Atch 12 HotWorkPermit.pdf
PDF 124 KB Posted
- Solicitation number
- 36C24926R0065
About this file
This is a Hot Work Permit template developed by the National Fire Protection Association (NFPA 51B) for authorizing operations involving open flame or heat and spark generation. The permit is valid for one day only and applies to activities including welding, brazing, cutting, grinding, soldering, thawing pipe, torch-applied roofing, and chemical welding. The form requires documentation of the date, location/building and floor, work description, start time, and completion time, along with identification of whether the hot work is being performed by an employee or contractor.
The permit mandates compliance with specific safety precautions across multiple categories. General requirements include verification that sprinklers and extinguishers are operational, equipment is in manufacturer-specified condition, and appropriate fire extinguishers are readily available. Within 35 feet of hot work, facilities must remove flammable liquids, dust, and combustible materials; eliminate explosive atmospheres; cover floor and wall openings; and protect or shut down ducts and conveyors. Special requirements apply for work on walls, ceilings, and roofs (noncombustible construction verification and combustible material removal) and enclosed equipment (cleaning and purging of flammable substances). The permit requires a trained fire watch to be present during work and for a minimum of one hour after completion, equipped with suitable extinguishers and hose where practical. A permit-authorizing individual must verify that the location has been examined and all required precautions have been implemented before granting permission.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NFPA 51B© 2018 National Fire Protection Association
Seek an alternative/safer method if possible!
Before initiating hot work, ensure precautions are in place as required by NFPA 51B and ANSI Z49.1.
Make sure an appropriate fire extinguisher is readily available.
This Hot Work Permit is required for any operation involving open flame or producing heat and/or sparks. This work includes, but is not limited to, welding, brazing, cutting, grinding, soldering, thawing pipe, torch-applied roofing, or chemical welding.
Date
Location/Building and floor
Work to be done
Time started Time completed
THIS PERMIT IS GOOD FOR ONE DAY ONLY
❏ Available sprinklers, hose streams, and extinguishers are in service and operable.
❏ Hot work equipment is in good working condition in accordance with manufacturer’s specifications.
❏ Special permission obtained to conduct hot work on metal vessels or piping lined with rubber or plastic.
Requirements within 35 ft (11 m) of hot work
❏ Flammable liquid, dust, lint, and oily deposits removed.
❏ Explosive atmosphere in area eliminated.
❏ Floors swept clean and trash removed.
❏ Combustible floors wet down or covered with damp sand or fire-resistive/noncombustible materials or equivalent.
❏ Personnel protected from electrical shock when floors are wet.
❏ Other combustible storage material removed or covered with listed or approved materials (welding pads, blankets, or curtains;
fire-resistive tarpaulins), metal shields, or noncombustible materials.
❏ All wall and floor openings covered.
❏ Ducts and conveyors that might carry sparks to distant combustible material covered, protected, or shut down.
Requirements for hot work on walls, ceilings, or roofs
❏ Construction is noncombustible and without combustible coverings or insulation.
❏ Combustible material on other side of walls, ceilings, or roofs is moved away.
Requirements for hot work on enclosed equipment
❏ Enclosed equipment is cleaned of all combustibles.
❏ Containers are purged of flammable liquid/vapor.
❏ Pressurized vessels, piping, and equipment removed from service, isolated, and vented.
Requirements for hot work fire watch and fire monitoring
❏ Fire watch is provided during and for a minimum of 1 hour after hot work, including any break activity.
❏ Fire watch is provided with suitable extinguishers and, where practical, a charged small hose.
❏ Fire watch is trained in use of equipment and in sounding alarm.
❏ Fire watch can be required in adjoining areas, above and below.
❏ Yes ❏ No Per the PAI/fire watch, monitoring of hot work area has been extended beyond 1 hour.
Hot work by ❏ employee ❏ contractor
Name (print) and signature of person doing hot work
I verify that the above location has been examined, the precautions marked on the checklist below have been taken, and permission is granted for this work.
Name (print) and signature of permit-authorizing individual (PAI)
© 2018 National Fire Protection Association. This form may be copied for individual use other than for resale. It may not be copied for commercial sale or distribution.
| Date: |
| Time started: |
| Time completed: |
| Available sprinklers hose streams and extinguishers are in service and operable: Off |
| Hot work equipment is in good working condition in accordance with manufacturers specifications: Off |
| Special permission obtained to conduct hot work on metal vessels or piping lined with rubber or plastic: Off |
| Flammable liquid dust lint and oily deposits removed: Off |
| Explosive atmosphere in area eliminated: Off |
| Floors swept clean and trash removed: Off |
| Combustible floors wet down or covered with damp sand or fireresistivenoncombustible materials or equivalent: Off |
| Personnel protected from electrical shock when floors are wet: Off |
| Other combustible storage material removed or covered with listed or approved materials welding pads blankets or curtains: Off |
| All wall and floor openings covered: Off |
| Ducts and conveyors that might carry sparks to distant combustible material covered protected or shut down: Off |
| Construction is noncombustible and without combustible coverings or insulation: Off |
| Combustible material on other side of walls ceilings or roofs is moved away: Off |
| Enclosed equipment is cleaned of all combustibles: Off |
| Containers are purged of flammable liquidvapor: Off |
| Pressurized vessels piping and equipment removed from service isolated and vented: Off |
| Fire watch is provided during and for a minimum of 30 min after hot work including any break activity: Off |
| Fire watch is provided with suitable extinguishers and where practical a charged small hose: Off |
| Fire watch is trained in use of equipment and in sounding alarm: Off |
| Fire watch can be required in adjoining areas above and below: Off |
| Yes: Off |
| No: Off |
| Location/Building and floor: |
| Location/Building and floor cont: |
| Work to be done: |
| Work to be done cont: |
| Name and signature: |
| Name and signature PAI: |
| Employee: Off |
| Contractor: Off |