Attach. 2 QJKL 24-0014 Specifications.pdf
PDF 1 MB Posted
- Attached to
- Design and Build Repair Facade and Roof B707
- Solicitation number
- FA663326R0002
About this file
This is a Technical Specifications document for a construction project. The file contains Division 01 General Requirements sections for Project No. QJKL 24-0014, Repair Facade and Roof, Building 707 at the 934th Airlift Wing Minneapolis-St. Paul Air Reserve Station, located at 760 Military Highway, Building 744, Minneapolis, Minnesota. The specifications are issued by MSP-ARS Civil Engineering and are under the Air Force Reserve Command (AFRC).
The document establishes administrative and technical requirements for the repair of the building's facade and roof. Key requirements include: contractors must submit a Schedule of Prices within 15 calendar days of contract award and obtain Contracting Officer approval before processing payments; a Baseline Construction Schedule must be submitted within 30 calendar days of Notice to Proceed, with monthly updates required thereafter; a project superintendent with minimum 10 years of construction experience and at least 5 years as superintendent on similar projects is mandatory, with fluent English communication skills required; contractors must mobilize to the jobsite within 30 calendar days of final design approval with equipment and personnel; preconstrction and Red Zone planning meetings are required, with Red Zone meetings beginning at approximately 75 percent project completion; and a partnering session must be hosted within 45 calendar days of contract award. Submittal procedures are detailed for various submission types (SD-01 through SD-11), including preconstruction submittals, shop drawings, product data, samples, design data, test reports, certificates, manufacturer instructions, field reports, operation and maintenance data, and closeout submittals, with specific formatting and electronic file requirements. Payment is contingent on approval of the Schedule of Prices, and materials may be eligible for progress payments only if they are high-cost, long-lead items with supporting documentation and insurance coverage.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL SPECIFICATIONS
934th Airlift Wing Minneapolis-St. Paul Air Reserve Station
Project No. QJKL 24-0014
REPAIR FACADE AND ROOF, B707 FINAL DESIGN
MSP-ARS Civil Engineering 760 Military Highway, Building 744 Minneapolis, MN 55450
MSP- ARS Roof and Facade Repai r s, B707
AFRC QJKL 24- 0014
PROJECT TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 20 00 11/ 20, CHG 5: 02/ 25 PRI CE AND PAYMENT PROCEDURES
payment i nst r uct i on par agr aphs r equi r ed f or use i n al l pr oj ect s
01 30 00 11/ 20, CHG 5: 02/ 25 ADMI NI STRATI VE REQUI REMENTS
gener al admi ni st r at i ve and pr ocedur al r equi r ement s f or Cont r act or management and coor di nat i on
01 32 16. 00 20 08/ 18, CHG 1: 08/ 20 SMALL PROJECT CONSTRUCTI ON PROGRESS
SCHEDULES
t he pr epar at i on and use of const r uct i on schedul es f or smal l pr oj ect s
01 33 00 08/ 18, CHG 4: 02/ 21 SUBMI TTAL PROCEDURES
gener al pr ocedur es r egar di ng submi t t al s, dat a nor mal l y submi t t ed f or r evi ew t o est abl i sh conf or mance wi t h t he desi gn concept and cont r act document s
01 35 26 05/ 24 GOVERNMENTAL SAFETY REQUI REMENTS
saf et y and occupat i onal heal t h r equi r ement s f or t he pr ot ect i on of Cont r act or and Gover nment per sonnel , pr oper t y, and r esour ces
01 42 00 05/ 24 SOURCES FOR REFERENCE PUBLI CATI ONS
l i st i ng of or gani zat i ons whose publ i cat i ons ar e r ef er enced i n ot her sect i ons of t he speci f i cat i ons.
01 45 00 08/ 23, CHG 1: 05/ 24 QUALI TY CONTROL
pr epar at i on and use of Desi gn- Bi d- Bui l d ( DBB) and Desi gn- Bui l d ( DB) Qual i t y Cont r ol
01 50 00 11/ 20, CHG 3: 08/ 24 TEMPORARY CONSTRUCTI ON FACI LI TI ES AND
CONTROLS
t empor ar y const r uct i on f aci l i t i es, saf et y syst ems, const r uct i on t r af f i c pr ovi s i ons, const r uct i on s i gnage, j obsi t e Wi - Fi , and cont r ol s over Cont r act or oper at i ons r equi r ed f or use i n al l pr oj ect s.
01 57 19 08/ 22 TEMPORARY ENVI RONMENTAL CONTROLS
envi r onment al pr ot ect i on and ot her envi r onment al t empor ar y cont r ol s
01 58 00 08/ 19, CHG 5: 08/ 22 PROJECT I DENTI FI CATI ON
t empor ar y s i gns f or pr oj ect i dent i f i cat i on
01 74 19 02/ 19, CHG 3: 11/ 21 CONSTRUCTI ON WASTE MANAGEMENT AND
DI SPOSAL
t he management of non- hazar dous const r uct i on wast e and demol i t i on debr i s/ wast e mat er i al s
01 78 00 05/ 19, CHG 1: 08/ 21 CLOSEOUT SUBMI TTALS
cl oseout submi t t al s i ncl udi ng: r evi sed pr oj ect document s, war r ant y management , t est i ng, adj ust i ng and bal anci ng, O & M manual s, and cl eanup
DOCUMENT PROJSCP Page 1 Fr i day Jul y 11, 2025
01 78 23 05/ 23 OPERATI ON AND MAI NTENANCE DATA
Oper at i on and Mai nt enance ( O&M) dat a packages, manual s and t r ai ni ng
- - End of Pr oj ect Tabl e of Cont ent s - -
DOCUMENT PROJSCP Page 2
SECTI ON TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
SECTI ON 01 20 00
PRI CE AND PAYMENT PROCEDURES
11/ 20, CHG 5: 02/ 25
payment i nst r uct i on par agr aphs r equi r ed f or use i n al l pr oj ect s
PART 1 GENERAL
1. 1 REFERENCES
1. 2 SUBMI TTALS
1. 3 SCHEDULE OF PRI CES
1. 3. 1 Dat a Requi r ed
1. 3. 2 Payment Schedul e I nst r uct i ons
1. 4 CONTRACT COST BREAKDOWN
1. 5 CONTRACTOR' S I NVOI CE AND CONTRACT PERFORMANCE STATEMENT
1. 5. 1 Cont ent of I nvoi ce
1. 5. 2 Submi ssi on of I nvoi ces
1. 5. 3 Fi nal I nvoi ce
1. 6 PAYMENTS TO THE CONTRACTOR
1. 6. 1 Obl i gat i on of Gover nment Payment s
1. 6. 2 Payment f or Onsi t e and Of f s i t e Mat er i al s
PART 2 PRODUCTS
PART 3 EXECUTI ON
- - End of Sect i on Tabl e of Cont ent s - -
SECTI ON 01 20 00 Page 1
SECTI ON 01 20 00
PRI CE AND PAYMENT PROCEDURES
11/ 20, CHG 5: 02/ 25
PART 1 GENERAL
1. 1 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.
