Att. J-03 ECDIS GFI LIST.pdf
PDF 2 MB Posted
- Attached to
- Navy Electronic Chart Display and Information System (ECDIS) Hardware and Software Production
- Solicitation number
- N00025-26-R-5246
About this file
This is a NAVSEA Form 4340/2 Government Furnished Information (GFI) listing for the ECDIS Consolidation Draft RFP solicitation N0002426R5246, dated September 18, 2026.
The form documents 17 government-furnished information items that contractors must receive to perform work under this naval contract. Key documents include ECDIS Software Source Code, the ECDIS Technical Data Package (TDP) dated November 11, 2021, Software Requirements Document (SRD) for U.S. Navy ECDIS dated January 13, 2016, and Requirements Traceability Matrix dated January 13, 2016. Additional supporting documents include Configuration Management Plan (November 11, 2021), Risk Management Plan (November 20, 2014), DMSMS Plan (June 30, 2023), Security Classification Guide ID# 03-198 for Shipboard Navigation Systems (December 15, 2023), IUID Implementation Plan (February 11, 2019), Security Production Assurance Plan (November 1, 2010), Naval Warfare Systems Certification Policy (August 24, 2012), SIBS GEN 3 Interface Control Documents/Drawings, LRU List, Software Support Sustainment Plan (September 15, 2022), PEO IWS Requirements Traceability Matrix (March 27, 2020), Navy ECDIS Software Life Cycle Sustainment Plan (May 11, 2023), and Technical Review Manual (December 18, 2009). All GFI items show a due date designation of "ACA" (As Coordinated Agreement), indicating timing to be determined through coordination between government and contractor.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NAVSEA 4340/2 (Rev. Aug. 2021) Page 1 of 6
GOVERNMENT FURNISHED INFORMATION
ATTACHMENT # PR#
PROGRAM TITLE: CONTRACT NUMBER: DATE:
CODE:
(1) NUMBER (5) GFI DUE DATE(4) DOCUMENT DATE(3) DOCUMENT NUMBER(2) DOCUMENT TITLE
NAVSEA 4340/2 (Rev. Aug. 2021) Page 2 of 6
GOVERNMENT FURNISHED INFORMATION (CON'T)
NAVSEA 4340/2 (Rev. Aug. 2021) Page 3 of 6
NAVSEA 4340/2 (Rev. Aug. 2021) Page 4 of 6
NAVSEA 4340/2 (Rev. Aug. 2021) Page 5 of 6
NAVSEA 4340/2 (Rev. Jul 2020) Page 6 of 6
NAVSEA Form 4340/2 - Government Furnished Information Instructions
ATTACHMENT #: Leave blank, contracting officer will complete when preparing solicitation or contract.
PR #: Enter Purchase Request (PR) number.
PROGRAM TITLE: Enter the title of the program.
CONTRACT NO.: Leave blank if this requirement will result in a new contract. Insert contract number if the PR will result in the modification to an existing contract.
DATE: Enter the calendar date that this form was prepared.
CODE: Enter the Program Office / Requiring Activity's office code.
NUMBER, Column (1): Enter a sequential number for each item of GFI to be supplied.
DOCUMENT TITLE, Column (2): Enter Document Title for each item.
DOCUMENT NUMBER, Column (3): Enter Document Number assigned to identify a specific document. If no number has been assigned, leave blank.
DOC DATE, Column (4): Enter publication date of the document. If the item has no date assigned, leave blank. This format (MM/DD/YR) for the date is preferred (e.g., 06/25/16).
GFI DUE DATE, Column (5): Insert the date the item is due at the contractor's plant or is to be first available to the contractor for use. A calendar date format (MM/DD/YR) is preferred (e.g., 02/28/19), but following non-calendar methods are acceptable:
DAC - Days after contract award date MAC - Months after contract award date MACM - Months after contract modification date MAOE - Months after option exercise MBD - Months before delivery MBT - Months before the start of ship builder's trials or equipment test
PAGE __ OF __: Assign page numbers sequentially.
NAVSEA 4340/2 (Rev. Aug. 2021) Page of NAVSEA 4340/2 (Rev. Jul 2020) Page of
GOVERNMENT FURNISHED INFORMATION
(1) NUMBER
(5) GFI DUE DATE
(4) DOCUMENT DATE
(3) DOCUMENT NUMBER
(2) DOCUMENT TITLE
GOVERNMENT FURNISHED INFORMATION (CON'T)
(1) NUMBER
(5) GFI DUE DATE
(4) DOCUMENT DATE
(3) DOCUMENT NUMBER
(2) DOCUMENT TITLE
GOVERNMENT FURNISHED INFORMATION (CON'T)
(1) NUMBER
(5) GFI DUE DATE
(4) DOCUMENT DATE
(3) DOCUMENT NUMBER
(2) DOCUMENT TITLE
GOVERNMENT FURNISHED INFORMATION (CON'T)
(1) NUMBER
(5) GFI DUE DATE
(4) DOCUMENT DATE
(3) DOCUMENT NUMBER
(2) DOCUMENT TITLE
GOVERNMENT FURNISHED INFORMATION (CON'T)
(1) NUMBER
(5) GFI DUE DATE
(4) DOCUMENT DATE
(3) DOCUMENT NUMBER
(2) DOCUMENT TITLE
NAVSEA Form 4340/2 - Government Furnished Information Instructions
ATTACHMENT #: Leave blank, contracting officer will complete when preparing solicitation or contract.
PR #: Enter Purchase Request (PR) number.
PROGRAM TITLE: Enter the title of the program.
CONTRACT NO.: Leave blank if this requirement will result in a new contract. Insert contract number if the PR will result in the modification to an existing contract.
DATE: Enter the calendar date that this form was prepared.
CODE: Enter the Program Office / Requiring Activity's office code.
NUMBER, Column (1): Enter a sequential number for each item of GFI to be supplied.
DOCUMENT TITLE, Column (2): Enter Document Title for each item.
DOCUMENT NUMBER, Column (3): Enter Document Number assigned to identify a specific document. If no number has been assigned, leave blank.
DOC DATE, Column (4): Enter publication date of the document. If the item has no date assigned, leave blank. This format (MM/DD/YR) for the date is preferred (e.g., 06/25/16).
GFI DUE DATE, Column (5): Insert the date the item is due at the contractor's plant or is to be first available to the contractor for use. A calendar date format (MM/DD/YR) is preferred (e.g., 02/28/19), but following non-calendar methods are acceptable:
DAC - Days after contract award date MAC - Months after contract award date MACM - Months after contract modification date MAOE - Months after option exercise MBD - Months before delivery MBT - Months before the start of ship builder's trials or equipment test
PAGE __ OF __: Assign page numbers sequentially.
11.0.1.20130826.2.901444.899636
| CurrentPage: |
| PageCount: |
| TextField1: J-3 |
| TextField2: N0002425NR46040 |
| TextField7: ECDIS CONSOLIDATION DRAFT RFP |
| TextField8: Solicitation N0002426R5246 |
| DateField1: 18 September, 2026 |
| TextField3: |
| DateField3: ACA |
| DateField3: ACA |
| DateField3: ACA |
| DateField3: ACA |
| DateField3: ACA |
| DateField3: ACA |
| DateField3: ACA |
| DateField3: ACA |
| DateField3: ACA |
| DateField3: ACA |
| DateField3: ACA |
| DateField3: ACA |
| DateField3: ACA |
| DateField3: ACA |
| DateField3: ACA |
| DateField3: ACA |
| DateField3: ACA |
| DateField2: 2012-08-24 |
| DateField2: 2016-01-13 |
| DateField2: 2016-01-13 |
| DateField2: 2010-11-01 |
| DateField2: 2023-12-15 |
| DateField2: 2019-02-11 |
| DateField2: 2023-06-30 |
| DateField2: 2014-11-20 |
| DateField2: 2021-11-11 |
| DateField2: 2022-09-15 |
| DateField2: 2020-03-27 |
| DateField2: 2023-05-11 |
| DateField2: 2009-12-18 |
| TextField6: PEO IWS6 NECDIS RTM |
| TextField6: PEO IWS6 NECDIS SRD |
| TextField6: PEO IWS6 SPA |
| TextField6: PEO IWS6 SCG |
| TextField6: PEO IWS6 IUID |
| TextField6: PEO IWS6 DMSMS |
| TextField6: PEO IWS6 RMP |
| TextField6: PEO IWS6 CMP |
| TextField6: PEO IWS6 TDP |
| TextField6: PEO IWS6 ICDs |
| TextField6: PEO IWS6 SSSP |
| TextField6: PEO IWS RTM |
| TextField6: PEO IWS6 LCSP |
| TextField6: NAVSEA INST |
| TextField5: ECDIS Software Source Code |
| TextField5: Naval Warfare Systems Certification Policy |
| TextField5: Requirements Traceability Matrix for the U.S. Navy Electronic Chart Display and Information System (NAVY ECDIS), Rev 1.0 (with Change 1) |
| TextField5: Software Requirements Document (SRD) for the U.S. Navy Electronic Chart Display and Information System (NAVY ECDIS), Rev 1.0 (with Change 1) |
| TextField5: Security Production Assurance Plan (SPA) |
| TextField5: Security Classification Guide (SCG) ID# 03-198, Shipboard Navigation Systems, PEO IWS 6.0 Version 1 |
| TextField5: Item Unique Identification (IUID) Implementation Plan |
| TextField5: PEO IWS 6 Government Diminishing Manufacturing Sources and Material Shortages (DMSMS) Plan |
| TextField5: PEO IWS 6.0 Risk Management Plan |
| TextField5: Configuration Management Plan |
| TextField5: ECDIS Technical Data Package (TDP) |
| TextField5: |
SIBS GEN 3 Interface Control Documents / Drawings
| TextField5: LRU LIST |
| TextField5: Software Support Sustainment Plan (SSP) |
| TextField5: Requirements Traceability Matrix |
| TextField5: TECHNICAL REVIEW MANUAL (TRM) |
| TextField5: PEO IWS 6.0 Navy ECDIS Software Life Cycle Sustainment Plan |
| TextField4: 1 |
| TextField4: 11 |
| TextField4: 10 |
| TextField4: 9 |
| TextField4: 8 |
| TextField4: 7 |
| TextField4: 6 |
| TextField4: 5 |
| TextField4: 4 |
| TextField4: 3 |
| TextField4: 2 |
| TextField4: 12 |
| TextField4: 13 |
| TextField4: 14 |
| TextField4: 15 |
| TextField4: 17 |
| TextField4: 16 |
File details come from the government source that posted it. Updated .