Atch 5 - Past Performance Information (PPI) Sheet.pdf

PDF 87 KB Posted

Attached to
Hill AFB, Utah Air National Guard, and Geographically Separated Locations Paving Requirement
Solicitation number
FA8201-22-R-0012
Issued by

About this file

This solicitation is seeking proposals for an Indefinite-Delivery, Indefinite-Quantity contract to provide paving services at Hill Air Force Base in Utah as well as other geographically separated locations. Services will include general construction across multiple disciplines. Task orders will define specific project requirements. Proposals are due no later than July 14, 2022. The Department of the Air Force Materiel Command Air Force Sustainment Center is the contracting agency. Project locations may involve remote sites in Wyoming, Utah and other areas. An attachment provides an example template for past performance references related to relevance of previous experience.

View the file

Other files

File Type Posted
Solicitation Amendment FA820122R00120006.pdf PDF
Atch 3-Section L-Instructions Conditions and Notices to Bidders 220712.pdf PDF
Atch 4 - Section M - Evaluation Factors for Award 220711.pdf PDF
Atch 3-Section L-Instructions Conditions and Notices to Bidders 220711.pdf PDF
Solicitation Amendment FA820122R00120005.pdf PDF
Paving Solicitation Q and A Matrix 220706.xlsx XLSX spreadsheet
Atch 3-Section L-Instructions Conditions and Notices to Bidders 220706.pdf PDF
Solicitation Amendment FA820122R00120004.pdf PDF
Atch 4 - Section M - Evaluation Factors for Award 220706.pdf PDF
Atch 3-Section L-Instructions Conditions and Notices to Bidders 220705.pdf PDF
Solicitation Amendment FA820122R00120003.pdf PDF
Atch 4 - Section M - Evaluation Factors for Award 220705.pdf PDF
Paving Solicitation Q and A Matrix 220705.xlsx XLSX spreadsheet
Solicitation Amendment FA820122R00120002.pdf PDF
Atch 1 - BASIC IDIQ SOW-220628.pdf PDF
Solicitation Amendment FA820122R00120001.pdf PDF
Paving Solicitation Q and A Matrix-220627.xlsx XLSX spreadsheet
Atch 1 - BASIC IDIQ SOW-220627.pdf PDF
Appendix 15 - UFGS 32 17 23.pdf PDF
Atch 2 - Paving Contractor Ordering Procedures 220525.pdf PDF
Atch 3 - Section L - Instructions Conditions and Notices to Bidders.pdf PDF
Appendix 13 - UFGS 32 13 13.06.pdf PDF
Appendix 12 - UFGS 32 12 36.13.pdf PDF
Paving Solicitation Q and A Matrix.xlsx XLSX spreadsheet
Atch 9 - Sublette County Wage Determination 220107.pdf PDF
Atch 7 - Davis County Wage Determination 220107.pdf PDF
Appendix 10 - UFGS 32 01 11.51.pdf PDF
Appendix 16 - Safety Appendix.pdf PDF
Atch 4 - Section M - Evaluation Factors for Award.pdf PDF
Atch 8 - Salt Lake County Wage Determination 220107.pdf PDF
Appendix 2 - UFGS 01 42 00.pdf PDF
Appendix 5 - UFGS 03 01 00.pdf PDF
Atch 11 - Weber County Wage Determination 220107.pdf PDF
Appendix 3 - UFGS 01 57 19.pdf PDF
Appendix 14 - UFGS 32 16 19.pdf PDF
Atch 6 - Paving Past Performance Relevancy Baseline.pdf PDF
Solicitation - FA820122R0012.pdf PDF
Appendix 6 - UFGS 03 30 00.pdf PDF
Appendix 4 - UFGS 01 78 00.pdf PDF
Appendix 9 - UFGS 31 00 00.pdf.pdf PDF
Appendix 8 - UFGS 07 61 14.00 20.pdf PDF
Atch 10 - Tooele County Wage Determination 220107.pdf PDF
Appendix 11 - UFGS 32 11 26.pdf PDF
Atch 1 - BASIC IDIQ SOW.pdf PDF
Appendix 1 - UFC 1-200-01.pdf PDF
Appendix 7 - UFGS 03 37 00.pdf PDF
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 5 – Past Performance Information (PPI) Sheet

Example Project Template Page formatting shall be IAW Section L para L1.2.

1. Project Number: Number example projects consecutively (i.e. Project 1, Project 2, 3…)

2. Example Project: Provide Project Title. If the construction portion of the contract was not direct with the end user, then the example project experience is not considered to be Prime Contractor Experience.

3. Contractor Name: Provide Name, Address, Point of Contact, Email, and Telephone number.

4. Contractor Basic Information: Provide contract number, title, location, award amount, award date, Beneficial Occupancy Date (BOD), and/or completion date (BOD or completion date must be before Paving RFP proposal due date).

5. Project End User: Provide project owner or end user, such as a Government agency or installation, an institution, or corporation or private individual. Provide name, title, and telephone number (including area code) of an individual associated with the end user or the organization that contracted for the project, who is familiar with the project and the firm’s performance.

6. Licensed Professional: Provide Point of Contact Name, Phone Number, Email, and Firm for all licensed disciplines.

7. Description of the Project: Provide contract type (design-bid-build or design-build), physical size, and a brief description of the effort. Provide sufficient detail (200 words or more) to establish the relevance to the technical subfactor requirements. Pictures may be provided but are not required.

8. Example Project Attachments: Any documents, drawings, calculations, etc. required to establish relevance to the technical subfactor.

Attachment 5 – Past Performance Information (PPI) Sheet

File details come from the government source that posted it. Updated .