DEMO
PLAN 2/AE-101A.
G.C. SHALL CUT IN ALL
REQUIRED INFRASTRUCTURE TO
SUPPORT SUPPLY & RETURN
DIFFUSERS. SEE MECHANICAL
G.C. SHALL CUT IN ALL
REQUIRED INFRASTRUCTURE TO
SUPPORT SUPPLY & RETURN
DIFFUSERS. SEE MECHANICAL
G.C. TO DEMOLISH AND REPLACE
EXISTING ACCESS PANEL WITH
NEW GASKET TYPE ACCESS PANEL
2' - 5 3/4"
NEW GWB WALL SHALL BE
6" ABOVE NEW 9'-0" CEILING
(TYP)
NEW 2'X 4' RECESSED
CEILING MOUNTED LIGHT
FIXTURE (SEE ELEC)
EXISTING CEILING
SP
SP
EXISTING DECONTAMINATION AREA
NEW SUPPLY
REGISTER
SEE MECH
SP
SP
REAGENT WATER
GENERATION
MECHANICAL
ROOM
C-1D
ENVIRONMENTAL
STOCK ROOM
C-5J
SPS SOILED AREA
NEW 2'X 4' RECESSED
CEILING MOUNTED LIGHT
FIXTURE (SEE ELEC)
/4
/4
/8
/1
8 1/4" 1' - 8" 6' - 7"
/1
2' - 3"
NEW SUPPLY
REGISTER
SEE MECH
NEW RETURN
REGISTER
SEE MECH
4"
4"
NEW RETURN
REGISTER
SEE MECH
NEW ACCESS PANEL
WITH GASKET. LARSENS
L-GD OR EQUAL.
NEW ACCESS PANEL
WITH GASKET. LARSENS
L-GD OR EQUAL.
NEW ACCESS PANEL
WITH GASKET. LARSENS
L-GD OR EQUAL.
NEW ACCESS
PANEL WITH
GASKET. LARSENS
L-GD OR EQUAL.
NEW ACCESS
PANEL WITH
GASKET. LARSENS
L-GD OR EQUAL.
2' - 2"
NEW 5/8" GWB CEILING
NEW ACCESS
PANEL WITH
GASKET. LARSENS
L-GD OR EQUAL.
NEW 2'X 4' RECESSED
CEILING MOUNTED LIGHT
FIXTURE (SEE ELEC)
NEW 2'X 4' RECESSED
CEILING MOUNTED LIGHT
FIXTURE (SEE ELEC)
WALL MOUNTED
DEVICE TO REMAIN
WALL MOUNTED
DEVICE TO REMAIN
BALL-M-WALL
PRESSURE SENSOR
N
TRUE
NORTH
REVISIONS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
FMS
Project and
Section
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CD(100%CD-ISSUE FOR BID) SUBMITTAL - 04/22/2024
672-22-810
KEY PLAN NTS
PROJECT LOCATION
VA PROVIDE HIGH LEVEL
DISINFECTION FOR SPS
10 CALLE CASIA - ADM. BLDG. SUITE
4M456 SAN JUAN, PR 00921-3201
/2
/2
:5
:4
A
M
REFLECTED CEILING PLAN
AE-122A
04/22/2024 RSM PJG
CD(100%CD-ISSUE FOR BID)
1/2" = 1'-0"1
CEILING DEMO PLAN
NOTE:
COORDINATE ACCESS PANEL WITH LIGHTING AND HVAC
1/2" = 1'-0"2
PROPOSED REFELCTED CEILING PLAN
NOTE:
FIRE SPRINKLERS TO CONFORM WITH 61G15 DESIGN
SEE PLUMBING FOR LAYOUT AND DETAILS
G.C. COORDINATE FOR FIRE SPRINKLERS WITH ENGINEER
R.O.
12"-9" +/- 6"
AER MACHINE
PER MFR
AER MACHINE
PER MFR
AER MACHINE
PER MFR
PASSTHROUGH
/4
/4
STERILE CLEANING TABLE
CLOCK
DRYING CABINETS
LAVATORY
PAPER TOWEL
DISPENSER
EYEWASH
SOAP DISPENSER
17' - 8 11/16"
1' - 0"
AER PER MFR
FLOOR FRAIN UNDER EACH AER UNIT
SEE PLUMBING FOR LOCATION AND DETAILS
NEW GWB
CEILING
EXISTING GWB CEILING
EXISTING CONC SLAB
NEW PARTITION WALL
WITH NEOPRENE GASKET
AT ALL SEAMS
PROVIDE NEOPRENE SEAL
AT CEILING
R.O / AER PERIMETER
SEAL KIT BY AER MFR
NEW ACCESS PANEL. ALIGN
WITH EDGE OF NEW AER
6" RUBBER BASE
EXISTING AER TO BE
REMOVED, G.C. SHALL
COORDINATE REMOVAL
AND DISPOSAL W/ CLIENT
(TYP.)
EXISTING TILE TO REMAIN
PROVIDE STAINLESS
STEEL "WRAP AROUND" ,
KNOCK DOWN FRAME AT
OPENING, G.C. SHALL
COORDINATE SIZE
REQUIREMENT
3' - 0"
G.C. SHALL SAWCUT
TILE AND REMOVE
LOWER PORTION OF
WALL TO CREATE
OPENING
DEMO EXIST
PASS THRU UNIT
AND BOTTOM
PORTION OF
WALL TO
CREATE FRAMED
OPENING (TYP.)
CLEAR OPENING
C
L E
A R
O P
E N
IN
G
AER MACHINE
PER MFR
AER MACHINE
PER MFR
AER MACHINE
PER MFR
6" MACHINE SEALING
BORDER PER AER MFR
R.O.
12'-9" +/- 6"
PASSTHROUGH
17' - 8 11/16"
6" 4"
/4
/4
X
CHECK WALL TYPE
WALL NOT TO EXCEED 7"
MOLD RESISTANT CEMENT
GWB WALL BOARD
DOUBLE SIDED HEADER
(METAL STUD TYP.)
MANUF. CLOSER PANEL
(PROVIDED BY MANUF,
INSTALLED BY G.C.)
6" BATT INSULATION
SOUND ATTUNATION
S/S SCREWS AT 8" O/C
URATHANE SEALANT ALL
SIZES (TYP.)
3" NEOPRENE FOAM COMPRESSED
BETWEEN MEDIVATOR & WALL.
CONSTRUCTION G.C. TO
COORDINATE INSTALLATION OF
EQUIPMENT WITH MANUFACTURER
ADVANTAGE PLUS PASS-THRU MEDIVATOR
(PER MANUF OFCI)
X
CHECK WALL TYPE
WALL NOT TO EXCEED 7"
MOLD RESISTANT CEMENT
GWB WALL BOARD
DOUBLE SIDED HEADER
(METAL STUD TYP.)
MANUF. CLOSER PANEL
(PROVIDED BY MANUF,
INSTALLED BY G.C.)
6" BATT INSULATION
SOUND ATTUNATION
S/S SCREWS AT 8" O/C
URETHANE SEALANT ALL
SIZES (TYP.)
3" NEOPRENE FOAM COMPRESSED
BETWEEN MEDIVATOR & WALL.
