ATT002 - SurvivorCCE_QASP_final_v3.docx

DOCX document 88 KB Posted

Attached to
Solicitation - World Trade Center Health Program - Survivor Clinical Center of Excellence
Solicitation number
CDC-75D301-01-Solicitation-WTCHP
Issued by

About this file

This document is a Quality Assurance Surveillance Plan (QASP) for the World Trade Center (WTC) Health Program. The QASP provides a comprehensive framework for evaluating the performance of the Contractor (Survivor Clinical Center of Excellence) across five key performance areas: Contract and System Management, Member Services, Health Benefit Administration, Care Coordination and Case Management, and Claims Submission and Payment.

The plan establishes detailed Acceptable Quality Levels (AQLs) for numerous specific metrics, with surveillance methods including observation, periodic inspection, and contractor reporting. Key performance expectations include timely system access, member services issue resolution, scheduling health evaluations, processing transfers, managing pharmacy services, coordinating care, and submitting accurate and timely claims. The QASP will be used to monitor contractor performance throughout the sustainment phase, with provisions for corrective action plans if performance standards are not met, and performance will be documented in the Contractor Performance Assessment and Reporting System (CPARS).

View the file

Other files

File Type Posted
Amendment 0002 to Solicitation 75D301-25-R-00088.pdf PDF
Section L _ Instructions to Offerors revised thru AMD 0003.pdf PDF
Solicitation Amendment 75D30125R000880003 SF 30.pdf PDF
ATTJ108_Solicitation QandAs.pdf PDF
ATTJ104 _ Business Proposal Format 04212025.xlsx XLSX spreadsheet
ATTJ102_SurivorCCE_CRM 04152025.xlsx XLSX spreadsheet
Section M _ Evaluation Factors for Award revised thru AMD 0003.pdf PDF
ATTJ107 - Question and Answer Template.xlsx XLSX spreadsheet
Amendment 0001 to Solicitation 75D301-25-R-00088.pdf PDF
Section L - Instructions to Offerors_Revised thru AMD 0001.pdf PDF
Section L - Instructions to Offerors.pdf PDF
ATT012_SurvivorCCE_TranslationGuide.xlsx XLSX spreadsheet
ATT016_SurvivorCCE_TGD011_IHE_MonitoringExams.pdf PDF
ATT015_SurvivorCCE_BEAST.docx DOCX document
ATT005_SurvivorCCE_CostTrackingInvoice.xlsx XLSX spreadsheet
Attachment J104 - Business Proposal Format.xlsx XLSX spreadsheet
ATT022_Survivor CCE_Template_BAA.docx DOCX document
ATT001_Glossary Survivor CCE Recompete.xlsx XLSX spreadsheet
ATT008_SurvivorCCE_Template_StaffingandWages.xlsx XLSX spreadsheet
ATT017_SurvivorCCE_ReferenceGuide_CM_UM.pdf PDF
ATT013_SurvivorCCE_TransferHandbook.pdf PDF
ATT010_SurvivorCCE_TGD020_PartnerCommsPlans.pdf PDF
ATT021_SurvivorCCE_TGD006_Billing_IHE_AME.pdf PDF
ATTJ106 - Facilities Capital Cost of Money Factors Computation Template.pdf PDF
ATT003_SurvivorCCE_TGD009_MonthlyReport.pdf PDF
ATT004_SurvivorCCE_Template_RAIDLog.xlsx XLSX spreadsheet
Section M - Evaluation Factors for Award.pdf PDF
ATTJ101_SurvivorCCE_SummaryVolumeData.xlsx XLSX spreadsheet
ATT007_SurvivorCCE_TGD003_SemiannualReports.pdf PDF
ATTJ102_SurivorCCE_CRM.xlsx XLSX spreadsheet
ATTJ103_CUI-SSP (System Security Plan).docx DOCX document
ATTJ105 - PastPresent Performance Questionnaire.docx DOCX document
ATT019_SurvivorCCE_TGD010_CleanClaims.pdf PDF
ATT014_SurvivorCCE_DisruptiveMember_IncidentReport SAMPLE.docx DOCX document
ATT006_SurvivorCCE_LaborCategory.xlsx XLSX spreadsheet
Solicitation - 75D30125R00088.pdf PDF
Section C - SurvivorCCE_PWS_20March2025.pdf PDF
ATT018_SurvivorCCE_TGD016_RetrospectiveAuthorization.pdf PDF
ATT009_SurvivorCCE_MandatoryTraining.docx DOCX document
ATT020_SurvivorCCE_TGD007_TimelyFiling.pdf PDF
ATT011_SurvivorCCE_BrandGuidelines.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

