Atch 6 Calc. of Self Performed Work.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
Z1DA--Project 626-22-103_Video Surveillance Security TVHS VAMC - Nashville Campus
Solicitation number
36C24926R0065
Issued by

About this file

This is a calculation template for demonstrating self-performed work requirements for specialty trade contractors. The template is designed for offerors under NAICS code 23xxxxx (specialty trade contractors) to document that at least 25 percent of contract performance costs will be incurred for personnel performed by the prime contractor's own employees rather than subcontractors. The template requires offerors to provide a detailed breakdown of personnel costs and material/equipment costs organized by specification division, with separate line items for the prime contractor and multiple subcontractors, designating each as either a small business (SB) vendor or non-small business entity. The spreadsheet includes sections for calculating subtotals of personnel and material/equipment costs, followed by additions for home office overhead, profit/fee, and bond costs to arrive at a grand total.

The template includes a self-performed work calculation section that compares total personnel costs across the prime and all subcontractors against subcontractor personnel costs to determine the percentage of work being self-performed by the prime contractor. The definition of personnel costs explicitly includes labor, mechanics, other tradesmen, and office personnel directly charged to the project, such as project managers, job superintendents, administrative staff, and estimators. The form concludes with a certification statement requiring an authorized representative's signature, typed name, title, and date to attest that the representations are true and correct. This template is an appendix supporting a VA solicitation for video surveillance security services at the Nashville VA Medical Center.

View the file

Other files

File Type Posted
S06 AMEND_7 36C24926R0065 0007-NASH Campus.pdf PDF
AMEND-6_36C24926R0065 0006 VIDEO NASH.pdf PDF
S02 AMEND-6_36C24926R0065 0006 NASH.pdf PDF
S02 36C24926R0065 0005 Video -NASH.pdf PDF
Atch 17 JA Brand Name Avigilon VIDEO 626-22-103 NASH_Redacted.pdf PDF
S02 AMEND_4 36C24926R0065 0004.pdf PDF
S02 36C24926R0065 0003_1 Protest.pdf PDF
Atch 1 UPDATED TR ROOMS FROM EHRM.pdf PDF
S02 36C24926R0065 0002 VIDEO-Nash.pdf PDF
Atch 1 Video camera design changes.pdf PDF
S02 AMEND_1 36C24926R0065 0001 VIDEO NASH.pdf PDF
Atch 1 Site Visit Video Surveillance Nashville.pdf PDF
S02 36C24926R0065_1 VIDEO 626-22-103 NASH.pdf PDF
Atch 16 SF1442 36C24926R0065_2 NASH.pdf PDF
Atch 15 JA Brand Name JCI VIDEO 626-22-103 NASH_Redacted.pdf PDF
Atch 12 HotWorkPermit.pdf PDF
Atch 10 Specs 626-22-103 BD Video Surveillance NASH - 1.pdf PDF
Atch 9 Price Breakout Schedule.xlsx XLSX spreadsheet
Atch 5 RFI Form.docx DOCX document
Atch 11 Drawings 626-22-103 BD Video Surveillance NASH - 1.pdf PDF
Atch 2 WD SCA 2015-4647 REV31 _05.13.2026 Rutherford-Davidson.docx DOCX document
Atch 13 Fire-Smoke Barrier Permit.doc DOC document
Atch 8 General Conditions Breakout.xlsx XLSX spreadsheet
Atch 7 Contractor EMR Certification Form.docx DOCX document
Atch 14 JA Brand Name Avigilon VIDEO 626-22-103 NASH_Redacted.pdf PDF
Atch 4 UEI _ TAX ID.docx DOCX document
Atch 3 Past Performance Questionnaire NASH.docx DOCX document
Atch 1 WD DBA-TN20250178 BUILDING MOD-3 06-05-2025 -NASH.docx DOCX document
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 1

CALCULATION OF SELF-PERFORMED/SUBCONTRACTED WORK
Offerors for All Other Specialty Trade Contractors (NAICS code 23xxxxx) must provide
at least 25 percent of the cost of the contract performance incurred for personnel will be spent on the prime contractor's employees. Provide a breakdown of material and personnel costs, by specification division listed for the project. Home Office overhead,profit/fee and bond costs shall be added after a subtotal of personnel and material/ Equipment costs has been calculated. Clearly identify the personnel costs you will be performing. Below is a suggested format.
Specification DivisionSB Vendor (Y or N)Personnel CostMaterial/Equipment Costs
PrimeY$0.00$0.00Change SB Vendor to Y or N based on vendor size. Add costs to gray areas only.
SubY$0.00$0.00
SubY$0.00$0.00
SubY$0.00$0.00
SubY$0.00$0.00
SubY$0.00$0.00
SubN$0.00$0.00
SubN$0.00$0.00
SubN$0.00$0.00
SubN$0.00$0.00
SubN$0.00$0.00
(Add additional lines as necessary for each Division applicable to this project)$$
$ - 0$0.00
$$
Sub Total (Personnel Costs, Material/Equipment Costs)$0.00Add percentage to gray areas only.
Percentage0Profit$0.00
Percentage0Home Office Overhead$0.00
Percentage0Bond$0.00
Grand Total$0.00
Calculation of self-performed personnel costs:
1. Total personnel costs * both prime and all subcontractors:$0.00
2. Subtract all subcontractor personnel costs* companies that will perform work
on this contract:$0.00
3. Remainder is ‘Total amount of work to be self-performed under the
Contract’:$0.00
4. Self-performed work = Line 3/Line 1 x 100 =ERROR:#DIV/0!
*personnel costs include labors, mechanics, other tradesmen, and office personnel directly charged to
the project (includes project manager, job superintendent, administrative, estimators, etc.)
I certify the above representations are true and correct to the best of my knowledge.

(Signature and Typed Name of Authorized Representative) Date

(Title of Authorized Representative)

File details come from the government source that posted it. Updated .