CONSTRUCTION G.C. TO
COORDINATE INSTALLATION OF
EQUIPMENT WITH MANUFACTURER
ADVANTAGE PLUS PASS-THRU MEDIVATOR
(PER MANUF OFCI)
REVISIONS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
FMS
Project and
Section
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CD(100%CD-ISSUE FOR BID) SUBMITTAL - 04/22/2024
672-22-810VA PROVIDE HIGH LEVEL
DISINFECTION FOR SPS
10 CALLE CASIA - ADM. BLDG. SUITE
4M456 SAN JUAN, PR 00921-3201
/2
/2
:5
:4
A
M
INTERIOR ELEVATIONS AND
DETAILS
AE-405
04/22/2024 RSM PJG
CD(100%CD-ISSUE FOR BID)
1/2" = 1'-0"4
ELEVATION STERILE SIDE
1/2" = 1'-0"1
STERILE SIDE
3/4" = 1'-0"3
AER MANCHINE WALL SECTION
1/2" = 1'-0"5
ELEVATION WALL OUTSIDE DECONTAMINATION
1/2" = 1'-0"2
ELEVATION DECONTAMINATION SIDE
3" = 1'-0"6
HM FRAME DOOR DETAILS
3" = 1'-0"7
HM FRAME DOOR DETAILS
AE-405
AE-405
AE-405
PARTITION TYPE SYMBOL
PARTITION DESIGNATION 3M6C
FIRE
RATING
MATERIAL
NOMINAL
THICKNESS ** OPTION(S) ***
- 1 HR
- 2 HR
- 3 HR
- STUDS
- CMU
- CONCRETE
S
M
C
A
B
C
SUGGESTED
OPTIONS LIST
A - ACOUSTICAL INSULATION
B - BOTH FACES
C - GWB TO 6" ABOVE CEILING
D - DOUBLE WALL
H - SHAFTWALL
L - LEAD LINED (THICKNESS)
O - ONE FACE ONLY
P - PARTIAL HEIGHT PARTITION
R - RIGID INSULATION W/ GWB COVERING
(or RESILIENT CHANNEL)
S - SMOKE PARTITION / BARRIER
T - TEMPORARY PARTITION
Z - STAGGERED STUDS (ACOUSTICAL)
2 - 2 LAYERS GWB
* - DESIGNATION NOT INDICATED FOR NON-RATED PARTITIONS
** - DESIGNATION NOT INDICATED FOR PROJECT STANDARD
THICKNESS
*** - DESIGNATION NOT INDICATED IF OPTIONS ARE NOT APPLICABLE;
ONE OR TWO OPTION DESIGNATORS MAY BE USED.
- WOOD STUDSW
- LEAD LINER
ON STUDS
L
NON-RATED PARTITION
SCA
ACOUSTICAL
INSULATION W/
OPTION 'A' ONLY
3 5/8" METAL STUDS @ 16" OC W/
ACOUSTICAL INSULATION
(STC-49) W/ 5/8" GWB BOTH
SIDES TO STRUCTURE, 5/8" GYP
ON INTERIOR SIDE.
BASE AS
SCHEDULED
DECK BR'G VIF
SCAO 3 5/8" METAL STUDS @ 16" OC W/
ACOUSTICAL INSULATION
(STC-49) W/ 5/8" GWB ONE SIDE,
5/8" GYP ON INTERIOR SIDE.
NON-RATED PARTITION
5/8" TYPE X GWB
SO 3 5/8" METAL STUDS @ 16" OC
W/ 5/8" GWB ONE SIDE TO
STRUCTURE
BASE AS
SCHEDULED
STUD TRACK TO BE
INSTALLED 6"
ABOVE CEILING,
BRACE AS REQ'D.
5/8" GWB CEILING (TYP.)
NON-RATED PARTITION
SS 3 5/8" METAL STUDS @ 16" OC W/
5/8" GWB BOTH SIDES TO
STRUCTURE. SMOKE PARTITION
BASE AS
SCHEDULED
ACOUSTICAL INSULATION TO FILL
VOID BETWEEN DECKING AND
STUD TRACK. INSTALL
ACOUSTICAL SEALANT
CONTINUOUS. STUD TRACK TO
BE INSTALLED TO ALLOW
MOVEMENT.
NEOPRENE GASKET
BARRIER (TYP.)
