Atch 11 Drawings 626-22-103 BD Video Surveillance NASH - 1.pdf

PDF 20 MB Posted

Attached to
Z1DA--Project 626-22-103_Video Surveillance Security TVHS VAMC - Nashville Campus
Solicitation number
36C24926R0065
Issued by

About this file

This is a set of bid documents and construction drawings for a Video Surveillance Security improvement project at Nashville VA Medical Center (VAMC) located at 1310 24th Avenue South, Nashville, TN 37212. The project number is VA 626-22-103 and the contracting vehicle is BID DOCUMENTS.

The project encompasses installation of a comprehensive closed-circuit television (CCTV) security system throughout the Nashville VAMC campus, including Buildings 1, 1A-ACRE, Mental Health Annex (Building 1A), and the ACRE Building. The scope includes removal and replacement of 235 security cameras utilizing Avigilon basis-of-design equipment (H5A dual-head, H5A fixed dome, H6 fixed dome, H6SL fixed dome, and H5A/H6 multisensor cameras in 90, 180, 270, and 360-degree configurations). New cabling infrastructure includes 4-pair unshielded twisted pair (UTP) copper cabling for distances under 295 feet and fiber optic cabling for longer runs. Equipment headend will be installed in Room A-139, including Cisco 9300 switches, Avigilon NVR units with minimum 30-day backup capability, and associated power distribution and UPS systems. The project requires coordination with Infection Control Risk Assessment (ICRA) precautions, use of mobile containment carts in corridors, and phased installation to maintain operational camera coverage. All work must comply with VA standards, NFPA codes, ANSI/TIA telecommunications standards, and requirements for plenum-rated cabling, fire-rated wall penetrations, and proper grounding per ANSI/TIA 607D specifications.

View the file

Other files

File Type Posted
AMEND-6_36C24926R0065 0006 VIDEO NASH.pdf PDF
S06 AMEND_7 36C24926R0065 0007-NASH Campus.pdf PDF
S02 AMEND-6_36C24926R0065 0006 NASH.pdf PDF
S02 36C24926R0065 0005 Video -NASH.pdf PDF
S02 AMEND_4 36C24926R0065 0004.pdf PDF
Atch 17 JA Brand Name Avigilon VIDEO 626-22-103 NASH_Redacted.pdf PDF
S02 36C24926R0065 0003_1 Protest.pdf PDF
Atch 1 UPDATED TR ROOMS FROM EHRM.pdf PDF
S02 36C24926R0065 0002 VIDEO-Nash.pdf PDF
Atch 1 Video camera design changes.pdf PDF
Atch 1 Site Visit Video Surveillance Nashville.pdf PDF
S02 AMEND_1 36C24926R0065 0001 VIDEO NASH.pdf PDF
S02 36C24926R0065_1 VIDEO 626-22-103 NASH.pdf PDF
Atch 10 Specs 626-22-103 BD Video Surveillance NASH - 1.pdf PDF
Atch 16 SF1442 36C24926R0065_2 NASH.pdf PDF
Atch 3 Past Performance Questionnaire NASH.docx DOCX document
Atch 14 JA Brand Name Avigilon VIDEO 626-22-103 NASH_Redacted.pdf PDF
Atch 15 JA Brand Name JCI VIDEO 626-22-103 NASH_Redacted.pdf PDF
Atch 12 HotWorkPermit.pdf PDF
Atch 9 Price Breakout Schedule.xlsx XLSX spreadsheet
Atch 4 UEI _ TAX ID.docx DOCX document
Atch 1 WD DBA-TN20250178 BUILDING MOD-3 06-05-2025 -NASH.docx DOCX document
Atch 6 Calc. of Self Performed Work.xlsx XLSX spreadsheet
Atch 2 WD SCA 2015-4647 REV31 _05.13.2026 Rutherford-Davidson.docx DOCX document
Atch 5 RFI Form.docx DOCX document
Atch 7 Contractor EMR Certification Form.docx DOCX document
Atch 8 General Conditions Breakout.xlsx XLSX spreadsheet
Atch 13 Fire-Smoke Barrier Permit.doc DOC document
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT IMAGE