World Trade Center (WTC) Health Program Quality Assurance Surveillance Plan (QASP) Publish Date: Month Day, Year Most Recent Revision Date: Month Day, Year

I. Introduction This performance-based Quality Assurance Surveillance Plan (QASP) sets forth the procedures and guidance that the World Trade Center Health Program (”Program”) will use in evaluating the technical performance of the corresponding Performance Work Statement (PWS), contract no. [CONTRACT ID] (the “Contract”), in accordance with the terms and conditions of the Contract.

II. Objective The purpose of this QASP is to serve as a proactive tool for the Program to evaluate the quality of [AWARDED VENDOR]’s (the “Contractor”) performance during Sustainment and to help identify, avoid, and mitigate unacceptable or deficient contractor performance. This document provides a framework and methodology for the Program to evaluate the quality of the Contractor's performance, including the performance of any and all agents or subcontractors. The information provided in this QASP identifies minimum acceptable quality levels (AQLs) to be consistently maintained by [AWARDED VENDOR] throughout the period of performance after Start of Healthcare Delivery (SHCD). Not every PWS task has a corresponding performance standard in the QASP, and some performance standards in the QASP are associated with more than one PWS task.

This QASP describes the structure of the Program’s surveillance activities of contractor performance during the period of sustainment. Sustainment is defined as starting after Start of Healthcare Delivery and continuing through transition-out, until the start of healthcare delivery of the successor contract. The QASP details how and when the Program will monitor, evaluate, and document key tasks of contractor performance. Though the QASP highlights key performance indicators that will be monitored on a regular basis, the Program will also perform additional surveillance activities to ensure adherence to all PWS requirements, including for those that do not have a corresponding QASP metric.

The primary goals of this QASP are to:

· Bring structure and organization to the Program’s monitoring and surveillance of key tasks/services and deliverables under the above contract;

· Indicate key tasks and deliverables that will be regularly assessed against established performance standards;

· Establish AQLs;

· Describe the evaluation methods and processes that will be used by the Program during surveillance activities; and

· Guide the Program’s surveillance efforts to ensure acceptable performance by the Contractor.

This QASP will be used to assist in monitoring contractor activities and during inspection and acceptance of contract deliverables. The QASP is intended to be a “living” document and reviewed as performance warrants The Program may propose to change elements of the QASP throughout the lifetime of the contract. Any such proposed changes would be communicated by the Program to the Contractor and formalized through a contractual modification.

This QASP sets forth the minimum performance standards and AQLs for the Contractor, focusing on the assessment of whether the Contractor achieves desired outcomes relative to contract requirements. In contrast, the Contractor’s Quality Assurance Plan in the Contract Management Plan (CMP) and the Contractor’s Quality Assurance chapter of the Operations Manual describe how the Contractor will ensure quality of services at or above the AQLs.

If a QASP AQL or performance standard of the contract is not met, the Contractor is expected to propose, upon request from the Contracting Officer Representative (COR) or Contracting Officer, a corrective action plan (CAP) to improve performance to meet the relevant AQL. The CAP shall include the Contractor personnel responsible for implementing the CAP; a description of the activities and steps the Contractor is undertaking to improve performance to meet the relevant AQL; the timeline and milestones for CAP activities; the resources required for the CAP; and reporting cadence and format on CAP activities. The Contracting Officer Representative (COR) and Program will review the proposed CAP. Upon the Government’s approval of the CAP, the COR or Contracting Officer will provide written approval to the Contractor. Thereafter, the Contractor shall implement the CAP upon receipt of COR or Contracting Officer approval of the Contractor’s CAP. If and once the Contractor’s performance is improved under the CAP to meet the relevant AQL or performance standard of the contract, the Government may, at its discretion, consider the CAP complete and closed. The Government reserves the right to require another CAP should performance for a QASP metric subsequently fail again to meet the relevant AQL following the implementation and completion of an earlier CAP.

