This is a set of bid documents and construction drawings for a Video Surveillance Security improvement project at Nashville VA Medical Center (VAMC) located at 1310 24th Avenue South, Nashville, TN 37212. The project number is VA 626-22-103 and the contracting vehicle is BID DOCUMENTS.
The project encompasses installation of a comprehensive closed-circuit television (CCTV) security system throughout the Nashville VAMC campus, including Buildings 1, 1A-ACRE, Mental Health Annex (Building 1A), and the ACRE Building. The scope includes removal and replacement of 235 security cameras utilizing Avigilon basis-of-design equipment (H5A dual-head, H5A fixed dome, H6 fixed dome, H6SL fixed dome, and H5A/H6 multisensor cameras in 90, 180, 270, and 360-degree configurations). New cabling infrastructure includes 4-pair unshielded twisted pair (UTP) copper cabling for distances under 295 feet and fiber optic cabling for longer runs. Equipment headend will be installed in Room A-139, including Cisco 9300 switches, Avigilon NVR units with minimum 30-day backup capability, and associated power distribution and UPS systems. The project requires coordination with Infection Control Risk Assessment (ICRA) precautions, use of mobile containment carts in corridors, and phased installation to maintain operational camera coverage. All work must comply with VA standards, NFPA codes, ANSI/TIA telecommunications standards, and requirements for plenum-rated cabling, fire-rated wall penetrations, and proper grounding per ANSI/TIA 607D specifications.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT IMAGE
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
PROJECT SITE MAP PROJECT LOCATION MAP
VOLUME 1 OF 1
/1
/2
:2
:3
P
M C
U s e rs
\l s ta rn e s \D o c u m e n ts \E
-2 -2
N -V
A N a s h v ill e -V id e o S e c I m p ro v ls ta rn e s C
B U
M B
.r v t
G-001
ENG. PROJECT COVER
1 3LAS
VIDEO SURVEILLANCE
SECURITY- NASHVILLE
NASHVILLE VAMC
1310 24TH AVENUE SOUTH
NASHVILLE, TN 37212 JUNE 13, 2024
BID DOCUMENTS
626-22-10322-215N
VIDEO SURVEILLANCE SECURITY- NASHVILLE
NASHVILLE VAMC
1310 24TH AVENUE SOUTH
NASHVILLE, TN 37212
VA PROJECT #: 626-22-103
JVE
DRAWING LIST
GENERAL
G-001 ENG. PROJECT COVER 1 3
G-002 SITE PLAN - NASHVILLE VAMC 2 3
G-100 ICRA INFORMATION AND DETAILS & NOTES 3 3
MECHANICAL
M-001 MECHANICAL GENERAL INFORMATION AND DETAILS 1 2
M-101 FIRST FLOOR MECHANICAL PLANS, CONTROLS, AND SCHEDULES 2 2
TECHNOLOGY
T-001 TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS 1 29
TS101 TECHNOLOGY SITE PLAN 2 29
T-101 MENTAL HEALTH ANNEX FIRST FLOOR SECURITY PLAN 3 29
T-102 BUILDING 1 & 1A-ACRE BASEMENT SECURITY PLAN 4 29
T-103 BUILDING 1 & 1A-ACRE FIRST FLOOR SECURITY PLAN 5 29
T-104 BUILDING 1 & 1A-ACRE SECOND FLOOR SECURITY PLAN 6 29
T-105 BUILDING 1 & 1A-ACRE THIRD FLOOR SECURITY PLAN 7 29
T-106 BUILDING 1 & 1A-ACRE FOURTH FLOOR SECURITY PLAN 8 29
T-107 BUILDING 1A-ACRE FIFTH AND SIXTH FLOOR SECURITY PLAN 9 29
T-401A BUILDING 1 & 1A-ACRE BASEMENT SECURITY PLAN - AREA A 10 29
T-401B BUILDING 1 & 1A-ACRE BASEMENT SECURITY PLAN - AREA B 11 29
T-401C BUILDING 1 & 1A-ACRE BASEMENT SECURITY PLAN - AREA C 12 29
T-401D BUILDING 1 & 1A-ACRE BASEMENT SECURITY PLAN - AREA D 13 29
T-402A BUILDING 1 & 1A-ACRE FIRST FLOOR SECURITY PLAN - AREA A 14 29
T-402B BUILDING 1 & 1A-ACRE FIRST FLOOR SECURITY PLAN - AREA B 15 29
T-402C BUILDING 1 & 1A-ACRE FIRST FLOOR SECURITY PLAN - AREA C 16 29
T-402D BUILDING 1 & 1A-ACRE FIRST FLOOR SECURITY PLAN - AREA D 17 29
T-403A BUILDING 1 & 1A-ACRE SECOND FLOOR SECURITY PLAN - AREA A 18 29
T-403B BUILDING 1 & 1A-ACRE SECOND FLOOR SECURITY PLAN - AREA B 19 29
T-403C BUILDING 1 & 1A-ACRE SECOND FLOOR SECURITY PLAN - AREA C 20 29
T-404A BUILDING 1 & 1A-ACRE THIRD FLOOR SECURITY PLAN - AREA A 21 29
T-404B BUILDING 1 & 1A-ACRE THIRD FLOOR SECURITY PLAN - AREA B 22 29
T-404C BUILDING 1 & 1A-ACRE THIRD FLOOR SECURITY PLAN - AREA C 23 29
T-405A BUILDING 1 & 1A-ACRE FOURTH FLOOR SECURITY PLAN - AREA A 24 29
T-405B BUILDING 1 & 1A-ACRE FOURTH FLOOR SECURITY PLAN - AREA B 25 29
T-405C BUILDING 1 & 1A-ACRE FOURTH FLOOR SECURITY PLAN - AREA C 26 29
T-501 TECHNOLOGY DETAILS 27 29
T-502 TECHNOLOGY DETAILS 28 29
T-601 TECHNOLOGY RISERS 29 29
PROJECT
LOCATION
DocuSign Envelope ID: 4170B743-6FE2-4320-BC0E-F6BE3A006436
6/12/2024
PARKING GARAGE
BUILDING #9
VA MEDICAL CENTER
BUILDING #1
CLINICAL ADDITION
MAIN ENTRANCE PARKING ATTENDANT
BUILDING #10
P
IE
R C
E A
V E
N U
E
OXYGEN TANK
#4 SERVICE DRIVE
WAREHOUSE-DOCK
AMBULATORY CARE
ENTRANCE
BOILER ROOM
CHIMNEY STACK
EMPLOYEE
PARKING
M O
D U
L A
R B
U
IL
D
IN
G
B
U
IL
D
IN
G
#3
#7
ACRE BLDG
MH ANNEX
BLDG #1A
G A
R L
A N
D A
V E
N U
E
BACKFLOW PREVENTER
#6
24TH AVENUE SOUTH
FLAGPOLE
#2
CONTRACTOR PARKING
9,442 SF
EMPLOYEE PARKING
H
IG
H L A
N D
A V
E N
U E
SPS
GUARD STATION
ELECTRIC MANHOLEVAULT
AREA OF WORK
LEGEND
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:2
:4
P
M C
U s e rs
\l s ta rn e s \D o c u m e n ts \E
-2 -2
N -V
A N a s h v ill e -V id e o S e c I m p ro v ls ta rn e s C
B U
M B
.r v t
G-002
SITE PLAN - NASHVILLE VAMC
2 3NPM
VIDEO SURVEILLANCE
SECURITY- NASHVILLE
NASHVILLE VAMC
1310 24TH AVENUE SOUTH
NASHVILLE, TN 37212 JUNE 13, 2024
BID DOCUMENTS
626-22-10322-215N
GTS
A. REFERENCE SHEET TS101 FOR EXTERIOR
CAMERA LOCATIONS.
B. ALL EXISTING CONDITIONS ARE BASED ON THE
BEST AVAILABLE INFORMATION AT THE TIME
OF SURVEY.
C. NEW CCTV CABLING TO BE RUN ON J-HOOKS 2'
OC ABOVE CEILING IN CORRIDORS.
D. ALL CONDUIT SHALL BE 3/4" MINIMUM. EC TO
SIZE CONDUIT. PER THE MOST CURRENT
EDITION OF THE NEC.
E. WHERE LENGTH FROM CAMERA TO RACK
EQUIPMENT EXCEED 295' (90M) CONTRACTOR
SHALL USE FIBER OPTIC CABLE.
F. COORDINATE AND CONFIRM ALL ROUTING
WITH COR PRIOR TO ROUGH-IN.
Scale: 1" = 40'-0"
SITE PLAN - NASHVILLE VAMC
N O
R T
H0 4020 80
SITE, 1, 1A, ACRE
IIILOW Risk Group 1
Class III
Note: Infection Control approval will be required when the Construction Activity and Risk Level indicate that
It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation
I
I
III
MEDIUM Risk Group 2
HIGH Risk Group 3
HIGHEST Risk Group 4 V
V
IV
V
IV
III
IV
II
III
Patient Risk Group Table
Infection Control Matrix - Class of Precautions: Construction Project by Patient Risk
TYPE A
Construction Project Type
Major demolition and construction projects Includes, but is not limited to:
• Removal or replacement of building system component(s).
• Removal/installation of drywall partitions.
• Invasive large-scale new building construction.
• Renovation work in two or more rooms.
Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies Includes, but is not limited to:
• Removal of preexisting floor covering, walls, casework or other building components.
• New drywall placement.
• Renovation work in a single room.
• Nonexisting cable pathway or invasive electrical work above ceilings.
• The removal of drywall where a moderate amount of dust and debris is created.
• Dry sanding where a moderate amount of dust and debris is created.
• Work creating significant vibration and/or noise.
• Any activity that cannot be completed in a single work shift.
Small scale, short duration activities which create minimal dust Includes, but is not limited to:
• Work conducted above the ceiling (e.g., prolonged inspection or repair of firewalls and barriers, installation of conduit and/or cabling, and access to mechanical and/or electrical chase spaces).
• Fan shutdown/startup.
• Installation of electrical devices or new flooring that produces minimal dust and debris.
• The removal of drywall where minimal dust and debris is created.
• Controlled sanding activities (e.g., wet or dry sanding) that produce minimal dust and debris.
Inspection and Non-Invasive Activities Includes, but is not limited to:
• Removal of ceiling tile for visual inspection-limited to 1 tile per 50 square feet with limited exposure time.
• Limited building system maintenance (e.g., pneumatic tube station, HVAC system, fire suppression system, electrical and carpentry work to include painting without sanding) that does not create dust or debris.
• Clean plumbing activity limited in nature.
Type of Construction / Project Activity Table
Group 2 Medium Risk
Group 1 Low Risk
• Physical Therapy
• Radiology departments
• All patient waiting rooms
• All outpatient clinics
• Research Areas
• Respiratory Therapy
• Office areas (non-clinical)
• FES/EMS areas
I
Patient Risk Group
TYPE D
TYPE C
TYPE B
TYPE A
Group 4 Highest Risk
Group 3 High Risk
• Emergency Room
• Clinical Laboratories (specimen)
• Same Day Surgery
• Pharmacy
• Nutrition and Food
Service/Canteen
• Procedural Areas (GI)
• Inpatient Mental Health
• Any area caring for immunocompromised patients
• Cardiac Cath Lab/IR
• Central Sterile Supply
• Sterile Processing Service
• Intensive Care Units
IIII
TYPE DTYPE CTYPE B
Class IVor control procedures are necessary.
C
LA
S S
IV
During Construction Project Upon Completion of Project
1. Includes all activities required by Class III
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities Management
Maintenance and Engineering department before construction begins.
3. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.
4. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage. Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.
5. Seal all penetrations in containment barriers, including floors and ceiling, using approved materials (UL schedule firestop if applicable for barrier type).
6. Containment units or environmental containment units (ECUs) approved for Class IV precautions in small areas totally contained by the unit and that has HEPA-filtered exhaust air.
7. Remove or isolate return air diffusers to avoid dust entering the HVAC system.
8. Remove or isolate the supply air diffusers to avoid positive pressurization of the space.
9. Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.
10. Maintain negative pressurization of the entire workspace by use of HEPA exhaust air systems directed outdoors. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows does not require HEPA-filtered air.
11. If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, HEPA filtration must be verified by particulate measurement as no less than 99.97% efficiency and must not alter or change airflow/pressure relationships in other areas.
12. Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (e.g., bathroom exhaust) is not acceptable.
13. Install device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.
14. Contain all trash and debris in the work area.
15. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.
16. Worker clothing must be clean and free of visible dust before leaving the work area.
HEPA vacuuming of clothing or use of cover suites is acceptable.
17. Workers must wear shoe covers prior to entry into the work area. Shoe covers must be changed prior to exiting the anteroom to the occupied space (non-work area). Damaged shoe covers must be immediately changed.
18. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.
19. Consider collection of particulate data during work to monitor and ensure that contaminates do not enter the occupied spaces. Routine collection of particulate samples may be used to verify HEPA filtration efficiencies.
• Medical/Surgical Units
• Negative pressure isolation rooms
• Outpatient Chemotherapy
Areas
• Operating rooms
• Post Anesthesia Care Unit
• Dialysis
• Dental
C
LA
S S
V
1. Includes all activities required by Class IV
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities Management
Maintenance and Engineering department before construction begins.
3. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.
4. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage. Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.
5. Seal all penetrations in containment barriers, anteroom barriers, including floors and ceiling using approved materials (UL schedule firestop if applicable for barrier type).
6. Construct anteroom large enough for equipment staging, cart cleaning, workers. The anteroom must be constructed adjacent to entrance of construction work area.
7. Personnel will be required to wear coveralls at all times during Class V work activities.
Coveralls must be removed before leaving the anteroom.
8. Remove or isolate return air diffusers to avoid dust entering the HVAC system.
9. Remove or isolate the supply air diffusers to avoid positive pressurization of the space.
10. Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.
11. Maintain negative pressurization of the entire workspace using HEPA exhaust air systems directed outdoors. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows does not require HEPA-filtered air.
12. If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, HEPA filtration must be verified by particulate measurement as no less than 99.97% efficiency and must not alter or change airflow/pressure relationships in other areas.
13. Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (bathroom exhaust) is not acceptable.
14. Install device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.
15. Contain all trash and debris in the work area.
16. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.
17. Worker clothing must be clean and free of visible dust before leaving the work area anteroom.
18. Workers must wear shoe covers prior to entry into the work area. Shoe covers must be changed prior to exiting the anteroom to the occupied space (non-work area).
Damaged shoe covers must be immediately changed.
19. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.
20. Consider collection of particulate data during work to monitor and ensure that contaminates do not enter the occupied spaces. Routine collection of particulate samples may be used to verify HEPA filtration efficiencies.
Construction areas must be inspected by an infection preventionist or designee and engineering representative for discontinuation or downgrading of ICRA precautions.
Work Area Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
Removal of Critical Barriers:
1. Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed.
2. All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:
1. Carefully remove screws and painter tape.
2. If dust will be generated during screw removal, use hand-held HEPA vacuum.
3. Drywall cutting is prohibited during removal process.
4. Clean all stud tracks with HEPA vacuum before removing outer hard barrier.
5. Use a plastic barrier to enclose area if dust could be generated.
Negative Air Requirements:
1. The use of negative air must be designed to remove contaminates from the work area.
2. Negative air devices must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.
HVAC systems:
1. Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed.
2. Verify that HVAC systems are clean and operational.
3. Verify the HVAC systems meets original airflow and air exchange design specifications.
It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation
During Construction Project
C
LA
S S
I
Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
HVAC Systems:
1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.
2. Verify the HVAC systems meet original airflow and air exchange design specifications.
Upon Completion of Project
1. Execute work by methods to minimize raising dust from construction operations.
2. Perform noninvasive work activity as to not block or interrupt patient care.
3. Perform noninvasive work activities in areas that are not directly occupied with patients.
4. Perform noninvasive work activity in a manner that does not create dust.
5. Immediately replace any displaced ceiling tile before leaving the area and/or at end of noninvasive work activity.
C
LA
S S
II
Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
HVAC Systems:
1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.
2. Verify the HVAC systems meet original airflow and air exchange design specifications.
1. Includes all activities required by Class I
2. Perform only limited dust work and/or activities designed for basic facilities and engineering work.
3. Perform limited dust and invasive work following standing precautions procedures approved by the organization.
4. This Class of Precautions must never be used for construction or renovation activities.
5. Provide active means to prevent airborne dust from dispersing into atmosphere.
6. Water mist work surfaces to control dust while cutting.
7. Seal unused doors with duct tape.
8. Block off and seal air vents.
9. Replace adhesive walk-off mats at entrance and exit of work area. Replace used mats in accordance with manufacturer's recommendations.
10. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
Construction areas must be inspected by an infection preventionist or designee and engineering representative for discontinuation or downgrading of ICRA precautions.
Work Area Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
Removal of Critical Barriers:
1. Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed.
2. All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:
1. Carefully remove screws and painter tape.
2. If dust will be generated during screw removal, use hand-held HEPA vacuum.
3. Drywall cutting is prohibited during removal process.
4. Clean all stud tracks with HEPA vacuum before removing outer hard barrier.
5. Use a plastic barrier to enclose area if dust could be generated.
Negative Air Requirements:
1. The use of negative air must be designed to remove contaminates from the work area.
2. Negative air devices must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.
HVAC systems:
1. Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed.
2. Verify that HVAC systems are clean and operational.
3. Verify the HVAC systems meets original airflow and air exchange design specifications.
CONSTRUCTION ACTIVITIES SHALL BE CLASSIFIED AS FOLLOWS UNLESS NOTED OTHERWISE:
1. INSTALLATION OF CABLE TRAY IN CORRIDOR CEILINGS SHALL BE CONSIDERED CONSTRUCITON ACTIVITY TYPE B.
2. ALL CONDUIT SPECIFIED TO BE INSTALLED IN WALL SHALL BE CONSIDERED CONSTRUCTION ACTIVITY TYPE C.
3. CONSTRUCTION OF NEW ROOMS SHALL BE CONSIDERED CONSTRUCTION ACTIVITY TYPE D.
4. INSTALLATION OF NEW DOORS TO OR FROM EXISTING SPACES SHALL BE CONSIDERED CONSTRUCTION ACTIVITY TYPE C.
C
LA
S S
II
I
1. Includes all activities required by Class II
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities
Management Maintenance and Engineering department before construction begins.
3. Provide active means to prevent airborne dust dispersion into the occupied areas.
4. Means for controlling minimal dust dispersion may include hand-held HEPA vacuum devices, polyethylene plastic containment, or isolation of work area by closing room door.
5. Remove or isolate return air diffusers to avoid dust from entering the HVAC system.
6. Remove or isolate the supply air diffusers to avoid positive pressurization of the space,
7. If work area is contained, then it must be neutrally to negatively pressurized at all times.
8. Seal all doors with tape that will not leave residue.
9. Contain all trash and debris in the work area.
10. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.
11. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.
12. Maintain clean surroundings when area is not contained by damp mopping or HEPA vacuuming surfaces.
13. Clean construction area at the end of each shift by damp mopping or HEPA Vacuum.
For Type C activities, follow procedures for Class IV.
Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
HVAC Systems:
1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.
2. Verify the HVAC systems meet original airflow and air exchange design specifications.
ILSM SIGNAGE
INTERIM LIFE SAFETY MEASURES IN EFFECT
[VIDEO SURVEILLANCE SECURITY - NASHVILLE]
THIS EXIT IS CLOSED AND LEADS TO A
CONSTRUCTION AREA.
PLEASE USE ALL ALTERNATE EXITS AS MARKED.
1' - 5"
1/2"1/2"
/2
/2
/2
/2
/2
/2
EQ.EQ.
ILSM TEMPORARY BARRIER TAG
PROJECT:
PRIME CONTRACTOR:
SUB CONTRACTOR:
EMERGENCY CONTACT NO.:
BARRIER INSTALLATION DATE:
BARRIER EXPIRATION DATE:
NOTE:
TAG SHALL BE PLACED ON ALL ILSM
TEMPORARY BARRIERS, FINAL LOCATION BY G.C.
EXISTING CEILING
TOP SEALING RUNNER
EXISTING WALL
ASSEMBLY
PLASTIC SHEET BARRIER
SUPPORT POLES,
QUANTITY PER MANUF.
RECOMMENDATIONS
BOTTOM SEALING
RUNNER
REQU.
AS
A PLASTIC SHEET BARRIER
NON-RATED
INFECTION CONTROL RISK
ASSESSMENT, INTERIM LIFE
SAFETY MEASURES, FIRE
WATCH AND MISCELLANEOUS
FORMS
PAPER
CADDY
FIRE EXTINGUISHER
ON PORTABLE FLOOR
BRACKET (ILSM MAY
REQUIRE MORE THAN
ONE).
SUPPLY DUCTS
EITHER KEEP
RUNNING OR COVER
WHEN NOT RUNNING
TO KEEP DUST OUT
COVER ALL
RETURNS AT THE
GRATE/DIFFUSERS
SUSPENDED PLASTIC
ZIPPER WALL
CURTAIN BARRIER
POST ICRA, ILSM, FIRE
INPECTION SHEETS
VISIBLE TO PUBLIC
EXISTING WALL
BARRIER
GI002
POST ICRA,
ILSM, FIRE
INSPECTION
SHEETS
VISIBLE TO
PUBLIC
G-100
SUSPENDED
PLASTIC ZIPPER
WALL CURTAIN
BARRIER
A P
P R
O X
A .F
.F
PLASTIC
WINDOW
SWIVEL CASTERS
WITH TWO
LOCKING BRAKES
MOBILE CART
A D
J U
S T
A B
L E
H
E
IG
H T
HEPA NEGATIVE
AIR UNIT
EXISTING
WALL
EXISTING CEILINGFLEX DUCT
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:2
:4
P
M C
U s e rs
\l s ta rn e s \D o c u m e n ts \E
-2 -2
N -V
A N a s h v ill e -V id e o S e c I m p ro v ls ta rn e s C
B U
M B
.r v t
G-100
ICRA INFORMATION AND DETAILS &
NOTES
3 3NPM
VIDEO SURVEILLANCE
SECURITY- NASHVILLE
NASHVILLE VAMC
1310 24TH AVENUE SOUTH
NASHVILLE, TN 37212 JUNE 13, 2024
BID DOCUMENTS
626-22-10322-215N
GTS
Scale: 3" = 1'-0"
ILSM CONSTRUCTION EGRESS SIGNAGE
Scale: No Scale
ILSM BARRIER TAG
A. TAPE ALL SERVICES TO PROTECT AGAINST
CONTAMINATION
B. THE CONTRACTOR SHALL NOT HAUL DEBRIS
THROUGH PATIENT-CARE AREAS WITHOUT PRIOR
APPROVAL OF THE COR AND THE MEDICAL CENTER
C. USING A HEPA VACUUM, CLEAN INSIDE THE BARRIER
AND VACUUM CEILING TILE PRIOR TO REPLACEMENT.
ANY CEILING ACCESS PANELS OPENED FOR
INVESTIGATION BEYOND SEALED AREAS SHALL BE
SEALED IMMEDIATELY WHEN UNATTENDED.
D. AT COMPLETION, REMOVE CONSTRUCTION
BARRIERS AND CEILING PROTECTION CAREFULLY,
OUTSIDE OF NORMAL WORK HOURS. VACUUM AND
CLEAN ALL SURFACES FREE OF DUST AFTER THE
REMOVAL.
E. CONTRACTOR TO VERIFY AND COORDINATE FINAL
AND APPROVED ICRA MEASURES WITH THE
NASHVILLE VA MEDICAL CENTER'S ICRA PERSONNEL,
PRIOR TO THE COMMENCEMENT OF CONSTRUCTION
ACTIVITY.
Scale: 3/4" = 1'-0"
ICRA BARRIER WALL TYPE
Scale: 1/2" = 1'-0"
TYPICAL CONSTRUCTION PLAN LAYOUT
Scale: 1/2" = 1'-0"
ICRA ROOM ELEVATION
Scale: 1/2" = 1'-0"
ICRA MOBILE CONTAINMENT CART
S SS
A/E ARCHITECT / ENGINEER
AAHX AIR TO AIR HEAT EXCHANGER
AB AIR BLENDER
AAV AUTOMATIC AIR VENT
ACC AIR-COOLED CONDENSER
ACCH AIR-COOLED CHILLER
ACCU AIR-COOLED CONDENSING UNIT
ACU AIR CONDITIONING UNIT
ACD AUTOMATIC CONTROL DAMPER,
MODULATING
ACD-TP AUTOMATIC CONTROL DAMPER,TWO
POSITION
AD ACCESS DOOR
AF AFTER FILTER
AFCV AIR FLOW CONTROL VALVE
AFF ABOVE FINISHED FLOOR
AFMD AIR FLOW MEASURING DEVICE
AFW AIR FOIL WHEEL (FAN)
AHU AIR-HANDLING UNIT
AMP AMPERAGE
AP ACCESS PANEL
APD AIR PRESSURE DROP
ARI AIR CONDITIONING AND
REFRIGERATION INSTITUTE
AS AIR SEPARATOR
ASME AMERICAN SOCIETY OF MECHANICAL
ENGINEERS
AW AIR WASHER
AXF AXIAL FLOW
B BOILER
BD BUTTERFLY DAMPER
BDD BACKDRAFT DAMPER
BDR BASE BOARD RADIATOR
BFP BACKFLOW PREVENTER
BFT BOILER PLANT FIRE TUBE
BHP BRAKE HORSEPOWER
BHW HOT WATER HEATING BOILER
BHX BOILER BLOWDOWN HEAT
EXCHANGER
BIW BACKWARD INCLINED WHEEL (FAN)
BSC BIOLOGICAL SAFETY CABINETS
BT BUFFER TANK
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
C CENTIGRADE (CELSIUS)
CC COOLING COIL
CCD COOLING COIL CONDENSATE DRAIN
CENT CENTRIFUGAL
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFT CUBIC FEET
CFP CHEMICAL FEED PUMP
CH CHILLER
CHWP CHILLED WATER PUMP
CHW CHILLER WATER
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
CI CAST IRON
CM CARBON MONOXIDE
CM CUBIC METER
CM/S CUBIC METER PER SECOND
CO CLEAN OUT
CO2 CARBON DIOXIDE
COMP COMPRESSOR UNIT
COP COEFFICIENT OF PERFORMANCE
CP CONDENSATE PUMP
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CV CONSTANT VOLUME
CW COLD WATER (POTABLE)
CHWCC CHILLED WATER COOLING COIL
D DAMPER - AUTOMATIC
D-1 OUTDOOR AIR DAMPER
D-2 RETURN AIR DAMPER
D-3 RELIEF AIR DAMPER
D-4 ECONOMIZER OUTDOOR AIR
DAMPER
dB DECIBELS Db DRY-BULB TEMPERATURE
DDC DIRECT DIGITAL CONTROLS
DEG DEGREE
DF DIFFUSER
DIA DIAMETER
DIW DEIONIZED WATER
DP DEW POINT TEMPERATURE
DP DIFFUSER PLATE
DPA DIFFERENTIAL PRESSURE
ASSEMBLY
DPS DIFFERENTIAL PRESSURE SENSOR
DX DIRECT EXPANSION
DXCC DIRECT EXPANSION COOLING COIL
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
ECC ENGINEERING CONTROL CENTER
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
EG EXHAUST GRILLE
EGS EMERGENCY GAS SHUTOFF
EH EXHAUST HOOD
EJ EXPANSION JOINT
EMD END OF MAIN DRIP (STEAM)
ENT ENTERING
ESP EXTERNAL STATIC PRESSURE
EWT ENTERING WATER TEMPERATURE
EX EXISTING
F FAHRENHEIT
F&T FLOAT AND THERMOSTATIC
F/SDPR COMBINATION FIRE SMOKE DAMPER
FA FREE AREA
FC FLEXIBLE CONNECTION
FCU FAN COIL UNIT (4 PIPE)
FCW FORWARD CURVED WHEEL (FAN)
FD FLOOR DRAIN
FD FIRE DAMPER
FF FINAL FILTER
FM FLOW METER
FPM FEET PER MINUTE
FPS FEET PER SECOND
FRP FIBER REINFORCED POLYESTER
FS FLOW SWITCH
FSTAT FREEZESTAT
FT FEET
FT-LB FOOT-POUND
FTR FIN TUBE RADIATION
FV FACE VELOCITY
GA GAUGE
GAL GALLONS
GH GRAVITY HOOD
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GS GALVANIZED STEEL
H HUMIDIFIER
H&CW HOT & COLD WATER
HAC HOUSEKEEPING AID CLOSET
HB HOSE BIBB
HC HEATING COIL
HD HEAD
HD HOOD
HHW HEATING HOT WATER
HHWC HEATING HOT WATER COIL
HHWP HEATING HOT WATER PUMP
HHWR HEATING HOT WATER RETURN
HHWS HEATING HOT WATER SUPPLY
HOA HAND/OFF/AUTOMATIC
HP HEAT PUMP
HP HORSEPOWER
HPDT HIGH PRESSURE DRIP TRAP
HPR HIGH PRESSURE RETURN (STEAM
CONDENSATE)
HPS HIGH PRESSURE SUPPLY (STEAM)
HRC HEAT RECOVERY COIL
HRD HEAT RECOVERY DEVICE
HRP HYDRONIC RADIANT (CEILING) PANEL
HRW HEAT RECOVERY WHEEL
HSTAT HUMIDISTAT
HUM HUMIDIFIER UNIT MOUNTED
HVU HEATING AND VENTILATING UNIT
HW HOT WATER
HWC HOT WATER COIL
HWUH HOT WATER UNIT HEATER
HX HEAT EXCHANGER
Hz HERTZ
I/O INPUT/OUTPUT
IAQ INDOOR AIR QUALITY
IBT INVERTED BUCKET TRAP
ICF IN-LINE CENTRIFUGAL FAN
ICU INTENSIVE CARE UNIT
ID INSIDE DIAMETER
IFB INTEGRAL FACE AND BYPASS
IN INCHES
IN HG INCHES OF MERCURY
IN WC INCH WATER COLUMN
IN WG INCH WATER GAUGE
IN-LB INCH-POUND
IPLV INTEGRATED PART LOAD VALUE
IRH INFRARED HEATER
IS INSECT SCREEN
IV INLET VANES
kg KILOGRAM kg/HR KILOGRAM PER HOUR kPa KILOPASCAL kW KILOWATT kWh KILOWATT HOUR
L LITER
L/s LITERS PER SECOND
LAT LEAVING AIR TEMPERATURE
LBS/HR POUNDS PER HOUR
LF LINEAR FOOT (FEET)
LH LATENT HEAT
LPR LOW PRESSURE RETURN (STEAM
CONDENSATE)
LPS LOW PRESSURE SUPPLY (STEAM)
LSD LINEAR SLOT DIFFUSER
LTCP LOCAL TEMPERATURE CONTROL
PANEL
LVG LEAVING
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
M METER, SI UNIT
M/s METERS PER SECOND (OR
METERS/SECOND)
MA MIXED AIR
MAT MIXED AIR TEMPERATURE
MAV MANUAL AIR VENT
MAX MAXIMUM
MB MIXING BOX
MBH 1000 BTUH
MCA MINIMUM BRANCH CIRCUIT AMPACITY
MER MECHANICAL EQUIPMENT ROOM
MERV MINIMUM EFFICIENCY REPORTING
VALUE
MHP MOTOR HORSEPOWER
MIN MINIMUM
MM MILLIMETER
MOV MOTOR OPERATED VALVE
MPR MEDIUM PRESSURE RETURN (STEAM
CONDENSATE)
MPS MEDIUM PRESSURE SUPPLY (STEAM)
MTD MEAN TEMPERATURE DIFFERENCE
MVD MANUAL VOLUME DAMPER
NA NOT APPLICABLE
NC NOISE CRITERIA
NC NORMALLY CLOSED
NO NORMALLY OPEN
NOAA NATIONAL OCEANIC & ATMOSPHERIC
ADMINISTRATION
NOM NOMINAL
NPLV NON-STANDARD PART LOAD VALUE
NPSH NET POSITIVE SUCTION HEAD
NTS NOT TO SCALE
OA OUTSIDE AIR
OAI OUTSIDE AIR INTAKE
OD OUTSIDE DIAMETER
OR OPERATING ROOM
OSA OUTSIDE SUPPLY AIR
(CONDITIONED)
P PUMP
PC PUMPED CONDENSATE
PCF POUNDS PER CUBIC FOOT (FEET)
PD PRESSURE DROP
PF PRE-FILTER
PG PRESSURE GAGE
PHC PREHEAT COIL
PHCP PREHEAT COIL PUMP
PPM PARTS PER MILLION
PRV PRESSURE REGULATING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH –
ABSOLUTE
PSIG POUNDS PER SQUARE INCH – GAGE
PSS PRIMARY SECONDARY SYSTEM
PSV PRESSURE SAFETY VALVE
R/E RETURN OR EXHAUST
RA RETURN AIR
RAT RETURN AIR TEMPERATURE
RDS ROOM DATA SHEETS
REA RELIEF AIR
RF RETURN FAN
RG RETURN GRILLE
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RL REFRIGERANT LIQUID LINE
RLA RUN LOAD AMPERE
RPM REVOLUTIONS PER MINUTE
RS REFRIGERANT SUCTION
RTU ROOF TOP UNIT
RV RELIEF VALVE
SA SUPPLY AIR
SAD SOUND ATTENUATING DEVICE
SAT SUPPLY AIR TEMPERATURE
SC SHADING COEFFICIENT
SCFM STANDARD CUBIC FEET PER MINUTE
SCR SILICON CONTROLLED RECTIFIER
SD SMOKE DETECTOR
SD SUPPLY AIR DIFFUSER
SDPR SMOKE DAMPER
SDR SMOKE DAMPER (RETURN)
SDS SMOKE DAMPER (SUPPLY)
SEN SENSIBLE HEAT
SF SUPPLY FAN
SH STEAM HUMIDIFIER
SHC STEAM HEATING COIL
SI SQUARE INCHES
SP STATIC PRESSURE
SP GR SPECIFIC GRAVITY
SPD SUPPLY PROCESS AND
DISTRIBUTION
SPRV STEAM PRESSURE REDUCING VALVE
SPS STATIC PRESSURE SENSOR
SQ FT SQUARE FOOT (FEET)
SR SUPPLY AIR REGISTER
SS STAINLESS STEEL
SSR SOLID SEPARATOR
ST STEAM TRAP
SV STEAM SAFETY VALVE
SVS STEAM VENT SILENCER
T & PCV TEMPERATURE AND PRESSURE
CONTROL VALVE
TAB TESTING, ADJUSTING, BALANCE
TD TEMPERATURE DIFFERENCE
TDH TOTAL DYNAMIC HEAD
TDS TOTAL DISSOLVED SOLIDS
TP TRAP
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
TU TERMINAL UNIT
UC UNDER CUT
UH UNIT HEATER
UL UNDERWRITERS LABORATORY
V VALVE
VAF VANE-AXIAL FAN
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER (MANUAL
OPPOSED BLADE)
VFD VARIABLE FREQUENCY DRIVE
VHA VETERANS HEALTH ADMINISTRATION
VI VIBRATION ISOLATOR
VP VACUUM PUMP
VPS VARIABLE PRIMARY SYSTEM
VR VACUUM (STEAM CONDENSATE)
RETURN
VSD VARIABLE SPEED DRIVE
VUH VERTICAL UNIT HEATER
W WATTS
Wb WET-BULB (TEMPERATURE)
WFCV WATER FLOW CONTROL VALVE
WFM WATER FLOWMETER
WFMD WATER FLOW MEASURING DEVICE
WG WATER GAGE
WPD WATER SIDE PRESSURE DROP
XT EXPANSION TANK
YR YEAR
MECHANICAL ABBREVIATIONS
CO2 CARBON DIOXIDE SENSOR
HUMIDISTAT OR HUMIDITY SENSOR
SUPPLY DIFFUSER
RETURN GRILLE
EXHAUST GRILLE
ROUND FLEX DUCT
LINEAR SLOT DIFFUSER
BALANCING DAMPER
FIRE DAMPER
SMOKE DAMPER
D
R INCLINED RISE, IN
DIRECTION OF AIRFLOW
INCLINED DROP, IN DIRECTION
OF AIRFLOW
CONNECT NEW DUCT
TO EXISTING
LIMIT OF DEMOLITION
VANED ELBOW (PROVIDE ALL
SQUARE OR RECTANGULAR
ELBOWS WITH VANES EVEN IF
SYMBOL IS MISSING)
STANDARD RADIUS ELBOW
(LONG RADIUS)
10x8 NEW DUCT (INSIDE
DIMENSIONS: WIDTH X DEPTH)
EXISTING DUCT TO REMAIN
EXISTING DUCT TO BE
DEMOLISHED
DUCT TRANSITION
END MOUNTED OR SIDEWALL GRILLE
SUPPLY
RETURN45°
45°
DN
DN
UP
UP
DNUP
STANDARD BRANCH SUPPLY OR
RETURN, NO SPLITTER (45° TAP)
SUPPLY DUCT (UP & DOWN)
EXHAUST DUCT (UP & DOWN)
RETURN DUCT (UP & DOWN)
S-60
S-15
CR-15
CHWS
CHWR
HIGH PRESSURE STEAM
PIPING (60 PSI)
LOW PRESSURE STEAM PIPING
(15 PSI AND BELOW)
LOW PRESSURE STEAM
CONDENSATE RETURN
CHILLED WATER SUPPLY PIPING
CHILLED WATER RETURN PIPING
PIPE UP
PIPE DOWN
BOTTOM CONNECTION
TOP CONNECTION
CAPPED OR PLUGGED PIPE
GLOBE VALVE
GATE VALVE
BALL VALVE
STEAM SAFETY VALVE
PRESSURE REGULATING VALVE
WYE STRAINER VALVE
BALANCING VALVE
MODULATING TWO-WAY CONTROL
VALVE
STEAM TRAP
D CONDENSATE DRAIN LINE
CR-60 HIGH PRESSURE STEAM
CONDENSATE RETURN
HWS
HWR
HEATING HOT WATER SUPPLY
PIPING
HEATING HOT WATER RETURN PIPING
RLS REFRIGERANT LINE SET (LIQUID
AND SUCTION)
CONNECT TO EXISTING PIPE
LIMIT OF DEMOLITION
INLINE CENTRIFUGAL PUMP
STEAM PRESSURE REDUCING
VALVE
DRAIN VALVE
TEST PLUG
SUPPLY
TERMINAL UNIT SUPPLY
DUCT BRANCH (CONICAL
TAP)
CHECK VALVE
FIRE / SMOKE DAMPER
VANED ELBOW (SHORT RADIUS) S-30
CR-30
MEDIUM PRESSURE STEAM
PIPING (16 PSI AND 59 PSI)
MEDIUM PRESSURE STEAM
CONDENSATE RETURN
THERMOSTAT OR TEMPERATURE SENSOR
TWO POSITION CONTROL VALVE
MODULATING THREE-WAY
CONTROL VALVE
T
H
F
SD
FS
MECHANICAL LEGEND
MOTORIZED DAMPER
1. WORK SHALL CONFORM TO APPLICABLE LOCAL, STATE, AND NATIONAL CODES AND APPLICABLE VA STANDARDS.
2. INSTALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS.
3. PROVIDE NEW MATERIALS, EQUIPMENT AND PRODUCTS INCORPORATED IN THE WORK, OF A SUITABLE GRADE FOR THE PURPOSES INTENDED.
4. WHERE POSSIBLE, PROVIDE STANDARD PRODUCTS OF THE VARIOUS MANUFACTURERS EXCEPT WHERE SPECIAL CONSTRUCTION OR PERFORMANCE FEATURES ARE REQUIRED.
5. EQUIPMENT OR MATERIAL DEVIATIONS FROM INDICATED CONTRACT REQUIREMENTS SHALL BE SUBJECT TO THE APPROVAL OF THE COR. SUBMIT PROPOSED EQUIPMENT DEVIATIONS THAT ARE SIMILAR BOTH IN QUALITY AND CAPACITY TO THAT EQUIPMENT SPECIFIED, AS SOLELY DETERMINED BY THE COR.
6. PROVIDE MECHANICAL EQUIPMENT THAT IS LISTED AND LABELED BY UNDERWRITERS LABORATORIES (U.L.).
7. INSTALL EQUIPMENT AS INDICATED, ALLOWING FOR SUFFICIENT ACCESS AND CLEARANCE SPACE FOR EQUIPMENT MAINTENANCE, REPAIRS, AND REPLACEMENT.
8. INSTALL EQUIPMENT WITH PROPER CLEARANCES FOR REQUIRED PIPING AND ELECTRICAL SERVICES AND CONNECTIONS. INSTALL EQUIPMENT WITH REQUIRED ACCESS AND CLEARANCES IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS AND APPLICABLE CODES AND STANDARDS.
9. COORDINATE LOCATION, INSTALLATION, AND ROUTING OF DUCTWORK, PIPING, AND EQUIPMENT WITH WORK OF ALL OTHER TRADES.
10. PROVIDE SUPPORT FOR MECHANICAL EQUIPMENT. COORDINATE SUPPORT LOCATIONS WITH ALL CONTRACTORS PRIOR TO INSTALLATION.
11. PROVIDE POWER CONNECTIONS TO EQUIPMENT PROVIDED UNDER THIS CONTRACT AS WORK OF DIVISION 26.
12. PROVIDE CONTROL WIRING FOR MECHANICAL EQUIPMENT AS WORK OF DIVISION 23.
13. DUCTWORK AND PIPING LAYOUTS AND LOCATIONS ARE SCHEMATIC. DO NOT SCALE THESE DRAWINGS. COORDINATE AND DETERMINE EXACT ROUTING OF DUCTWORK AND
PIPING IN THE FIELD.
14. FIELD VERIFY DIMENSIONS BY ACTUAL MEASUREMENT AND OBSERVATION BEFORE ORDERING OR FABRICATING DUCTWORK, PIPING OR EQUIPMENT.
15. NOTIFY COR REGARDING DISCREPANCIES BETWEEN CONTRACT DOCUMENTS AND EXISTING CONDITIONS OR DIMENSIONS BEFORE PERFORMING WORK. FAILURE TO VERIFY AND REPORT SHALL CONSTITUTE CONTRACTOR'S ACCEPTANCE OF EXISTING CONDITIONS AS FIT FOR THE PROPER EXECUTION OF THE WORK.
16. SEE ARCHITECTURAL DRAWINGS FOR FINAL LOCATION OF CEILING INSTALLED EQUIPMENT.
17. INSTALL DUCTWORK AND PIPING AS HIGH AS POSSIBLE AND AS CLOSE AS POSSIBLE TO BUILDING WALLS, CEILING AND FLOOR AND ROOF STRUCTURE. PROVIDE OFFSETS, FITTINGS, AND DIMENSIONAL TRANSITIONS NOT SHOWN BUT REQUIRED TO MAINTAIN MINIMUM CLEAR SPACE TO BUILDING SURFACES AT NO ADDITIONAL COST.
18. PATCH, PAINT AND CLEAN SURFACES SUSTAINING DAMAGE ASSOCIATED WITH MECHANICAL WORK OF THIS CONTRACT, UNLESS NOTED OTHERWISE.
19. SUBMIT BOUND SET OF OPERATING AND MAINTENANCE INSTRUCTIONS FOR EQUIPMENT AT COMPLETION OF PROJECT.
20. INSTALL ESCUTCHEONS IN ALL PLACES WHERE PIPING PENETRATES A WALL IN AN EXPOSED LOCATION.
21. MAKE A COMPLETE REVIEW OF DRAWINGS, INCLUDING SCHEDULES AND DETAILS, PRIOR TO BEGINNING MECHANICAL SYSTEM INSTALLATION. RESOLVE CONFLICTS WITH COR.
22. DRAWING PLANS, SCHEMATICS, AND DIAGRAMS INDICATE GENERAL LOCATION AND ARRANGEMENT OF PIPING SYSTEMS.
23. INSTALL PIPING INDICATED TO BE EXPOSED AND PIPING IN EQUIPMENT ROOMS AND SERVICE AREAS AT RIGHT ANGLES OR PARALLEL TO BUILDING WALLS. DIAGONAL RUNS ARE
NOT ACCEPTABLE UNLESS SPECIFICALLY INDICATED OTHERWISE.
24. INSTALL PIPING FREE OF SAGS AND BENDS.
25. INSTALL PIPING TO ALLOW APPLICATION OF INSULATION.
26. PIPING SHALL NOT BE ROUTED OVER TELECOM OR ELECTRICAL CLOSETS/ROOMS.
27. INSTALLATION COMMENCED PRIOR TO COORDINATION DRAWING APPROVAL IS TAKEN AT THE CONTRACTORS OWN RISK. MODIFY, MOVE OR RECONFIGURE WORK LACKING
COORDINATION AT NO ADDITIONAL COST.
MECHANICAL GENERAL NOTES
1. VERIFY EXISTING CONDITIONS PRIOR TO BEGINNING WORK. NOTIFY COR REGARDING CONFLICTS BEFORE PROCEEDING WITH WORK.
2. REMOVED ITEMS REMAIN PROPERTY OF GOVERNMENT UNTIL COR DETERMINES THAT THEY ARE NOT REQUIRED. REMOVE FROM SITE ITEMS NOT BEING RETAINED BY
GOVERNMENT OR REINSTALLED AS PART OF THIS WORK.
3. DO NOT DISTURB ITEMS NOT INDICATED FOR DEMOLITION.
4. VERIFY SIZE AND LOCATION OF EXISTING UTILITIES PRIOR TO START OF DEMOLITION. RELOCATE, REMOVE AND ADJUST MECHANICAL AND ELECTRICAL ITEMS AS NECESSARY TO
COORDINATE WITH NEW WORK.
5. AFTER DEMOLITION IS COMPLETE, PATCH AND REPAIR FINISHES TO MATCH EXISTING ADJACENT CONDITIONS.
6. COORDINATE DEMOLITION WITH COR. SUBMIT SHUTDOWN PLAN AND SCHEDULE TO COR FOR REVIEW AND APPROVAL.
7. PROTECT EXISTING UTILITIES TO REMAIN FROM DAMAGE DURING DEMOLITION. REPAIR UTILITIES AND SERVICES DAMAGED AT NO ADDITIONAL COST.
8. TEMPORARILY MOVE OR TAKE EQUIPMENT OUT OF SERVICE AS NECESSARY TO COMPLETE WORK.
MECHANICAL DEMOLITION GENERAL NOTES
EXISTING
NEW WORK KEYNOTE
DEMOLITION KEYNOTE
NEW BOLD TEXT INDICATES NEW ITEM
ITALICIZED TEXT INDICATES EXISTING ITEM
DIFFUSER TAG
DETAIL OR SECTION MARK
SHOWN ON DRAWING
DETAIL MODULE NUMBER
CONNECT TO EXISTING
LIMIT OF DEMOLITION
EQUIPMENT TAG
ANNOTATION SYMBOLS
##-VAV-#
SD-## ###
2 HOUR FIRE SEPARATION
1 HOUR FIRE SEPARATION
SMOKE RATED
SEE SPECIFICATIONS FOR CLAMPS
AND SEALANT (TYP.)
SUPPORT SADDLE
FROM STRUCTURE
FLEXIBLE DUCT SIZE
SAME AS DIFFUSER
INLET: 5'-0" MAX
LENGTH
USE RIGID ELBOWS
FOR CHANGE OF
DIRECTION GREATER
THAN 45°
TYPICAL DIFFUSER
OR REGISTER IN
LAY-IN CLG.
THERMAL INSULATION
SEE SPECIFICATIONS
CONICAL OUTLET
BRANCH DUCT
12"
SHEET METAL SADDLE
VOLUME DAMPER WITH
LOCKING QUAD
CEILING
NOTE:
THE USE OF FLEXIBLE AIR DUCT CONNECTORS ARE NOT PERMITTED FOR
THE DEDICATED AHU SERVING THE SURGICAL SUITE
SMACNA FIGURE 4-6 45°
LEED IN RIGID DUCT TO
AIR TERMINAL UNIT
MAIN SUPPLY
FLOW
F L O
W
PLAN VIEW
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:0
:1
A
M C
U s e rs
\s g e o rg e
\D o c u m e n ts \R e v it F ile s \R e v it
\M P
-2
-2
N
-V A
N a s h v ill e -V id e o S e c I m p ro v R s p g e o rg e
J u n
.r v t
M-001
MECHANICAL GENERAL INFORMATION
AND DETAILS
1 2KSC
VIDEO SURVEILLANCE
SECURITY- NASHVILLE
NASHVILLE VAMC
1310 24TH AVENUE SOUTH
NASHVILLE, TN 37212 JUNE 13, 2024
BID DOCUMENTS
626-22-10322-215N
SPG
Scale: No Scale
FLEX AIR DUCT CONNECTOR DETAIL
WALL RATING LEGEND
Scale: N.T.S.
SUPPLY DUCT TAKEOFF - AIR TERMINAL UNITS
SS
S S
S S
SS
S S
SS SS
SS
S S
S S
SS
S S
SS SS
6ø RA
12ø
10ø
8ø ø
S A ø
R A
SECURITY
MONITOR
A-140
OFFICE
A-139
CORRIDOR
C1-16
EXISTING WSHP
AND DUCTWORK
TO REMAIN
EXISTING TU AND
DUCTWORK TO
REMAIN
EXAM
A-128
TRAINING
ROOM
A-127
ORTHO
OFFICE
PHYSICIAN
A-138
EXAM
A-129
TOILET
A-140A
TOILET
A-WT133A
3/4" HWR
3/4" HWS
SECURITY
MONITOR
A-140
OFFICE
A-139
CORRIDOR
C1-16
8ø RA ø
R A ø S
A
8ø
10ø
12x12
12x12
2-TU-139
EXISTING WSHP
AND DUCTWORK
TO REMAIN
EXISTING TU AND
DUCTWORK TO
REMAIN
200RG-19
400SD-14
12ø
EXAM
A-128
TRAINING
ROOM
A-127
ORTHO
OFFICE
PHYSICIAN
A-138
EXAM
A-129
TOILET
A-140A
TOILET
A-WT133A
3/4" HWR
3/4" HWS
ø S
A
DA
T
AI - DISCHARGE AIR TEMP
AI - AIRFLOW
M
AO - ZONE DAMPER
SA
T AI - ZONE TEMP
AI - ZONE SETPOINT ADJUST
F
POINT NAME:
ZONE TEMPERATURE
ZONE TEMPERATURE SETPOINT
AIRFLOW
DISCHARGE AIR TEMPERATURE
ZONE DAMPER
MAXIMUM OCCUPIED AIRFLOW SETPOINT
COOLING SETPOINT
HIGH ZONE TEMPERATURE
LOW ZONE TEMPERATURE
HIGH DISCHARGE TEMPERATURE
LOW DISCHARGE TEMPERATURE
HARDWARE POINTS
AI AO
X
X
X
X
BI BO
SOFTWARE POINTS
AV BV LOOP SCHED TREND ALARM SHOW ON GRAPHIC
X
X
X
X
X
X
X
X
X
X
X
TOTAL HARDWARE (5) TOTAL SOFTWARE (14)
4 1 3
X
X
X
7 4 9
X
X
X
X
MINIMUM OCCUPIED AIR FLOW SETPOINT
MINIMUM UNOCCUPIED AIRFLOW SETPOINT
X
X
X
X
X
X
VAV TERMINAL UNIT
VARIABLE AIR VOLUME - TERMINAL UNIT
RUN CONDITIONS - CONTINUOUS:
THE UNIT SHALL RUN CONTINUOUSLY AND SHALL MAINTAIN:
• A 72°F (ADJ.) COOLING SETPOINT.
ALARMS SHALL BE PROVIDED AS FOLLOWS:
• HIGH ZONE TEMP: IF THE ZONE TEMPERATURE IS GREATER THAN THE COOLING SETPOINT BY A USER
DEFINABLE AMOUNT (ADJ.).
• LOW ZONE TEMP: IF THE ZONE TEMPERATURE IS LESS THAN THE HEATING SETPOINT BY A USER
DEFINABLE AMOUNT (ADJ.).
ZONE SETPOINT ADJUST:
THE OCCUPANT SHALL BE ABLE TO ADJUST THE ZONE TEMPERATURE COOLING SETPOINTS AT THE ZONE
SENSOR.
PRESSURE INDEPENDENT VARIABLE VOLUME TERMINAL UNIT - FLOW CONTROL:
• WHEN ZONE TEMPERATURE IS GREATER THAN ITS COOLING SETPOINT, THE ZONE DAMPER SHALL MODULATE BETWEEN THE MINIMUM OCCUPIED AIRFLOW (ADJ.) AND THE MAXIMUM COOLING AIRFLOW
(ADJ.) UNTIL THE ZONE IS SATISFIED.
DISCHARGE AIR TEMPERATURE:
THE CONTROLLER SHALL MONITOR THE DISCHARGE AIR TEMPERATURE.
ALARMS SHALL BE PROVIDED AS FOLLOWS:
• HIGH DISCHARGE AIR TEMP: IF THE DISCHARGE AIR TEMPERATURE IS GREATER THAN 70°F (ADJ.).
• LOW DISCHARGE AIR TEMP: IF THE DISCHARGE AIR TEMPERATURE IS LESS THAN 50°F (ADJ.).
Engineers Architects
# KEY NOTES:
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:0
:1
A
M C
U s e rs
\s g e o rg e
\D o c u m e n ts \R e v it F ile s \R e v it
\M P
-2
-2
N
-V A
N a s h v ill e -V id e o S e c I m p ro v R s p g e o rg e
J u n
.r v t
M-101
FIRST FLOOR MECHANICAL PLANS,
CONTROLS, AND SCHEDULES
2 2KSC
VIDEO SURVEILLANCE
SECURITY- NASHVILLE
NASHVILLE VAMC
1310 24TH AVENUE SOUTH
NASHVILLE, TN 37212 JUNE 13, 2024
BID DOCUMENTS
626-22-10322-215N
SPG
Scale: 1/4" = 1'-0"
FIRST FLOOR HVAC PLAN
Scale: 1/4" = 1'-0"
FIRST FLOOR MECHANICAL DEMOLITION PLAN
Scale: No Scale
VAV TERMINAL UNIT CONTROLS
Scale: No Scale
VAV TERMINAL SCHEMATIC
Scale: No Scale
VAV TERMINAL SEQUENCE OF OPERATION
N
AREA OF WORK
KEY PLAN - FIRST FLOOR
SCALE: NO SCALE
0 2 4 8
N O
R T
H 0 2 4 8
N O
R T
H
1 DEMOLISH EXISTING TERMINAL UNIT, DIFFUSER,
AND DUCTWORK FEEDING OFFICE A-139 BACK TO
SUPPLY MAIN. CAP HEATING HOT WATER PIPING.
2 DEMOLISH EXISTING DIFFUSER AND DUCTWORK
SERVINGING OFFICE A-139 BACK TO LOCATION
INDICATED.
1 REPLACE EXISTING TERMINAL UNIT, DIFFUSER,
AND DUCTWORK FEEDING OFFICE A-139 AND TIE
INTO EXISTING SUPPLY MAIN. PROVIDE WITH DDC
CONTROLS AND CONNECT INTO CAMPUS
SIEMENS BAS.
2 REPLACE EXISTING DIFFUSER AND DUCTWORK
FEEDING OFFICE A-139 AND TIE INTO EXISTING
RETURN MAIN.
AIR DEVICE SCHEDULE (RETURN)
MARK TYPE
AIR FLOW
MAX. APD MOUNTING
PANEL/FRAME
SIZE NECK SIZE MAX NC DAMPER FINISH MATERIAL REMARKSMIN. MAX.
RG-19 EGG CRATE 110 200 0.09 in-wg CEILING 12x12 8"Ø 18 No WHITE STEEL 1, 2
SINGLE DUCT AIR TERMINAL SCHEDULE
MARK ROOM SERVED
SYSTEM AIR
HANDLING DUCT INLET
DESIGN AIRFLOW (CFM)
ALLOWABLE
AIRFLOW (CFM) CONTROL
TYPE
CONTROL
SEQUENCE REHEAT REMARKSMAX MIN REHEAT MAX MIN
2-TU-139 A-139 AHU-2 10 in 400 100 0 1050 350 VAV 5°F DEADBAND NONE 1, 2
AIR DEVICE SCHEDULE (SUPPLY)
DIFFUSER
MARK TYPE
AIR FLOW
MAX. APD MOUNTING
PANEL/FRAME
SIZE NECK SIZE MAX NC DAMPER FINISH MATERIAL REMARKSMIN. MAX.
SD-14 LOUVERED FACE 301 450 0.08 in-wg CEILING 24x24 12"Ø 19 No WHITE STEEL 1, 2
NOTES:
1. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.
2. PROVIDE DAMPER IN BRANCH DUCT AS SHOWN ON PLANS.
NOTES:
1. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.
2. PROVIDE DAMPER IN BRANCH DUCT AS SHOWN ON PLANS.
NOTES:
1. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.
2. PROVIDE WITH 120V-24V TRANSFORMER.
TECHNOLOGY GENERAL NOTES
1. PROVIDE TECHNOLOGY DEVICES AND EQUIPMENT IN ACCORDANCE WITH THE CONTRACT DOCUMENTS, MANUFACTURER'S RECOMMENDED PROCEDURES, ALL APPLICABLE LOCAL AND STATE CODES, AMERICANS WITH DISABILITIES ACT, LATEST EDITION OF THE NATIONAL ELECTRICAL CODE, BICSI STANDARDS, AND VA OIT
STANDARDS.
2. PROVIDE ADDITIONAL SUPPORT FOR DEVICES AND EQUIPMENT WHERE BUILDING CONSTRUCTION IS NOT
SUITABLE FOR DIRECT MOUNTING.
3. FIRESTOP, DRAFTSTOP, SMOKESTOP OR PROTECT ANNULAR SPACE AROUND PENETRATIONS THROUGH WALLS, PARTITIONS, FLOORS, CEILINGS, AND ROOF IN ACCORDANCE WITH REQUIREMENTS OF NFPA 70, UL LISTING
REQUIREMENT AND APPLICABLE BUILDING CODES.
4. PROVIDE CABLING THAT COMPLIES WITH THE LATEST EDITION OF TELECOMMUNICATIONS DISTRIBUTION
METHOD MANUAL AND ANSI/TIA/EIA PUBLICATIONS.
5. COMPLY WITH THE LATEST ANSI/TIA/EIA 758 AND 607D - BONDING AND GROUNDING TELECOMMUNICATIONS.
6. COMPLY WITH THE LATEST ANSI/TIA/EIA 568.1E - COMMERCIAL BUILDING TELECOMMUNICATIONS WIRING
STANDARD.
7. COMPLY WITH THE LATEST ANSI/TIA/EIA 569E - TELECOMMUNICATIONS PATHWAYS AND SPACES.
8. COMPLY WITH ANSI/TIA-1069 STANDARD FOR HOSPITAL SIGNALING & NURSE CALL EQUIPMENT.
9. COMPLY WITH ANSI/TIA-1179 HEALTHCARE FACILITY TELECOMMUNICATION INFRASTRUCTURE STANDARD.
10. COMPLY WITH THE LATEST NFPA 70 NATIONAL ELECTRICAL CODE.
11. COMPLY WITH THE LATEST NFPA 99 HEALTHCARE FACILITIES CODE.
12. COMPLY WITH THE LATEST NFPA 101 LIFE SAFETY CODE.
13. CONTRACTOR RESPONSIBLE FOR THE COORDINATION OF ALL WORK WITH ALL OTHER TRADES PRIOR TO
INSTALLATION.
14. MANUFACTURER'S NAME AND MODEL NUMBER ARE GIVEN FOR DESCRIPTIVE PURPOSES TO INDICATE A QUALITY STANDARD AND ARE NOT INTENDED TO LIMIT PRODUCTS TO A PARTICULAR MANUFACTURER. PRODUCTS DEEMED EQUAL IN ACCORDANCE WITH SPECIFIED PROCESSES FOR APPROVAL AND APPROVED BY THE COR
WILL BE ACCEPTABLE. COMPLY WITH "BUY AMERICAN ACT".
15. MOUNTING HEIGHTS INDICATED ARE TO CENTER OF DEVICE, BOXES, OUTLET, OR EQUIPMENT UNLESS NOTED
OTHERWISE.
16. PROVIDE RGS OR EMT CONDUIT UNLESS OTHERWISE NOTED.
17. PROVIDE MATERIALS, DEVICES, APPLIANCES AND EQUIPMENT LABEL LISTED BY APPROVED THIRD PARTY
TESTING AGENCY.
18. NOTIFY COR REGARDING DISCREPANCY BETWEEN PLANS AND SPECIFICATIONS FOR CLARIFICATION. THE MORE
STRINGENT SHALL TAKE PRECEDENCE.
19. PROVIDE TIA/EIA 4 PR UTP COPPER CABLE, JACKS, AND CONNECTORS.
20. ALL WORK AREA OUTLETS SHALL BE 8 PIN, 8P8C KEYSTONE JACK WIRED PER T568B.
21. LABEL DEVICES IN ACCORDANCE WITH LATEST ANSI/TIA 606A OR 606B EDITION AS WELL AS THE STANDARDS SET
FORTH BY THE VAMC OIT.
22. PROVIDE A MINIMUM OF 12" CLEARANCE ABOVE THE CABLE TRAY PER TIA/EIA 569.B PARAGRAPH 4.5.6.2.
23. VA SHALL CONDUCT A WAP SURVEY AND PROVIDE THE SURVEY TO THE CONTRACTOR. CONTRACTOR SHALL INSTALL CABLING AND EQUIPMENT IN ACCORDANCE WITH THE SURVEY. COORDINATE WITH COR/OIT.
24. ALL CABLING INSTALLED ABOVE CEILING SHALL BE PLENUM RATED.
25. MINIMUM CONDUIT SIZE TO BE USED IS 1 1/4" CONDUIT.
26. WALL MOUNTED DEVICES PLACED IN TELECOMMUNICATIONS ROOM TO BE MOUNTED ON FIRE RETARDANT
PLYWOOD.
27. ALL CAMERAS SHALL BE IN COMPLIANCE WITH THE NATIONAL DEFENSE AUTHORIZATION ACT.
ADO AUTOMATIC DOOR OPERATOR
AFF ABOVE FINISH FLOOR
AFG ABOVE FINISH GRADE
BOD BASIS OF DESIGN
CCTV CLOSED CIRCUIT TELEVISION
COAX COAXIAL CABLE
COMM COMMUNICATION
COR CONTRACTING OFFICER REPRESENTATIVE
DC DOOR CONTACT SWITCH
DN DOWN
DO DOOR OPERATOR
DVC DIGITAL VOICE COMMAND
DVR DIGITAL VIDEO RECORDER
E EXISTING DEVICES
EEB EMERGENCY EXIT BUTTON
EL ELECTRICAL STRIKE
EMT ELECTRICAL METALLIC CONDUIT
ETR EXISTING TO REMAIN
FA FIRE ALARM
FACP FIRE ALARM CONTROL PANEL
FAAP FIRE ALARM ANNUNCIATOR PANEL
FO FIBER OPTIC
FAGAP FIRE ALARM GRAPHIC ANNUNCIATOR PANEL
IT INTERCOMMUNICATION ROOM
MATV MASTER ANTENNA TELEVISION
MM MULTI MODE FIBER
NAC NOTIFICATION APPLIANCE CONTROL PANEL
N NEW DEVICES
NCA NETWORK CONTROL ANNUNCIATOR
NS…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .