Atch 26-APPENDIX 24 Work Clearance Triggers.pdf

PDF 136 KB Posted

Attached to
Nellis AFB Paving IDIQ
Solicitation number
FA486125R0006
Issued by

About this file

This document is an appendix listing Work Clearance Triggers for the Nellis AFB Paving IDIQ contract, detailing specific environmental and regulatory compliance requirements across multiple areas. The work clearance triggers include Air Quality requirements such as obtaining Clark County Dust Permits for land disturbances over 0.25 acres or mechanized trenching over 100 linear feet, Storm Water Pollution Prevention Permit requirements for construction activities disturbing one or more acres, and Water Quality permit needs for main water line tapping. Additional triggers involve Cultural Resources archaeological site checks and Natural Resources endangered species site assessments, with specific attention to species like Desert Tortoise, burrowing owls, and Desert Poppy.

The document also outlines Air Quality-Title V Permit Revision requirements for any new or replaced emissions equipment, noting a 120-day processing period and mandatory detailed reporting of equipment specifications. Petroleum, Oils, and Lubricants (POL) storage tank management is addressed, requiring reporting to the Nellis AFB POL Program Manager for new, replacement, relocated, or decommissioned tanks, with comprehensive documentation including location, serial number, model number, usage, and capacity details.

View the file

Other files

File Type Posted
Atch 2-Nellis PAVING IDIQ PRICING SCHEDULE.xlsx XLSX spreadsheet
Solicitation - FA486125R0006.pdf PDF
Atch 50-Past Performance Questionnaire.pdf PDF
Atch 49-Past Performance Information Sheet.pdf PDF
Atch 47-AF Form 103 - Outage Request.pdf PDF
Atch 46-Nellis Single Pass (2 Months Max).pdf PDF
Atch 45-99 SFS-Mass Pass Request.xlsx XLSX spreadsheet
Atch 40-APPENDIX 38 Nellis-Creech 2710 Communication Installation Standards.pdf PDF
Atch 39-APPENDIX 37 Typical Exterior Color Schedule.pdf PDF
Atch 38-APPENDIX 36 AF 3000 Material Approval Submittal.pdf PDF
Atch 37-APPENDIX 35 AF 66 Schedule of Material Submittals.xlsx XLSX spreadsheet
Atch 36-APPENDIX 34 NAFB Suitable Tree List.pdf PDF
Atch 33-APPENDIX 31 14_USAF Integrated Cultural Resources Mgmt Plan 32-7065 ICRMP (15 Nov 2019).pdf PDF
Atch 18-Appendix 16 Nellis Creech IFS.pdf PDF
Atch 14-APPENDIX 12 Crack Rpr Detail.pdf PDF
Atch 2-Nellis PAVING IDIQ PRICING SCHEDULE 09AUG24_Blank.xlsx XLSX spreadsheet
Atch 44-APPENDIX 42 Uniform Standard Specifications for Clark County.pdf PDF
Atch 42-APPENDIX 40 Uniform Design and Construction Standards (UDACS).pdf PDF
Atch 41-APPENDIX 39 Nellis-Creech IFS Electrical Req.pdf PDF
Atch 34-APPENDIX 32 Installation Plan 12 - Hazardous Waste Management Plan (27 Sep 23).pdf PDF
Atch 31-APPENDIX 29 AF 3064 Progress Schedule Template.xlsx XLSX spreadsheet
Atch 24-APPENDIX 22 NAFB 0-74 Range Pass.pdf PDF
Atch 23-APPENDIX 21 Nuclear Gauge Request Form 2.pdf PDF
Atch 19-APPENDIX 17 AF Form 103 - Dig Permit.pdf PDF
Atch 17-APPENDIX 15 ADA Warning Panel Detail.pdf PDF
Atch 15-APPENDIX 13 Field Molded Joint Seal Details.pdf PDF
Atch 12-APPENDIX 10 Full Depth Rpr Details.pdf PDF
Atch 10-APPENDIX 8 Sleeve Bollards Detail.pdf PDF
Atch 9-APPENDIX 7 Valley Gutter Detail.pdf PDF
Atch 7-APPENDIX 5 L Curb and Gutter Detail.pdf PDF
Atch 4-APPENDIX 2 Mooring Detail.pdf PDF
Atch 52-NV20250001 Building Heavy and Highway.pdf PDF
Atch 51-Sample Client Authorization Letter.pdf PDF
Atch 48-Sub or Teaming Partner Consent Form.pdf PDF
Atch 43-APPENDIX 41 Uniform Standard Drawings for Clark County.pdf PDF
Atch 35-APPENDIX 33 Desert Tortoise Temporary Fencing Guidelines.pdf PDF
Atch 30-APPENDIX 28 AF Form 3065 Progress Report Template.pdf PDF
Atch 29-APPENDIX 27 NTTR Visit Request.pdf PDF
Atch 28-APPENDIX 26 DOD Supplement to National Manual Uniform Traffic Control Devices.pdf PDF
Atch 27-APPENDIX 25 National Manual Uniform Traffic Control Devices 11th Edition.pdf PDF
Atch 25-APPENDIX 23 Env Permit-ATP Guidance (2023).pdf PDF
Atch 20-APPENDIX 18 AF Form 103 - Outage Request.pdf PDF
Atch 3-APPENDIX 1 Utility Ducts Detail.pdf PDF
Atch 53-NV20250058 Highway.pdf PDF
Atch 32-APPENDIX 30 Plan 32-7086 Hazardous Material Management Plan June 2021.pdf PDF
Atch 22-APPENDIX 20 Nuclear Gauge Request Form 1.xlsx XLSX spreadsheet
Atch 21-APPENDIX 19 Schedule of Values Template.xlsx XLSX spreadsheet
Atch 16-APPENDIX 14 Compression Seal Detail.pdf PDF
Atch 13-APPENDIX 11 Rpr of Concrete (Fail Keyway).pdf PDF
Atch 11-APPENDIX 9 Partial Depth Rpr Details.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Work Clearance Triggers Air Quality- Clark County Dust Permit:

• 0.25 acre (10,890 square feet) disturbance in overall area

• Mechanized trenching more than one hundred (100) linear feet

• Mechanical demolition of any structure larger than one thousand (1,000) square feet

• Disturbance includes driving, laydown areas, earth moving activities, etc.

Storm Water Pollution Prevention Permit:

• Construction activities disturbing one (1) or more acres (more than 43,560 square feet) in aggregate require a site specific SWPPP and the timely submission of a Notice of Intent (NOI) to NDEP

• Per NDEP Permit NVR100000, part 1.4.6.2, Routine maintenance that disturbs less than 5 acres that is performed to maintain the original line and grade, hydraulic capacity, or original purpose of a facility or structure is exempt.

• Disturbance does not include driving, laydown areas, and paving repairs as long as soil is not exposed

Water Quality

• Any tapping activity to the main water lines will require specific permits through NDEP.

Cultural Resources:

• Check to see if disturbance will affect any archaeological sites.

Natural Resources:

• Check to see if disturbance will affect any endangered species sites, such as

Desert Tortoise, burrowing owls, and Desert Poppy.

Air Quality- Title V Permit Revisions:

• Any new emissions equipment (Storage Tank, Fuel Dispenser, Boiler, Generator, Fire Pump, Hush House, Paint Booth, Media Blaster, Cooling

Tower, Incinerator, Woodworking Equipment, Degreaser, Etc.) being added or replaced.

o It takes about 120 days to add a new item to the next permit revision, and equipment cannot be used until on the permit.

o Air Quality needs: list of equipment, manufacturer, model number, designed rated capacities/heat ratings, production/throughput, etc.

• Any old emissions equipment (see above list) being removed.

POL

• New or replacement POL storage tanks must be reported to the Nellis

AFB POL Program Manager. The program manager will need detailed information from the tank (location, serial number, model number, usage, capacity, etc.).

• Tank custodians must also report when a tank is taken out of service or moved.

File details come from the government source that posted it. Updated .