ASTM I NTERNATI ONAL ( ASTM)
ASTM A615/ A615M ( 2024) St andar d Speci f i cat i on f or Def or med and Pl ai n Car bon- St eel Bar s f or Concr et e Rei nf or cement
U. S. ARMY CORPS OF ENGI NEERS ( USACE)
EP 1110- 1- 8 ( 2021) Engi neer i ng and Desi gn - - Const r uct i on Equi pment Owner shi p and Oper at i ng Expense Schedul e
1. 2 SUBMI TTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" or " S" c l assi f i cat i on. Submi t t al s not havi ng a " G" or " S" c l assi f i cat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:
SD- 01 Pr econst r uct i on Submi t t al s
Schedul e of Pr i ces; G
1. 3 SCHEDULE OF PRI CES
1. 3. 1 Dat a Requi r ed
Wi t hi n 15 cal endar days of Cont r act Awar d, pr epar e and del i ver t o t he Cont r act i ng Of f i cer a Schedul e of Pr i ces ( const r uct i on Cont r act ) as di r ect ed by t he Cont r act i ng Of f i cer . Schedul e of Pr i ces must have cost summar i zed and t ot al s pr ovi ded f or each const r uct i on cat egor y. Pr ovi de a det ai l ed br eakdown of t he Cont r act pr i ce, gi v i ng quant i t i es f or each of t he var i ous k i nds of wor k, uni t pr i ces, and ext ended pr i ces. I ndi r ect act i v i t i es ( e. g. , meet i ngs, pr esent at i ons, submi t t al s, sur veys, haul r oad or st or age yar d mai nt enance, dust cont r ol , secur i t y) wi l l not be cost l oaded. Evenl y di st r i but e t he cost s acr oss t he associ at ed const r uct i on act i v i t i es. Cont r act or over head and pr of i t i ncl udi ng sal ar i es f or f i el d of f i ce per sonnel , i f appl i cabl e, must be pr opor t i onat el y spr ead over al l pay i t ems and not i ncl uded as i ndi v i dual pay i t ems.
1. 3. 2 Payment Schedul e I nst r uct i ons
Payment s wi l l not be made unt i l t he Schedul e of Pr i ces has been submi t t ed t o and accept ed by t he Cont r act i ng Of f i cer . For desi gn phase pr ogr ess payment ( s) , t he Schedul e of Pr i ces or Ear ned Val ue Repor t f r om t he Cost
SECTI ON 01 20 00 Page 2
Loaded CPM must i ncl ude det ai l ed desi gn act i v i t i es and gener al ( summar i zed) appr oach f or t he const r uct i on phase( s) of t he pr oj ect . The Schedul e of Pr i ces must be f ul l y devel oped wi t h det ai l ed const r uct i on l i ne i t ems as desi gn pr ogr esses. The compl et e desi gn and const r uct i on Schedul e of Pr i ces or Ear ned Val ue Repor t must be submi t t ed and accept ed pr i or t o st ar t i ng const r uct i on wor k.
For Fast - Tr acked or Cr i t i cal Pat h Submi t t al s of const r uct i on pr oj ect s, t he Schedul e of Pr i ces must i ncl ude det ai l ed desi gn and const r uct i on l i ne i t ems f or each f ast - t r acked/ cr i t i cal pat h phase( s) , submi t t ed t o and accept ed by t he Cont r act i ng Of f i cer dur i ng t he Post Awar d Ki ckof f Meet i ngs and conf i r med pr i or t o st ar t i ng const r uct i on wor k i n t hat phase.
Addi t i onal l y, t he Schedul e of Pr i ces must be separ at ed as f ol l ows:
a. Pr i mar y Faci l i t i es Cost Br eakdown:
Def i ned as wor k on t he pr i mar y f aci l i t i es out t o t he 5 f oot l i ne.
Wor k out t o t he 5 f oot l i ne i ncl udes const r uct i on encompassed wi t hi n a t heor et i cal l i ne 5 f oot f r om t he f ace of ext er i or wal l s and i ncl udes at t endant const r uct i on, such as pad mount ed HVAC cool i ng equi pment , cool i ng t ower s, and t r ansf or mer s pl aced beyond t he 5 f oot l i ne.
b. Suppor t i ng Faci l i t i es Cost Br eakdown:
Def i ned as s i t e wor k, i ncl udi ng i nci dent al wor k, out s i de t he 5 f oot l i ne.
1. 4 CONTRACT COST BREAKDOWN
The Cont r act or must f ur ni sh wi t hi n 30 days af t er t he dat e of Not i ce t o Pr oceed, and pr i or t o t he submi ssi on of i t s f i r st par t i al payment est i mat e, a br eakdown of i t s s i ngl e j ob pay i t em or i t ems whi ch wi l l be r evi ewed by t he Cont r act i ng Of f i cer as t o pr opr i et y of di st r i but i on of t he t ot al cost t o t he var i ous account s. Any unbal anced i t ems as bet ween ear l y and l at e payment i t ems or ot her di scr epanci es wi l l be r evi sed by t he Cont r act i ng Of f i cer t o agr ee wi t h a r easonabl e cost of t he wor k i ncl uded i n t he var i ous i t ems. Thi s Cont r act cost br eakdown wi l l t hen be ut i l i zed as t he basi s f or pr ogr ess payment s t o t he Cont r act or .
1. 5 CONTRACTOR' S I NVOI CE AND CONTRACT PERFORMANCE STATEMENT
1. 5. 1 Cont ent of I nvoi ce
Request s f or payment wi l l be pr ocessed i n accor dance wi t h t he Cont r act Cl ause FAR 52. 232- 27 Pr ompt Payment f or Const r uct i on Cont r act s and FAR
52. 232- 5 Payment s Under Fi xed- Pr i ce Const r uct i on Cont r act s. I nvoi ces not compl et ed i n accor dance wi t h cont r act r equi r ement s wi l l be r et ur ned t o t he Cont r act or f or cor r ect i on of t he def i c i enci es. I ncl ude t he document s l i s t ed bel ow i n t he r equest s f or payment .
a. The Cont r act or ' s i nvoi ce showi ng i n summar y f or m, t he basi s f or ar r i v i ng at t he amount of t he i nvoi ce. I nvoi ce must i ncl ude cer t i f i cat i on by Qual i t y Cont r ol ( QC) Manager as r equi r ed by t he Cont r act .
b. Mont hl y Wor k- hour r epor t .
c. Updat ed Const r uct i on Pr ogr ess Schedul e and t abul ar r epor t s r equi r ed by t he cont r act .
SECTI ON 01 20 00 Page 3
d. Cont r act or Saf et y Sel f Eval uat i on Checkl i st .
e. Updat ed submi t t al r egi st er .
f . Sol i d Wast e Di sposal Repor t .
g. Cer t i f i ed payr ol l s.
h. Updat ed t est i ng l ogs.
i . Ot her suppor t i ng document s as r equest ed.
j . Li en Rel ease f r om subcont r act or s
1. 5. 2 Submi ssi on of I nvoi ces
I f DFARS Cl ause 252. 232- 7006 Wi de Ar ea Wor kFl ow Payment I nst r uct i ons i s i ncl uded i n t he Cont r act , pr ovi de t he document s l i s t ed i n above par agr aph CONTENT OF I NVOI CE i n t hei r ent i r et y as at t achment s i n Wi de Ar ea Wor k Fl ow ( WAWF) f or each i nvoi ce submi t t ed. The maxi mum si ze of each WAWF at t achment i s t wo megabyt es, but t her e ar e no l i mi t s on t he number of at t achment s. I f a document cannot be at t ached i n WAWF due t o syst em or s i ze r est r i ct i on, pr ovi de i t as i nst r uct ed by t he Cont r act i ng Of f i cer .
Mont hl y i nvoi ces and suppor t i ng f or ms f or wor k per f or med t hr ough t he anni ver sar y awar d dat e of t he Cont r act must be submi t t ed t o t he Cont r act i ng Of f i cer wi t hi n 5 cal endar days of t he dat e of i nvoi ce. For exampl e, i f Cont r act awar d dat e i s t he 7t h of t he mont h, t he dat e of each mont hl y i nvoi ce must be t he 7t h and t he i nvoi ce must be submi t t ed by t he 12t h of t he mont h.
1. 5. 3 Fi nal I nvoi ce
a. A f i nal i nvoi ce must be accompani ed by t he cer t i f i cat i on r equi r ed by DFARS 252. 247. 7023 Tr anspor t at i on of Suppl i es by Sea, and t he Cont r act or ' s Fi nal Rel ease. I f t he Cont r act or i s i ncor por at ed, t he Fi nal Rel ease must cont ai n t he cor por at e seal . An of f i cer of t he cor por at i on must s i gn and t he cor por at e secr et ar y must cer t i f y t he Fi nal Rel ease.
b. For f i nal i nvoi ces bei ng submi t t ed v i a WAWF, t he or i gi nal Cont r act or ' s Fi nal Rel ease For m and r equi r ed cer t i f i cat i on of Tr anspor t at i on of Suppl i es by Sea must be pr ovi ded di r ect l y t o t he r espect i ve Cont r act i ng Of f i cer pr i or t o submi ssi on of t he f i nal i nvoi ce. Once r ecei pt of t he or i gi nal Fi nal Rel ease For m and r equi r ed cer t i f i cat i on of Tr anspor t at i on of Suppl i es by Sea has been conf i r med by t he Cont r act i ng Of f i cer , t he Cont r act or must t hen submi t f i nal i nvoi ce and at t ach a copy of t he Fi nal Rel ease For m and r equi r ed cer t i f i cat i on of Tr anspor t at i on of Suppl i es by Sea i n WAWF.
c. Fi nal i nvoi ces not accompani ed by t he Cont r act or ' s Fi nal Rel ease and r equi r ed cer t i f i cat i on of Tr anspor t at i on of Suppl i es by Sea wi l l be consi der ed i ncompl et e and wi l l be r et ur ned t o t he Cont r act or .
1. 6 PAYMENTS TO THE CONTRACTOR
Payment s wi l l be made on submi ssi on of i t emi zed r equest s by t he Cont r act or whi ch compl y wi t h t he r equi r ement s of t hi s sect i on, and wi l l be subj ect t o
SECTI ON 01 20 00 Page 4 r educt i on f or over payment s or i ncr ease f or under payment s made on pr evi ous payment s t o t he Cont r act or .
1. 6. 1 Obl i gat i on of Gover nment Payment s
The obl i gat i on of t he Gover nment t o make payment s r equi r ed under t he pr ovi s i ons of t hi s Cont r act wi l l , at t he di scr et i on of t he Cont r act i ng Of f i cer , be subj ect t o r educt i ons and suspensi ons per mi t t ed under t he FAR and agency r egul at i ons i ncl udi ng t he f ol l owi ng i n accor dance wi t h FAR
32. 103 Pr ogr ess Payment s Under Const r uct i on Cont r act s:
a. Reasonabl e deduct i ons due t o def ect s i n mat er i al or wor kmanshi p;
b. Cl ai ms whi ch t he Gover nment may have agai nst t he Cont r act or under or i n connect i on wi t h t hi s Cont r act ;
c. Unl ess ot her wi se adj ust ed, r epayment t o t he Gover nment upon demand f or over payment s made t o t he Cont r act or ; and
d. Fai l ur e t o mai nt ai n accur at e " as- bui l t " or r ecor d dr awi ngs i n accor dance wi t h FAR 52. 236. 21 and t he cont r act .
e. Fai l ur e t o submi t accur at e mont hl y schedul e updat es i n accor dance wi t h t he cont r act .
1. 6. 2 Payment f or Onsi t e and Of f s i t e Mat er i al s
Pr ogr ess payment s may be made t o t he Cont r act or f or mat er i al s del i ver ed on t he si t e, f or mat er i al s st or ed of f const r uct i on s i t es, or mat er i al s t hat ar e i n t r ansi t t o t he const r uct i on s i t es under t he f ol l owi ng condi t i ons:
a. FAR 52. 232- 5( b) Payment s Under Fi xed Pr i ce Const r uct i on Cont r act s.
b. Mat er i al s del i ver ed on t he si t e, but not i nst al l ed, and of f - s i t e mat er i al s t o be consi der ed f or pr ogr ess payment must be maj or hi gh cost , l ong l ead, speci al or der , or speci al t y i t ems, not suscept i bl e t o det er i or at i on or physi cal damage i n st or age or i n t r ansi t t o t he const r uct i on s i t e. Exampl es of mat er i al s accept abl e f or payment consi der at i on i ncl ude, but ar e not l i mi t ed t o, st r uct ur al st eel , non- magnet i c st eel , non- magnet i c aggr egat e, equi pment , machi ner y, l ar ge pi pe and f i t t i ngs, pr ecast / pr est r essed concr et e pr oduct s, pl ast i c l umber ( e. g. , f ender pi l es/ cur bs) , and hi gh- vol t age el ect r i cal cabl e. Mat er i al s not accept abl e f or payment i ncl ude consumabl e mat er i al s such as nai l s, f ast ener s, condui t s, gypsum boar d, gl ass, i nsul at i on, and wal l cover i ngs.
c. Pr ovi de t he Cont r act i ng Of f i cer wi t h document at i on ( e. g. , Pur chase Or der s or Mat er i al Cont r act s) t o j ust i f y payment f or mat er i al s i n advance of i nst al l at i on. When appr opr i at e, i ncl ude t he Def ense Pr i or i t i es and Al l ocat i ons Syst em ( DFAS) r at i ngs ( e. g. , DX or DO) on pur chase or der s or mat er i al cont r act s t o ensur e t i mel y del i ver y.
d. Mat er i al s t o be consi der ed f or pr ogr ess payment pr i or t o i nst al l at i on must be speci f i cal l y and separ at el y i dent i f i ed i n t he Cont r act or ' s est i mat es of wor k submi t t ed f or t he Cont r act i ng Of f i cer ' s appr oval i n accor dance wi t h Schedul e of Pr i ces r equi r ement of t hi s Cont r act .
Request s f or pr ogr ess payment consi der at i on f or such i t ems must be suppor t ed by document s est abl i shi ng t hei r val ue ( e. g. , pai d i nvoi ces) and t hat t he t i t l e r equi r ement s of t he c l ause at FAR 52. 232- 5 Payment s
SECTI ON 01 20 00 Page 5
Under Fi xed- Pr i ce Const r uct i on Cont r act s have been met .
e. Ensur e mat er i al s ar e adequat el y i nsur ed and pr ot ect ed f r om t hef t and exposur e. Pr ovi de i nsur ance document at i on ( e. g. , Bui l der ' s Ri sk I nsur ance) whi ch cover s t he over al l val ue of t he mat er i al s t o be pai d i n advance of i nst al l at i on.
f . Pr ovi de a wr i t t en consent f r om t he sur et y company wi t h each payment r equest f or of f s i t e mat er i al s.
g. Mat er i al s t o be consi der ed f or pr ogr ess payment s pr i or t o i nst al l at i on must be st or ed ei t her i n Hawai i , Guam, Puer t o Ri co, or t he Cont i nent al Uni t ed St at es. Ot her l ocat i ons ar e subj ect t o wr i t t en appr oval by t he Cont r act i ng Of f i cer .
h. Mat er i al s i n t r ansi t t o t he j ob s i t e or st or age si t e ar e not accept abl e f or payment .
PART 2 PRODUCTS
Not used.
PART 3 EXECUTI ON
Not used.
- - End of Sect i on - -
SECTI ON 01 20 00 Page 6
SECTI ON TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
SECTI ON 01 30 00
ADMI NI STRATI VE REQUI REMENTS
11/ 20, CHG 5: 02/ 25
gener al admi ni st r at i ve and pr ocedur al r equi r ement s f or Cont r act or management and coor di nat i on
PART 1 GENERAL
1. 1 REFERENCES
1. 2 SUBMI TTALS
1. 3 MI NI MUM I NSURANCE REQUI REMENTS
1. 4 SUPERVI SI ON
1. 4. 1 Super i nt endent Qual i f i cat i ons
1. 4. 2 Mi ni mum Communi cat i on Requi r ement s
1. 4. 3 Dut i es
1. 4. 4 Non- Compl i ance Act i ons
1. 5 PRECONSTRUCTI ON
1. 5. 1 At t endees
1. 6 FACI LI TY TURNOVER PLANNI NG MEETI NGS ( Red Zone Meet i ngs)
1. 6. 1 Red Zone Checkl i st
1. 6. 2 Meet i ngs
1. 7 PARTNERI NG
1. 8 MOBI LI ZATI ON
PART 2 PRODUCTS
PART 3 EXECUTI ON
- - End of Sect i on Tabl e of Cont ent s - -
SECTI ON 01 30 00 Page 1
SECTI ON 01 30 00
ADMI NI STRATI VE REQUI REMENTS
11/ 20, CHG 5: 02/ 25
PART 1 GENERAL
1. 1 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.
U. S. ARMY CORPS OF ENGI NEERS ( USACE)
EM 385- 1- 1 ( 2024) Saf et y - - Saf et y and Occupat i onal Heal t h ( SOH) Requi r ement s
U. S. NATI ONAL ARCHI VES AND RECORDS ADMI NI STRATI ON ( NARA)
15 CFR 772 Def i ni t i on of Ter ms
15 CFR 773 Speci al Li censi ng Pr ocedur es
1. 2 SUBMI TTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" or " S" c l assi f i cat i on. Submi t t al s not havi ng a " G" or " S" c l assi f i cat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:
SD- 01 Pr econst r uct i on Submi t t al s
Pr oj ect Super i nt endent
Mi ni mum I nsur ance Cover age
1. 3 MI NI MUM I NSURANCE REQUI REMENTS
Pr ovi de t he mi ni mum i nsur ance cover age r equi r ed by FAR 28. 307- 2 Li abi l i t y , dur i ng t he ent i r e per i od of per f or mance under t hi s cont r act . Pr ovi de ot her i nsur ance cover age as r equi r ed by St at el aw.
1. 4 SUPERVI SI ON
1. 4. 1 Super i nt endent Qual i f i cat i ons
Pr ovi de pr oj ect super i nt endent wi t h a mi ni mum of 10 year s exper i ence i n const r uct i on wi t h at l east 5 of t hose year s as a super i nt endent on pr oj ect s s i mi l ar i n s i ze and compl exi t y. The i ndi v i dual must be f ami l i ar wi t h t he r equi r ement s of EM 385- 1- 1 and have exper i ence i n t he ar eas of hazar d i dent i f i cat i on and saf et y compl i ance. The i ndi v i dual must be capabl e of i nt er pr et i ng a cr i t i cal pat h schedul e and const r uct i on dr awi ngs. The qual i f i cat i on r equi r ement s f or t he al t er nat e super i nt endent ar e t he same as f or t he pr oj ect super i nt endent . The Cont r act i ng Of f i cer may r equest pr oof of t he super i nt endent ' s qual i f i cat i ons at any poi nt i n t he pr oj ect i f t he per f or mance of t he super i nt endent i s i n quest i on.
SECTI ON 01 30 00 Page 2
For pr oj ect s wher e t he super i nt endent i s per mi t t ed t o al so ser ve as t he Qual i t y Cont r ol ( QC) Manager as est abl i shed i n Sect i on01 45 00 QUALI TY CONTROL, t he super i nt endent must have qual i f i cat i ons i n accor dance wi t h t hat sect i on.
1. 4. 2 Mi ni mum Communi cat i on Requi r ement s
Have at l east one qual i f i ed super i nt endent , or compet ent al t er nat e, capabl e of r eadi ng, wr i t i ng, and conver si ng f l uent l y i n t he Engl i sh l anguage, on t he j ob- si t e at al l t i mes dur i ng t he per f or mance of Cont r act wor k. I n addi t i on, i f a Qual i t y Cont r ol ( QC) r epr esent at i ve i s r equi r ed on t he Cont r act , t hen t hat i ndi v i dual must al so have f l uent Engl i sh communi cat i on ski l l s .
1. 4. 3 Dut i es
The pr oj ect super i nt endent i s pr i mar i l y r esponsi bl e f or managi ng subcont r act or s and coor di nat i ng day- t o- day pr oduct i on and schedul e adher ence on t he pr oj ect . The super i nt endent i s r equi r ed t o at t end Red Zone meet i ngs, par t ner i ng meet i ngs, and qual i t y cont r ol meet i ngs. The super i nt endent or qual i f i ed al t er nat i ve must be on- si t e at al l t i mes dur i ng t he per f or mance of t hi s cont r act unt i l t he wor k i s compl et ed and accept ed.
1. 4. 4 Non- Compl i ance Act i ons
The Pr oj ect Super i nt endent i s subj ect t o r emoval by t he Cont r act i ng Of f i cer f or non- compl i ance wi t h r equi r ement s speci f i ed i n t he cont r act and f or f ai l ur e t o manage t he pr oj ect t o ensur e t i mel y compl et i on.
Fur t her mor e, t he Cont r act i ng Of f i cer may i ssue an or der st oppi ng al l or par t of t he wor k unt i l sat i sf act or y cor r ect i ve act i on has been t aken. No par t of t he t i me l ost due t o such st op or der s i s accept abl e as t he subj ect of c l ai m f or ext ensi on of t i me or excess cost s or damages by t he Cont r act or .
1. 5 PRECONSTRUCTI ON
Upon compl et i on of desi gn and desi gn accept ance by t he gover nment , pr i or t o commenci ng any wor k at t he s i t e, coor di nat e wi t h t he Cont r act i ng Of f i cer a t i me and pl ace t o meet f or t he Pr econst r uct i on Meet i ng. The pur pose of t hi s i s t o di scuss and devel op a mut ual under st andi ng of t he admi ni st r at i ve r equi r ement s of t he Cont r act i ncl udi ng but not l i mi t ed t o:
dai l y r epor t i ng, i nvoi c i ng, val ue engi neer i ng, saf et y, base- access, out age r equest s, hot wor k per mi t s, schedul e r equi r ement s, qual i t y cont r ol , schedul e of pr i ces or ear ned val ue r epor t , shop dr awi ngs, submi t t al s, cyber secur i t y, pr osecut i on of t he wor k, gover nment accept ance, f i nal i nspect i ons and cont r act c l ose- out . Cont r act or must pr esent and di scuss t hei r basi c appr oach t o schedul i ng t he const r uct i on wor k and any r equi r ed phasi ng.
1. 5. 1 At t endees
Cont r act or at t endees must i ncl ude t he Pr oj ect Manager , Super i nt endent , Si t e Saf et y and Heal t h Of f i cer ( SSHO) , Qual i t y Cont r ol Manager and maj or subcont r act or s.
SECTI ON 01 30 00 Page 3
1. 6 FACI LI TY TURNOVER PLANNI NG MEETI NGS ( Red Zone Meet i ngs)
Meet wi t h t he Gover nment t o i dent i f y st r at egi es t o ensur e t he pr oj ect i s car r i ed t o expedi t i ous c l osur e and t ur nover t o t he Cl i ent . St ar t pl anni ng t he t ur nover pr ocess at t he Pr e- Const r uct i on Conf er ence meet i ng wi t h a di scussi on of t he Red Zone pr ocess and convene at r egul ar l y schedul ed Red Zone Meet i ngs begi nni ng at appr oxi mat el y 75 per cent of pr oj ect compl et i on. I ncl ude t he f ol l owi ng i n t he f aci l i t y Tur nover ef f or t :
1. 6. 1 Red Zone Checkl i st
a. Cont r act i ng Of f i cer ' s Techni cal Repr esent at i ve ( COTR) wi l l pr ovi de t he Cont r act or a copy of t he Red Zone Checkl i st t empl at e.
b. Pr i or t o 75 per cent compl et i on, modi f y t he Red Zone Checkl i st t empl at e by addi ng or del et i ng cr i t i cal act i v i t i es appl i cabl e t o t he pr oj ect and assi gn pl anned compl et i on dat es f or each act i v i t y. Submi t t he modi f i ed Red Zone Checkl i st t o t he Cont r act i ng Of f i cer . The Cont r act i ng Of f i cer may r equest addi t i onal act i v i t i es be added t o t he Red Zone Checkl i st at any t i me as necessar y.
1. 6. 2 Meet i ngs
a. Conduct r egul ar Red Zone Meet i ngs begi nni ng at appr oxi mat el y 75 per cent pr oj ect compl et i on, or t hr ee t o s i x mont hs pr i or t o Benef i c i al Occupancy Dat e ( BOD) , whi chever comes f i r st .
b. The Cont r act i ng Of f i cer wi l l est abl i sh t he f r equency of t he meet i ngs, whi ch i s expect ed t o i ncr ease as t he pr oj ect compl et i on dr aws near er .