If a QASP AQL or performance standard of the contract is not met, the Contractor’s deficient performance will be documented in the Contractor’s Contractor Performance Assessment and Reporting System (CPARS) performance evaluation. Positive performance will also be similarly documented in its CPARS evaluation.

III. QASP Elements

a. Performance Standard The performance standard column describes the Program’s quality expectations of the Contractor in performing the tasks listed in the Performance Work Statement.

Though the Program recognizes that some tasks will be performed exclusively by the Contractor’s agents and subcontractors, all contractor performance will be evaluated holistically such that the Prime Contractor is responsible for all performance outcomes.

b. Acceptable Quality Levels (AQLs) AQLs are the minimum performance threshold(s) that the Program will accept for each outlined performance standard. The Contractor shall meet AQLs and performance standards of the contract. Services that fail to meet the relevant AQL are nonconforming.

In accordance with paragraph (a) of the clause at Federal Acquisition Regulation (FAR) section 52.246-5, Inspection of Services-Cost-Reimbursement, incorporated by reference in Section I of the Contract, the Government may require reperformance of nonconforming services at no additional fee to the contract. If reperformance will not correct the defects or is not possible, the Government may seek an equitable fee reduction or adequate consideration for acceptance of nonconforming services, in addition to any other rights and remedies available to the Government.

c. Surveillance Method The Program will oversee the Contractor’s adherence to AQLs through various methodologies including but not limited to; sampling, documenting, testing, and reporting reviews; formal evaluations, reviews, and assessments (FERAs); and general observation. The frequency of surveillance is at the Government’s discretion; frequency is determined based on the relative risks in potential contractor non-compliance. Periodic sampling may also be leveraged during ad hoc reviews, where a sample is taken when a problem/deficiency is suspected.

Primary methods of QASP surveillance include, but are not limited to, the following:

· Observation: Program assesses and observes contract performance in real time.

· Periodic Inspection: Program reviews data available to the Program and evaluates outcomes on a periodic basis.

· Contractor Reporting: Contractor provides data related to the performance standard, and the Program reviews the Contractor’s reporting to determine if the AQL is met.

The performance standards, acceptable quality levels, and methods of surveillance outlined in the tables below will support the Program in its assessment of contractor performance during the Sustainment phase starting after Start of Healthcare Delivery (SHCD) and continuing through transition-out, until the start of healthcare delivery of the successor contract.

1. CONTRACT AND SYSTEM MANAGEMENT5
Timely System Access and Control5
Timely Submission of Change Requests5
Maintenance of Member Contact Information5
2. MEMBER SERVICES5
Member Services – Issue Resolution5
Transfers – Processing6
Transfers – Initiation of Services6
Collection of Other Health Insurance (OHI) Information6
3. HEALTH BENEFIT ADMINISTRATION6
Scheduling Initial Health Evaluations (IHE)6
Annual Monitoring Exams (AME)6
Timely Reporting of IHE/AME Results6
Cancer Screening6
Quality of Certification Requests7
Pharmacy Services – Issue Resolution7
Pharmacy Services – Referrals7
4. CARE COORDINATION AND CASE MANAGEMENT7
Intensive Case Management (ICM)7
Prior Authorizations for Treatment7
Treatment Referrals8
5. CLAIMS SUBMISSION AND PAYMENT8
Claims Submission – Accuracy8
Claims Submission – Timeliness8
Review of External Claims8
Coordination of Benefits (COB)9

1. CONTRACT AND SYSTEM MANAGEMENT

PWS Reference(s): Section 4.2; Section 4.9

QASP Ref.
Topic
PWS Ref.
Performance Standard
AQL
Surveillance Method
1.1
Timely System Access and Control
4.1.3

4.9.1

Staff identified as requiring access to non-CCE systems (e.g., CARE Portal) shall obtain and maintain access until/unless job duties change.
95% of users identified as requiring access successfully obtain access on the first attempt and do not require re-registration due to account expiration.
Observation
1.2
Timely Submission of Change Requests
4.2.1
Change Requests (CRs) are submitted timely in response to any direction or technical guidance from the COR that the Contractor determines will affect a change in level of effort, cost, or time to implement beyond the effective date of the direction/technical guidance. Any such changes shall not be enacted until formal written approval from the Contracting Officer has been received.
85% of CR requests are submitted within three weeks of the triggering direction/technical guidance.
Observation
1.3
Maintenance of Member Contact Information
4.9.2
Member contact information is up to date, defined as having been verified within the last 12 months.
80% of members assigned to the CCE have contact information verified within the last 12 months.[footnoteRef:2] [2: Exclude from the calculation members who have been identified as “lost to follow-up” per TGD003. ]

Contractor Reporting

2. MEMBER SERVICES

PWS Reference(s): Section 4.5

QASP Ref.
Topic
PWS Ref.
Performance Standard
AQL
Surveillance Method
2.1
Member Services – Issue Resolution
4.5
Member Services team addresses member needs identified by the Program and other Program contractors (e.g., via CARE message) upon inquiry, without requiring follow-up from the individual making the inquiry.
90% of member inquiries are resolved without the individual making the inquiry following up.
Contractor Reporting
2.2
Transfers – Processing
4.5.3
Transfer requests (incoming and outgoing) are processed in accordance with the timelines listed in the Transfer Handbook.
95% of transfer requests are processed in accordance with the timelines listed in the Transfer Handbook.
Periodic Inspection
2.3
Transfers – Initiation of Services
4.5.3
Members who transfer into the CCE are reached out to within 3 business days of transfer acceptance.
90% of members transferring in receive outreach within 3 business days.
Contractor Reporting
2.4
Collection of Other Health Insurance (OHI) Information
4.5.4
The CCE collects and maintains complete, accurate, and current medical and pharmacy Other Health Insurance (OHI) information.
75% of members who have had a date of service (DOS) within the previous 18 months have primary insurance information on file.
Periodic Inspection

3. HEALTH BENEFIT ADMINISTRATION

PWS Reference(s): Section 4.6

QASP Ref.
Topic
PWS Ref.
Performance Standard
AQL
Surveillance Method
3.1
Scheduling Initial Health Evaluations (IHE)
4.6.1
New members are contacted to schedule the IHE:

a) 1+ times within the first four weeks of assignment to the CCE and

b) 3+ times within the first three months of assignment to the CCE.

90% of new members are successfully contacted to schedule the IHE within the first three months of assignment to the CCE.
Contractor Reporting
3.2
Annual Monitoring Exams (AME)
4.5.2

4.6.1

Members eligible for annual monitoring (as identified in TGD003) receive a monitoring exam within 18 months of the previous monitoring exam.
65% of eligible members received a monitoring exam in the previous 18 months.[footnoteRef:3] [3: Exclusions for calculation this metric can be found in TGD 003. ]

Contractor Reporting

3.3
Timely Reporting of IHE/AME Results
4.6.1
Members who complete an IHE or AME receive results in a timely manner.
98% receive results within 15 business days.
Contractor Reporting
3.4
Cancer Screening
4.6.3
Members eligible for cancer screening(s) are “current” on cancer screenings, using the methodology(ies) described in TGD 003.
70% of members eligible for cancer screening(s) are “current” on cancer screenings.
Contractor Reporting
3.5
Quality of Certification Requests
4.6.4
Certification requests are submitted in accordance with Program certification criteria, including:

a) Usage of Program’s current WTC-3 form Positive attestation of disease-exposure linkage, with signature and date within 60 days of submission to the Program.