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

PROJECT SITE MAP PROJECT LOCATION MAP

VOLUME 1 OF 1

/1

/2

:2

:3

P

M C

U s e rs

\l s ta rn e s \D o c u m e n ts \E

-2 -2

N -V

A N a s h v ill e -V id e o S e c I m p ro v ls ta rn e s C

B U

M B

.r v t

G-001

ENG. PROJECT COVER

1 3LAS

VIDEO SURVEILLANCE

SECURITY- NASHVILLE

NASHVILLE VAMC

1310 24TH AVENUE SOUTH

NASHVILLE, TN 37212 JUNE 13, 2024

BID DOCUMENTS

626-22-10322-215N

VIDEO SURVEILLANCE SECURITY- NASHVILLE

NASHVILLE VAMC

1310 24TH AVENUE SOUTH

NASHVILLE, TN 37212

VA PROJECT #: 626-22-103

JVE

DRAWING LIST

GENERAL

G-001 ENG. PROJECT COVER 1 3

G-002 SITE PLAN - NASHVILLE VAMC 2 3

G-100 ICRA INFORMATION AND DETAILS & NOTES 3 3

MECHANICAL

M-001 MECHANICAL GENERAL INFORMATION AND DETAILS 1 2

M-101 FIRST FLOOR MECHANICAL PLANS, CONTROLS, AND SCHEDULES 2 2

TECHNOLOGY

T-001 TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS 1 29

TS101 TECHNOLOGY SITE PLAN 2 29

T-101 MENTAL HEALTH ANNEX FIRST FLOOR SECURITY PLAN 3 29

T-102 BUILDING 1 & 1A-ACRE BASEMENT SECURITY PLAN 4 29

T-103 BUILDING 1 & 1A-ACRE FIRST FLOOR SECURITY PLAN 5 29

T-104 BUILDING 1 & 1A-ACRE SECOND FLOOR SECURITY PLAN 6 29

T-105 BUILDING 1 & 1A-ACRE THIRD FLOOR SECURITY PLAN 7 29

T-106 BUILDING 1 & 1A-ACRE FOURTH FLOOR SECURITY PLAN 8 29

T-107 BUILDING 1A-ACRE FIFTH AND SIXTH FLOOR SECURITY PLAN 9 29

T-401A BUILDING 1 & 1A-ACRE BASEMENT SECURITY PLAN - AREA A 10 29

T-401B BUILDING 1 & 1A-ACRE BASEMENT SECURITY PLAN - AREA B 11 29

T-401C BUILDING 1 & 1A-ACRE BASEMENT SECURITY PLAN - AREA C 12 29

T-401D BUILDING 1 & 1A-ACRE BASEMENT SECURITY PLAN - AREA D 13 29

T-402A BUILDING 1 & 1A-ACRE FIRST FLOOR SECURITY PLAN - AREA A 14 29

T-402B BUILDING 1 & 1A-ACRE FIRST FLOOR SECURITY PLAN - AREA B 15 29

T-402C BUILDING 1 & 1A-ACRE FIRST FLOOR SECURITY PLAN - AREA C 16 29

T-402D BUILDING 1 & 1A-ACRE FIRST FLOOR SECURITY PLAN - AREA D 17 29

T-403A BUILDING 1 & 1A-ACRE SECOND FLOOR SECURITY PLAN - AREA A 18 29

T-403B BUILDING 1 & 1A-ACRE SECOND FLOOR SECURITY PLAN - AREA B 19 29

T-403C BUILDING 1 & 1A-ACRE SECOND FLOOR SECURITY PLAN - AREA C 20 29

T-404A BUILDING 1 & 1A-ACRE THIRD FLOOR SECURITY PLAN - AREA A 21 29

T-404B BUILDING 1 & 1A-ACRE THIRD FLOOR SECURITY PLAN - AREA B 22 29

T-404C BUILDING 1 & 1A-ACRE THIRD FLOOR SECURITY PLAN - AREA C 23 29

T-405A BUILDING 1 & 1A-ACRE FOURTH FLOOR SECURITY PLAN - AREA A 24 29

T-405B BUILDING 1 & 1A-ACRE FOURTH FLOOR SECURITY PLAN - AREA B 25 29

T-405C BUILDING 1 & 1A-ACRE FOURTH FLOOR SECURITY PLAN - AREA C 26 29

T-501 TECHNOLOGY DETAILS 27 29

T-502 TECHNOLOGY DETAILS 28 29

T-601 TECHNOLOGY RISERS 29 29

PROJECT

LOCATION

DocuSign Envelope ID: 4170B743-6FE2-4320-BC0E-F6BE3A006436

6/12/2024

PARKING GARAGE

BUILDING #9

VA MEDICAL CENTER

BUILDING #1

CLINICAL ADDITION

MAIN ENTRANCE PARKING ATTENDANT

BUILDING #10

P

IE

R C

E A

V E

N U

E

OXYGEN TANK

#4 SERVICE DRIVE

WAREHOUSE-DOCK

AMBULATORY CARE

ENTRANCE

BOILER ROOM

CHIMNEY STACK

EMPLOYEE

PARKING

M O

D U

L A

R B

U

IL

D

IN

G

B

U

IL

D

IN

G

#3

#7

ACRE BLDG

MH ANNEX

BLDG #1A

G A

R L

A N

D A

V E

N U

E

BACKFLOW PREVENTER

#6

24TH AVENUE SOUTH

FLAGPOLE

#2

CONTRACTOR PARKING

9,442 SF

EMPLOYEE PARKING

H

IG

H L A

N D

A V

E N

U E

SPS

GUARD STATION

ELECTRIC MANHOLEVAULT

AREA OF WORK

LEGEND

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/1

/2

:2

:4

P

M C

U s e rs

\l s ta rn e s \D o c u m e n ts \E

-2 -2

N -V

A N a s h v ill e -V id e o S e c I m p ro v ls ta rn e s C

B U

M B

.r v t

G-002

SITE PLAN - NASHVILLE VAMC

2 3NPM

VIDEO SURVEILLANCE

SECURITY- NASHVILLE

NASHVILLE VAMC

1310 24TH AVENUE SOUTH

NASHVILLE, TN 37212 JUNE 13, 2024

BID DOCUMENTS

626-22-10322-215N

GTS

A. REFERENCE SHEET TS101 FOR EXTERIOR

CAMERA LOCATIONS.

B. ALL EXISTING CONDITIONS ARE BASED ON THE

BEST AVAILABLE INFORMATION AT THE TIME

OF SURVEY.

C. NEW CCTV CABLING TO BE RUN ON J-HOOKS 2'

OC ABOVE CEILING IN CORRIDORS.

D. ALL CONDUIT SHALL BE 3/4" MINIMUM. EC TO

SIZE CONDUIT. PER THE MOST CURRENT

EDITION OF THE NEC.

E. WHERE LENGTH FROM CAMERA TO RACK

EQUIPMENT EXCEED 295' (90M) CONTRACTOR

SHALL USE FIBER OPTIC CABLE.

F. COORDINATE AND CONFIRM ALL ROUTING

WITH COR PRIOR TO ROUGH-IN.

Scale: 1" = 40'-0"

SITE PLAN - NASHVILLE VAMC

N O

R T

H0 4020 80

SITE, 1, 1A, ACRE

IIILOW Risk Group 1

Class III

Note: Infection Control approval will be required when the Construction Activity and Risk Level indicate that

It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation

I

I

III

MEDIUM Risk Group 2

HIGH Risk Group 3

HIGHEST Risk Group 4 V

V

IV

V

IV

III

IV

II

III

Patient Risk Group Table

Infection Control Matrix - Class of Precautions: Construction Project by Patient Risk

TYPE A

Construction Project Type

Major demolition and construction projects Includes, but is not limited to:

• Removal or replacement of building system component(s).

• Removal/installation of drywall partitions.

• Invasive large-scale new building construction.

• Renovation work in two or more rooms.

Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies Includes, but is not limited to:

• Removal of preexisting floor covering, walls, casework or other building components.

• New drywall placement.

• Renovation work in a single room.

• Nonexisting cable pathway or invasive electrical work above ceilings.

• The removal of drywall where a moderate amount of dust and debris is created.

• Dry sanding where a moderate amount of dust and debris is created.

• Work creating significant vibration and/or noise.

• Any activity that cannot be completed in a single work shift.

Small scale, short duration activities which create minimal dust Includes, but is not limited to:

• Work conducted above the ceiling (e.g., prolonged inspection or repair of firewalls and barriers, installation of conduit and/or cabling, and access to mechanical and/or electrical chase spaces).

• Fan shutdown/startup.

• Installation of electrical devices or new flooring that produces minimal dust and debris.

• The removal of drywall where minimal dust and debris is created.

• Controlled sanding activities (e.g., wet or dry sanding) that produce minimal dust and debris.

Inspection and Non-Invasive Activities Includes, but is not limited to:

• Removal of ceiling tile for visual inspection-limited to 1 tile per 50 square feet with limited exposure time.

• Limited building system maintenance (e.g., pneumatic tube station, HVAC system, fire suppression system, electrical and carpentry work to include painting without sanding) that does not create dust or debris.

• Clean plumbing activity limited in nature.

Type of Construction / Project Activity Table

Group 2 Medium Risk

Group 1 Low Risk

• Physical Therapy

• Radiology departments

• All patient waiting rooms

• All outpatient clinics

• Research Areas

• Respiratory Therapy

• Office areas (non-clinical)

• FES/EMS areas

I

Patient Risk Group

TYPE D

TYPE C

TYPE B

TYPE A

Group 4 Highest Risk

Group 3 High Risk

• Emergency Room

• Clinical Laboratories (specimen)

• Same Day Surgery

• Pharmacy

• Nutrition and Food

Service/Canteen

• Procedural Areas (GI)

• Inpatient Mental Health

• Any area caring for immunocompromised patients

• Cardiac Cath Lab/IR

• Central Sterile Supply

• Sterile Processing Service

• Intensive Care Units

IIII

TYPE DTYPE CTYPE B

Class IVor control procedures are necessary.

C

LA

S S

IV

During Construction Project Upon Completion of Project

1. Includes all activities required by Class III

2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities Management

Maintenance and Engineering department before construction begins.

3. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.

4. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage. Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.

5. Seal all penetrations in containment barriers, including floors and ceiling, using approved materials (UL schedule firestop if applicable for barrier type).

6. Containment units or environmental containment units (ECUs) approved for Class IV precautions in small areas totally contained by the unit and that has HEPA-filtered exhaust air.

7. Remove or isolate return air diffusers to avoid dust entering the HVAC system.

8. Remove or isolate the supply air diffusers to avoid positive pressurization of the space.

9. Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.

10. Maintain negative pressurization of the entire workspace by use of HEPA exhaust air systems directed outdoors. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows does not require HEPA-filtered air.

11. If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, HEPA filtration must be verified by particulate measurement as no less than 99.97% efficiency and must not alter or change airflow/pressure relationships in other areas.

12. Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (e.g., bathroom exhaust) is not acceptable.

13. Install device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.

14. Contain all trash and debris in the work area.

15. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.

16. Worker clothing must be clean and free of visible dust before leaving the work area.

HEPA vacuuming of clothing or use of cover suites is acceptable.

17. Workers must wear shoe covers prior to entry into the work area. Shoe covers must be changed prior to exiting the anteroom to the occupied space (non-work area). Damaged shoe covers must be immediately changed.

18. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.

19. Consider collection of particulate data during work to monitor and ensure that contaminates do not enter the occupied spaces. Routine collection of particulate samples may be used to verify HEPA filtration efficiencies.

• Medical/Surgical Units

• Negative pressure isolation rooms

• Outpatient Chemotherapy

Areas

• Operating rooms

• Post Anesthesia Care Unit

• Dialysis

• Dental

C

LA

S S

V

1. Includes all activities required by Class IV

2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities Management

Maintenance and Engineering department before construction begins.

3. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.

4. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage. Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.

5. Seal all penetrations in containment barriers, anteroom barriers, including floors and ceiling using approved materials (UL schedule firestop if applicable for barrier type).

6. Construct anteroom large enough for equipment staging, cart cleaning, workers. The anteroom must be constructed adjacent to entrance of construction work area.

7. Personnel will be required to wear coveralls at all times during Class V work activities.

Coveralls must be removed before leaving the anteroom.

8. Remove or isolate return air diffusers to avoid dust entering the HVAC system.

9. Remove or isolate the supply air diffusers to avoid positive pressurization of the space.

10. Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.

11. Maintain negative pressurization of the entire workspace using HEPA exhaust air systems directed outdoors. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows does not require HEPA-filtered air.

12. If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, HEPA filtration must be verified by particulate measurement as no less than 99.97% efficiency and must not alter or change airflow/pressure relationships in other areas.

13. Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (bathroom exhaust) is not acceptable.

14. Install device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.

15. Contain all trash and debris in the work area.

16. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.

17. Worker clothing must be clean and free of visible dust before leaving the work area anteroom.

18. Workers must wear shoe covers prior to entry into the work area. Shoe covers must be changed prior to exiting the anteroom to the occupied space (non-work area).

Damaged shoe covers must be immediately changed.

19. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.

20. Consider collection of particulate data during work to monitor and ensure that contaminates do not enter the occupied spaces. Routine collection of particulate samples may be used to verify HEPA filtration efficiencies.

Construction areas must be inspected by an infection preventionist or designee and engineering representative for discontinuation or downgrading of ICRA precautions.

Work Area Cleaning:

1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.

2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.

Removal of Critical Barriers:

1. Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed.

2. All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:

1. Carefully remove screws and painter tape.

2. If dust will be generated during screw removal, use hand-held HEPA vacuum.

3. Drywall cutting is prohibited during removal process.

4. Clean all stud tracks with HEPA vacuum before removing outer hard barrier.

5. Use a plastic barrier to enclose area if dust could be generated.

Negative Air Requirements:

1. The use of negative air must be designed to remove contaminates from the work area.

2. Negative air devices must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.

HVAC systems:

1. Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed.

2. Verify that HVAC systems are clean and operational.

3. Verify the HVAC systems meets original airflow and air exchange design specifications.

It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation

During Construction Project

C

LA

S S

I

Cleaning:

1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.

2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.

HVAC Systems:

1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.

2. Verify the HVAC systems meet original airflow and air exchange design specifications.

Upon Completion of Project

1. Execute work by methods to minimize raising dust from construction operations.

2. Perform noninvasive work activity as to not block or interrupt patient care.

3. Perform noninvasive work activities in areas that are not directly occupied with patients.

4. Perform noninvasive work activity in a manner that does not create dust.

5. Immediately replace any displaced ceiling tile before leaving the area and/or at end of noninvasive work activity.

C

LA

S S

II

Cleaning:

1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.

2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.

HVAC Systems:

1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.

2. Verify the HVAC systems meet original airflow and air exchange design specifications.

1. Includes all activities required by Class I

2. Perform only limited dust work and/or activities designed for basic facilities and engineering work.

3. Perform limited dust and invasive work following standing precautions procedures approved by the organization.

4. This Class of Precautions must never be used for construction or renovation activities.

5. Provide active means to prevent airborne dust from dispersing into atmosphere.

6. Water mist work surfaces to control dust while cutting.

7. Seal unused doors with duct tape.

8. Block off and seal air vents.

9. Replace adhesive walk-off mats at entrance and exit of work area. Replace used mats in accordance with manufacturer's recommendations.

10. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.

Construction areas must be inspected by an infection preventionist or designee and engineering representative for discontinuation or downgrading of ICRA precautions.

Work Area Cleaning:

1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.

2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.

Removal of Critical Barriers:

1. Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed.

2. All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:

1. Carefully remove screws and painter tape.

2. If dust will be generated during screw removal, use hand-held HEPA vacuum.

3. Drywall cutting is prohibited during removal process.

4. Clean all stud tracks with HEPA vacuum before removing outer hard barrier.

5. Use a plastic barrier to enclose area if dust could be generated.

Negative Air Requirements:

1. The use of negative air must be designed to remove contaminates from the work area.

2. Negative air devices must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.

HVAC systems:

1. Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed.

2. Verify that HVAC systems are clean and operational.

3. Verify the HVAC systems meets original airflow and air exchange design specifications.

CONSTRUCTION ACTIVITIES SHALL BE CLASSIFIED AS FOLLOWS UNLESS NOTED OTHERWISE:

1. INSTALLATION OF CABLE TRAY IN CORRIDOR CEILINGS SHALL BE CONSIDERED CONSTRUCITON ACTIVITY TYPE B.

2. ALL CONDUIT SPECIFIED TO BE INSTALLED IN WALL SHALL BE CONSIDERED CONSTRUCTION ACTIVITY TYPE C.

3. CONSTRUCTION OF NEW ROOMS SHALL BE CONSIDERED CONSTRUCTION ACTIVITY TYPE D.

4. INSTALLATION OF NEW DOORS TO OR FROM EXISTING SPACES SHALL BE CONSIDERED CONSTRUCTION ACTIVITY TYPE C.

C

LA

S S

II

I

1. Includes all activities required by Class II

2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities

Management Maintenance and Engineering department before construction begins.

3. Provide active means to prevent airborne dust dispersion into the occupied areas.

4. Means for controlling minimal dust dispersion may include hand-held HEPA vacuum devices, polyethylene plastic containment, or isolation of work area by closing room door.

5. Remove or isolate return air diffusers to avoid dust from entering the HVAC system.

6. Remove or isolate the supply air diffusers to avoid positive pressurization of the space,

7. If work area is contained, then it must be neutrally to negatively pressurized at all times.

8. Seal all doors with tape that will not leave residue.

9. Contain all trash and debris in the work area.

10. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.

11. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.

12. Maintain clean surroundings when area is not contained by damp mopping or HEPA vacuuming surfaces.

13. Clean construction area at the end of each shift by damp mopping or HEPA Vacuum.

For Type C activities, follow procedures for Class IV.

Cleaning:

1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.

2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.

HVAC Systems:

1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.

2. Verify the HVAC systems meet original airflow and air exchange design specifications.

ILSM SIGNAGE

INTERIM LIFE SAFETY MEASURES IN EFFECT

[VIDEO SURVEILLANCE SECURITY - NASHVILLE]

THIS EXIT IS CLOSED AND LEADS TO A

CONSTRUCTION AREA.

PLEASE USE ALL ALTERNATE EXITS AS MARKED.

1' - 5"

1/2"1/2"

/2

/2

/2

/2

/2

/2

EQ.EQ.

ILSM TEMPORARY BARRIER TAG

PROJECT:

PRIME CONTRACTOR:

SUB CONTRACTOR:

EMERGENCY CONTACT NO.:

BARRIER INSTALLATION DATE:

BARRIER EXPIRATION DATE:

NOTE:

TAG SHALL BE PLACED ON ALL ILSM

TEMPORARY BARRIERS, FINAL LOCATION BY G.C.

EXISTING CEILING

TOP SEALING RUNNER

EXISTING WALL

ASSEMBLY

PLASTIC SHEET BARRIER

SUPPORT POLES,

QUANTITY PER MANUF.

RECOMMENDATIONS

BOTTOM SEALING

RUNNER

REQU.

AS

A PLASTIC SHEET BARRIER

NON-RATED

INFECTION CONTROL RISK

ASSESSMENT, INTERIM LIFE

SAFETY MEASURES, FIRE

WATCH AND MISCELLANEOUS

FORMS

PAPER

CADDY

FIRE EXTINGUISHER

ON PORTABLE FLOOR

BRACKET (ILSM MAY

REQUIRE MORE THAN

ONE).

SUPPLY DUCTS

EITHER KEEP

RUNNING OR COVER

WHEN NOT RUNNING

TO KEEP DUST OUT

COVER ALL

RETURNS AT THE

GRATE/DIFFUSERS

SUSPENDED PLASTIC

ZIPPER WALL

CURTAIN BARRIER

POST ICRA, ILSM, FIRE

INPECTION SHEETS

VISIBLE TO PUBLIC

EXISTING WALL

BARRIER

GI002

POST ICRA,

ILSM, FIRE

INSPECTION

SHEETS

VISIBLE TO

PUBLIC

G-100

SUSPENDED

PLASTIC ZIPPER

WALL CURTAIN

BARRIER

A P

P R

O X

A .F

.F

PLASTIC

WINDOW

SWIVEL CASTERS

WITH TWO

LOCKING BRAKES

MOBILE CART

A D

J U

S T

A B

L E

H

E

IG

H T

HEPA NEGATIVE

AIR UNIT

EXISTING

WALL

EXISTING CEILINGFLEX DUCT

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/1

/2

:2

:4

P

M C

U s e rs

\l s ta rn e s \D o c u m e n ts \E

-2 -2

N -V

A N a s h v ill e -V id e o S e c I m p ro v ls ta rn e s C

B U

M B

.r v t

G-100

ICRA INFORMATION AND DETAILS &

NOTES

3 3NPM

VIDEO SURVEILLANCE

SECURITY- NASHVILLE

NASHVILLE VAMC

1310 24TH AVENUE SOUTH

NASHVILLE, TN 37212 JUNE 13, 2024

BID DOCUMENTS

626-22-10322-215N

GTS

Scale: 3" = 1'-0"

ILSM CONSTRUCTION EGRESS SIGNAGE

Scale: No Scale

ILSM BARRIER TAG

A. TAPE ALL SERVICES TO PROTECT AGAINST

CONTAMINATION

B. THE CONTRACTOR SHALL NOT HAUL DEBRIS

THROUGH PATIENT-CARE AREAS WITHOUT PRIOR

APPROVAL OF THE COR AND THE MEDICAL CENTER

C. USING A HEPA VACUUM, CLEAN INSIDE THE BARRIER

AND VACUUM CEILING TILE PRIOR TO REPLACEMENT.

ANY CEILING ACCESS PANELS OPENED FOR

INVESTIGATION BEYOND SEALED AREAS SHALL BE

SEALED IMMEDIATELY WHEN UNATTENDED.

D. AT COMPLETION, REMOVE CONSTRUCTION

BARRIERS AND CEILING PROTECTION CAREFULLY,

OUTSIDE OF NORMAL WORK HOURS. VACUUM AND

CLEAN ALL SURFACES FREE OF DUST AFTER THE

REMOVAL.

E. CONTRACTOR TO VERIFY AND COORDINATE FINAL

AND APPROVED ICRA MEASURES WITH THE

NASHVILLE VA MEDICAL CENTER'S ICRA PERSONNEL,

PRIOR TO THE COMMENCEMENT OF CONSTRUCTION

ACTIVITY.

Scale: 3/4" = 1'-0"

ICRA BARRIER WALL TYPE

Scale: 1/2" = 1'-0"

TYPICAL CONSTRUCTION PLAN LAYOUT

Scale: 1/2" = 1'-0"

ICRA ROOM ELEVATION

Scale: 1/2" = 1'-0"

ICRA MOBILE CONTAINMENT CART

S SS

A/E ARCHITECT / ENGINEER

AAHX AIR TO AIR HEAT EXCHANGER

AB AIR BLENDER

AAV AUTOMATIC AIR VENT

ACC AIR-COOLED CONDENSER

ACCH AIR-COOLED CHILLER

ACCU AIR-COOLED CONDENSING UNIT

ACU AIR CONDITIONING UNIT

ACD AUTOMATIC CONTROL DAMPER,

MODULATING

ACD-TP AUTOMATIC CONTROL DAMPER,TWO

POSITION

AD ACCESS DOOR

AF AFTER FILTER

AFCV AIR FLOW CONTROL VALVE

AFF ABOVE FINISHED FLOOR

AFMD AIR FLOW MEASURING DEVICE

AFW AIR FOIL WHEEL (FAN)

AHU AIR-HANDLING UNIT

AMP AMPERAGE

AP ACCESS PANEL

APD AIR PRESSURE DROP

ARI AIR CONDITIONING AND

REFRIGERATION INSTITUTE

AS AIR SEPARATOR

ASME AMERICAN SOCIETY OF MECHANICAL

ENGINEERS

AW AIR WASHER

AXF AXIAL FLOW

B BOILER

BD BUTTERFLY DAMPER

BDD BACKDRAFT DAMPER

BDR BASE BOARD RADIATOR

BFP BACKFLOW PREVENTER

BFT BOILER PLANT FIRE TUBE

BHP BRAKE HORSEPOWER

BHW HOT WATER HEATING BOILER

BHX BOILER BLOWDOWN HEAT

EXCHANGER

BIW BACKWARD INCLINED WHEEL (FAN)

BSC BIOLOGICAL SAFETY CABINETS

BT BUFFER TANK

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNIT PER HOUR

C CENTIGRADE (CELSIUS)

CC COOLING COIL

CCD COOLING COIL CONDENSATE DRAIN

CENT CENTRIFUGAL

CFH CUBIC FEET PER HOUR

CFM CUBIC FEET PER MINUTE

CFT CUBIC FEET

CFP CHEMICAL FEED PUMP

CH CHILLER

CHWP CHILLED WATER PUMP

CHW CHILLER WATER

CHWR CHILLED WATER RETURN

CHWS CHILLED WATER SUPPLY

CI CAST IRON

CM CARBON MONOXIDE

CM CUBIC METER

CM/S CUBIC METER PER SECOND

CO CLEAN OUT

CO2 CARBON DIOXIDE

COMP COMPRESSOR UNIT

COP COEFFICIENT OF PERFORMANCE

CP CONDENSATE PUMP

CU CONDENSING UNIT

CUH CABINET UNIT HEATER

CV CONSTANT VOLUME

CW COLD WATER (POTABLE)

CHWCC CHILLED WATER COOLING COIL

D DAMPER - AUTOMATIC

D-1 OUTDOOR AIR DAMPER

D-2 RETURN AIR DAMPER

D-3 RELIEF AIR DAMPER

D-4 ECONOMIZER OUTDOOR AIR

DAMPER

dB DECIBELS Db DRY-BULB TEMPERATURE

DDC DIRECT DIGITAL CONTROLS

DEG DEGREE

DF DIFFUSER

DIA DIAMETER

DIW DEIONIZED WATER

DP DEW POINT TEMPERATURE

DP DIFFUSER PLATE

DPA DIFFERENTIAL PRESSURE

ASSEMBLY

DPS DIFFERENTIAL PRESSURE SENSOR

DX DIRECT EXPANSION

DXCC DIRECT EXPANSION COOLING COIL

EA EXHAUST AIR

EAT ENTERING AIR TEMPERATURE

ECC ENGINEERING CONTROL CENTER

EER ENERGY EFFICIENCY RATIO

EF EXHAUST FAN

EG EXHAUST GRILLE

EGS EMERGENCY GAS SHUTOFF

EH EXHAUST HOOD

EJ EXPANSION JOINT

EMD END OF MAIN DRIP (STEAM)

ENT ENTERING

ESP EXTERNAL STATIC PRESSURE

EWT ENTERING WATER TEMPERATURE

EX EXISTING

F FAHRENHEIT

F&T FLOAT AND THERMOSTATIC

F/SDPR COMBINATION FIRE SMOKE DAMPER

FA FREE AREA

FC FLEXIBLE CONNECTION

FCU FAN COIL UNIT (4 PIPE)

FCW FORWARD CURVED WHEEL (FAN)

FD FLOOR DRAIN

FD FIRE DAMPER

FF FINAL FILTER

FM FLOW METER

FPM FEET PER MINUTE

FPS FEET PER SECOND

FRP FIBER REINFORCED POLYESTER

FS FLOW SWITCH

FSTAT FREEZESTAT

FT FEET

FT-LB FOOT-POUND

FTR FIN TUBE RADIATION

FV FACE VELOCITY

GA GAUGE

GAL GALLONS

GH GRAVITY HOOD

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GS GALVANIZED STEEL

H HUMIDIFIER

H&CW HOT & COLD WATER

HAC HOUSEKEEPING AID CLOSET

HB HOSE BIBB

HC HEATING COIL

HD HEAD

HD HOOD

HHW HEATING HOT WATER

HHWC HEATING HOT WATER COIL

HHWP HEATING HOT WATER PUMP

HHWR HEATING HOT WATER RETURN

HHWS HEATING HOT WATER SUPPLY

HOA HAND/OFF/AUTOMATIC

HP HEAT PUMP

HP HORSEPOWER

HPDT HIGH PRESSURE DRIP TRAP

HPR HIGH PRESSURE RETURN (STEAM

CONDENSATE)

HPS HIGH PRESSURE SUPPLY (STEAM)

HRC HEAT RECOVERY COIL

HRD HEAT RECOVERY DEVICE

HRP HYDRONIC RADIANT (CEILING) PANEL

HRW HEAT RECOVERY WHEEL

HSTAT HUMIDISTAT

HUM HUMIDIFIER UNIT MOUNTED

HVU HEATING AND VENTILATING UNIT

HW HOT WATER

HWC HOT WATER COIL

HWUH HOT WATER UNIT HEATER

HX HEAT EXCHANGER

Hz HERTZ

I/O INPUT/OUTPUT

IAQ INDOOR AIR QUALITY

IBT INVERTED BUCKET TRAP

ICF IN-LINE CENTRIFUGAL FAN

ICU INTENSIVE CARE UNIT

ID INSIDE DIAMETER

IFB INTEGRAL FACE AND BYPASS

IN INCHES

IN HG INCHES OF MERCURY

IN WC INCH WATER COLUMN

IN WG INCH WATER GAUGE

IN-LB INCH-POUND

IPLV INTEGRATED PART LOAD VALUE

IRH INFRARED HEATER

IS INSECT SCREEN

IV INLET VANES

kg KILOGRAM kg/HR KILOGRAM PER HOUR kPa KILOPASCAL kW KILOWATT kWh KILOWATT HOUR

L LITER

L/s LITERS PER SECOND

LAT LEAVING AIR TEMPERATURE

LBS/HR POUNDS PER HOUR

LF LINEAR FOOT (FEET)

LH LATENT HEAT

LPR LOW PRESSURE RETURN (STEAM

CONDENSATE)

LPS LOW PRESSURE SUPPLY (STEAM)

LSD LINEAR SLOT DIFFUSER

LTCP LOCAL TEMPERATURE CONTROL

PANEL

LVG LEAVING

LVR LOUVER

LWT LEAVING WATER TEMPERATURE

M METER, SI UNIT

M/s METERS PER SECOND (OR

METERS/SECOND)

MA MIXED AIR

MAT MIXED AIR TEMPERATURE

MAV MANUAL AIR VENT

MAX MAXIMUM

MB MIXING BOX

MBH 1000 BTUH

MCA MINIMUM BRANCH CIRCUIT AMPACITY

MER MECHANICAL EQUIPMENT ROOM

MERV MINIMUM EFFICIENCY REPORTING

VALUE

MHP MOTOR HORSEPOWER

MIN MINIMUM

MM MILLIMETER

MOV MOTOR OPERATED VALVE

MPR MEDIUM PRESSURE RETURN (STEAM

CONDENSATE)

MPS MEDIUM PRESSURE SUPPLY (STEAM)

MTD MEAN TEMPERATURE DIFFERENCE

MVD MANUAL VOLUME DAMPER

NA NOT APPLICABLE

NC NOISE CRITERIA

NC NORMALLY CLOSED

NO NORMALLY OPEN

NOAA NATIONAL OCEANIC & ATMOSPHERIC

ADMINISTRATION

NOM NOMINAL

NPLV NON-STANDARD PART LOAD VALUE

NPSH NET POSITIVE SUCTION HEAD

NTS NOT TO SCALE

OA OUTSIDE AIR

OAI OUTSIDE AIR INTAKE

OD OUTSIDE DIAMETER

OR OPERATING ROOM

OSA OUTSIDE SUPPLY AIR

(CONDITIONED)

P PUMP

PC PUMPED CONDENSATE

PCF POUNDS PER CUBIC FOOT (FEET)

PD PRESSURE DROP

PF PRE-FILTER

PG PRESSURE GAGE

PHC PREHEAT COIL

PHCP PREHEAT COIL PUMP

PPM PARTS PER MILLION

PRV PRESSURE REGULATING VALVE

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH –

ABSOLUTE

PSIG POUNDS PER SQUARE INCH – GAGE

PSS PRIMARY SECONDARY SYSTEM

PSV PRESSURE SAFETY VALVE

R/E RETURN OR EXHAUST

RA RETURN AIR

RAT RETURN AIR TEMPERATURE

RDS ROOM DATA SHEETS

REA RELIEF AIR

RF RETURN FAN

RG RETURN GRILLE

RH RELATIVE HUMIDITY

RHC REHEAT COIL

RL REFRIGERANT LIQUID LINE

RLA RUN LOAD AMPERE

RPM REVOLUTIONS PER MINUTE

RS REFRIGERANT SUCTION

RTU ROOF TOP UNIT

RV RELIEF VALVE

SA SUPPLY AIR

SAD SOUND ATTENUATING DEVICE

SAT SUPPLY AIR TEMPERATURE

SC SHADING COEFFICIENT

SCFM STANDARD CUBIC FEET PER MINUTE

SCR SILICON CONTROLLED RECTIFIER

SD SMOKE DETECTOR

SD SUPPLY AIR DIFFUSER

SDPR SMOKE DAMPER

SDR SMOKE DAMPER (RETURN)

SDS SMOKE DAMPER (SUPPLY)

SEN SENSIBLE HEAT

SF SUPPLY FAN

SH STEAM HUMIDIFIER

SHC STEAM HEATING COIL

SI SQUARE INCHES

SP STATIC PRESSURE

SP GR SPECIFIC GRAVITY

SPD SUPPLY PROCESS AND

DISTRIBUTION

SPRV STEAM PRESSURE REDUCING VALVE

SPS STATIC PRESSURE SENSOR

SQ FT SQUARE FOOT (FEET)

SR SUPPLY AIR REGISTER

SS STAINLESS STEEL

SSR SOLID SEPARATOR

ST STEAM TRAP

SV STEAM SAFETY VALVE

SVS STEAM VENT SILENCER

T & PCV TEMPERATURE AND PRESSURE

CONTROL VALVE

TAB TESTING, ADJUSTING, BALANCE

TD TEMPERATURE DIFFERENCE

TDH TOTAL DYNAMIC HEAD

TDS TOTAL DISSOLVED SOLIDS

TP TRAP

TSP TOTAL STATIC PRESSURE

TSTAT THERMOSTAT

TU TERMINAL UNIT

UC UNDER CUT

UH UNIT HEATER

UL UNDERWRITERS LABORATORY

V VALVE

VAF VANE-AXIAL FAN

VAV VARIABLE AIR VOLUME

VD VOLUME DAMPER (MANUAL

OPPOSED BLADE)

VFD VARIABLE FREQUENCY DRIVE

VHA VETERANS HEALTH ADMINISTRATION

VI VIBRATION ISOLATOR

VP VACUUM PUMP

VPS VARIABLE PRIMARY SYSTEM

VR VACUUM (STEAM CONDENSATE)

RETURN

VSD VARIABLE SPEED DRIVE

VUH VERTICAL UNIT HEATER

W WATTS

Wb WET-BULB (TEMPERATURE)

WFCV WATER FLOW CONTROL VALVE

WFM WATER FLOWMETER

WFMD WATER FLOW MEASURING DEVICE

WG WATER GAGE

WPD WATER SIDE PRESSURE DROP

XT EXPANSION TANK

YR YEAR

MECHANICAL ABBREVIATIONS

CO2 CARBON DIOXIDE SENSOR

HUMIDISTAT OR HUMIDITY SENSOR

SUPPLY DIFFUSER

RETURN GRILLE

EXHAUST GRILLE

ROUND FLEX DUCT

LINEAR SLOT DIFFUSER

BALANCING DAMPER

FIRE DAMPER

SMOKE DAMPER

D

R INCLINED RISE, IN

DIRECTION OF AIRFLOW

INCLINED DROP, IN DIRECTION

OF AIRFLOW

CONNECT NEW DUCT

TO EXISTING

LIMIT OF DEMOLITION

VANED ELBOW (PROVIDE ALL

SQUARE OR RECTANGULAR

ELBOWS WITH VANES EVEN IF

SYMBOL IS MISSING)

STANDARD RADIUS ELBOW

(LONG RADIUS)

10x8 NEW DUCT (INSIDE

DIMENSIONS: WIDTH X DEPTH)

EXISTING DUCT TO REMAIN

EXISTING DUCT TO BE

DEMOLISHED

DUCT TRANSITION

END MOUNTED OR SIDEWALL GRILLE

SUPPLY

RETURN45°

45°

DN

DN

UP

UP

DNUP

STANDARD BRANCH SUPPLY OR

RETURN, NO SPLITTER (45° TAP)

SUPPLY DUCT (UP & DOWN)

EXHAUST DUCT (UP & DOWN)

RETURN DUCT (UP & DOWN)

S-60

S-15

CR-15

CHWS

CHWR

HIGH PRESSURE STEAM

PIPING (60 PSI)

LOW PRESSURE STEAM PIPING

(15 PSI AND BELOW)

LOW PRESSURE STEAM

CONDENSATE RETURN

CHILLED WATER SUPPLY PIPING

CHILLED WATER RETURN PIPING

PIPE UP

PIPE DOWN

BOTTOM CONNECTION

TOP CONNECTION

CAPPED OR PLUGGED PIPE

GLOBE VALVE

GATE VALVE

BALL VALVE

STEAM SAFETY VALVE

PRESSURE REGULATING VALVE

WYE STRAINER VALVE

BALANCING VALVE

MODULATING TWO-WAY CONTROL

VALVE

STEAM TRAP

D CONDENSATE DRAIN LINE

CR-60 HIGH PRESSURE STEAM

CONDENSATE RETURN

HWS

HWR

HEATING HOT WATER SUPPLY

PIPING

HEATING HOT WATER RETURN PIPING

RLS REFRIGERANT LINE SET (LIQUID

AND SUCTION)

CONNECT TO EXISTING PIPE

LIMIT OF DEMOLITION

INLINE CENTRIFUGAL PUMP

STEAM PRESSURE REDUCING

VALVE

DRAIN VALVE

TEST PLUG

SUPPLY

TERMINAL UNIT SUPPLY

DUCT BRANCH (CONICAL

TAP)

CHECK VALVE

FIRE / SMOKE DAMPER

VANED ELBOW (SHORT RADIUS) S-30

CR-30

MEDIUM PRESSURE STEAM

PIPING (16 PSI AND 59 PSI)

MEDIUM PRESSURE STEAM

CONDENSATE RETURN

THERMOSTAT OR TEMPERATURE SENSOR

TWO POSITION CONTROL VALVE

MODULATING THREE-WAY

CONTROL VALVE

T

H

F

SD

FS

MECHANICAL LEGEND

MOTORIZED DAMPER

1. WORK SHALL CONFORM TO APPLICABLE LOCAL, STATE, AND NATIONAL CODES AND APPLICABLE VA STANDARDS.

2. INSTALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS.

3. PROVIDE NEW MATERIALS, EQUIPMENT AND PRODUCTS INCORPORATED IN THE WORK, OF A SUITABLE GRADE FOR THE PURPOSES INTENDED.

4. WHERE POSSIBLE, PROVIDE STANDARD PRODUCTS OF THE VARIOUS MANUFACTURERS EXCEPT WHERE SPECIAL CONSTRUCTION OR PERFORMANCE FEATURES ARE REQUIRED.

5. EQUIPMENT OR MATERIAL DEVIATIONS FROM INDICATED CONTRACT REQUIREMENTS SHALL BE SUBJECT TO THE APPROVAL OF THE COR. SUBMIT PROPOSED EQUIPMENT DEVIATIONS THAT ARE SIMILAR BOTH IN QUALITY AND CAPACITY TO THAT EQUIPMENT SPECIFIED, AS SOLELY DETERMINED BY THE COR.

6. PROVIDE MECHANICAL EQUIPMENT THAT IS LISTED AND LABELED BY UNDERWRITERS LABORATORIES (U.L.).

7. INSTALL EQUIPMENT AS INDICATED, ALLOWING FOR SUFFICIENT ACCESS AND CLEARANCE SPACE FOR EQUIPMENT MAINTENANCE, REPAIRS, AND REPLACEMENT.

8. INSTALL EQUIPMENT WITH PROPER CLEARANCES FOR REQUIRED PIPING AND ELECTRICAL SERVICES AND CONNECTIONS. INSTALL EQUIPMENT WITH REQUIRED ACCESS AND CLEARANCES IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS AND APPLICABLE CODES AND STANDARDS.

9. COORDINATE LOCATION, INSTALLATION, AND ROUTING OF DUCTWORK, PIPING, AND EQUIPMENT WITH WORK OF ALL OTHER TRADES.

10. PROVIDE SUPPORT FOR MECHANICAL EQUIPMENT. COORDINATE SUPPORT LOCATIONS WITH ALL CONTRACTORS PRIOR TO INSTALLATION.

11. PROVIDE POWER CONNECTIONS TO EQUIPMENT PROVIDED UNDER THIS CONTRACT AS WORK OF DIVISION 26.

12. PROVIDE CONTROL WIRING FOR MECHANICAL EQUIPMENT AS WORK OF DIVISION 23.

13. DUCTWORK AND PIPING LAYOUTS AND LOCATIONS ARE SCHEMATIC. DO NOT SCALE THESE DRAWINGS. COORDINATE AND DETERMINE EXACT ROUTING OF DUCTWORK AND

PIPING IN THE FIELD.

14. FIELD VERIFY DIMENSIONS BY ACTUAL MEASUREMENT AND OBSERVATION BEFORE ORDERING OR FABRICATING DUCTWORK, PIPING OR EQUIPMENT.

15. NOTIFY COR REGARDING DISCREPANCIES BETWEEN CONTRACT DOCUMENTS AND EXISTING CONDITIONS OR DIMENSIONS BEFORE PERFORMING WORK. FAILURE TO VERIFY AND REPORT SHALL CONSTITUTE CONTRACTOR'S ACCEPTANCE OF EXISTING CONDITIONS AS FIT FOR THE PROPER EXECUTION OF THE WORK.

16. SEE ARCHITECTURAL DRAWINGS FOR FINAL LOCATION OF CEILING INSTALLED EQUIPMENT.

17. INSTALL DUCTWORK AND PIPING AS HIGH AS POSSIBLE AND AS CLOSE AS POSSIBLE TO BUILDING WALLS, CEILING AND FLOOR AND ROOF STRUCTURE. PROVIDE OFFSETS, FITTINGS, AND DIMENSIONAL TRANSITIONS NOT SHOWN BUT REQUIRED TO MAINTAIN MINIMUM CLEAR SPACE TO BUILDING SURFACES AT NO ADDITIONAL COST.

18. PATCH, PAINT AND CLEAN SURFACES SUSTAINING DAMAGE ASSOCIATED WITH MECHANICAL WORK OF THIS CONTRACT, UNLESS NOTED OTHERWISE.

19. SUBMIT BOUND SET OF OPERATING AND MAINTENANCE INSTRUCTIONS FOR EQUIPMENT AT COMPLETION OF PROJECT.

20. INSTALL ESCUTCHEONS IN ALL PLACES WHERE PIPING PENETRATES A WALL IN AN EXPOSED LOCATION.

21. MAKE A COMPLETE REVIEW OF DRAWINGS, INCLUDING SCHEDULES AND DETAILS, PRIOR TO BEGINNING MECHANICAL SYSTEM INSTALLATION. RESOLVE CONFLICTS WITH COR.

22. DRAWING PLANS, SCHEMATICS, AND DIAGRAMS INDICATE GENERAL LOCATION AND ARRANGEMENT OF PIPING SYSTEMS.

23. INSTALL PIPING INDICATED TO BE EXPOSED AND PIPING IN EQUIPMENT ROOMS AND SERVICE AREAS AT RIGHT ANGLES OR PARALLEL TO BUILDING WALLS. DIAGONAL RUNS ARE

NOT ACCEPTABLE UNLESS SPECIFICALLY INDICATED OTHERWISE.

24. INSTALL PIPING FREE OF SAGS AND BENDS.

25. INSTALL PIPING TO ALLOW APPLICATION OF INSULATION.

26. PIPING SHALL NOT BE ROUTED OVER TELECOM OR ELECTRICAL CLOSETS/ROOMS.

27. INSTALLATION COMMENCED PRIOR TO COORDINATION DRAWING APPROVAL IS TAKEN AT THE CONTRACTORS OWN RISK. MODIFY, MOVE OR RECONFIGURE WORK LACKING

COORDINATION AT NO ADDITIONAL COST.

MECHANICAL GENERAL NOTES

1. VERIFY EXISTING CONDITIONS PRIOR TO BEGINNING WORK. NOTIFY COR REGARDING CONFLICTS BEFORE PROCEEDING WITH WORK.

2. REMOVED ITEMS REMAIN PROPERTY OF GOVERNMENT UNTIL COR DETERMINES THAT THEY ARE NOT REQUIRED. REMOVE FROM SITE ITEMS NOT BEING RETAINED BY

GOVERNMENT OR REINSTALLED AS PART OF THIS WORK.

3. DO NOT DISTURB ITEMS NOT INDICATED FOR DEMOLITION.

4. VERIFY SIZE AND LOCATION OF EXISTING UTILITIES PRIOR TO START OF DEMOLITION. RELOCATE, REMOVE AND ADJUST MECHANICAL AND ELECTRICAL ITEMS AS NECESSARY TO

COORDINATE WITH NEW WORK.

5. AFTER DEMOLITION IS COMPLETE, PATCH AND REPAIR FINISHES TO MATCH EXISTING ADJACENT CONDITIONS.

6. COORDINATE DEMOLITION WITH COR. SUBMIT SHUTDOWN PLAN AND SCHEDULE TO COR FOR REVIEW AND APPROVAL.

7. PROTECT EXISTING UTILITIES TO REMAIN FROM DAMAGE DURING DEMOLITION. REPAIR UTILITIES AND SERVICES DAMAGED AT NO ADDITIONAL COST.

8. TEMPORARILY MOVE OR TAKE EQUIPMENT OUT OF SERVICE AS NECESSARY TO COMPLETE WORK.

MECHANICAL DEMOLITION GENERAL NOTES

EXISTING

NEW WORK KEYNOTE

DEMOLITION KEYNOTE

NEW BOLD TEXT INDICATES NEW ITEM

ITALICIZED TEXT INDICATES EXISTING ITEM

DIFFUSER TAG

DETAIL OR SECTION MARK

SHOWN ON DRAWING

DETAIL MODULE NUMBER

CONNECT TO EXISTING

LIMIT OF DEMOLITION

EQUIPMENT TAG

ANNOTATION SYMBOLS

##-VAV-#

SD-## ###

2 HOUR FIRE SEPARATION

1 HOUR FIRE SEPARATION

SMOKE RATED

SEE SPECIFICATIONS FOR CLAMPS

AND SEALANT (TYP.)

SUPPORT SADDLE

FROM STRUCTURE

FLEXIBLE DUCT SIZE

SAME AS DIFFUSER

INLET: 5'-0" MAX

LENGTH

USE RIGID ELBOWS

FOR CHANGE OF

DIRECTION GREATER

THAN 45°

TYPICAL DIFFUSER

OR REGISTER IN

LAY-IN CLG.

THERMAL INSULATION

SEE SPECIFICATIONS

CONICAL OUTLET

BRANCH DUCT

12"

SHEET METAL SADDLE

VOLUME DAMPER WITH

LOCKING QUAD

CEILING

NOTE:

THE USE OF FLEXIBLE AIR DUCT CONNECTORS ARE NOT PERMITTED FOR

THE DEDICATED AHU SERVING THE SURGICAL SUITE

SMACNA FIGURE 4-6 45°

LEED IN RIGID DUCT TO

AIR TERMINAL UNIT

MAIN SUPPLY

FLOW

F L O

W

PLAN VIEW

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/1

/2

:0

:1

A

M C

U s e rs

\s g e o rg e

\D o c u m e n ts \R e v it F ile s \R e v it

\M P

-2

-2

N

-V A

N a s h v ill e -V id e o S e c I m p ro v R s p g e o rg e

J u n

.r v t

M-001

MECHANICAL GENERAL INFORMATION

AND DETAILS

1 2KSC

VIDEO SURVEILLANCE

SECURITY- NASHVILLE

NASHVILLE VAMC

1310 24TH AVENUE SOUTH

NASHVILLE, TN 37212 JUNE 13, 2024

BID DOCUMENTS

626-22-10322-215N

SPG

Scale: No Scale

FLEX AIR DUCT CONNECTOR DETAIL

WALL RATING LEGEND

Scale: N.T.S.

SUPPLY DUCT TAKEOFF - AIR TERMINAL UNITS

SS

S S

S S

SS

S S

SS SS

SS

S S

S S

SS

S S

SS SS

6ø RA

12ø

10ø

8ø ø

S A ø

R A

SECURITY

MONITOR

A-140

OFFICE

A-139

CORRIDOR

C1-16

EXISTING WSHP

AND DUCTWORK

TO REMAIN

EXISTING TU AND

DUCTWORK TO

REMAIN

EXAM

A-128

TRAINING

ROOM

A-127

ORTHO

OFFICE

PHYSICIAN

A-138

EXAM

A-129

TOILET

A-140A

TOILET

A-WT133A

3/4" HWR

3/4" HWS

SECURITY

MONITOR

A-140

OFFICE

A-139

CORRIDOR

C1-16

8ø RA ø

R A ø S

A

8ø

10ø

12x12

12x12

2-TU-139

EXISTING WSHP

AND DUCTWORK

TO REMAIN

EXISTING TU AND

DUCTWORK TO

REMAIN

200RG-19

400SD-14

12ø

EXAM

A-128

TRAINING

ROOM

A-127

ORTHO

OFFICE

PHYSICIAN

A-138

EXAM

A-129

TOILET

A-140A

TOILET

A-WT133A

3/4" HWR

3/4" HWS

ø S

A

DA

T

AI - DISCHARGE AIR TEMP

AI - AIRFLOW

M

AO - ZONE DAMPER

SA

T AI - ZONE TEMP

AI - ZONE SETPOINT ADJUST

F

POINT NAME:

ZONE TEMPERATURE

ZONE TEMPERATURE SETPOINT

AIRFLOW

DISCHARGE AIR TEMPERATURE

ZONE DAMPER

MAXIMUM OCCUPIED AIRFLOW SETPOINT

COOLING SETPOINT

HIGH ZONE TEMPERATURE

LOW ZONE TEMPERATURE

HIGH DISCHARGE TEMPERATURE

LOW DISCHARGE TEMPERATURE

HARDWARE POINTS

AI AO

X

X

X

X

BI BO

SOFTWARE POINTS

AV BV LOOP SCHED TREND ALARM SHOW ON GRAPHIC

X

X

X

X

X

X

X

X

X

X

X

TOTAL HARDWARE (5) TOTAL SOFTWARE (14)

4 1 3

X

X

X

7 4 9

X

X

X

X

MINIMUM OCCUPIED AIR FLOW SETPOINT

MINIMUM UNOCCUPIED AIRFLOW SETPOINT

X

X

X

X

X

X

VAV TERMINAL UNIT

VARIABLE AIR VOLUME - TERMINAL UNIT

RUN CONDITIONS - CONTINUOUS:

THE UNIT SHALL RUN CONTINUOUSLY AND SHALL MAINTAIN:

• A 72°F (ADJ.) COOLING SETPOINT.

ALARMS SHALL BE PROVIDED AS FOLLOWS:

• HIGH ZONE TEMP: IF THE ZONE TEMPERATURE IS GREATER THAN THE COOLING SETPOINT BY A USER

DEFINABLE AMOUNT (ADJ.).

• LOW ZONE TEMP: IF THE ZONE TEMPERATURE IS LESS THAN THE HEATING SETPOINT BY A USER

DEFINABLE AMOUNT (ADJ.).

ZONE SETPOINT ADJUST:

THE OCCUPANT SHALL BE ABLE TO ADJUST THE ZONE TEMPERATURE COOLING SETPOINTS AT THE ZONE

SENSOR.

PRESSURE INDEPENDENT VARIABLE VOLUME TERMINAL UNIT - FLOW CONTROL:

• WHEN ZONE TEMPERATURE IS GREATER THAN ITS COOLING SETPOINT, THE ZONE DAMPER SHALL MODULATE BETWEEN THE MINIMUM OCCUPIED AIRFLOW (ADJ.) AND THE MAXIMUM COOLING AIRFLOW

(ADJ.) UNTIL THE ZONE IS SATISFIED.

DISCHARGE AIR TEMPERATURE:

THE CONTROLLER SHALL MONITOR THE DISCHARGE AIR TEMPERATURE.

ALARMS SHALL BE PROVIDED AS FOLLOWS:

• HIGH DISCHARGE AIR TEMP: IF THE DISCHARGE AIR TEMPERATURE IS GREATER THAN 70°F (ADJ.).

• LOW DISCHARGE AIR TEMP: IF THE DISCHARGE AIR TEMPERATURE IS LESS THAN 50°F (ADJ.).

Engineers Architects

# KEY NOTES:

# KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/1

/2

:0

:1

A

M C

U s e rs

\s g e o rg e

\D o c u m e n ts \R e v it F ile s \R e v it

\M P

-2

-2

N

-V A

N a s h v ill e -V id e o S e c I m p ro v R s p g e o rg e

J u n

.r v t

M-101

FIRST FLOOR MECHANICAL PLANS,

CONTROLS, AND SCHEDULES

2 2KSC

VIDEO SURVEILLANCE

SECURITY- NASHVILLE

NASHVILLE VAMC

1310 24TH AVENUE SOUTH

NASHVILLE, TN 37212 JUNE 13, 2024

BID DOCUMENTS

626-22-10322-215N

SPG

Scale: 1/4" = 1'-0"

FIRST FLOOR HVAC PLAN

Scale: 1/4" = 1'-0"

FIRST FLOOR MECHANICAL DEMOLITION PLAN

Scale: No Scale

VAV TERMINAL UNIT CONTROLS

Scale: No Scale

VAV TERMINAL SCHEMATIC

Scale: No Scale

VAV TERMINAL SEQUENCE OF OPERATION

N

AREA OF WORK

KEY PLAN - FIRST FLOOR

SCALE: NO SCALE

0 2 4 8

N O

R T

H 0 2 4 8

N O

R T

H

1 DEMOLISH EXISTING TERMINAL UNIT, DIFFUSER,

AND DUCTWORK FEEDING OFFICE A-139 BACK TO

SUPPLY MAIN. CAP HEATING HOT WATER PIPING.

2 DEMOLISH EXISTING DIFFUSER AND DUCTWORK

SERVINGING OFFICE A-139 BACK TO LOCATION

INDICATED.

1 REPLACE EXISTING TERMINAL UNIT, DIFFUSER,

AND DUCTWORK FEEDING OFFICE A-139 AND TIE

INTO EXISTING SUPPLY MAIN. PROVIDE WITH DDC

CONTROLS AND CONNECT INTO CAMPUS

SIEMENS BAS.

2 REPLACE EXISTING DIFFUSER AND DUCTWORK

FEEDING OFFICE A-139 AND TIE INTO EXISTING

RETURN MAIN.

AIR DEVICE SCHEDULE (RETURN)

MARK TYPE

AIR FLOW

MAX. APD MOUNTING

PANEL/FRAME

SIZE NECK SIZE MAX NC DAMPER FINISH MATERIAL REMARKSMIN. MAX.

RG-19 EGG CRATE 110 200 0.09 in-wg CEILING 12x12 8"Ø 18 No WHITE STEEL 1, 2

SINGLE DUCT AIR TERMINAL SCHEDULE

MARK ROOM SERVED

SYSTEM AIR

HANDLING DUCT INLET

DESIGN AIRFLOW (CFM)

ALLOWABLE

AIRFLOW (CFM) CONTROL

TYPE

CONTROL

SEQUENCE REHEAT REMARKSMAX MIN REHEAT MAX MIN

2-TU-139 A-139 AHU-2 10 in 400 100 0 1050 350 VAV 5°F DEADBAND NONE 1, 2

AIR DEVICE SCHEDULE (SUPPLY)

DIFFUSER

MARK TYPE

AIR FLOW

MAX. APD MOUNTING

PANEL/FRAME

SIZE NECK SIZE MAX NC DAMPER FINISH MATERIAL REMARKSMIN. MAX.

SD-14 LOUVERED FACE 301 450 0.08 in-wg CEILING 24x24 12"Ø 19 No WHITE STEEL 1, 2

NOTES:

1. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.

2. PROVIDE DAMPER IN BRANCH DUCT AS SHOWN ON PLANS.

NOTES:

1. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.

2. PROVIDE DAMPER IN BRANCH DUCT AS SHOWN ON PLANS.

NOTES:

1. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.

2. PROVIDE WITH 120V-24V TRANSFORMER.

TECHNOLOGY GENERAL NOTES

1. PROVIDE TECHNOLOGY DEVICES AND EQUIPMENT IN ACCORDANCE WITH THE CONTRACT DOCUMENTS, MANUFACTURER'S RECOMMENDED PROCEDURES, ALL APPLICABLE LOCAL AND STATE CODES, AMERICANS WITH DISABILITIES ACT, LATEST EDITION OF THE NATIONAL ELECTRICAL CODE, BICSI STANDARDS, AND VA OIT

STANDARDS.

2. PROVIDE ADDITIONAL SUPPORT FOR DEVICES AND EQUIPMENT WHERE BUILDING CONSTRUCTION IS NOT

SUITABLE FOR DIRECT MOUNTING.

3. FIRESTOP, DRAFTSTOP, SMOKESTOP OR PROTECT ANNULAR SPACE AROUND PENETRATIONS THROUGH WALLS, PARTITIONS, FLOORS, CEILINGS, AND ROOF IN ACCORDANCE WITH REQUIREMENTS OF NFPA 70, UL LISTING

REQUIREMENT AND APPLICABLE BUILDING CODES.

4. PROVIDE CABLING THAT COMPLIES WITH THE LATEST EDITION OF TELECOMMUNICATIONS DISTRIBUTION

METHOD MANUAL AND ANSI/TIA/EIA PUBLICATIONS.

5. COMPLY WITH THE LATEST ANSI/TIA/EIA 758 AND 607D - BONDING AND GROUNDING TELECOMMUNICATIONS.

6. COMPLY WITH THE LATEST ANSI/TIA/EIA 568.1E - COMMERCIAL BUILDING TELECOMMUNICATIONS WIRING

STANDARD.

7. COMPLY WITH THE LATEST ANSI/TIA/EIA 569E - TELECOMMUNICATIONS PATHWAYS AND SPACES.

8. COMPLY WITH ANSI/TIA-1069 STANDARD FOR HOSPITAL SIGNALING & NURSE CALL EQUIPMENT.

9. COMPLY WITH ANSI/TIA-1179 HEALTHCARE FACILITY TELECOMMUNICATION INFRASTRUCTURE STANDARD.

10. COMPLY WITH THE LATEST NFPA 70 NATIONAL ELECTRICAL CODE.

11. COMPLY WITH THE LATEST NFPA 99 HEALTHCARE FACILITIES CODE.

12. COMPLY WITH THE LATEST NFPA 101 LIFE SAFETY CODE.

13. CONTRACTOR RESPONSIBLE FOR THE COORDINATION OF ALL WORK WITH ALL OTHER TRADES PRIOR TO

INSTALLATION.

14. MANUFACTURER'S NAME AND MODEL NUMBER ARE GIVEN FOR DESCRIPTIVE PURPOSES TO INDICATE A QUALITY STANDARD AND ARE NOT INTENDED TO LIMIT PRODUCTS TO A PARTICULAR MANUFACTURER. PRODUCTS DEEMED EQUAL IN ACCORDANCE WITH SPECIFIED PROCESSES FOR APPROVAL AND APPROVED BY THE COR

WILL BE ACCEPTABLE. COMPLY WITH "BUY AMERICAN ACT".

15. MOUNTING HEIGHTS INDICATED ARE TO CENTER OF DEVICE, BOXES, OUTLET, OR EQUIPMENT UNLESS NOTED

OTHERWISE.

16. PROVIDE RGS OR EMT CONDUIT UNLESS OTHERWISE NOTED.

17. PROVIDE MATERIALS, DEVICES, APPLIANCES AND EQUIPMENT LABEL LISTED BY APPROVED THIRD PARTY

TESTING AGENCY.

18. NOTIFY COR REGARDING DISCREPANCY BETWEEN PLANS AND SPECIFICATIONS FOR CLARIFICATION. THE MORE

STRINGENT SHALL TAKE PRECEDENCE.

19. PROVIDE TIA/EIA 4 PR UTP COPPER CABLE, JACKS, AND CONNECTORS.

20. ALL WORK AREA OUTLETS SHALL BE 8 PIN, 8P8C KEYSTONE JACK WIRED PER T568B.

21. LABEL DEVICES IN ACCORDANCE WITH LATEST ANSI/TIA 606A OR 606B EDITION AS WELL AS THE STANDARDS SET

FORTH BY THE VAMC OIT.

22. PROVIDE A MINIMUM OF 12" CLEARANCE ABOVE THE CABLE TRAY PER TIA/EIA 569.B PARAGRAPH 4.5.6.2.

23. VA SHALL CONDUCT A WAP SURVEY AND PROVIDE THE SURVEY TO THE CONTRACTOR. CONTRACTOR SHALL INSTALL CABLING AND EQUIPMENT IN ACCORDANCE WITH THE SURVEY. COORDINATE WITH COR/OIT.

24. ALL CABLING INSTALLED ABOVE CEILING SHALL BE PLENUM RATED.

25. MINIMUM CONDUIT SIZE TO BE USED IS 1 1/4" CONDUIT.

26. WALL MOUNTED DEVICES PLACED IN TELECOMMUNICATIONS ROOM TO BE MOUNTED ON FIRE RETARDANT

PLYWOOD.

27. ALL CAMERAS SHALL BE IN COMPLIANCE WITH THE NATIONAL DEFENSE AUTHORIZATION ACT.

ADO AUTOMATIC DOOR OPERATOR

AFF ABOVE FINISH FLOOR

AFG ABOVE FINISH GRADE

BOD BASIS OF DESIGN

CCTV CLOSED CIRCUIT TELEVISION

COAX COAXIAL CABLE

COMM COMMUNICATION

COR CONTRACTING OFFICER REPRESENTATIVE

DC DOOR CONTACT SWITCH

DN DOWN

DO DOOR OPERATOR

DVC DIGITAL VOICE COMMAND

DVR DIGITAL VIDEO RECORDER

E EXISTING DEVICES

EEB EMERGENCY EXIT BUTTON

EL ELECTRICAL STRIKE

EMT ELECTRICAL METALLIC CONDUIT

ETR EXISTING TO REMAIN

FA FIRE ALARM

FACP FIRE ALARM CONTROL PANEL

FAAP FIRE ALARM ANNUNCIATOR PANEL

FO FIBER OPTIC

FAGAP FIRE ALARM GRAPHIC ANNUNCIATOR PANEL

IT INTERCOMMUNICATION ROOM

MATV MASTER ANTENNA TELEVISION

MM MULTI MODE FIBER

NAC NOTIFICATION APPLIANCE CONTROL PANEL

N NEW DEVICES

NCA NETWORK CONTROL ANNUNCIATOR

NS…

This is the start of the file's text. The full file is on GovTribe.