At t he begi nni ng, Red Zone meet i ngs may be ever y t wo weeks t hen i ncr ease t o weekl y t owar ds t he f i nal mont h of t he pr oj ect .
c. Usi ng t he Red Zone Checkl i st as a Pl an of Act i on and Mi l est ones ( POAM) and basi s f or di scussi on, r evi ew upcomi ng cr i t i cal act i v i t i es and st r at egi es t o ensur e wor k i s compl et ed on t i me.
d. Dur i ng t he Red Zone Meet i ngs di scuss wi t h t he COTR any upcomi ng act i v i t i es t hat r equi r e Gover nment i nvol vement .
e. Mai nt ai n t he Red Zone Checkl i st by document i ng t he act ual compl et i on dat es as wor k i s compl et ed and updat e t he Red Zone Checkl i st wi t h r evi sed pl anned compl et i on dat es as necessar y t o mat ch pr ogr ess.
Di st r i but e copi es of t he cur r ent Red Zone Checkl i st t o at t endees at each Red Zone Meet i ng.
1. 7 PARTNERI NG
Host t he par t ner i ng sessi on wi t hi n 45 cal endar days of cont r act awar d. To most ef f ect i vel y accompl i sh t hi s Cont r act , t he Cont r act or and Gover nment must f or m a cohesi ve par t ner shi p wi t h t he common goal of dr awi ng on t he st r engt h of each or gani zat i on i n an ef f or t t o achi eve a successf ul pr oj ect wi t hout saf et y mi shaps, conf or mi ng t o t he Cont r act , wi t hi n budget and on schedul e. The par t ner i ng t eam must consi st of per sonnel f r om bot h t he Gover nment and Cont r act or i ncl udi ng pr oj ect l evel and cor por at e l evel l eader shi p posi t i ons. Key Per sonnel f r om t he suppor t ed command, end user , Ai r For ce I nns, Cont r act or , key subcont r act or s and t he Desi gner of Recor d ( DOR) ( r egar dl ess of whet her t he cont r act i s a desi gn- bui l d or a desi gn- bi d- bui l d) ar e r equi r ed t o par t i c i pat e i n t he Par t ner i ng pr ocess.
SECTI ON 01 30 00 Page 4
1. 8 MOBI LI ZATI ON
Mobi l i ze t o t he j obsi t e wi t hi n 30 cal endar days of f i nal s i t e or bui l di ng desi gn appr oval . Mobi l i ze i s def i ned as havi ng equi pment AND havi ng a physi cal pr esence of at l east one per son f r om t he cont r act or ' s t eam on t he j obsi t e.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTI ON
Not used.
- - End of Sect i on - -
SECTI ON 01 30 00 Page 5
SECTI ON TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
SECTI ON 01 32 16. 00 20
SMALL PROJECT CONSTRUCTI ON PROGRESS SCHEDULES
08/ 18, CHG 1: 08/ 20
t he pr epar at i on and use of const r uct i on schedul es f or smal l pr oj ect s
PART 1 GENERAL
1. 1 SUBMI TTALS
1. 2 PRE- CONSTRUCTI ON SCHEDULE REQUI REMENT
1. 3 SCHEDULE FORMAT
1. 3. 1 Schedul e Submi t t al s and Pr ocedur es
1. 4 SCHEDULE MONTHLY UPDATES
1. 5 3- WEEK LOOK AHEAD SCHEDULE
1. 6 CORRESPONDENCE AND TEST REPORTS:
1. 7 ADDI TI ONAL SCHEDULI NG REQUI REMENTS
PART 2 PRODUCTS
PART 3 EXECUTI ON
- - End of Sect i on Tabl e of Cont ent s - -
SECTI ON 01 32 16. 00 20 Page 1
SECTI ON 01 32 16. 00 20
SMALL PROJECT CONSTRUCTI ON PROGRESS SCHEDULES
08/ 18, CHG 1: 08/ 20
PART 1 GENERAL
1. 1 SUBMI TTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" or " S" c l assi f i cat i on. Submi t t al s not havi ng a " G" or " S" c l assi f i cat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:
SD- 01 Pr econst r uct i on Submi t t al s
Basel i ne Const r uct i on Schedul e; G
SD- 07 Cer t i f i cat es
Mont hl y Updat es
1. 2 PRE- CONSTRUCTI ON SCHEDULE REQUI REMENT
Wi t hi n 30 cal endar days of not i ce t o pr oceed wi t h const r uct i on and Pr i or t o t he st ar t of wor k, pr epar e and submi t t o t he Cont r act i ng Of f i cer a Basel i ne Const r uct i on Schedul e i n t he f or m of a i n accor dance wi t h t he t er ms i n Cont r act Cl ause FAR 52. 236- 15 Schedul es f or Const r uct i on Cont r act s, except as modi f i ed i n t hi s cont r act . The appr oval of a Basel i ne Const r uct i on Schedul e i s a condi t i on pr ecedent t o:
a. The Cont r act or st ar t i ng demol i t i on wor k or const r uct i on st age( s) of t he cont r act .
b. Pr ocessi ng Cont r act or ' s i nvoi ce( s) f or const r uct i on act i v i t i es/ i t ems of wor k.
c. Revi ew of any schedul e updat es.
Submi t t al of t he Basel i ne Const r uct i on Schedul e, and subsequent schedul e updat es, i s under st ood t o be t he Cont r act or ' s cer t i f i cat i on t hat t he submi t t ed schedul e meet s t he r equi r ement s of t he Cont r act Document s, r epr esent s t he Cont r act or ' s pl an on how t he wor k wi l l be accompl i shed, and accur at el y r ef l ect s t he wor k t hat has been accompl i shed and how i t was sequenced ( as- bui l t l ogi c) .
1. 3 SCHEDULE FORMAT
1. 3. 1 Schedul e Submi t t al s and Pr ocedur es
Submi t Schedul es and updat es i n har d copy and on el ect r oni c medi a t hat i s accept abl e t o t he Cont r act i ng Of f i cer . Submi t an el ect r oni c back- up of t he pr oj ect schedul e i n an i mpor t f or mat compat i bl e wi t h t he Gover nment ' s schedul i ng pr ogr am.
SECTI ON 01 32 16. 00 20 Page 2
1. 4 SCHEDULE MONTHLY UPDATES
Updat e t he Const r uct i on Schedul e at mont hl y i nt er val s or when t he schedul e has been r evi sed. Keep t he updat ed schedul e cur r ent , r ef l ect i ng act ual act i v i t y pr ogr ess and pl an f or compl et i ng t he r emai ni ng wor k. Submi t copi es of pur chase or der s and conf i r mat i on of del i ver y dat es as di r ect ed by t he Cont r act i ng Of f i cer .
a. Nar r at i ve Repor t : I dent i f y and j ust i f y t he f ol l owi ng:
( 1) Pr ogr ess made i n each ar ea of t he pr oj ect ;
( 2) Longest Pat h: I ncl ude pr i nt ed copy on 11 by 17 i nch paper , l andscape set t i ng;
( 3) Dat e/ t i me const r ai nt ( s) , ot her t han t hose r equi r ed by t he cont r act ;
( 4) Li st i ng of changes made bet ween t he pr evi ous schedul e and cur r ent updat ed schedul e i ncl udi ng: added or r emoved act i v i t i es, or i gi nal and r emai ni ng dur at i ons f or act i v i t i es t hat have not st ar t ed, l ogi c ( sequence, const r ai nt , l ag/ l ead) , mi l est ones, pl anned sequence of oper at i ons, l ongest pat h, cal endar s or cal endar assi gnment s, and cost l oadi ng.
( 5) Any decr ease i n pr evi ousl y r epor t ed act i v i t y Ear ned Amount ;
( 6) Pendi ng i t ems and st at us t her eof , i ncl udi ng per mi t s, changes or der s, and t i me ext ensi ons;
( 7) St at us of Cont r act Compl et i on Dat e and i nt er i m mi l est ones;
( 8) Cur r ent and ant i c i pat ed del ays ( descr i be cause of del ay and cor r ect i ve act i ons( s) and mi t i gat i on measur es t o mi ni mi ze) ;
( 9) Descr i pt i on of cur r ent and f ut ur e schedul e pr obl em ar eas.
For each ent r y i n t he nar r at i ve r epor t , c i t e t he r espect i ve Act i v i t y I D and Act i v i t y Name, t he dat e and r eason f or t he change, and descr i pt i on of t he change.
1. 5 3- WEEK LOOK AHEAD SCHEDULE
Pr epar e and i ssue a 3- Week Look Ahead schedul e t o pr ovi de a mor e det ai l ed day- t o- day pl an of upcomi ng wor k i dent i f i ed on t he Const r uct i on Schedul e.
Key t he wor k pl ans t o act i v i t y number s when a NAS i s r equi r ed and updat e each week t o show t he pl anned wor k f or t he cur r ent and f ol l owi ng t wo- week per i od. Addi t i onal l y, i ncl ude upcomi ng out ages, c l osur es, pr epar at or y meet i ngs, and i ni t i al meet i ngs. I dent i f y cr i t i cal pat h act i v i t i es on t he Thr ee- Week Look Ahead Schedul e. The det ai l wor k pl ans ar e t o be bar char t t ype schedul es, mai nt ai ned separ at el y f r om t he Const r uct i on Schedul e on an el ect r oni c spr eadsheet pr ogr am and pr i nt ed on 8- 1/ 2 by 11 i nch sheet s as di r ect ed by t he Cont r act i ng Of f i cer . Act i v i t i es must not exceed 5 wor ki ng days i n dur at i on and have suf f i c i ent l evel of det ai l t o assi gn cr ews, t ool s and equi pment r equi r ed t o compl et e t he wor k. Del i ver t hr ee har d copi es and one el ect r oni c f i l e of t he 3- Week Look Ahead Schedul e t o t he Cont r act i ng Of f i cer no l at er t han 8 a. m. each Monday, and r evi ew dur i ng t he weekl y CQC Coor di nat i on or Pr oduct i on Meet i ng.
SECTI ON 01 32 16. 00 20 Page 3
1. 6 CORRESPONDENCE AND TEST REPORTS:
Cor r espondence ( e. g. , l et t er s, Request s f or I nf or mat i on ( RFI s) , e- mai l s, meet i ng mi nut e i t ems, Pr oduct i on and QC Dai l y Repor t s, mat er i al del i ver y t i cket s, phot ogr aphs) must r ef er ence Schedul e Act i v i t i es t hat ar e bei ng addr essed. Test r epor t s ( e. g. , concr et e, soi l compact i on, wel d, pr essur e) must r ef er ence Schedul e Act i v i t i es t hat ar e bei ng addr essed.
1. 7 ADDI TI ONAL SCHEDULI NG REQUI REMENTS
Any r ef er ences t o addi t i onal schedul i ng r equi r ement s, i ncl udi ng syst ems t o be i nspect ed, t est ed and commi ssi oned, t hat ar e l ocat ed t hr oughout t he r emai nder of t he Cont r act Document s, ar e subj ect t o al l r equi r ement s of t hi s sect i on.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTI ON
Not used.
- - End of Sect i on - -
SECTI ON 01 32 16. 00 20 Page 4
SECTI ON TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
SECTI ON 01 33 00
SUBMI TTAL PROCEDURES
08/ 18, CHG 4: 02/ 21
gener al pr ocedur es r egar di ng submi t t al s, dat a nor mal l y submi t t ed f or r evi ew t o est abl i sh conf or mance wi t h t he desi gn concept and cont r act document s
PART 1 GENERAL
1. 1 DEFI NI TI ONS
1. 1. 1 Submi t t al Descr i pt i ons ( SD)
1. 1. 2 Appr ovi ng Aut hor i t y
1. 1. 3 Wor k
1. 2 SUBMI TTALS
1. 3 SUBMI TTAL CLASSI FI CATI ON
1. 3. 1 Gover nment Appr oved ( G)
1. 3. 2 For I nf or mat i on Onl y
1. 4 PREPARATI ON
1. 4. 1 Tr ansmi t t al For m
1. 4. 2 Submi t t al For mat
1. 4. 2. 1 For mat of SD- 01 Pr econst r uct i on Submi t t al s
1. 4. 2. 2 For mat f or SD- 02 Shop Dr awi ngs
1. 4. 2. 2. 1 Dr awi ng I dent i f i cat i on
1. 4. 2. 3 For mat of SD- 03 Pr oduct Dat a
1. 4. 2. 3. 1 Pr oduct I nf or mat i on
1. 4. 2. 3. 2 St andar ds
1. 4. 2. 3. 3 Dat a Submi ssi on
1. 4. 2. 4 For mat of SD- 04 Sampl es
1. 4. 2. 4. 1 Sampl e Char act er i st i cs
1. 4. 2. 4. 2 Sampl e I ncor por at i on
1. 4. 2. 4. 3 Compar i son Sampl e
1. 4. 2. 5 For mat of SD- 05 Desi gn Dat a
1. 4. 2. 6 For mat of SD- 06 Test Repor t s
1. 4. 2. 7 For mat of SD- 07 Cer t i f i cat es
1. 4. 2. 8 For mat of SD- 08 Manuf act ur er ' s I nst r uct i ons
1. 4. 2. 8. 1 St andar ds
1. 4. 2. 9 For mat of SD- 09 Manuf act ur er ' s Fi el d Repor t s
1. 4. 2. 10 For mat of SD- 10 Oper at i on and Mai nt enance Dat a ( O&M)
1. 4. 2. 11 For mat of SD- 11 Cl oseout Submi t t al s
1. 4. 3 Sour ce Dr awi ngs f or Shop Dr awi ngs
1. 4. 3. 1 Sour ce Dr awi ngs
1. 4. 3. 2 Ter ms and Condi t i ons
1. 4. 4 El ect r oni c Fi l e For mat
1. 5 QUANTI TY OF SUBMI TTALS
1. 5. 1 Number of SD- 01 Pr econst r uct i on Submi t t al Copi es
1. 5. 2 Number of SD- 04 Sampl es
1. 6 I NFORMATI ON ONLY SUBMI TTALS
1. 7 PROJECT SUBMI TTAL REGI STER
1. 7. 1 Submi t t al Management
SECTI ON 01 33 00 Page 1
1. 7. 2 Pr econst r uct i on Use of Submi t t al Regi st er
1. 7. 3 Cont r act or Use of Submi t t al Regi st er
1. 7. 4 Appr ovi ng Aut hor i t y Use of Submi t t al Regi st er
1. 7. 5 Act i on Codes
1. 7. 6 Del i ver y of Copi es
1. 8 VARI ATI ONS
1. 8. 1 Consi der i ng Var i at i ons
1. 8. 2 Pr oposi ng Var i at i ons
1. 8. 3 War r ant i ng t hat Var i at i ons ar e Compat i bl e
1. 8. 4 Revi ew Schedul e Ext ensi on
1. 9 SCHEDULI NG
1. 10 GOVERNMENT APPROVI NG AUTHORI TY
1. 10. 1 Revi ew Not at i ons
1. 11 DI SAPPROVED SUBMI TTALS
1. 12 APPROVED SUBMI TTALS
1. 13 APPROVED SAMPLES
PART 2 PRODUCTS
PART 3 EXECUTI ON
ATTACHMENTS:
At t achment A - Submi t t al Regi st er
- - End of Sect i on Tabl e of Cont ent s - -
SECTI ON 01 33 00 Page 2
SECTI ON 01 33 00
SUBMI TTAL PROCEDURES
08/ 18, CHG 4: 02/ 21
PART 1 GENERAL
1. 1 DEFI NI TI ONS
1. 1. 1 Submi t t al Descr i pt i ons ( SD)
Submi t t al r equi r ement s ar e speci f i ed i n t he t echni cal sect i ons. Exampl es and descr i pt i ons of submi t t al s i dent i f i ed by t he Submi t t al Descr i pt i on ( SD) number s and t i t l es f ol l ow:
SD- 01 Pr econst r uct i on Submi t t al s
Gover nment appr oved Di vi s i on 01 pr econst r uct i on submi t t al s t hat ar e r equi r ed pr i or t o or commenci ng wi t h t he st ar t of wor k must be submi t t ed wi t hi n 30 cal endar days of cont r act awar d unl ess speci f i ed el sewher e i n t he speci f i cat i ons. Cont r act or appr oved Di vi s i on 01 submi t t al s t hat ar e r equi r ed pr i or t o or commenci ng wi t h t he st ar t of wor k must be submi t t ed wi t hi n 45 cal endar days of cont r act awar d unl ess speci f i ed el sewher e i n t he speci f i cat i ons.
Pr econst r uct i on Submi t t al s i ncl ude schedul es and a t abul ar l i s t of l ocat i ons, f eat ur es, and ot her per t i nent i nf or mat i on r egar di ng pr oduct s, mat er i al s, equi pment , or component s t o be used i n t he wor k.
Cer t i f i cat es Of I nsur ance
Sur et y Bonds
Li st Of Pr oposed Subcont r act or s
Li st Of Pr oposed Pr oduct s
Basel i ne Net wor k Anal ysi s Schedul e ( NAS)
Submi t t al Regi st er
Schedul e Of Pr i ces Or Ear ned Val ue Repor t
Wor k Pl an
Qual i t y Cont r ol ( QC) pl an
Envi r onment al Pr ot ect i on Pl an
SD- 02 Shop Dr awi ngs
Dr awi ngs, di agr ams and schedul es speci f i cal l y pr epar ed t o i l l ust r at e some por t i on of t he wor k.
Di agr ams and i nst r uct i ons f r om a manuf act ur er or f abr i cat or f or use i n pr oduci ng t he pr oduct and as ai ds t o t he Cont r act or f or i nt egr at i ng t he pr oduct or syst em i nt o t he pr oj ect .
SECTI ON 01 33 00 Page 3
Dr awi ngs pr epar ed by or f or t he Cont r act or t o show how mul t i pl e syst ems and i nt er di sci pl i nar y wor k wi l l be coor di nat ed.
SD- 03 Pr oduct Dat a
Cat al og cut s, i l l ust r at i ons, schedul es, di agr ams, per f or mance char t s, i nst r uct i ons and br ochur es i l l ust r at i ng s i ze, physi cal appear ance and ot her char act er i st i cs of mat er i al s, syst ems or equi pment f or some por t i on of t he wor k.
Sampl es of war r ant y l anguage when t he cont r act r equi r es ext ended pr oduct war r ant i es.
SD- 04 Sampl es
Fabr i cat ed or unf abr i cat ed physi cal exampl es of mat er i al s, equi pment or wor kmanshi p t hat i l l ust r at e f unct i onal and aest het i c char act er i st i cs of a mat er i al or pr oduct and est abl i sh st andar ds by whi ch t he wor k can be j udged.
Col or sampl es f r om t he manuf act ur er ' s st andar d l i ne ( or cust om col or sampl es i f speci f i ed) t o be used i n sel ect i ng or appr ovi ng col or s f or t he pr oj ect .
Fi el d sampl es and mock- ups const r uct ed on t he pr oj ect s i t e est abl i sh st andar ds ensur i ng wor k can be j udged. I ncl udes assembl i es or por t i ons of assembl i es t hat ar e t o be i ncor por at ed i nt o t he pr oj ect and t hose t hat wi l l be r emoved at concl usi on of t he wor k.
SD- 05 Desi gn Dat a
Desi gn cal cul at i ons, mi x desi gns, anal yses or ot her dat a per t ai ni ng t o a par t of wor k.
SD- 06 Test Repor t s
Repor t s i gned by aut hor i zed of f i c i al of t est i ng l abor at or y t hat a mat er i al , pr oduct or syst em i dent i cal t o t he mat er i al , pr oduct or syst em t o be pr ovi ded has been t est ed i n accor d wi t h speci f i ed r equi r ement s. Unl ess speci f i ed i n anot her sect i on, t est i ng must have been wi t hi n t hr ee year s of dat e of cont r act awar d f or t he pr oj ect .
Repor t t hat i ncl udes f i ndi ngs of a t est r equi r ed t o be per f or med on an act ual por t i on of t he wor k or pr ot ot ype pr epar ed f or t he pr oj ect bef or e shi pment t o j ob s i t e.
Repor t t hat i ncl udes f i ndi ng of a t est made at t he j ob s i t e or on sampl e t aken f r om t he j ob s i t e, on por t i on of wor k dur i ng or af t er i nst al l at i on.
I nvest i gat i on r epor t s
Dai l y l ogs and checkl i st s
Fi nal accept ance t est and oper at i onal t est pr ocedur e
SD- 07 Cer t i f i cat es
SECTI ON 01 33 00 Page 4
St at ement s pr i nt ed on t he manuf act ur er ' s l et t er head and si gned by r esponsi bl e of f i c i al s of manuf act ur er of pr oduct , syst em or mat er i al at t est i ng t hat t he pr oduct , syst em, or mat er i al meet s speci f i cat i on r equi r ement s. Must be dat ed af t er awar d of pr oj ect cont r act and cl ear l y name t he pr oj ect .
Document r equi r ed of Cont r act or , or of a manuf act ur er , suppl i er , i nst al l er or Subcont r act or t hr ough Cont r act or . The document pur pose i s t o f ur t her pr omot e t he or der l y pr ogr essi on of a por t i on of t he wor k by document i ng pr ocedur es, accept abi l i t y of met hods, or per sonnel qual i f i cat i ons.
Conf i ned space ent r y per mi t s
Text of post ed oper at i ng i nst r uct i ons
SD- 08 Manuf act ur er ' s I nst r uct i ons
Pr epr i nt ed mat er i al descr i bi ng i nst al l at i on of a pr oduct , syst em or mat er i al , i ncl udi ng speci al not i ces and Saf et y Dat a Sheet s( SDS) concer ni ng i mpedances, hazar ds and saf et y pr ecaut i ons.
SD- 09 Manuf act ur er ' s Fi el d Repor t s
Document at i on of t he t est i ng and ver i f i cat i on act i ons t aken by manuf act ur er ' s r epr esent at i ve at t he j ob s i t e, i n t he v i c i ni t y of t he j ob s i t e, or on a sampl e t aken f r om t he j ob s i t e, on a por t i on of t he wor k, dur i ng or af t er i nst al l at i on, t o conf i r m compl i ance wi t h manuf act ur er ' s st andar ds or i nst r uct i ons. The document at i on must be si gned by an aut hor i zed of f i c i al of a t est i ng l abor at or y or agency and st at e t he t est r esul t s; and i ndi cat e whet her t he mat er i al , pr oduct , or syst em has passed or f ai l ed t he t est .
Fact or y t est r epor t s.
SD- 10 Oper at i on and Mai nt enance Dat a
Dat a pr ovi ded by t he manuf act ur er , or t he syst em pr ovi der , i ncl udi ng manuf act ur er ' s hel p and pr oduct l i ne document at i on, necessar y t o mai nt ai n and i nst al l equi pment , f or oper at i ng and mai nt enance use by f aci l i t y per sonnel .
Dat a r equi r ed by oper at i ng and mai nt enance per sonnel f or t he saf e and ef f i c i ent oper at i on, mai nt enance and r epai r of t he i t em.
Dat a i ncor por at ed i n an oper at i ons and mai nt enance manual or cont r ol syst em.
SD- 11 Cl oseout Submi t t al s
Document at i on t o r ecor d compl i ance wi t h t echni cal or admi ni st r at i ve r equi r ement s or t o est abl i sh an admi ni st r at i ve mechani sm.
Submi t t al s r equi r ed f or Gui di ng Pr i nci pl e Val i dat i on ( GPV) or Thi r d Par t y Cer t i f i cat i on ( TPC) .
Speci al r equi r ement s necessar y t o pr oper l y c l ose out a const r uct i on cont r act . For exampl e, Recor d Dr awi ngs and as- bui l t dr awi ngs. Al so, submi t t al r equi r ement s necessar y t o pr oper l y c l ose out a maj or phase
SECTI ON 01 33 00 Page 5 of const r uct i on on a mul t i - phase cont r act .
1. 1. 2 Appr ovi ng Aut hor i t y
Of f i ce or desi gnat ed per son aut hor i zed t o appr ove t he submi t t al .
1. 1. 3 Wor k
As used i n t hi s sect i on, on- si t e and of f - s i t e const r uct i on r equi r ed by cont r act document s, i ncl udi ng l abor necessar y t o pr oduce submi t t al s, const r uct i on, mat er i al s, pr oduct s, equi pment , and syst ems i ncor por at ed or t o be i ncor por at ed i n such const r uct i on. I n except i on, excl udes wor k t o pr oduce SD- 01 submi t t al s.
1. 2 SUBMI TTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" or " S" c l assi f i cat i on. Submi t t al s not havi ng a " G" or " S" c l assi f i cat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:
SD- 01 Pr econst r uct i on Submi t t al s
Submi t t al Regi st er ; G
1. 3 SUBMI TTAL CLASSI FI CATI ON
1. 3. 1 Gover nment Appr oved ( G)
Wi t hi n t he t er ms of t he Cont r act Cl ause SPECI FI CATI ONS AND DRAWI NGS FOR CONSTRUCTI ON, submi t t al s ar e consi der ed t o be " shop dr awi ngs. "
1. 3. 2 For I nf or mat i on Onl y
Submi t t al s not r equi r i ng Gover nment appr oval wi l l be f or i nf or mat i on onl y. Wi t hi n t he t er ms of t he Cont r act Cl ause SPECI FI CATI ONS AND DRAWI NGS FOR CONSTRUCTI ON, t hey ar e not consi der ed t o be " shop dr awi ngs. "
1. 4 PREPARATI ON
1. 4. 1 Tr ansmi t t al For m
1. 4. 2 Submi t t al For mat
1. 4. 2. 1 For mat of SD- 01 Pr econst r uct i on Submi t t al s
When t he submi t t al i ncl udes a document t hat i s t o be used i n t he pr oj ect , or i s t o become par t of t he pr oj ect r ecor d, ot her t han as a submi t t al , do not appl y t he Cont r act or ' s appr oval st amp t o t he document i t sel f , but t o a separ at e sheet accompanyi ng t he document .
Pr ovi de dat a i n t he uni t of measur e used i n t he cont r act document s.
1. 4. 2. 2 For mat f or SD- 02 Shop Dr awi ngs
Pr ovi de shop dr awi ngs not l ess t han 8 1/ 2 by 11 i nches nor mor e t han 30 by 42 i nches, except f or f ul l - s i ze pat t er ns or t empl at es. Pr epar e dr awi ngs t o accur at e s i ze, wi t h scal e i ndi cat ed, unl ess anot her f or m i s r equi r ed.
Ensur e dr awi ngs ar e sui t abl e f or r epr oduct i on and of a qual i t y t o pr oduce
SECTI ON 01 33 00 Page 6 cl ear , di st i nct l i nes and l et t er s, wi t h dar k l i nes on a whi t e backgr ound.
a. I ncl ude t he namepl at e dat a, s i ze, and capaci t y on dr awi ngs. Al so i ncl ude appl i cabl e f eder al , mi l i t ar y, i ndust r y, and t echni cal soci et y publ i cat i on r ef er ences.
b. Di mensi on dr awi ngs, except di agr ams and schemat i c dr awi ngs. Pr epar e dr awi ngs demonst r at i ng i nt er f ace wi t h ot her t r ades t o scal e. Use t he same uni t of measur e f or shop dr awi ngs as i ndi cat ed on t he cont r act dr awi ngs. I dent i f y mat er i al s and pr oduct s f or wor k shown.
Submi t an el ect r oni c copy of dr awi ngs i n PDF f or mat and nat i ve el ect r oni c f or mat .
1. 4. 2. 2. 1 Dr awi ng I dent i f i cat i on
I ncl ude on each dr awi ng t he dr awi ng t i t l e, number , dat e, and r evi s i on number s and dat es, i n addi t i on t o i nf or mat i on r equi r ed i n par agr aph
I DENTI FYI NG SUBMI TTALS.
Number dr awi ngs i n a l ogi cal sequence. Each dr awi ng i s t o bear t he number of t he submi t t al i n a uni f or m l ocat i on next t o t he t i t l e bl ock. Pl ace t he Gover nment cont r act number i n t he mar gi n, i mmedi at el y bel ow t he t i t l e bl ock, f or each dr awi ng.
1. 4. 2. 3 For mat of SD- 03 Pr oduct Dat a
Pr esent pr oduct dat a submi t t al s f or each sect i on. I ncl ude a t abl e of cont ent s, l i s t i ng t he page and cat al og i t em number s f or pr oduct dat a.
I ndi cat e, by pr omi nent not at i on, each pr oduct t hat i s bei ng submi t t ed;
i ndi cat e t he speci f i cat i on sect i on number and par agr aph number t o whi ch i t per t ai ns.
1. 4. 2. 3. 1 Pr oduct I nf or mat i on
Suppl ement pr oduct dat a wi t h mat er i al pr epar ed f or t he pr oj ect t o sat i sf y t he submi t t al r equi r ement s wher e pr oduct dat a does not exi st . I dent i f y t hi s mat er i al as devel oped speci f i cal l y f or t he pr oj ect , wi t h i nf or mat i on and f or mat as r equi r ed f or submi ssi on of SD- 07 Cer t i f i cat es.
Pr ovi de pr oduct dat a i n uni t s used i n t he Cont r act document s. Wher e pr oduct dat a ar e i ncl uded i n pr epr i nt ed cat al ogs wi t h anot her uni t , submi t t he di mensi ons i n cont r act document uni t s, on a separ at e sheet .
1. 4. 2. 3. 2 St andar ds
Wher e equi pment or mat er i al s ar e speci f i ed t o conf or m t o i ndust r y or t echni cal - soci et y r ef er ence st andar ds of such or gani zat i ons as t he Amer i can Nat i onal St andar ds I nst i t ut e ( ANSI ) , ASTM I nt er nat i onal ( ASTM) , Nat i onal El ect r i cal Manuf act ur er ' s Associ at i on ( NEMA) , Under wr i t er s Labor at or i es ( UL) , or Associ at i on of Edi son I l l umi nat i ng Compani es ( AEI C) , submi t pr oof of such compl i ance. The l abel or l i s t i ng by t he speci f i ed or gani zat i on wi l l be accept abl e evi dence of compl i ance. I n l i eu of t he l abel or l i s t i ng, submi t a cer t i f i cat e f r om an i ndependent t est i ng or gani zat i on, compet ent t o per f or m t est i ng, and appr oved by t he Cont r act i ng Of f i cer . St at e on t he cer t i f i cat e t hat t he i t em has been t est ed i n accor dance wi t h t he speci f i ed or gani zat i on' s t est met hods and t hat t he i t em compl i es wi t h t he speci f i ed or gani zat i on' s r ef er ence
SECTI ON 01 33 00 Page 7 st andar d.
1. 4. 2. 3. 3 Dat a Submi ssi on
Col l ect r equi r ed dat a submi t t al s f or each speci f i c mat er i al , pr oduct , uni t of wor k, or syst em i nt o a s i ngl e submi t t al t hat i s mar ked f or choi ces, opt i ons, and por t i ons appl i cabl…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .