This document is a comprehensive set of architectural construction drawings for a consolidated lodging facility in Minnesota. The drawings detail the 1st, 2nd, 3rd, and 4th floor plans, basement plans, utility plaza layouts, and various architectural details for what appears to be a multi-story commercial building project. The facility includes office suites, open office spaces, receiving and recycling areas, mechanical rooms, elevators, and associated infrastructure.
The drawings incorporate multiple design options and renovation specifications throughout the project. BID OPTION 1 addresses replacement of carpet and wall base in public spaces, including removal of existing carpet and adhesive, floor preparation, and installation of new materials with paint and wall base matching existing conditions. BID OPTION 2 involves repair of damaged sheetrock walls and preparation of surfaces for new paint, including skim coating and sanding. BID OPTION 3 addresses parking lot repairs, including crack sealing and asphalt surface repairs as needed. The drawings include detailed floor layouts with dimensional annotations, mechanical systems routing, fire-rated walls marked with "1 HR" designations, stairwells, restrooms, and loading areas. Key architectural elements such as accessible routes, corridor walls, electrical infrastructure, HVAC systems, and structural components are clearly marked. The facility design accommodates ADA requirements with appropriate elevator access and accessible features throughout multiple floors. The documentation indicates coordination between architectural, structural, mechanical, and electrical systems for a comprehensive building renovation or new construction project.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
I j i l I I l l l j i ' ' I I :j l I l I I I l I
I I
I l j l I l l
J
I l l I I l l I I ' 1 • i l i
I l l i I ! • I ' 1 l :i j l l
' l I J ' l ' j
I I l -1 i l l I I j I l l I l j
D
C
B
A r-,~ bl In -;_ ~ ~o .,., ,-..
0 a, ,,, 305 [1'-o"], I I 8636 [28'-4")
1829 [6'-o·J~~ L 2235 2110 1016 Jj< 1930 , 1 6'-4" f 8'-4"fs'-o 6'-4"
IM
26416 [86'-8"] 0 8534 [ 28' -0")
1930 6096
8636 [28'-4") 305 [1'-0")
3861 [12'-8"] 2235 1829 [6'-0"] s'-4"T 20·-o· 2438 8'-0"
{w 4D
8'-0"
.AS.5.
. AS.5.
@---1 1,---- I - L.
1H l ~ 5309 [1t-s"J
051 [10'-o"J l~tt !lo i\l -
TO DECK TO DECK L .J L3;'
'b I co N
:2 a, co N
• 0 I
"'"'------+----::;j -
I sj--~ a, 'ix>
' N I
0 :g I -
'i-., I
MECH. ~ J, II I A
(}§jDMECH. GRILLE, LOCATE 300
[1'-0"] FROM
FACE OF WALL•
ez.
1HR
CO!.IB!QQR • ii ThB ~-I j J ~~ lf
1QU_) - 0
lO DECK
H.IS-illl1..CE • 00 [ 1 O' -0"]
~ ~ 34 [2'-1"] co
H.K. 6 jillff_ <J.2!iJ=
.1
1") SUN. TO DECK RECEIVING &
ST R. TO OE~ RECYCLING
1013 .. (12!D
-1orrc >'-
I I
I , ~-~--eL.-~------- 1 HR 1 HRI ~ ----~~------~---·-~~ - 2i)h I J
·-·- : .,., .L.. I I......J,J • lfllJQ
,,I( 102
'' Ii i !
LL __
__0 :: - !1 - ---==-- -,, P7·---
- !! tHR r-"ll
' ' . 11 I""):
>i a.:
I( 11 __________ j' 025 v~G T:ll ri,,n~n, DF r-- ,a ,:= L--
I t; 1HR Pl ~
HRI ~
I 1HR
I ELEV.
lliV.
UP tt,ff, -0 -
OPEN
OFFICE
1 009/ OFFICE
I I I
I I \ :(L<>') I I _ .
I .
!Ill·~ ~L J. SIM
I I .1
I b I . -~
"" 0 ,,, b I
I ,.,. -~
"' I t N
N 00 ,,, OC)
1o
N
"" I
L
30s [r-o·j l 2438 8'-0"
'ix> I
"' N
"' 0 0, ' IJ ___ .,
1HR
cp 26416 [86'-8")
8636 [28'-4"] l 8534 [ 28' -0"]
'1 4267 [14'-0")
1930 [6'-4"]
4267 [14'-0"] _ w A3.1
1930 [6'-4") I i:
" II
" II
II
" il Ii
'' [r.::::::::::::.::::..::: .:;.:;..-:.::.-:. :::::.:-
I;
1:
·1• " ii I:!