Fewer than 5% of certification requests submitted are determined to be Unprocessable or have insufficient information to render a decision (“Redo” decision).
Periodic Inspection
3.6
Pharmacy Services – Issue Resolution
4.6.8
CCE provides timely response and resolution to point-of-sale blocks that are the CCE’s responsibility to resolve, as identified by the Program or Pharmacy Benefits Manager (PBM) Contractor (e.g., provider block, prior authorization needed).
90% of point-of-sale blocks are resolved within 1 business day.
Contractor Reporting
3.7
Pharmacy Services – Referrals
4.6.8
CCE refers members requiring pharmacy benefits to providers who are in-network as both a provider and a prescriber.
80% of referrals to obtain pharmacy benefits are made to providers who are in-network as both a provider and a prescriber.
Periodic Inspection

4. CARE COORDINATION AND CASE MANAGEMENT

PWS Reference(s): Section 4.7

QASP Ref.
Topic
PWS Ref.
Performance Standard
AQL
Surveillance Method
4.1
Intensive Case Management (ICM)
4.7
Case Manager maintains regular outreach with members in Intensive Case Management in accordance with the Program’s ICM guidelines.
95% of Case Manager outreach attempts occur within standard outreach timeline and

100% of Case Manager outreach attempts occur within maximum outreach timeline.[footnoteRef:4] [4: As of January 2025, standard outreach timelines are 1-2 weeks and maximum outreach timelines are 1-2 months. Refer to the Program’s Case Management acuity requirements for current timelines. ]

Contractor Reporting

4.2
Prior Authorizations for Treatment
4.7.1
Prior authorizations for services performed by the CCE are obtained prior to services being rendered and are in compliance with Program requirements.[footnoteRef:5] [5: Program requirements for prior authorizations include those found in the Administrative Manual, applicable Medical Coverage Determination (MCD) documents, and the Program Codebook.]
96% of prior authorizations for services performed by the CCE meet performance standard.
Periodic Inspection

Random Sampling

4.3

Treatment Referrals
4.7.2
Members are referred to providers who are in-network with both the member’s primary. insurer and the CCE Provider Network.
80% of referrals are made to providers who are in both the member’s primary insurer network and the CCE Provider Network and

100% of referrals are made to providers who are in the CCE Provider Network.

Contractor Reporting Periodic Inspection Random Sampling

5. CLAIMS SUBMISSION AND PAYMENT

PWS Reference(s): Section 4.8

QASP Ref.
Topic
PWS Ref.
Performance Standard
AQL
Surveillance Method
5.1
Claims Submission – Accuracy
4.8.2
Claims submitted by the CCE to the Program are clean (as defined in TGD 010). meet medical necessity requirements, are filed timely (as defined in TGD 007), and otherwise meet Program claims submission requirements.
95% of claims submitted by the CCE are approved and do not require resubmission.
Periodic Inspection
5.2
Claims Submission – Timeliness
4.8.2
Claims submitted by the CCE to the Program are submitted timely:

a) Within 6 months for claims that don’t require COB

b) Within 12 months for claims that require COB[footnoteRef:6] [6: Program Requirements for Coordination of Benefits can be found in the Policy and Procedures for Coordination of Benefits for Treatment Costs for Non-Work-Related, Certified WTC-Related Health Conditions: Coordination with Health Insurance at https://www.cdc.gov/wtc/policies.html#payer-guidance. ]

99% of claims submitted by the CCE are submitted timely in accordance with the performance standard.
Periodic Inspection
5.3
Review of External Claims
4.8.2
The CCE reviews claims submitted by external providers for medical necessity in accordance with TGD 007.
90% of external provider claims are approved, denied, or pended within 5 business days of being posted in the claims portal and

99% of external provider claims are approved, denied, or pended within 10 business days of being posted in the claims portal and 99% of pended claims are resolved within 30 business days from the pend date.

Periodic Inspection

5.4
Coordination of Benefits (COB)
4.8.3
Claims that require COB are submitted to all other applicable payers prior to submission to the Program for reimbursement.[footnoteRef:7] [7: Program Payer Order Guidance can be found at https://www.cdc.gov/wtc/policies.html#payer-guidance. ]
70% of claims that require COB are submitted to all other applicable payers prior to submission to the Program.
Periodic Inspection

image1.png

File details come from the government source that posted it. Updated .