NON-RATED PARTITION
BASE AS
SCHEDULED
3 5/8" METAL STUDS @ 16" OC
W/ ACROVYN ONE SIDE TO
STRUCTURE
ACROVYN; WALL
FINISH FROM FLOOR
TO CEILING WHERE
INDICATED
ST
5/8" TYPE X GWB
TRACK SCREWED INTO CEILING
NOTE: PROVIDE NEOPRENE GASKET BETWEEN
TOP OF TRACK AND CEILING
ACOUSTICAL INSULATION TO FILL
VOID BETWEEN DECKING AND
STUD TRACK. INSTALL
ACOUSTICAL SEALANT
CONTINUOUS. STUD TRACK TO
BE INSTALLED TO ALLOW
MOVEMENT.
TRACK SCREWED INTO
CEILING
NOTE: PROVIDE NEOPRENE
GASKET BETWEEN
TOP OF TRACK AND CEILING
CONTINUOUS STUD RUNNER
EXTEND EVERY 4TH STUD TO
UNDERSIDE OF DECK
3 5/8" METAL
STUD KICKER
3 5/8" METAL STUDS
FASTENED TO
STRUCTURE ABOVE
3 5/8" METAL
STUD KICKER
3 5/8" METAL STUDS
FASTENED TO
STRUCTURE ABOVE
3 5/8" METAL
STUD KICKER
3 5/8" METAL
STUD KICKER
CONTINUOUS STUD RUNNER
EXTEND EVERY 4TH STUD TO
UNDERSIDE OF DECK
5/8" GWB CEILING (TYP.)
5/8" GWB CEILING
(TYP.)
PROVIDE URETHANE
SEALANT AROUND
STUD OPENING WHERE
STUD PENETRATES
CEILING (TYP.)
3 5/8" METAL
STUD @ 16" O/C
METAL STUD
RUNNER PROVIDE
ANCHOR @ 2' -0" O/C
MAXIMUM
METAL STUD
RUNNER PROVIDE
ANCHOR @ 2' -0" O/C
MAXIMUM
METAL STUD
RUNNER PROVIDE
ANCHOR @ 2' -0" O/C
MAXIMUM
METAL STUD
RUNNER PROVIDE
ANCHOR @ 2' -0" O/C
MAXIMUM
PROVIDE URETHANE
SEALANT AROUND
STUD OPENING WHERE
STUD PENETRATES
CEILING (TYP.)
PROVIDE URETHANE
SEALANT AROUND STUD
OPENING WHERE STUD
PENETRATES CEILING (TYP.)
3 5/8" METAL
STUD @ 16" O/C
3 5/8" METAL
STUD @ 16" O/C
3 5/8" METAL
STUD @ 16" O/C
INTERIOR STUD GAGE AND SPACING CHART*
STUD WIDTH
DESIGN
THICKNESS
(GAGE)
STUD SPACING
(INCHES)
PARTITION HEIGHT
DEFLECTION VALUE 5 psf
BRACING
SPACING
WHERE OCCURSL/120 L/240 L/360
1 5/8"
0.0179" (25)
0.0312" (20)
0.0179" (25)
0.0312" (20)
0.0179" (25)
0.0312" (20)
0.0179" (25)
0.0312" (20)
0.0179" (25)
0.0312" (20)
2 1/2"
3 5/8"
4"
6"
16"
24"
16"
24"
16"
24"
16"
24"
16"
24"
16"
24"
16"
24"
16"
24"
16"
24"
16"
24"
10'-7"
9'-9"
12'-1"
11'-0"
13'-3"
11'-10"
16'-5"
14'-10"
15'-4"
13'-9"
20'-8"
18'-6"
17'-2"
15'-1"
23'-1"
20'-9"
19'-9"
16'-9"
30'-10"
27'-2"
8'-4"
7'-11"
9'-8"
8'-9"
11'-3"
10'-7"
12'-10"
11'-7"
14'-4"
13'-5"
16'-5"
14'-9"
15'-4"
14'-2"
18'-4"
16'-5"
19'-9"
16'-9"
24'-6"
21'-7"
8'-5"
7'-8"
9'-10"
9'-3"
11'-2"
10'-0"
12'-4"
11'-7"
14'-3"
12'-9"
13'-4"
12'-4"
15'-11"
14'-3"
17'-11"
16'-9"
21'-4"
18'-10"
4'-0" OC
4'-0" OC
4'-0" OC
4'-0" OC
6'-0" OC
6'-0" OC
6'-0" OC
6'-0" OC
8'-0" OC
8'-0" OC
8'-0" OC
8'-0" OC
8'-0" OC
8'-0" OC
8'-0" OC
8'-0" OC
10'-0" OC
10'-0" OC
10'-0" OC
10'-0" OC
GENERAL NOTES:
INTERIOR STUD CHART NOTES:
1. PROVIDE MINIMUM 0.0312" STUDS @ WALLS TO RECEIVE FINISH (TILE, STONE, WOOD, ETC).
2. PROVIDE MINIMUM 0.0312" STUDS @ JAMBS OF DOOR AND FIXED GLASS FRAMES, @
OPEN PARTITION ENDS, AND WHERE PARTITION IS TO RECEIVE WALL MOUNTED
SHELVES, CASEWORK, PLUMBING FIXTURES, ETC.
3. USE 5/8" FR GWB @ ALL FIRE-RATED PARTITIONS, ANCHOR W/ SCREWS @ 8" OC
ON EDGES @ 12" OC IN FIELD PER UL DESIGN NUMBERS LISTED.
4. SEE ALL SPECIFICATIONS FOR GWB REQUIREMENTS @ TOILETS AND ALL WET AREAS.
5. APPLIES TO POWER AND COMMUNICATIONS, ETC.
A) BACK-TO-BACK PLACEMENT OF OUTLET BOXES NOT PERMITTED.
B) PLUG ALL UNUSED KNOCK-OUTS IN OUTLET BOXES WITH KNOCK-OUT CAPS.
C) PROVIDE 'HILTI' FIRESTOP PUTTY PAD OR EQUAL TO OUTLET BOXES IN FIRE-RATED WALLS
OR WHERE OTHERWISE INDICATED.
D) DEPTH OF OUTLET BOX TO BE COMPATIBLE WITH STUD SIZES IN
ORDER TO ACCOMMODATE BOX PAD.
6. PROVIDE BLOCKING @ WALL HUNG CASEWORK, EQUIPMENT, SHELVES,
COUNTERTOPS, HEAVY WALL SCONCES, AND MAJOR ARTWORK.
* REFERENCE STEEL STUD MANUFACTURER ASSOCIATION'S STANDARDS
FOR SECTION PROPERTIES AND DESIGN OF STUD SIZE LISTED HERE.
USE L/240 DEFLECTION CHART FOR ALL AREAS UNLESS OTHERWISE NOTED.
METAL STUDS WITH
5/8" GWB
METAL RUNNER
HM FRAME
GROUT FULL
DOOR AS SCH
DOOR AS SCH
HM FRAME
GROUT FILLED
METAL STUDS WITH 5/8" GWB
H E
IG
H
T
A S
S C
H
W
ID
T H
A S
S C
H
A
HEAD
B
JAMB
2"
5 7/8"
2"
4 7/8"
CERAMIC CARPET/ COLOR Q1310-408
ASH/TOP COAT AQUARMOR WBU FLAT
CERAMIC CARPET/ COLOR Q1310-408
ASH/TOP COAT AQUARMOR WBU FLAT
SHERWIN WILLIAMS
GRAVEL WHITE
EPOXY PAINT
SHERWIN WILLIAMS
GRAVEL WHITE
EPOXY PAINT
SHERWIN WILLIAMS
GRAVEL WHITE
EPOXY PAINT
SHERWIN WILLIAMS
GRAVEL WHITE
EPOXY PAINT
SHERWIN WILLIAMS
GRAVEL WHITE
EPOXY PAINT
NORTH SOUTH EAST WEST
ROOM FINISH SCHEDULE
SCOPE HLD
PROCESSING AREA
EPOXY RESIN SAND RESIN AND PREP
TOP COAT FOR SMOOTH FINISH (TYP.)
6" EPOXY RESIN COVE BASE EPOXY PAINT EPOXY PAINT EPOXY PAINT EPOXY PAINT EPOXY PAINT
ROOM # ROOM NAME FLOOR BASE
WALLS
CEILING
DOOR AND FRAME SCHEDULE - NOTES
1. THE CONTRACTOR SHALL CAREFULLY STUDY ANND COMPARE THE CONTRACT DOCUMENTS AND THIS SCHEDULE AND SHALL REPORT IN WRITING TO THE ARCHITECT ANY ERROR, INCONSISTANCY OR OMISSION THAT HE MAY DISCOVER.
2. ALL FRAMES SHALL BE CAULKED CONTINUOUSLY TO THE WALL ON BOTH SIDES.
3. DOOR SHALL BE ARRANGED TO BE OPENED READILY FROM THE EGRESS SIDE WHENEVER THE BUILDING IS OCCUPIED.
LOCKS, IF PROVIDED SHALL NOT REQUIRE THE USE OF A KEY, TOOL, SPECIAL KNOWLEDGE, OR EFFORT FOR OPERATION
FROM THE INSIDE OF THE BUILDING AS PER NFPD.101 5-2.1.5.
4. ALL HOLLOW METAL FRAMES SHALL BE WELDED CONSTRUCTION, 'KNOCK-DOWN' TYPE HOLLOW METAL FRAMES WILL NOT
BE ALLOWED.
5. ALL TOP OF HOLLOW METAL FRAMES (DOORS & GLASS OPENINGS) TO ALIGN. FOR ADDITIONAL HORIZONTAL MULLIONS TO
GLASS OPENING FRAMES REFER TO INTERIOR ELEVATIONS AS NOTED ON THE DRAWINGS.
6. ALL EXTERIOR DOORS SHALL BE FULLY WEATHERSTRIPPED.
7. ALL DOOR AND FRAME TO BE PAINTED (SEE SPECS.)
8. VERIFY WITH OWNER HARDWARE STANDARDS. MATCH ALL OWNER STANDARDS.
9. ALL DOORS SHALL HAVE STOPS. (GYNN-JOHNSON 50C WALL &/OR FB-13 FLOOR)
10. ALL LATCHES SHALL BE LEVER.
11. ALL HARDWARE SHALL HAVE 626 SATIN CHROMIUM FINISH OR FINISH AS SELECTED BY OWNER.
12. ALL DOORS EXISTING AND NEW KEYED DOORS SHALL RECEIVE NEW LOCK CORES AND SHALL BE KEYED TO MASTER.
PROVIDE OWNER WITH 10 MASTER KEYS.
13. PROVIDE AND INSTALL BRUSHED S.S.KICK PLATES ON ALL PUSH SIDES OF DOORS 10' HIGH 2' L.D.W.
14. DOORS TO BE LOCKED BY ELECTRIFIED PANIC HARDWARE DEVICE TO PROVIDE POSITIVE LATCHING ON FIRE RATED DOOR.
LOCATE CARD READER ON STRIKE SIDE AND CONNECT TO ELECTRIC PANIC TO PROVIDE ENTRY. EGRESS WILL BE BY PANIC
FUNCTION AT ALL TIMES.
PRODUCT
SPECIFIED
MANUFACTURER
1. HINGES HAGER
2. LOCKS & LATCHES SCHLAGE
3. CYLINDERS, KEYS, KEYING SCHLAGE
4. EXIT DEVICES VON DURPIN
5. DOOR CLOSERS LCN
6. AUTO OPERATORS STANLEY
7. DH STOPS/HOLDERS GLYNN JOHNSON
8. MAGNETIC HOLD OPENS LCN
9. WALL STOPS/FLOOR STOPS, ROCKWOOD
FLUSHBOLTS
10. KICK PLATES ROCKWOOD
11. THRESHOLD/WEATHER-STRIP NATIONAL GUARD
12. SILENCERS IVES
13. COORDINATORS ROCKWOOD
14. ASTRAGALS PEMKO
DOOR AND FRAME SCHEDULE
DOOR DOOR HARDWARE
MARK
SIZE
WIDTH HEIGHT THICK MAT TYPE GLASS
UNDER
CUT
FRAME
MAT TYPE
DETAILS ON S-202
JAMB HEAD SILL
FIRE
RATING
LABEL
SET
NO.
KEYSIDE
SPACE
REMARKS
102 3'-0'' 7'-0'' 1-3/4'' HM F - HM S EXTCS - - 1 CARD READER - COORD W/ SECURITY & FACILITYCS-
DOOR FRAME TYPES
S
SINGLE DOOR H.M. FRAME
10" 3"
DOOR TYPES
F NV
HARDWARE SCHEDULE AND NOTES
SET NO.1
DOORS: B & C
3 - HINGES - 41/2''X41/2'' - BB1279 NRP
1 - STOREROOM LOCK - D80PD
2 - CLOSER - 4041
2 - SILENCERS - SR64
1 - WEATHER STRIPING - 160SDKB - 1-102A, 1-103A, R-100A ONLY
SET NO.2
DOOR: A
3 - HINGES - 41/2''X41/2'' - BB1279 NRP
1 - CLOSER - 4041
3 - SILENCERS - SR64
1 - FLOOR STOP - 441
1 - PRIVACY SET - D405
SECURE TO
STRUCTURE
ABOVE
SEISMIC BRACING
MAIN RUNNER
5/8" GWB CEILING
5/8" GWB TYPE X CEILING
CROSS RUNNER
SEISMIC BRACING
2"
45° 45°
45°
45°
45°
2"
WALL RUNNER
MAIN RUNNER
FINISHED WALL
HANGER WIRE SECURE TO STR ABOVE
5/8" GWB TYPE X CEILING
GENERAL NOTES:
1. G.C. SHALL COORDINATE WITH METAL FRAMING FABRICATOR.
FABRICATOR WILL PROVIDE SHOP DRAWING FOR ALL LIGHT
GAUGE FRAMING CONSTRUCTION (TYP.)
REVISIONS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
FMS
Project and
Section
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CD(100%CD-ISSUE FOR BID) SUBMITTAL - 04/22/2024
672-22-810VA PROVIDE HIGH LEVEL
DISINFECTION FOR SPS
10 CALLE CASIA - ADM. BLDG. SUITE
4M456 SAN JUAN, PR 00921-3201
/2
/2
:5
:5
A
M
PARTITION TYPES, DOOR
SCHEDULE AND DETAILS
AE-600
04/22/2024 RSM PJG
CD(100%CD-ISSUE FOR BID)
PARTITION TYPES LEGEND
PARTITION TYPES
GEN NOTES & SPACING CHART
HM FRAME DOOR DETAILS
Room Finish Schedule
Door and Frame Schedule - Notes
Door & Frame Schedule
Door Frame TypesDoor Types
Hardware Schedules & Notes
SEISMIC SUSPENSION SYSTEM DETAIL
SEISMIC GYP BD CLG DETAIL
| Sheets |
| AE-101A - DEMO PLAN |
| AE-101B - PROPOSED FLOOR PLAN |
| AE-122A - REFLECTED CEILING PLAN |
| AE-405 - INTERIOR ELEVATIONS AND DETAILS |
| AE-600 - PARTITION TYPES, DOOR SCHEDULE AND DETAILS |
| GI-001 - COVER SHEET |
| GI-002 - SHEET INDEX, GENERAL NOTES, SYMBOLS AND ABBREVIATIONS |
| LS-001 - LIFE SAFETY PLAN |
| LS-002 - PROPOSED DEBRIS REMOVAL |