'i
---c,cc,1
II 1, I 11
~ II Ii !I II n L_JG 5 c:=7-,~-== ~n 5 n
Q II II 1 11 I!
N -: ==-:i!::===:!c!:=:=::::I:!.!,::
1HR
FEC
--- - l- 1118 ~ fS'-4'.l 'I( [6'-6') 1 [5'-10"] 1
1626 1982
P3 P7
1HR1HR P6 1HR
l 8636 [28'-4"]
'1 4267 [14'-0") f,1
'I . ' ,,, " 111 1:1 ;11
·1· ! :
'1' I :1, '.
~~~1~~;:l
1930 [6'-4")
'' il
" " ii
- ..._ ___ J_l:-------1 r .... ~~-----"'
" 5 l
K 2438 L k305 [1'-0"] s·-o" ,., ,,, ~ 1:10' 'I'~•' 11 I'
, 'I ::i .. •~ :==' I \ii-~ 1626 et]
1HR
_1
SIM ~.,., __ _
£1.
1HR u1_;
<O -
'b I ,.,. -~
:c==== n 1t
·---.-.,,,,,..da·=--~=JL.J[~ cc~~ _w-tt~~ 11 ----- · --------- -r--- -r---- ~ U.J ;, ,. L I ' ,,
• J , -.._.,..-.
1HR -
0 5 ii _________ 5 r;:: tc====
ELEVATOR
.bQBfil'..
C.12QQ)
#1------•
1H< 11'--/
:7 -
II ,:
~ - --~-==41=--·==-- 0 .k===" J ti • -
II 0
/4
◊ PLAN KEY NOTES
NIC<J>
NORTH CORRIDOR WALL
2020 SHALL
MAINTAIN A 1HR RATING
REFER TO OPTIONAL PLAN
5B/A2.2 FOR INTERIOR WALLS
AND DOOR LOCATIONS .
FRAME AS REQUIRED
FOR ELECTRICAL
PANELS TO MAINTAIN A
1HR RATING.
PARTIAL INTERIOR WALLS
SHALL BE FRAMED WITHOUT
GYP BD. ROUGH IN AND
STUB OUT FOR FUTURE
FIXTURES
PROVIDE METAL STUD
FRAMING AS REQUIRED
FOR DOORS TO
CORRIDOR
PROVIDE P-TAC
UNITS UNDER BASE
BID THIS FLOOR
SLIDING GATE BID
OPTION
ACCESSIBLE DOOR
OPERATOR ON
PEDESTAL
0 FIRE ANNUNCIATOR
PANEL
qp STAINLESS STEEL
CORNER GUARDS
b I co N
.5B A2.11 A4.1
Ji- I ~ ' , r -----+'·"
0 c=
@D ,. '1 P1 c I
I ~ . ,- I ~ 1007 OFFICE
~I -1 a., : I : I ~
GV~
1:,, 0, I co N
"o
. . ' .. :1 ------~---------~, ------r---------,, ii
1 '>-----"l I
OPEN TO
BELOW
e__
1HR
'' 'I
'' 'i
II = +===-------'------
It--/ 1 6 ;;; .,., co , 1HRi ,u ' (_..!QQV : :~1~ G@)
===============,L,' c~"C I j 4JA FLOOR S TQR, I ····" -ir, ,.., r.;r., ,....---;;;--- OUTLETS
==7: : A .8 ____ ---- A7.1 FOR
P1
~ = 0, I g
I LJ (ii} ~,,l ~1 ~ ~t '°f¼- 11 i
0 Sc== , ==i : __ LOCATION~-::--♦-=--:-~ 1'1
L - -r=; ;:::'17 = ".:' -::. 7 =-- -·-.a,:- - - . --------':'.:l_ ____ - -=·::., - -L:.; -= "-"-"-"-"-"--~~
P2
1HR
i] D
,----\8
:t:' - E
1HR
MANAGER'S
.9ffl£t
CJQ2±..)
~ bM J l,._AS.11 ,-.. ~
N -0 I ~
~.._,,,~--- •• ----- -------- -------- ----. -·,- , •• t •... 1 ______ "'" -- . _______ LI -··----'-j""',,'J\;:-fi,-"~-; ------ - -- ---------- - - . 1" 1 •• •• ... • ' 1 ' I 1 ..J ·
PROVIDE LIGHT L! ' ___ 1 ___ j_ __ ..; ' --'-----i--- -a;i;,.,-t_ -- + -- ----f---7r- . ;2, c BRooM TExT.~RE or--. 1 , r 1 • ! ~1RE:t,1_A_N·~. . ... , . . . . ..... ___ 1,::._ 1 i ---·_'._J__-,,-,r--- ~
1 WITH 100 [ 4 ] -t-"·----- ___ .,_! ~, ••• • •• I OCKBOXI I lz '\ i -o , , z .,,,..,.__, r- , IPORCH "' ~ SMOOTH EDGE AS I I ' il!! r:-::-:-i [A,T 15241 : · a.
;;:; SHOWN
§I ~-, i l5' -0"] i ! .~ \, -f. ... J_µ. _ _j K .J :':'. ~ DRAIN. DAYLIGHT , SLOPE SLOPE I I [!; i I < SLOPE • SLOP£)
'° THROUGH WALL ·lf7:=,h~ ,,____ cc, -·--.. - .. ..,.,,~ .. -~ "···j- .... - .• -· ... ,.,,,. . .... , , ' N I . -~
TO GRADE. (2 -"I"~ -50 [2") ! < • TOP Ill' IS • 1 !
THUS) }--f'++-- -------1~-10-r ___ .~. -· ... ,.. -·--- '
- •.-••--l·i•· " •"'""-"""' •• ·•--•·'" - • ., •• _ •• , •• ---- ~~ .:'.'..,_.==:=.- ~~= - ---·· -- ·-·-·--- .,- •s.~~.•-··· •• ·-· ---· :
305 [ 1'-0"]-+---._ 7823 [25'-8") 838 [2'-8"}
99-0
"tesi
838 [2'-8"]
5B A2.11 A4.2 ...
838 [2'-8"] 838 [2'-8"] 7823 [25'-8"] ~ [ 1'-0"]
0 ,,, 0-co
'f...
N
S'
• N ...... - I --~ co
I sj--~ <O
' co I ,.,. -~
"" ';j: .,.
' "' I
00 .,. .... -
' .. :, !C ·-·- - -0 0--41
-~,+~c-c=----J: ~ iii, . ' 04; ' llll t-<' 6
I ~~EC
j:
C,9!l.filQQR
,-y· (<P ,.,
• _ _:_1.:..:._·..:..,J
Ii ip·-c:-:, C':.. ;_·_ ;_·:;.,;. ~.;· .;_--..;. _·..:; ..:.-f· _·.;;.·..;.--,.;:.;;.-:3 '--~
0 0 6
' (6 ''
05-·- -
1969 [6'-5 1/2"]-t>, J2844 [9'-4"],l 5791 [19'-0"] ,l
J; ')
I
1778 [5'-10·~ i 8941 [29'-4"] J 8941 [29'-4"] --+-1778 [5'-10"] ® SECOND FLOOR PLAN 1:100
@ ~ "tesi
ADHERED MEMBRANE ( ~
ROOF SLOPE AT 1 /8" 41 A2 ~l~4 2
® FIRST FLOOR PLAN
1: 100
~ • co
' IIIILU!,l,AGE ~ ,lc,024': , I
8 ! rn. 0--··r- ~ I ...
~ I
- !O:::
o.l"' -P4
~ • 0
I co N
~4.-----,1-1
J I 0
;:::., ··I . 0 -·· ~..,..- ..
~ J
"oo I
0 -~
!I
A.D.A;, SUlllt.
I I I I I I I
UP
I I" I ,o
I , ' I , J__
I LI
I I
L--=-~~
PIPE TRENCH
WliH CHECKERED PLAlE COVER
533 '[ 1' ':"9"]
8636 [ 28' -4") !
I 12547 [ 41'-2"] '
PER 1 '-0" (BASE • '
BID)
cp 8534 [ 28' -0")
---------1 FUTURE LOCATION
FOR SWITCH GEAR
SEE Cl"1L FOR --
DETAILS
PANEL '
~ L .-, dPEA GRAVELTRENCHI 'f AT PERIMETER OF , ~.. ,_ ; . I ~ TRANSfROMER I b I
N
1640 [5' -4")--r---.1
'CONDENSE
~--------- r ___ L _____ . ' ' _, . ,.,.. . ..,, I f J (
: J' ' i DUMPS1ER ! : OU PSTER :
I NIC ' NIC l ' ------------· L---1------..J
• ------------r--, i 12850 [9''...,f]! : 948 AN -
• ,I( ·- ··-
,,."' I l ', ,---,~ J , I I 11 \ ,: ·-----·····:t-··'
I I ; I CO I
~--- ... - --- - --'-r-- _.J
I ====::J
P? t-0 J0
D .,. 1~_r1> , ___ :J
,e; FEC
" " " " ld
':".t·.::-;;.~- 11-.-.-.-:-.. --J'l lf)
: i
! t
------i------ --, :· - • I . • , • • • ..
' " J 'I.;
J 5791 [19·-0·1 J2844 [9'-4"JJ d969 [6'-5 112·i
CONC. SLAB &
STOOP - SEE
STRUCTURAL
I
4000 2000 E' __ ··-il"
"I---
SCALE: 1
KEY PLAN
• 100
N
C)
,.,.:J
I hereby certify this drawing was prepared by me or under my direct supervision and that I om a duly registered architect under the laws of the State of Minnesota.
For:~chitr9~~r9'_ Ajliaj),Cf;
By: r!IU<, ~ VI..._.;
Title: Principal Registration No: 16854
ALL SCALES SHOWN ARE BASED ON A STANDARD DRAWING SIZE OF 28" X 40" OR
METRIC DRAWING SIZE OF 841 mm X 594mm. IF ANY OTHER SIZE DRAWINGS ARE
FURNISHED OR PLOTTED THE CONTRACTOR SHALL ADJUST THE SCALES ACCORDINGLY.
THE CONTRACTOR SHALL ALSO ADVISE HIS SUB-CONTRACTORS OF THE ABOVE.
Revisions Descriptions Date I Approved Symbol
{NONE) CONTRACT AWARD SET WITH AMENDMENTS & SCOPE CHANGES 9=24-99
Architect:
ARCHITECTURAL ALLIANCE
MINNEAPOLIS, MINNESOTA
Engineer:
MEAD & HUNT
MADISON, WISCONSIN
U.S. ARMY ENGINEER DISTRICT
CORPS OF ENGINEERS
OMAHA, NEBRASKA
D
C
B
(ii}--i- ~-'!<---L-. @·-+i=~~",.--
;,- Designed by: MINNEAPOLIS-ST.PAUL AFR MINNESOTA I A
@ FIRST FLOOR SUITE FINISHES - N.I.C.
1:100
I
SUITE A
I o
N r-,,, -
ENLARGED UTILITY PLAZA PLAN
1:100
111 I ss Drawn by:
PS
Checked by:
PS
Reviewed by:
CONSOLIDATED LODGING FACILl1Y
-PHASE ONE-
1 ST & 2ND FLOOR PLANS
AND UTILITY PLAZA
Plot Scale Ratio: 1: 1 Dote: Sheet Desion File: 7-26-99 [;<r,fMSJlr~e
• Spec. No.: I Drawing Code:
' Submitted by: DACA 45-99-R-0030
EO
Contract No.: AF 721-315-01 A2.1
DACA 45-99-C-0067
1 QJKL-990011
1238915046C Text Box BID OPTION 1: Replace carpet and wall base in public spaces.
Remove existing carpet and wall base. Remove carpet adhesive and prepare floor & base of wall for installation of new materials. Install new carpet tiles (TBD) and new wall base (match exist.)
1238915046C Callout BID OPTION 3: Repair sheetrock damage from leaking skylight & paint.
Repair damaged sheetrock at ceiling and west wall. Prepare surfaces for new paint, prime and paint to match existing. Paint the entire surface to a transition point, i.e. change in direction. Paint entire ceiling on west side to full bank of skylights.
Note: Skylights not shown on plan.
1238915046C Polygon
1238915046C Line
1238915046C Line
1238915046C Line
1238915046C Callout BID OPTION 2: Repair sheetrock walls and paint.
Repair damaged sheetrock and prepare surfaces for new paint. Skim coat and sand, clean, prime and paint to match exist.
1238915046C Line
1238915046C Callout BID OPTION 2: Repair sheetrock walls and paint.
Repair damaged sheetrock and prepare surfaces for new paint. Skim coat and sand, clean, prime and paint to match exist.
1238915046C Callout BID OPTION 2: Repair sheetrock walls and paint.
Repair damaged sheetrock and prepare surfaces for new paint. Skim coat and sand, clean, prime and paint to match exist.
1238915046C Callout BID OPTION 2: Repair sheetrock walls and paint.
Repair damaged sheetrock and prepare surfaces for new paint. Skim coat and sand, clean, prime and paint to match exist.
1238915046C Polygonal Line
1238915046C Line
1238915046C Line
1238915046C Text Box BID OPTION 1: Replace carpet and wall base in public spaces.
Remove existing carpet and wall base. Remove carpet adhesive and prepare floor & base of wall for installation of new materials. Install new carpet tiles (TBD) and new wall base (match exist.)
1238915046C Callout BID OPTION 4: Paint lobby walls.
Paint first floor walls of Lobby 1002 and Front Desk 1003 to match exist. color. Paint up to first horizontal sheetrock joint.
1238915046C Line
1238915046C Callout BID OPTION 4: Add wainscoting to cart storage area.
Provide and install 4' tall stainless steel wainscoting. Finish with wood trim at the top to match the adjacent hallway.
Text Box BID OPTION 1: Replace carpet and wall base in public spaces.
Remove existing carpet and wall base. Remove carpet adhesive and prepare floor & base of wall for new installation of new materials. Install new carpet tiles (TBD) and new wall base (match exist.)
1238915046C Polygonal Line
1238915046C Callout BID OPTION 2: Repair sheetrock walls and paint.
Repair damaged sheetrock and prepare surfaces for new paint. Skim coat and sand, clean, prime and paint to match exist.
BID OPTION 1: Replace carpet and wall base in public spaces.
Remove existing carpet and wall base. Remove carpet adhesive and prepare floor & base of wall for new installation of new materials. Install new carpet tiles (TBD) and new wall base (match exist.)
1238915046C Callout BID OPTION 2: Repair sheetrock walls and paint.
Repair damaged sheetrock and prepare surfaces for new paint. Skim coat and sand, clean, prime and paint to match exist.
Polygonal Line
BID OPTION 1: Replace carpet and wall base in public spaces.
Remove existing carpet and wall base. Remove carpet adhesive and prepare floor & base of wall for new installation of new materials. Install new carpet tiles (TBD) and new wall base (match exist.)
1238915046C Callout BID OPTION 2: Repair sheetrock walls and paint.
Repair damaged sheetrock and prepare surfaces for new paint. Skim coat and sand, clean, prime and paint to match exist.
Callout BID OPTION 4: Restore corroded stairwell railing.
1238915046C Text Box BID OPTION 1: Replace carpet and wall base in public spaces.
Remove existing carpet and wall base. Remove carpet adhesive and prepare floor & base of wall for new installation of new materials. Install new carpet tiles (TBD) and new wall base (match exist.)
1238915046C Polygonal Line
1238915046C Callout BID OPTION 2: Repair sheetrock walls and paint.
Repair damaged sheetrock and prepare surfaces for new paint. Skim coat and sand, clean, prime and paint to match exist.
BID OPTION 1: Replace carpet and wall base in public spaces.
Remove existing carpet and wall base. Remove carpet adhesive and prepare floor & base of wall for new installation of new materials. Install new carpet tiles (TBD) and new wall base (match exist.)
1238915046C Polygonal Line
1238915046C Callout BID OPTION 2: Repair sheetrock walls and paint.
Repair damaged sheetrock and prepare surfaces for new paint. Skim coat and sand, clean, prime and paint to match exist.
BID OPTION 1: Replace carpet and wall base in public spaces.
Remove existing carpet and wall base. Remove carpet adhesive and prepare floor & base of wall for new installation of new materials. Install new carpet tiles (TBD) and new wall base (match exist.)
1238915046C Callout BID OPTION 4: Repair popcorn ceiling in Rooms 456 & 458. Paint to match exist.
1238915046C Polygon
1238915046C Callout BID OPTION 2: Repair sheetrock walls and paint.
Repair damaged sheetrock and prepare surfaces for new paint. Skim coat and sand, clean, prime and paint to match exist.
BID OPTION 1: Replace carpet and wall base in public spaces.
Remove existing carpet and wall base. Remove carpet adhesive and prepare floor & base of wall for new installation of new materials. Install new carpet tiles (TBD) and new wall base (match exist.)
Remove existing carpet and wall base. Remove carpet adhesive and prepare floor & base of wall for new installation of new materials. Install new carpet tiles (TBD) and new wall base (match exist.)
Remove existing carpet and wall base. Remove carpet adhesive and prepare floor & base of wall for new installation of new materials. Install new carpet tiles (TBD) and new wall base (match exist.)
BID OPTION 5: Parking Lot Repairs.
a. Crack seal where asphalt surface is stable - refer to SOW for approx. quantity.
b. Mill & re-surface where asphalt surface is alligatored - refer to SOW for approx. quantity.
c. Re-stripe all parking lots.
| Phase 1_1st and 2nd Floor Plans |
| Phase 2_1st Floor Plan |
| Phase 2_2nd and 3rd Floor Plans |
| Phase 2_4th Floor Plan |
| Phase 3_1st Floor Plan |
| Phase 3_2nd and 3rd Floor Plans |
| Phase 3_4th Floor Plan |
| Untitled |
| Phase 4_1st Floor Plan |
| Phase 4_2nd and 3rd Floor Plans |
| Phase 4_4th Floor Plan |
| SitePlan_Current Pavement |
| SitePlan_Current Pavement.pdf |
| Sheets and Views |
| Layout1 |