Appendix H6 - BLDG 3 Bid Documents.pdf
PDF 12 MB Posted
- Solicitation number
- IFB1-NHAA-2025000029
- Issued by
- Larimer County, Lakewood City, Colorado
About this file
This document is a comprehensive architectural bid set for the Fort Lyon Life Safety Corrections - Building 3 project, prepared by T.A. Duke & Associates and McShea Consulting LLC for the State of Colorado. The project involves life safety improvements and code upgrades for Building 3, a historic structure located in Bent County that was previously a Navy Hospital, Department of Corrections facility, and is now used for supportive housing for veterans. The scope of work includes modifications to hardware, restrooms, fire protection systems, electrical systems, and overall building accessibility, with specific attention to meeting current building codes, fire safety standards, and Americans with Disabilities Act (ADA) requirements. The bid documents are dated September 21, 2023, and are part of State Project #2024-110M23, with the work focusing on life safety corrections across multiple building systems and architectural elements.
The project documents detail extensive renovations including installing new doors with appropriate fire ratings, upgrading hardware, modifying restrooms for ADA compliance, installing new fire detection and notification systems, and performing necessary architectural and mechanical upgrades. The building is a Type VB, sprinklered structure with multiple occupancy types (A-1, A-3, B, and S-1), and the renovations aim to bring the facility into compliance with current 2021 International Building, Mechanical, Plumbing, and Fire Codes. An asbestos inspection report is included, identifying various asbestos-containing materials throughout the building that will require careful management during renovation. The project also includes lead-based paint detection and remediation strategies, with the total building area being approximately 16,916 gross square feet spanning three floors including a basement.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MARK DATE DESCRIPTION
G-001
SHEET TITLE
CONSULTANTS
MODEL FILE:
Fort Lyon Bldg 3 V26.pln
DRAWN BY: #CAD Technician Full Name
DATE: 12/9/2022
/U se rs /ta du ke
/D oc um en ts /A rc hi ca d
Fi le s/ Fo rt Ly on B ld g
V
.p ln
COVER SHEET
Fort Lyon Life Safety Corrections - Building
T.A. DUKE & ASSOCIATES, Inc.
4220 Brigadoon Lane
Colorado Springs, CO 80906 719 648 7722 taduke@earthlink.net
McShea Consulting LLC 4445 Northpark Dr., Suite 200 Colorado Springs, CO 80907
719 358 8208
Building 3 Fort Lyon, 81054
12/9/22 ISSUED FOR PRICING AND
PERMIT
3/20/23 CODE REVIEW COMMENTS
4/13/23 ISSUED FOR STATE REVIEW
5/4/23 ISSUED FOR STATE REVIEW
6/7/23 ISSUED FOR STATE REVIEW
7/19/23 ISSUED FOR CODE
CONSULTANT REVIEW
9/21/2023
8/23/23 ISSUED FOR CODE
CONSULTANT REVIEW
STATE PROJECT #2024-110M23
9/21/23 ISSUED FOR BIDS
Fort Lyon Life Safety Corrections - Building 3
G-002
SHEET TITLE
CONSULTANTS
MODEL FILE:
Fort Lyon Bldg 3 V26.pln
DRAWN BY: #CAD Technician Full Name
DATE: 12/9/2022
/U se rs /ta du ke
/D oc um en ts /A rc hi ca d
Fi le s/ Fo rt Ly on B ld g
V
.p ln
NOTE SHEET
Fort Lyon Life Safety Corrections - Building
T.A. DUKE & ASSOCIATES, Inc.
4220 Brigadoon Lane
Colorado Springs, CO 80906 719 648 7722 taduke@earthlink.net
McShea Consulting LLC 4445 Northpark Dr., Suite 200 Colorado Springs, CO 80907
719 358 8208
Building 3 Fort Lyon, 81054
12/9/22 ISSUED FOR PRICING AND
PERMIT
3/20/23 CODE REVIEW COMMENTS
4/13/23 ISSUED FOR STATE REVIEW
5/4/23 ISSUED FOR STATE REVIEW
6/7/23 ISSUED FOR STATE REVIEW
7/19/23 ISSUED FOR CODE
CONSULTANT REVIEW
9/21/2023
8/23/23 ISSUED FOR CODE
CONSULTANT REVIEW
STATE PROJECT #2024-110M23
9/21/23 ISSUED FOR BIDS
GENERAL NOTES
PROJECT: BUILDING 3 LIFE SAFETY CORRECTIONS
FORT LYON, CO
APPLICABLE CODES:
2021 INTERNATIONAL BUILDING CODE
2021 INTERNATIONAL EXISTING BUILDING CODE
2021 INTERNATIONAL MECHANICAL CODE
2021 INTERNATIONAL ENERGY CONSERVATION CODE
2018 INTERNATIONAL PLUMBING CODE
2020 NATIONAL ELECTRIC CODE
2021 INTERNATIONAL FIRE CODE
NATIONAL FIRE PROTECTION ASSOCIATION STANDARDS
ZONING: NOT APPLICABLE
SEISMIC ZONE: B
SCOPE OF WORK:
MODIFICATIONS TO HARDWARE AND RESTROOMS
SEPARATION OF BUILDING:
X = EQUAL TO OR GREATER THAN 30'
SEPARATION OF EXITS: 1/3 THE DIAGONAL (BUILDING IS SPRINKLERED)
DIAGONAL @ BASEMENT = 129'
DISTANCE BETWEEN EXITS = 107'
DIAGONAL @ 1ST FLOOR = 143'
DISTANCE BETWEEN EXITS = 154'
DIAGONAL @ 2ND FLOOR = 69'
DISTANCE BETWEEN EXITS = N/A - THERE IS ONLY ONE STAIR
CONSTRUCTION TYPE: VB, SPRINKLERED
INTERIOR FINISH FIRE RATING:
OCCUPANCY EXIT ENCLOSURES CORRIDORS INTERIOR ROOMS
A-1 B B B A-3 B B C B B B C S C C C
CLASS A: FLAME SPREAD INDEX 0-25; SMOKE DEVELOPED INDEX 0-450
CLASS B: FLAME SPREAD INDEX 26-75; SMOKE DEVELOPED INDEX 0-450
CLASS C: FLAME SPREAD INDEX 76-200; SMOKE DEVELOPED INDEX 0-450
FIRE RESISTANCE RATING (HOURS):
PRIMARY STRUCTURAL FRAME: 0
EXTERIOR BEARING WALLS: 0
INTERIOR BEARING WALLS: 0
INTERIOR NON BEARING WALLS: 0
FLOOR CONSTRUCTION AND
SECONDARY MEMBERS: 0
ROOF CONSTRUCTION AND
SECONDARY MEMBERS: 0
EXISTING CONSTRUCTION MEETS OR EXCEEDS THE REQUIRED FIRE
RESISTIVE RATINGS LISTED ABOVE
CODE REQUIREMENTS
PARTITION TYPES
12. DURING AND AT THE COMPLETION OF THE CONTRACTORS
DAILY WORK, CONTRACTORS ARE RESPONSIBLE FOR THE
CLEANING UP AND REMOVAL OF ALL RUBBISH AND DEBRIS
BEFORE LEAVING THE JOBSITE.
13. THE FOLLOWING ARE STRICTLY PROHIBITED WORK AND
PRACTICES:
A. ANY COMBUSTIBLE MATERIALS ABOVE FINISHED
CEILING
B. IMPOSING ANY STRUCTURAL LOAD, TEMPORARY OR
PERMANANT, ON ANY PART OF THE BUILDING
STRUCTURE WITHOUT PRIOR WRITTEN APPROVAL
C. CUTTING ANY HOLES IN FLOOR SLABS, WALLS OR ROOF
WITHOUT PROPER APPROVAL.
14. CONTRACTORS SHALL CARRY ADEQUATE LIABILITY INSURANCE
AS SET FORTH BY OWNER'S REQUIREMENTS.
15. A CERTIFICATE OF OCCUPANCY MUST BE OBTAINED UPON
COMPLETION OF ALL WORK AND FINAL INSPECTIONS. THE ORIGINAL
C.O. TO BE SUBMITTED TO OWNER
16. IN EVENT OF CONFLICT, DISCREPENCY, OBLIGATION, ETC.
CONTRACTOR TO CONTACT ARCHITECT AND OWNER
FOR CLARIFICATION PRIOR TO PROCEEDING.
17. PROVIDE ALL INSURANCE, LICENSES, BONDING AND RELEASE
OF LIENS REQUIRED BY OWNER. PROVIDE COPIES
OF ALL DOCUMENTATION UPON REQUEST.
18. PROVIDE COMPLETE OPERATING MAINTENANCE AND
SPECIFICATION MANUALS TO STAGE FOR ALL EQUIPMENT WITHIN
(15) DAYS OF FINAL COMPLETION OF JOB.
19. PROVIDE A WRITTEN LIST OF SERVICE SUB-CONTRACTORS TO
OWNER INCLUDING NAMES, ADDRESSES, PHONE NUMBERS AND
CONTACT PERSONS FOR FUTURE SERVICE NEEDS WITHIN (15) DAYS
OF COMPLETION OF JOB.
20. CONTRACTORS SHALL NOT BE ALLOWED TO USE, STORE OR
DISPOSE OF ANY HAZARDOUS, FLAMMABLE, EXPLOSIVE,
RADIOACTIVE TOXIC, CONTAMINATING, POLLUTING MATERIALS
OR SUBSTANCES RELATED TO INJUROUS OR CHEMICALLY
REGULATED MATERIALS ON THE JOB SITE.
21. ALL INTERIOR WALLS SHALL HAVE A MINIMUM OF ONE COAT OF
WHITE PRIMER INSTALLED AND TWO FINISH COATS.
22. GENERAL CONTRACTOR IS TO CONSTRUCT INTERIOR WALLS
FROM STEEL STUDS. GENERAL CONTRACTOR MUST USE FIRE
RETARDANT TREATED WOOD BLOCKING AT CRITICAL LOCATIONS
FOR THE MOUNTING OF MILLWORK, OR ACCESSORIES
23. ARCHITECTURAL SIGNAGE FOR TOILETS, EXITS, OTHER CODE
RELATED SIGNS NECESSARY SHALL BE FURNISHED AND INSTALLED
BY THE CONTRACTOR.
24. GENERAL CONTRACTOR SHALL PROVIDE ADEQUATE PROTECTION
OF ANY TENANT SUPPLIED MATERIALS, FIXTURES, ETC. ON JOB SITE.
25.GENERAL CONTRACTOR IS TO VERIFY ALL EXISTING CONDITIONS.
ANY DIMENSIONS SHOWN WHICH INDICATE AN EXISTING CONDITION
ARE APPROXIMATE AND SHOULD BE VERIFIED ON SITE.
26. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE
THE EXISTING CONDITIONS WHICH MAY AFFECT THE COMPLETION OF
THE PROJECT IN ACCORDANCE WITH THE CONSTRUCTION
DOCUMENTS. NOTIFY THE ARCHITECT IF EXISTING CONDITIONS VARY
SUCH THAT IMPLEMENTATION OF THE DOCUMENTS WILL ADVERSLY
AFFECT THE PROJECT COST OR PROJECT SCHEDULE.
27. IT IS NOT WITHIN THE SCOPE OF WORK OF THE ARCHITECT TO
DISCOVER, LOCATE, HANDLE, REMOVE OR DISPOSE OF ANY
HAZARDOUS MATERIALS INCLUDING, BUT NOT LIMITED TO: ASBESTOS,
ASBESTOS PRODUCTS, POLYCHLORINATED BIPHENYL (PCB),
HYDROCARBONS OR ANY OTHER TOXIC SUBSTANCES. SHOULD THE
G.C. OR ANY OTHER ENTITY WORKING ON BEHALF OF THE G.C. OR
THE OWNER DISCOVER OR ENCOUNTER ANY HAZARDOUS
MATERIALS, THE G.C. SHALL NOTIFY THE APPROPRIATE AUTHORITIES
IMMEDIATELY AND PROCEED IN ACCORDANCE WITH ALL APPLICABLE
LAWS AND REGULATIONS.
34. ARCHITECT AND OWNER SHALL INSPECT THE PROJECT TO
VERIFY STATUS OF COMPLETION WITH REASONABLE PROMPTNESS
AFTER NOTIFICATION BY CONTRACTOR.
35. CONTRACTOR TO PROVIDE ALL CIVIL, ELECTRICAL, AND
MECHANICAL ASSOCIATED WITH THE DESIGN INTENT SHOWN
ON THE ARCHITECTURAL AND ENGINEERING DRAWINGS
30. CONTRACTOR SHALL MAINTAIN REQUIRED DOCUMENTS AND UP
TO DATE CONSTRUCTION PLANS ON THE JOB SITE.
31. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR FINAL
CLEANING PRIOR TO TURNING THE SPACE OVER TO THE OWNER.
CLEANING SHALL INCLUDE, BUT NOT BE LIMITED TO: REMOVAL OF
GREASE MASTIC ADHESIVES, DUST, DIRT, STAINS, FINGERPRINTS,
LABELS AND OTHER FOREIGN MATERIALS FROM EXPOSED
INTERIOR AND EXTERIOR SURFACES. PRESSURE WASH EXTERIOR
PAVED SURFACES.
28. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ANY
DAMAGE TO THE FACILITY DURING CONSTRUCTION.
29. CONTRACTOR SHALL PROPERLY DISPOSE OF ALL DEMOLISHED
MATERIALS IN ACCORDANCE WITH ALL APPLICABLE REGULATIONS.
36. SHOULD CONTRACTOR, IN PREPARING HIS BID OR AT ANY TIME
THEREAFTER, FIND ANY DISCREPANCY, INCONSISTENCY, CONFLICT
OR OMISSION IN, OR BE IN DOUBT AS TO THE EXACT MEANING
OF THE DRAWINGS OR SPECIFICATIONS HE SHALL IMMEDIATELY
AND BEFORE PROCEEDING FURTHER NOTIFY OWNER IN WRITING.
OWNER WILL IMMEDIATELY RESOLVE SUCH DISCREPANCY AND
FURNISH CONTRACTOR WITH WRITTEN INSTRUCTIONS WITH
RESPECT THERETO. IT WILL NOT BE A DISCREPANCY IF THESE SPECS
DO NOT MENTION PORTIONS OF THE WORK WHICH THE DRAWINGS
COMPETENTLY EXPLAIN.
1. ALL NEW CONSTRUCTION SHALL BE IN STRICT COMPLIANCE
WITH NATIONAL, STATE, COUNTY AND CITY BUILDING CODES AND
THE AMERICANS WITH DISABILIITIES ACT (A.D.A) REGULATIONS.
2. ALL WORK SHALL BE DONE IN COMPLIANCE WITH THE
OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA)
3. DIMENSIONS GIVEN IN FIGURES ON THE PLANS SHALL TAKE
PRECEDENCE OVER SCALED DIMENSIONS. ALL DIMENSIONS
SHALL BE VERIFIED IN FIELD. DIMENSIONS ARE NOT
ADJUSTABLE UNLESS NOTED OTHERWISE.
4. ALL DIMENSIONS ARE GIVEN FROM FACE OF DRYWALL
TO FACE OF DRYWALL UNLESS NOTED OTHERWISE.
5. "EQUAL" WHEN USED SHALL MEAN AN EQUIVALENT PRODUCT
OR MATERIAL AS APPROVED BY THE TENANT.
6. ALL HEIGHTS ARE DIMENSIONED FROM FINISHED FLOOR
UNLESS NOTED OTHERWISE.
7. THE CONTRACTOR SHALL VERIFY THAT NO CONFLICTS
EXIST IN LOCATIONS OF ANY AND ALL MECHANICAL,
TELEPHONE/DATA, ELECTRICAL, LIGHTING, PLUMBING AND
SPRINKLER EQUIPMENT (TO INCLUDE ALL PIPING, DUCTWORK
AND CONDUIT) AND THAT ALL REQUIRED CLEARANCES FOR
INSTALLATION OR MAINTENANCE OF THE ABOVE EQUIPMENT
IS PROVIDED.
8. ALL GYPSUM BOARD PARTITIONS SHALL BE TAPED, BEDDED
AND SANDED SMOOTH WITH NO VISIBLE JOINTS. ALL CORNERS
SHALL RECEIVE METAL CORNER BEAD UNLESS OTHERWISE
NOTED
9. ALL RATED WALLS SHALL HAVE THEIR RATING MAINTAINED
AND ALL NEW PENETRATIONS SEALED TO MEET CURRENT
CODE REQUIREMENTS.
10. ALL MATERIALS FURNISHED AND INSTALLED SHALL BE FREE
FROM DEFECTS. ALL MATERIALS AND WORKMANSHIP SHALL
BE GUARANTEED FOR A PERIOD OF ONE YEAR FROM THE DATE
OF ACCEPTANCE. DURING THIS PERIOD, PROBLEMS DUE TO
DEFECTIVE MATERIALS OR FAULTY WORKMANSHIP SHALL BE
CORRECTED AT NO COST TO THE TENANT. ANY PROBLEMS
THAT OCCUR DURING CONSTRUCTION SHALL BE CORRECTED
IMMEDIATELY TO THE SATISFACTION OF THE TENANT.
11. GENERAL CONTRACTOR SHALL PROVIDE ADEQUATE BRACIING
AS REQUIRED TO SECURE WORK TO STRUCTURE ABOVE CEILING
WHERE REQUIRED AND SHALL BE TOTALLY RESPONSIBLE FOR
HIS WORK.
Partition Type 5: 3 5/8" metal stud (Clark Dietrich ProStud 20) @ 24" O.C. from floor to underside of ceiling; provide 5/8" type X FR gyp board at both sides.
Total wall thickness = 4 7/8"; install 3 1/2" batt insulation from floor to top of wall; brace to structure above 48" OC
DRAWING LISTING
ARCHITECTURAL DRAWINGS:
SHEET # NAME
G-001 COVER SHEET
G-002 NOTES
G-003 PLUMBING CALCULATIONS & ACM REPORT
G-004 CODE STUDY - BASEMENT
G-005 CODE STUDY - 1ST FLOOR
G-006 CODE STUDY - 2ND FLOOR
AS-001 VICINITY MAP
AS-002 BUILDING LOCATION PLAN
AS-003 SURVEY/PLAT MAP
A-101 BASEMENT DEMO PLAN
A-102 1ST FLOOR DEMO PLAN
A-103 2ND FLOOR DEMO PLAN
A-104 BASEMENT FLOOR PLAN
A-105 1ST FLOOR PLAN
A-106 2ND FLOOR PLAN
A-107 BASEMENT REFLECTED CEILING PLAN
A-108 1ST FLOOR REFLECTED CEILING PLAN
A-109 2ND FLOOR REFLECTED CEILING PLAN
A-201 INTERIOR ELEVATIONS
A-202 INTERIOR ELEVATIONS
A-203 INTERIOR ELEVATIONS
A-401 ENLARGED PLANS
A-402 ENLARGED REFLECTED CEILING PLANS
A-501 SPEC SHEETS
A-502 DETAILS AND SPEC SHEETS
A-503 SMOKE DETECTOR AND FIRE ANNUNCIATOR SPEC
A-504 FIRE SPRINKLER SYSTEM DEFICIENCIES & EDF SPEC
A-505 PHOTOS AND BALCONY DETAILS
A-506 FIRE STOP DETAILS
A-601 DOOR SCHEDULE
A-602 DOOR SCHEDULE
A-603 DOOR SCHEDULE
A-701 BASEMENT FINISH PLAN
A-702 1ST FLOOR FINISH PLAN
A-703 2ND FLOOR FINISH PLAN
A-704 LEGEND AND FINISH SPECS
A-705 FINISH SPECS
MEP DRAWINGS:
M0.1 MECHANICAL NOTES AND SCHEDULES
M1.1 LOWER LEVEL MECHANICAL PLAN
M2.1 1ST FLOOR MECHANICAL PLAN
M3.1 2ND FLOOR MECHANICAL PLAN
P0.1 PLUMBING NOTES, SCHEDULES AND DETAILS
P1.1 LOWER LEVEL PLUMBING PLAN
P2.1 1ST FLOOR PLUMBING PLAN
P3.1 2ND FLOOR PLUMBING PLAN
E0.1 ELECTRICAL NOTES AND SCHEDULES
E1.1 LOWER LEVEL ELECTRICAL PLAN
E2.1 1ST FLOOR ELECTRICAL PLAN
E3.1 2ND FLOOR ELECTRICAL PLAN
Partition Type 7: 3 5/8" metal stud (Clark Dietrich ProStud 20) @ 24" O.C. from floor to underside of structure; provide (1) layer of type X FR gyp board and
(1) layer 5/8" Sheetrock Brand Mold Tough Firecode X panel at kitchen exposed side. Provide batt insulation from floor to top of wall. Total wall thickness = 4 7/8"
(1) Hour rated - UL Des U419
32. PROVIDE OWNER WITH A MINIMUM OF ONE (1) SET OF "AS-BUILT"
DRAWINGS INDICATING ALL VARIANCES BETWEEN ORIGINAL
APPROVED CONSTRUCTION DOCUMENTS AND ACTUAL COMPLETED
CONSTRUCTION.
33. IN THE EVENT THAT CERTAIN FEATURES OF THE CONSTRUCTION
ARE NOT FULLY SHOWN ON THE DRAWINGS OR CALLED FOR IN
GENERAL NOTES, THEN THERE CONSTRUCTION SHALL BE OF THE
SAME CHARACTER AS FOR SIMILAR CONDITIONS.
GENERAL NOTES
Partition Type 1: 4" metal stud (Clark Dietrich ProStud
20) @ 24" O.C. with 5/8" type X FR gyp board at each side. Total wall thickness = 5 1/4" . Provide batt insulation from floor to top of wall. Verify thickness of adjacent wall prior to installation and notify Architect if dimension is not 5 1/4". Wall to extend from floor to underside of structure or top of opening (door infill);
(1) Hour rated - UL Des U419
Partition Type 3: 3 5/8" metal stud (Clark Dietrich ProStud 20) @ 24" O.C. from floor to underside of structure or opening; provide 5/8" Sheetrock Brand Mold Tough Firecode X at exposed side only. Provide insulation from floor to top of wall. Total wall thickness = 4 1/4"
Partition Type 9: 3 5/8" metal stud - (Clark Dietrich ProStud 20) @ 24" O.C. from floor to underside of structure or opening; provide (1) layer of " type X FR gyp board and (1) layer 5/8" Sheetrock Brand Mold Tough Firecode X panel at restroom exposed side. Total wall thickness = 4 7/8"
Partition Type 10: 3 5/8" metal stud (Clark Dietrich ProStud 20) @ 24" O.C. from floor to underside of ceiling; provide 5/8" type X gyp board at one side and
(1) layer of 5/8" type X USG Durock Brand Glass-Mat Tile Backerboard at Restroom side. Total wall thickness = 4 7/8"; install 3 1/2" batt insulation from floor to top of wall; brace to structure above 48" OC
Partition Type 3: 3 5/8" metal stud (Clark Dietrich ProStud
20) @ 24" O.C. from floor to underside of structure; provide
(1) layer of 5/8" type X USG Durock Brand Glass-Mat Tile Backerboard at Restroom side. Total wall thickness = 4 1/4"
Partition Type 1: 3 5/8" metal stud (Clark Dietrich ProStud 20) @ 24" O.C. with 5/8" Sheetrock Brand Mold Tough Firecode X at restroom side and either 3/4" or 1/2" plus 1/4" type X FR gyp board at opposite side. Total wall thickness = 5" . Provide batt insulation from floor to top of wall. Verify thickness of adjacent wall prior to installation and notify Architect if dimension is not 5".
Wall to extend from floor to underside of structure or top of opening (door infill); brace to structure above 48" OC if partition extend to ceiling
Partition Type 7: 3 5/8" metal stud (Clark Dietrich ProStud 20) @ 24" O.C. from floor to underside of structure or opening; provide (1) layer of 5/8" type X FR gyp board at both sides. Provide 3 1/2" batt insulation from floor to top of wall.Total wall thickness = 4 7/8"
(1) Hour rated - UL Des U419
Partition Type 5: 3 5/8" metal stud (Clark Dietrich ProStud 20) @ 24" O.C. from floor to underside of ceiling; provide 5/8" Sheetrock Brand Mold Tough Firecode X at both sides. Total wall thickness = 4 7/8"; i brace to structure above 48" OC
NOT USED
NOT USED
NOT USED
NOT USED
37. ALL PIPING PENETRATIONS THROUGH FLOORS SHALL BE
SEALED WATER TIGHT BY GROUTING PERIMETER GAP BETWEEN
PIPE AND FLOOR STRUCTURE OR BY USING APPROVED UL SLEEVE
AND SEALER SYSTEM. PENETRATIONS OF RATED WALLS SHALL
USE SLEEVE WITH UL APPROVED FIRE SEALANT PER SECTION
714.4.1.1 OF THE 2021 IBC. PENETRATIONS THROUGH FLOORS
SHALL COMPLY WITH SECTION 714.5.1.1 OR 714.5.1.2” .
38. FLOOR PENETRATIONS CONTAINED AND LOCATED WITHIN THE
CAVITY OF A WALL ABOVE OR BELOW THE FLOOR DO NOT REQUIRE
A T RATING PER SECTION 714.5.1.2 EXCEPTION 1. FLOOR
PENETRATIONS BY FLOOR DRAINS, TUB DRAINS OR SHOWER
DRAINS CONTAINED AND LOCATED WITHIN THE CONCEALED SPACE
OF A HORIZONTAL ASSEMBLY DO NOT REQUIRE A T RATING PER
SECTION 714.5.1.2 EXCEPTION 2
NOTE: SEE SHEET G-004 FOR SUBMITTAL REQUIREMENTS
G-003
SHEET TITLE
CONSULTANTS
MODEL FILE:
Fort Lyon Bldg 3 V26.pln
DRAWN BY: #CAD Technician Full Name
DATE: 12/9/2022
/U se rs /ta du ke
/D oc um en ts /A rc hi ca d
Fi le s/ Fo rt Ly on B ld g
V
.p ln
PLUMBING CALCULATIONS &
ACM REPORT
Fort Lyon Life Safety Corrections - Building
T.A. DUKE & ASSOCIATES, Inc.
4220 Brigadoon Lane
Colorado Springs, CO 80906 719 648 7722 taduke@earthlink.net
McShea Consulting LLC 4445 Northpark Dr., Suite 200 Colorado Springs, CO 80907
719 358 8208
Building 3 Fort Lyon, 81054
12/9/22 ISSUED FOR PRICING AND
PERMIT
3/20/23 CODE REVIEW COMMENTS
4/13/23 ISSUED FOR STATE REVIEW
5/4/23 ISSUED FOR STATE REVIEW
6/7/23 ISSUED FOR STATE REVIEW
7/19/23 ISSUED FOR CODE
CONSULTANT REVIEW
9/21/2023
8/23/23 ISSUED FOR CODE
CONSULTANT REVIEW
STATE PROJECT #2024-110M23
9/21/23 ISSUED FOR BIDS
Asbestos Inspection Report Page 5
4.0 ACM BY LOCATION
BUILDINGS
Building 3
Approximately 2,888 sq. ft. of various colored/patterned ACM sheet vinyl floor coverings exist throughout various locations of the building, (see drawings for locations), (12-22% Chrysotile). This material was in good condition at the time of this inspection exhibiting only minor marks and wearing.
Approximately 5,768 sq. ft. of various colored/patterned, 9” x 9” and 12” x 12” ACM floor tiles and associated adhesives exist throughout various locations of the building, (see drawings for locations), (2-25% Chrysotile). This material was in good condition at the time of this inspection exhibiting only minor breakage and wearing.
Floor tiles and sheet vinyl are normally considered non-friable if the material is in good condition and repair could be performed during routine operations and maintenance activities assuring that the material is not cut, abraded, or in any other way damaged causing release of asbestos fibers or the material must be properly abated prior to renovation/demolition activities.
Approximately 2,200 l.f. of ACM Thermal Systems Pipe Insulation (TSI) exists throughout the building, (see drawings for locations), (10-70% Chrysotile). This material was in good to poor condition at the time of this inspection. GHP inspected/assessed only those materials that were accessible. Access panels were not available for performing a thorough survey of pipe insulation inside wall cavities and/or pipe chases.
Pipe insulation inside walls/pipe chases should be assumed to be asbestos containing until determined otherwise. GHP determined that fiberglass insulation is obscuring remnant TSI on pipes. All fiberglass insulation should be assumed to be covering ACM material. Personal protective equipment should be worn by those entering wall cavities/pipe chases. Isolate the areas surrounding pipe chases when performing routine maintenance in these areas. Damaged material should be repaired immediately. The TSI in the crawlspace and mechanical room was abated in September 2006, GHP Project # 06505.02.
Approximately 9,650 sq. ft. of ACM wall/ceiling plaster exists throughout the facility, (see drawings for locations), (Trace-2 % Chrysotile). The material was in good condition at the time of this inspection. This material should be managed following the facilities Operations & Maintenance Program. The material should be properly abated by a State of Colorado licensed General Abatement Contractor prior to renovation/demolition or if the material becomes damaged.
Approximately 360 sq. ft. of ACM wall tile exists at various locations throughout the building basement, (see drawings for locations), (4% Chrysotile). The material was in good condition at the time of this inspection. This material should be managed following
Asbestos Inspection Report Page 6 the facilities Operations & Maintenance Program. The material should be properly abated by a State of Colorado licensed General Abatement Contractor prior to renovation/demolition or if the material becomes damaged.
Approximately 1,200 l.f. of ACM baseboard adhesives exist throughout the building, (see drawings for locations), (2% Chrysotile). This material was in good condition at the time of this inspection. This material should be managed following the facilities Operation & Maintenance Program. The material should be properly abated by a State of Colorado licensed General Abatement Contractor prior to renovation or if the material becomes damaged.
Approximately 900 sq. ft. of gypsum board with asbestos containing joint compounds exists in the auditorium, (see drawings for locations), (9% Chrysotile). The material was in good condition at the time of this inspection. This material should be managed following the facilities Operations & Maintenance Program. The material should be properly abated by a State of Colorado licensed General Abatement Contractor prior to renovation/demolition or if the material becomes damaged.
Approximately 3,000 sq. ft. of ACM tar impregnated roofing materials and flashing materials exist on the roof, (see drawings for locations), (15% Chrysotile). This material was in good condition at the time of this inspection exhibiting only minor weathering damage. Non-friable tar impregnated roofing materials are not regulated by the EPA or State of Colorado provided that the materials are well maintained and remain non-friable during removal, replacement, or repair. This material can be repaired or replaced by properly trained personnel (OSHA training) provided that the material is not cut, sanded, grinded, or abraded using mechanical means.
Sample Number Material and Location Asbestos Content B-06505.01-88 Floor tile – Sample acquired from Building 3 basement under door in
12A.
5% Chrysotile in adhesive 6% Chrysotile in tile
B-06505.01-89 Floor tile – Sample acquired from Building 3 basement collected at the threshold in 12A.
None Detected
B-06505.01- 90 Mastic – Sample acquired from Building 3 basement, collected from under dish rack in 12A from north wall in kitchen.
10% Chrysotile
B-06505.01-91 Base board- Sample acquired under dish rack in kitchen 12A from north wall.
None Detected
B-06505.01-92 Gypsum board with joint compound- Sampled acquired in Building 3 basement located on the north side of door 12B, four feet up from floor.
None Detected
B-06505.01-93 Wall plaster- Sampled acquired from room 11A, southeast corner, four feet up from floor.
Trace Chrysotile
B-06505.01-94 Ceramic tile- Sample acquired in Building 3 basement, located on the east wall under sink.
None Detected
B-06505.01-95 Ceiling plaster- Sample acquired in Building 3 basement located at the top of column at the west wall.
TR Chrysotile
B-06505.01-96 Ceramic floor tile gold and brown - Sampled acquired in Building 3 basement, located in the middle of room 05.
None Detected
Asbestos Inspection Report Page 7
B-06505.01-97 Metal paper ceiling and brown paint - Sampled acquired in Building 3 basement located only in room 06, collected in the center of ceiling.
None Detected
B-06505.01-98 TSI - sample acquired in Building 3 basement, located on the west wall inside wall cavity in room A.
2% Chrysotile
B-06505.01-99 Wall tile - Sample acquired in Building 3 basement, located on the south wall under wall sink.
4% Chrysotile in tile
B-06505.01-100 Cove base - sample acquired in Building 3 basement, located on south wall under wall sink.
TR Chrysotile
B-06505.01-101 Mud fitting - sample acquired in Building 3 basement, located on the west wall inside wall cavity.
80% Chrysotile
B-06505.01-102 Green tile - Sample acquired in Building 3 basement, taken from west wall of elevator from room 13.
None Detected
B-06505.01-103 Mud fitting - Sample acquired in Building 3 basement, located in the southeast closet corner from elevator room 13.
10% Chrysotile
B-06505.01-104 Mud fitting – Sample acquired in Building 3 basement, taken two feet east of sample 103.
35% Chrysotile
B-06505.01-105 Ceiling plaster - Sample acquired in Building 3 basement, located on the north wall in front of post office above window.
None Detected
B-06505.01-106 9x9 brown floor tile – Sample acquired from Building 3, room 209. 20% Chrysotile in adhesive 2% in tile
B-06505.01-107 Wall plaster – Sample acquired from Building 3 on the northwest wall, 2ft down from ceiling.
TR Chrysotile
B-06505.01-108 12X12 Acoustic tile brown adhesive – Sample acquired from Building 3, room 200, north wall right below projector window.
None Detected
B-06505.01-109 Floor tile adhesive – Sample acquired from Building 3 in room 200, 6ft in from doorway, 5ft west from floor.
None Detected
B-06505.01-110 Ceiling plaster – Sample acquired from floor of Building 3 room A – attic.
None Detected
B-06505.01-111 Vibration damper – Sample acquired from Building 3 center of attic on a vibration damper system located in attic.
None Detected
B-06505.01-112 Gypsum board with joint compounds – Sample acquired from Building 3 storage area in attic located on the southwest wall.
None Detected
B-06505.01-113 Felt paper – Sample acquired from Building 3 ceiling of attic in area B.
None Detected
B-06505.01-114 Roofing tar material – Sample acquired from Building 3 to the right of roof access.
15% Chrysotile
B-06505.01-115 Dark brown floor tile – Sample acquired from Building 3, room 201, located on the southwest wall, right side of door on floor.
15% Chrysotile in adhesive 2% in tile
B-06505.01-116 Black glazed floor tile – Sample acquired from Building 3, 16” from southwest wall, right side of door on floor.
12% Chrysotile in tile
B-06505.01-117 Wall plaster – Sample acquired from Building 3 in room 205, located in the center of west wall.
2%Chrysotile
B-06505.01-118 Wall plaster – Sample acquired from Building 3 in room 216, located in the center of north wall, four feet up from floor.
TR Chrysotile
B-06505.01-119 Wall plaster – Sample acquired from Building 3 in room 211, southeast wall, four feet up from floor.
TR Chrysotile
B-06505.01-120 Gypsum board with joint compounds – Sample acquired from north wall, east side of stage.
None Detected
B-06505.01-121 12”X12” ceiling tile with brown adhesive – Sample acquired in room 205 above suspended ceiling.
None Detected
B-06505.01-122 Gypsum board with joint compound – Sample acquired in Building 3, room 207, above door entry.
9% Chrysotile
B-06505.01-123 Ceiling spray applied (popcorn) – Sample acquired from Building 3, room 216, northeast upper corner.
Asbestos Inspection Report Page 8
B-06505.01-124 Ceiling spray applied (popcorn) – Sample acquired from Building 3, second floor hallway, southwest corner.
None Detected
B-06505.01-125 Ceiling spray applied (popcorn) – Sample acquired in Building 3, room 105E, located on the second floor on the north wall above door.
None Detected
B-06505.01-126 Ceiling spray applied (popcorn) – Sample acquired in Building 3 from room 104E, located on the first floor southwest above door.
None Detected
B-06505.01-127 Gypsum board with joint compound - Sample acquired in Building 3 located on first floor in room 104, east corner of room.
None Detected
B-06505.01-128 Mosaic sheet vinyl – Sample acquired from Building 3 located on the first floor, 10” from the middle of front stage.
25% Chrysotile
B-06505.02-01 White TSI VBM-Sample taken from tank piping in Building 3 Mechanical Room.
B-06505.02-04 White TSI-Sample was collected from Building 3, material lying on crawlspace soil, 10’ north of Mechanical Room access port.
15% Chrysotile
B-06505.02-05 Vapor barrier mastic-Sample was collected from Building 3 Mechanical Room, on pipe on north side of mechanical room.
None Detected
B-06505.02-06 Vapor barrier mastic-Sample was collected from Building 3 Mechanical Room, on pipe above south entrance door.
None Detected
B-06505.02-07 White TSI-Sample was collected from Building 3 Mechanical Room on pipe valve above south entrance door.
15% Chrysotile
B-06505.02-08 White paint-Sample was collected from Building 3 Mechanical Room on west wall at Plenum Chamber.
None Detected
B-06505.02-09 Brown soil-Sample was acquired from building 3 taken at north west corner 10ft south 10ft east.
Trace Chrysotile
B-06505.02-10 Brown soil-Sample was acquired from Building 3 taken at north east corner 10ft south and 10ft west.
Trace Chrysotile
B-06505.02-11 Brown soil-Sample was acquired from Building 3 taken directly in the center of the containment.
Trace Chrysotile
B-06505.02-12 Brown soil-Sample was acquired from Building 3, taken at south west corner, 10ft east and 10ft north.
Trace Chrysotile
B-06505.02-13 Brown soil-Sample was acquired from Building 3 taken at south east corner, 10ft west and 10ft north.
Trace Chrysotile
B-06505.02-14 Brown soil-Sample was acquired from Building 3, taken at south west corner 10ft east and 10ft north.
Trace Chrysotile
See GHP report 06505.02-Building 3 Partial Abatement.
This abatement project was done by DLM Inc. during the time of September 9th, 2006 through October 4th, 2006. Abatement project included approximately 1,900 linear feet of fiberglass insulation obscuring remnant ACM TSI on pipes, approximately 160 linear feet of ACM TSI on risers and approximately 6,400 sq. ft. of ACM contaminated dirt floors in the crawlspace located under Building 3. Abatement project also included approximately 500 linear feet of fiberglass insulation obscuring ACM TSI on pipes, and approximately 2,000 square feet of fiberglass insulation obscuring remnant ACM TSI on tanks and boilers throughout the Building 3 Mechanical Room.
See GHP report 06505.06-Building 3 Partial Abatement (Freight Elevator Mechanical Room). Abatement Project included the abatement of Building 3 Freight Elevator Mechanical Room (No Room #) in a “gross removal” enclosure that encompassed/abated the ACM plaster ceiling that was present, (approximately 150 sq. ft.), and abated all ACM TSI from all pipes and pipe fittings, (approximately 85 l.f. of 4”-5” OD TSI).
GOBBELL HAYES ACM REPORT GOBBELL HAYES ACM REPORT
GOBBELL HAYES ACM REPORT GOBBELL HAYES ACM REPORT
PLUMBING FIXTURES REQUIRED:
OCCUPANT LOAD CALCULATION:
1ST FLOOR:
A-1 (FIXED SEATS) OCCUPANCY: 95 OCCUPANTS
A-1 (MOVEABLE SEATS) OCCUPANCY: 1,428 SF/7 SF = 204 OCCUPANTS
A-1 STAGE OCCUPANCY: 894 NSF/ 15 = 59.6 OCCUPANTS
95 OCCUPANTS + 204 OCUPANTS + 59.6 OCCUPANTS = 358.6 OCCUPANTS
358.6 OCCUPANTS / 2 = 179.3 OCCUPANT LOAD PER SEX
PER IBC TABLE 2902.1: ASSEMBLY (THEATER) OCCUPANCY:
MINIMUM REQUIRED PLUMBING FIXTURES:
MALE WC FEMALE WC LAVS
1/125 1/65 1/200
A-1 MINIMUM REQUIRED FIXTURES:
179.3 OCCUPANT LOAD/125 OCCUPANTS PER WC = 1.434 MALE
179.3 OCCUPANT LOAD/65 OCCUPANTS PER WC = 2.758 FEMALE
179.3 OCCUPANT LOAD/200 OCCUPANTS PER LAV = .897 MALE
179.3 OCCUPANT LOAD/200 OCCUPANTS PER LAV = .897 FEMALE
B OCCUPANCY: 313 GSF/150 GSF = 2.09 OCCUPANTS
2.09 OCCUPANTS / 2 = 1.05 OCCUPANT LOAD PER SEX
PER IBC TABLE 2902.1: BUSINESS OCCUPANCY:
MINIMUM REQUIRED PLUMBING FIXTURES:
MALE WC FEMALE WC LAVS
1/25 FOR 1ST 50 1/25 FOR 1ST 50 1/40 FOR 1ST 80
AND 1 PER 50 FOR AND 1 PER 50 FOR AND 1 PER 80 FOR
THE REMAINDER THE REMAINDER THE REMAINDER
EXCEEDING 50 EXCEEDING 50 EXCEEDING 80
B MINIMUM REQUIRED FIXTURES:
1.05 OCCUPANT LOAD/25 OCCUPANTS PER WC = .04 MALE
1.05 OCCUPANT LOAD/25 OCCUPANTS PER WC = .04 FEMALE
1.05 OCCUPANT LOAD/40 OCCUPANTS PER LAV = .03 MALE
1.05 OCCUPANT LOAD/40 OCCUPANTS PER LAV = .03 FEMALE
S-1 OCCUPANCY: 130 GSF/300 GSF = .43 OCCUPANTS
.43 OCCUPANTS / 2 = .215 OCCUPANT LOAD PER SEX
PER IBC TABLE 2902.1: STORAGE OCCUPANCY:
MINIMUM REQUIRED PLUMBING FIXTURES:
MALE WC FEMALE WC LAVS
1/100 1/100 1/100
S-1 MINIMUM REQUIRED FIXTURES:
.215 OCCUPANT LOAD/100 OCCUPANTS PER WC = .002 MALE
.215 OCCUPANT LOAD/100 OCCUPANTS PER WC = .002 FEMALE
.215 OCCUPANT LOAD/100 OCCUPANTS PER LAV = .002 MALE
.215 OCCUPANT LOAD/100 OCCUPANTS PER LAV = .002 FEMALE
NOTE:
PER 2902.1.1: TO DETERMINE OCCUPANT LOAD OF EACH SEX, THE TOTAL
OCCUPANT LOAD SHALL BE DIVIDED IN HALF. …. FOR CALCULATIONS
INVOLVING MULTIPLE OCCUPANCIES, SUCH FRACTIONAL NUMBERS FOR
EACH OCCUPANCY SHALL BE FIRST SUMMED AND THEN ROUNDED UP TO
THE NEXT WHOLE NUMBER
TOTAL NUMBER OF MALE WC REQUIRED:
A-1 (THEATER AND STAGE) 1.434
B .040 S-1 .002
TOTAL: 1.476 = 2 WC
TOTAL NUMBER OF FEMALE WC REQUIRED:
A-1 (THEATER AND STAGE) 2.758
B .040 S-1 .002
TOTAL: 2.8 = 3 WC
TOTAL NUMBER OF MALE LAVS REQUIRED:
A-2 (THEATER AND STAGE) .897
B .030 S-1 .002
TOTAL: .939 = 1 LAV
TOTAL NUMBER OF FEMALE LAVS REQUIRED:
A-1 (THEATER AND STAGE) .897
B .030 S-1 .002
TOTAL: .939 = 1 LAV
WC'S PROVIDED
WOMEN: 4
MEN: 1 + 1 URINAL
UNISEX: 0
LAV'S PROVIDED
WOMEN: 2
MEN: 1
UNISEX 0
NOTE:
THE MAXIMUM POPULATION OF RESIDENTS IS CURRENTLY
CONTRACTUALLY LIMITED TO LESS THAN 245.
PLUMBING FIXTURES REQUIRED:
OCCUPANT LOAD CALCULATION:
2ND FLOOR:
B OCCUPANCY: 1,491 GSF/150 GSF = 9.94 OCCUPANTS
9.94 OCCUPANTS / 2 = 4.97 OCCUPANT LOAD PER SEX
PER IBC TABLE 2902.1: BUSINESS OCCUPANCY:
MINIMUM REQUIRED PLUMBING FIXTURES:
MALE WC FEMALE WC LAVS
1/25 FOR 1ST 50 1/25 FOR 1ST 50 1/40 FOR 1ST 80
AND 1 PER 50 FOR AND 1 PER 50 FOR AND 1 PER 80 FOR
THE REMAINDER THE REMAINDER THE REMAINDER
EXCEEDING 50 EXCEEDING 50 EXCEEDING 80
B MINIMUM REQUIRED FIXTURES:
4.97 OCCUPANT LOAD/25 OCCUPANTS PER WC = .199 MALE
4.97 OCCUPANT LOAD/25 OCCUPANTS PER WC = .199 FEMALE
4.97 OCCUPANT LOAD/40 OCCUPANTS PER LAV = .124 MALE
4.97 OCCUPANT LOAD/40 OCCUPANTS PER LAV = .124 FEMALE
S-1 OCCUPANCY: 668 GSF/300 GSF = 2.23 OCCUPANTS
U OCCUPANCY: 14 GSF/300 GSF = .05 OCCUPANTS
(2.23 OCCUPANTS + .05 OCCUPANTS) / 2 = 1.14 OCCUPANT LOAD PER SEX
PER IBC TABLE 2902.1: STORAGE OCCUPANCY:
MINIMUM REQUIRED PLUMBING FIXTURES:
MALE WC FEMALE WC LAVS
1/100 1/100 1/100
S-1/U MINIMUM REQUIRED FIXTURES:
1.14 OCCUPANT LOAD/100 OCCUPANTS PER WC = .011 MALE
1.14 OCCUPANT LOAD/100 OCCUPANTS PER WC = .011 FEMALE
1.14 OCCUPANT LOAD/100 OCCUPANTS PER LAV = .011 MALE
1.14 OCCUPANT LOAD/100 OCCUPANTS PER LAV = .011 FEMALE
NOTE:
PER 2902.1.1: TO DETERMINE OCCUPANT LOAD OF EACH SEX, THE TOTAL
OCCUPANT LOAD SHALL BE DIVIDED IN HALF. …. FOR CALCULATIONS
INVOLVING MULTIPLE OCCUPANCIES, SUCH FRACTIONAL NUMBERS FOR
EACH OCCUPANCY SHALL BE FIRST SUMMED AND THEN ROUNDED UP TO
THE NEXT WHOLE NUMBER
TOTAL NUMBER OF MALE WC REQUIRED:
B .26 S-1/U .013
TOTAL: 1.333 = 2 WC
TOTAL NUMBER OF FEMALE WC REQUIRED:
B .26 S-1/U .013
TOTAL: 2.313 = 3 WC
TOTAL NUMBER OF MALE LAVS REQUIRED:
B .16 S-1/U .013
TOTAL: 1.333 = 2 WC
TOTAL NUMBER OF FEMALE LAVS REQUIRED:
B .16 S-1/U .013
TOTAL: 1.333 = 2 WC
WC'S PROVIDED
UNISEX: 1
LAV'S PROVIDED
UNISEX: 1
NOTE: MALE AND FEMALE RESTROOMS ARE PROVIDED ON THE 1ST FLOOR
PLUMBING FIXTURES REQUIRED:
OCCUPANT LOAD CALCULATION:
BASEMENT LEVEL:
A-3 (FIXED SEATS) OCCUPANCY: 117 OCCUPANTS
A-3 (MOVEABLE SEATS) OCCUPANCY: 282 SF/15 SF = 18.8 OCCUPANTS
117 OCCUPANTS + 18.8 OCUPANTS + 59.6 OCCUPANTS = 135.8 OCCUPANTS
135.8 OCCUPANTS / 2 = 67.90 OCCUPANT LOAD PER SEX
PER IBC TABLE 2902.1: ASSEMBLY (LECTURE HALLS/ARCADES)
OCCUPANCY:
MINIMUM REQUIRED PLUMBING FIXTURES:
MALE WC FEMALE WC LAVS
1/125 1/65 1/200
A-3 MINIMUM REQUIRED FIXTURES:
67.90 OCCUPANT LOAD/125 OCCUPANTS PER WC = .543 MALE
67.90 OCCUPANT LOAD/65 OCCUPANTS PER WC = 1.045 FEMALE
67.90 OCCUPANT LOAD/200 OCCUPANTS PER LAV = .340 MALE
67.90 OCCUPANT LOAD/200 OCCUPANTS PER LAV = .340 FEMALE
B OCCUPANCY: 1,674 GSF/150 GSF = 9.17 OCCUPANTS
9.17 OCCUPANTS / 2 = 4.585 OCCUPANT LOAD PER SEX
PER IBC TABLE 2902.1: BUSINESS OCCUPANCY:
MINIMUM REQUIRED PLUMBING FIXTURES:
MALE WC FEMALE WC LAVS
1/25 FOR 1ST 50 1/25 FOR 1ST 50 1/40 FOR 1ST 80
AND 1 PER 50 FOR AND 1 PER 50 FOR AND 1 PER 80 FOR
THE REMAINDER THE REMAINDER THE REMAINDER
EXCEEDING 50 EXCEEDING 50 EXCEEDING 80
B MINIMUM REQUIRED FIXTURES:
4.585 OCCUPANT LOAD/25 OCCUPANTS PER WC = .183 MALE
4.585 OCCUPANT LOAD/25 OCCUPANTS PER WC = .183 FEMALE
4.585 OCCUPANT LOAD/40 OCCUPANTS PER LAV = .115 MALE
4.585 OCCUPANT LOAD/40 OCCUPANTS PER LAV = .115 FEMALE
S-1 OCCUPANCY: 1,915 GSF/300 GSF = 6.383 OCCUPANTS
6.383 OCCUPANTS / 2 = 3.192 OCCUPANT LOAD PER SEX
PER IBC TABLE 2902.1: STORAGE OCCUPANCY:
MINIMUM REQUIRED PLUMBING FIXTURES:
MALE WC FEMALE WC LAVS
1/100 1/100 1/100
S-1 MINIMUM REQUIRED FIXTURES:
3.192 OCCUPANT LOAD/100 OCCUPANTS PER WC = .032 MALE
3.192 OCCUPANT LOAD/100 OCCUPANTS PER WC = .032 FEMALE
3.192 OCCUPANT LOAD/100 OCCUPANTS PER LAV = .032 MALE
3.192 OCCUPANT LOAD/100 OCCUPANTS PER LAV = .032 FEMALE
U OCCUPANCY: 1,551 GSF/300 GSF = 5.17 OCCUPANTS
5.17 OCCUPANTS / 2 = 2.585 OCCUPANT LOAD PER SEX
PER IBC TABLE 2902.1: STORAGE OCCUPANCY:
MINIMUM REQUIRED PLUMBING FIXTURES:
MALE WC FEMALE WC LAVS
1/100 1/100 1/100
U MINIMUM REQUIRED FIXTURES:
2.585 OCCUPANT LOAD/100 OCCUPANTS PER WC = .026 MALE
2.585 OCCUPANT LOAD/100 OCCUPANTS PER WC = .026 FEMALE
2.585 OCCUPANT LOAD/100 OCCUPANTS PER LAV = .026 MALE
2.585 OCCUPANT LOAD/100 OCCUPANTS PER LAV = .026 FEMALE
NOTE:
PER 2902.1.1: TO DETERMINE OCCUPANT LOAD OF EACH SEX, THE TOTAL
OCCUPANT LOAD SHALL BE DIVIDED IN HALF. …. FOR CALCULATIONS
INVOLVING MULTIPLE OCCUPANCIES, SUCH FRACTIONAL NUMBERS FOR
EACH OCCUPANCY SHALL BE FIRST SUMMED AND THEN ROUNDED UP TO
THE NEXT WHOLE NUMBER
TOTAL NUMBER OF MALE WC REQUIRED:
A-3 .543 B .183 S-1 .032 U .026
TOTAL: .784 = 2 WC
TOTAL NUMBER OF FEMALE WC REQUIRED:
A-3 1.045 B .183 S-1 .032 U .026
TOTAL: 1.286 = 2 WC
TOTAL NUMBER OF MALE LAVS REQUIRED:
A-3 .340 B .115 S-1 .032 U .026
TOTAL: .513 = 1 LAV
TOTAL NUMBER OF FEMALE LAVS REQUIRED:
A-3 .340 B .115 S-1 .002 U .026
TOTAL: .513 = 1 LAV
WC'S PROVIDED
WOMEN: 2
MEN: 2 + 1 URINAL
UNISEX: 1
LAV'S PROVIDED
WOMEN: 2
MEN: 2
UNISEX: 1
NOTE:
THE MAXIMUM POPULATION OF RESIDENTS IS CURRENTLY
CONTRACTUALLY LIMITED TO LESS THAN 245.
PLUMBING CALCULATIONS - 1ST FLR PLUMBING CALCULATIONS - BASEMENT
PLUMBING CALCULATIONS - 2ND FLR
ACM NOTES
1. IT IS NOT WITHIN THE SCOPE OF WORK OF THE ARCHITECT TO
DISCOVER, LOCATE, HANDLE, REMOVE OR DISPOSE OF ANY
HAZARDOUS MATERIALS INCLUDING, BUT NOT LIMITED TO: ASBESTOS,
ASBESTOS PRODUCTS, POLYCHLORINATED BIPHENYL (PCB),
HYDROCARBONS OR ANY OTHER TOXIC SUBSTANCES. SHOULD THE
G.C. OR ANY OTHER ENTITY WORKING ON BEHALF OF THE G.C. OR
THE OWNER DISCOVER OR ENCOUNTER ANY HAZARDOUS
MATERIALS, THE G.C. SHALL NOTIFY THE APPROPRIATE AUTHORITIES
IMMEDIATELY AND PROCEED IN ACCORDANCE WITH ALL APPLICABLE
LAWS AND REGULATIONS.
2. ALL MATERIALS BEING REMOVED FROM THE SITE SHALL BE
TESTED FOR ACM PRIOR TO ANY DEMOLITION WORK. IF MATERIAL
TESTS POSITIVE FOR ACM (ASBESTOS CONTAINING MATERIALS),
AREA MUST BE CLEARED OF ALL ACM CONTAINING MATERIALS
AFFECTED BY CONSTRUCTION PRIOR TO DEMOLITION
OR CONSTRUCTION
3. ANY ABATEMENT OF ACM SHALL BE ACCOMPLISHED BY A
CONTRACTOR LICENSED BY THE STATE OF COLORADO
FOR ACM REMOVAL.
4. ALL ACM SHALL BE PROPERLY REMOVED AND DISPOSED OF
ACCORDING TO REGULATIONS DEFINED BY THE STATE OF COLORADO
5. ALL NEW MATERIAL BEING INSTALLED IN THE PROJECT,
INCLUDING GYP BOARD, JOINT COMPOUND, VINYL TILE,
SHEET VINYL, CEILING TILE, PLASTER, CARPET, BASE
ADHESIVE OR ANY OTHER MATERIAL BEING PROPOSED
SHALL BE TESTED FOR ACM. A REPORT SHALL BE GIVEN
TO THE OWNER INDICATING RESULTS OF ACM TESTING
ACM NOTESACM NOTES
AN ADDITIONAL ASBESTOS REPORT FOR BUILDING 3 WAS COMPLETED
IN 2019 BY WESTON SOLUTIONS, INC.. FOLLOWING ARE THE RESULTS
FOR BUILDING 3:
ACM LOCATION ESTIMATED EXTENT
COVE BASE MASTIC BASEMENT 55 LF
DRYWALL 2ND FLOOR 1,200 SF
FLOOR TILE AND MASTIC ALL FLOORS 5,240 SF
LINOLEUM 1ST FLOOR 4,200 SF
PIPE INSULATION ALL FLOORS 500 LF
PLASTER (WALL & CEILING) BASEMENT 500 SF
ADDITIONALLY, LEAD BASED PAINT WAS DETECTED IN THE FOLLOWING
AREAS:
AREA COLOR ESTIMATED EXTENT
BUILT-INS (STAGE LIGHTING BLACK 30 LF
BUILT-IN BANISTER PINK 160 SF
DOOR WHITE 2 DOORS
DOOR FRAME WHITE 90LF
YELLOW 15 LF
DARK BROWN 15 LF
DOOR JAMB WHITE 45 LF
YELLOW 15 LF
CEILING WHITE 4,000 SF
FLOOR BLACK 80 SF
GRAY 850 SF
DARK BROWN 154 SF
STAIRS DARK BROWN 270 SF
TRIM DARK BROWN 350 LF
BLACK 30 LF
GRAY 20 LF
WALL WHITE 6,800 SF
CREAM 1,000 SF
WINDOW FRAME WHITE 56 WINDOWS
BROWN 2 WINDOWS
BLACK 10 WINDOWS
WINDOW SASH BLACK 10 WINDOWS
WINDOW SILL WHITE 64 WINDOWS
BROWN 2 WINDOWS
AQUA 1 WINDOW
DARK BLUE 1 WINDOW
BUILT-IN POSTS (EXTERIOR) WHITE 120 LF
CEILING (EXTERIOR) WHITE 264 SF
DOOR (EXTERIOR) WHITE 1 DOOR
DARK BROWN 2 DOORS
DOOR FRAME (EXTERIOR) WHITE 30 LF
DARK BROWN 30 LF
WINDOW FRAME (EXTERIOR) WHITE 68 WINDOWS
G-004
SHEET TITLE
CONSULTANTS
MODEL FILE:
Fort Lyon Bldg 3 V26.pln
DRAWN BY: #CAD Technician Full Name
DATE: 12/9/2022
/U se rs /ta du ke
/D oc um en ts /A rc hi ca d
Fi le s/ Fo rt Ly on B ld g
V
.p ln
CODE STUDY - BASEMENT &
SUBMITTAL REQUIREMENTS
Fort Lyon Life Safety Corrections - Building
T.A. DUKE & ASSOCIATES, Inc.
4220 Brigadoon Lane
Colorado Springs, CO 80906 719 648 7722 taduke@earthlink.net
McShea Consulting LLC 4445 Northpark Dr., Suite 200 Colorado Springs, CO 80907
719 358 8208
Building 3 Fort Lyon, 81054
12/9/22 ISSUED FOR PRICING AND
PERMIT
3/20/23 CODE REVIEW COMMENTS
4/13/23 ISSUED FOR STATE REVIEW
5/4/23 ISSUED FOR STATE REVIEW
6/7/23 ISSUED FOR STATE REVIEW
7/19/23 ISSUED FOR CODE
CONSULTANT REVIEW
9/21/2023
8/23/23 ISSUED FOR CODE
CONSULTANT REVIEW
STATE PROJECT #2024-110M23
9/21/23 ISSUED FOR BIDS
002B
008A008B
001B
001A
010B
005A
009A
011A
011B
001C
002A
001D
EGRESS
EGRESS
EGRESS
E G
R E
S S
E G
R E
S S
E G
R E
S S
E G
R E
S S
PROJECT NAME: FORT LYON LIFE SAFETY IMPROVEMENTS - BUILDING 3
STATE PROJECT NUMBER: 2021-035M21/HB 1408
LOCATION: FORT LYON, COLORADO
BUILDING AREA: 16,916 GSF
CONSTRUCTION TYPE: TYPE VB, SPRINKLERED
ALLOWABLE HEIGHT: A-3 OCCUPANCY: 60'
B OCCUPANCY: 60'
S-1 OCCUPANCY: 60'
ACTUAL HEIGHT: 54'-11" (AT NORTH ELEVATION - TO TOP OF ROOF)
ALLOWABLE STORIES: A-3 OCCUPANCY: 2
B OCCUPANCY: 3
S-1 OCCUPANCY: 3
ACTUAL STORIES: 2 STORIES ABOVE GRADE; 1 STORY BELOW GRADE
ALLOWABLE FLOOR AREA
PER TABLE 506.2: A-3 OCCUPANCY: 18,000 SF
B OCCUPANCY: 27,000 SF
S-1 OCCUPANCY: 27,000 SF
FRONTAGE INCREASE FACTOR: 75-100% OF BUILDING PERIMETER AND
30' OR GREATER OPEN SPACE = .75
ALLOWABLE AREA THIS STORY:
A-3 OCCUPANCY: Aa = 18,000 SF + (6,000 SF X .75) = 22,500 SF B OCCUPANCY: Aa = 27,000 SF + (9,000 SF X .75) = 33,750 SF S-1 OCCUPANCY: Aa = 27,000 SF + (9,000 SF x .75) = 33,750 SF
MIXED OCCUPANCY FACTOR: 2,074 SF/22,500 SF = .09
1,674 SF/33,750 SF = .05
1,915 SF/33,750 SF = .06
TOTAL = .20 = LESS THAN 1
ACTUAL FLOOR AREA: BASEMENT - 7,673 GSF
OCCUPANCY CALCS: BASEMENT:
A-3 OCCUPANCY (FIXED SEATING): = 117
A-3 OCCUPANCY (TABLE & CHAIRS): 282 SF/15 = 18.8
B OCCUPANCY: 1,674 SF/150 = 9.17
S-1 OCCUPANCY: 1,915 SF/300 = 6.39
MECH/ELECT RM. OCCUPANCY: 1,551 SF/300 = 5.17
TOTAL FLOOR OCCUPANCY: 156.53 = 157
EXITS :
(EXITING WIDTH) 157 * .15 = 23.6"
REQUIRED EGRESS CORRIDOR WIDTH: 44"
ACTUAL EGRESS CORRIDOR WIDTH: 5'-10" (NARROWEST POINT)
(STAIR WIDTH) 157 * .20 = 72.4"
(2) STAIRS PROVIDED : (1) @ 31.4" WIDTH
NOTE: EXITING FROM THE BASEMENT IS PROVIDED DIRECTLY TO
THE EXTERIOR AT (3) LOCATIONS (2 AT 42" WIDTH AND 1 AT 36" WIDTH) AND TO AN EGRESS
CORRIDOR AT (2) LOCATIONS (48" WIDTH EACH)
GROUP S-2 OCCUPANCY - STORAGE
GROUP B OCCUPANCY - BUSINESS
LEGEND
GROUP A-3 OCCUPANCY - ASSEMBLY
UNASSIGNED OCCUPANCY - MECHANICAL/
ELECTRICAL
GROUP A-1 OCCUPANCY - ASSEMBLY
(1) HOUR WALL CONSTRUCTION (NEW WALL
CONSTRUCTION)
GROUP S-1 OCCUPANCY - STORAGE
NOTES
6" CLAY TILE CONSTRUCTION WITH FINSH
ON ONE SIDE (UP TO 1 HOUR FIRE RATING) -
PENETRATIONS HAVE NOT BEEN VERIFIED
FOR (1) HOUR COMPLIANCE
6" CLAY TILE CONSTRUCTION WITH FINSH
BOTH SIDES (UP TO 2 HOUR FIRE RATING) -
PENETRATIONS HAVE NOT BEEN VERIFIED
FOR (2) HOUR COMPLIANCE
4" CLAY TILE CONSTRUCTION WITH FINSH
BOTH SIDES (UP TO 1 HOUR 34 MINUTES
FIRE RATING) - PENETRATIONS HAVE NOT
BEEN VERIFIED FOR (1) HOUR COMPLIANCE
12 1/2" CLAY TILE CONSTRUCTION WITH
BRICK AT EXTERIOR AND PLASTER AT
INTERIOR (UP TO 6 HOUR FIRE RATING) -
PENETRATIONS HAVE NOT BEEN VERIFIED
FOR (1) HOUR COMPLIANCE
2 x 4 WOOD STUD AT 16" OC WITH 5/8"
PLASTER ON METAL LATHE EACH SIDE- (1)
HOUR FIRE RATING - PENETRATIONS HAVE
NOT BEEN VERIFIED FOR (1) HOUR
COMPLIANCE
8" DOUBLE WYTHE BRICK CONSTRUCTION
WITH FINSH ON ONE SIDE (UP TO 6 HOUR
FIRE RATING) - PENETRATIONS HAVE NOT
BEEN VERIFIED FOR (1) HOUR COMPLIANCE
D
IS
TA
N
C E
O F
C O
M M
O N
P
AT
H
'-6
D
IS
TA
N C
E O
F C
O M
M O
N P
AT
H
'-3
D
IS
TA
NCE
O
F
COMMON P
AT
H
UTILITY
A: 99 sq ft
UTILITY
008B A: 75 sq ft
UTILITY
008A
A: 69 sq ft
MUSIC RM
A: 283 sq ft
RESTRM
001A
A: 66 sq ft
RESTRM
001B
A: 76 sq ft
STORAGE
006A
A: 238 sq ft
STORAGE
002A
A: 354 sq ft
ELECTRICAL RM
A: 131 sq ft
GAME RM
A: 722 sq ft
GAME RM
010A
A: 607 sq ft
STORAGE
A: 606 sq ft
STORAGE
A: 99 sq ft
GAME RM
A: 462 sq ft
STORAGE
A: 557 sq ft
RESTRM
011A
A: 63 sq ft
UTILITY
A: 302 sq ft
MECH RM
A: 875 sq ft
UTILITY
012A
A: 86 sq ft
MAIL RM
A: 370 sq ft
LOBBY
A: 996 sq ft
BASEMENT FLOOR AREA
A: 7,673 sq ft
RESTRM
A: 158 sq ft
FUTURE
SEATING
FUTURE
SEATING
FUTURE
SEATING
FUTURE
SEATING
N
SCALE: 1/8" = 1'-0"1 BASEMENT - CODE STUDY PLAN
0 4' 8' 16'
D. ALL RESTROOM SIGNAGE
E. EXHAUST FAN
F. ALL DOORS AND HARDWARE INCLUDING:
1. ALL NEW DOORS INCLUDING
A. HOLLOW METAL DOORS
B. SOLID CORE WOOD DOORS
2. LEVER LOCKSET
3. LEVER PRIVACY SET
4. LEVER PASSAGE SET
5. PANIC HARDWARE
6. AUTOMATIC CLOSER
7. HINGES
8. DOOR FRAME
G. PORTABLE FIRE EXTINGUISHER
THE FOLLOWING MATERIALS REQUIRE SUBMITTALS PRIOR TO
PROCUREMENT OR INSTALLATION:
A. ALL FINISH MATERIALS INCLUDING:
1. WALL FINISHES INCLUDING:
A. PRIMER PAINT
B. FINISH PAINT
C. CERAMIC WALL TILE
D. VINYL WALL COVERING
2. FLOOR COVERINGS INCLUDING
A. CERAMIC FLOOR TILE
B. CARPET
C. SHEET VINYL
D. VINYL TILE
3. ALL CEILING TILE INCLUDING
A. 2 X 4 TILE
B. 2 X 2 TILE
B. ALL ELECTRCAL ITEMS INCLUDING:
1. 2 X 4 LIGHT FIXTURES
2. 1 X 4 LIGHT FIXTURES
3. EMERGENCY EXIT/LIGHT COMBO UNIT
4. CEILING MOUNTED FIRE ANNUNCIATOR
5. WALL MOUNTED FIRE ANNUNCIATOR
6. ILLUMINATED EXIT SIGNAGE
7. ALL CEILING TILE INCLUDING
A. 2 X 4 TILE
B. 2 X 2 TILE
8. SMOKE DETECTOR
9. CEILING MOUNTED EXIT DIRECTIONAL SIGN
10. WALL MOUNTED EXIT DIRECTIONAL SIGN
11. WALL MOUNTED EMERGENCY LIGHT
C. ALL PLUMBING FIXTURES INCLUDING:
1. RESTROOM ACCESSORIES INCLUDING
A. MIRROR
B. GRAB BARS
C. TOILET TISSUE DISPENSER
D. TOILET SEAT COVER DISPENSER
E. BABY CHANGING STATION
F. SOAP DISPENSER
G. WASTE RECEPTACLE/PAPER TOWEL
DISPENSER
2. DRINKING FOUNTAINS
3. ALL NEW RESTROOM FIXTURES INCLUDING:
A. STANDARD TOILET
B. ADA TOILET
C. STANDARD LAVATORY
D. ADA LAVATORY
E. TOILET PARTITIONS/URINAL SCREEN
F. STANDARD URINAL
G. ADA URINAL
H. SHOWER UNIT
SUBMITTAL REQUIREMENTS
A A
B B
C C
D D
SHEET TITLE
CONSULTANTS
PROJECT NO: #Project Code
MODEL FILE:
Fort Lyon Bldg 3 V26.pln
DRAWN BY: #CAD Technician Full Name
G-005
DATE: 12/9/2022
/U se rs /ta du ke
/D oc um en ts /A rc hi ca d
Fi le s/ Fo rt Ly on B ld g
V
.p ln
CODE STUDY - 1ST FLOOR
Fort Lyon Life Safety Corrections - Building
T.A. DUKE & ASSOCIATES, Inc.
4220 Brigadoon Lane
Colorado Springs, CO 80906 719 648 7722 taduke@earthlink.net
McShea Consulting LLC 4445 Northpark Dr., Suite 200 Colorado Springs, CO 80907
719 358 8208
Building 3 Fort Lyon, 81054
12/9/22 ISSUED FOR PRICING AND
PERMIT
3/20/23 CODE REVIEW COMMENTS
4/13/23 ISSUED FOR STATE REVIEW
5/4/23 ISSUED FOR STATE REVIEW
6/7/23 ISSUED FOR STATE REVIEW
7/19/23 ISSUED FOR CODE
CONSULTANT REVIEW
9/21/2023
8/23/23 ISSUED FOR CODE
CONSULTANT REVIEW
STATE PROJECT #2024-110M23
9/21/23 ISSUED FOR BIDS
104K
104C
104H
101B
101A
100C
100B
104J
104F
104G
104B
104L
104E
104A
104D
UNFIXED SEATSUNFIXED SEATS
EGRESS
E G
R E
S S
E G
R E
S S
EGRESS
PROJECT NAME: FORT LYON LIFE SAFETY IMPROVEMENTS - BUILDING 3
STATE PROJECT NUMBER: 2021-035M21/HB 1408
LOCATION: FORT LYON, COLORADO
BUILDING AREA: 16,916 GSF
CONSTRUCTION TYPE: TYPE VB, SPRINKLERED
ALLOWABLE HEIGHT: A-1 OCCUPANCY: 60'
B OCCUPANCY: 60'
S-1 OCCUPANCY: 60'
ACTUAL HEIGHT: 54'-11" (AT NORTH ELEVATION - TO TOP OF ROOF)
ALLOWABLE STORIES: A-1 OCCUPANCY: 2
B OCCUPANCY: 3
S-1 OCCUPANCY: 3
ACTUAL STORIES: 2 STORIES ABOVE GRADE; 1 STORY BELOW GRADE
ALLOWABLE FLOOR AREA
PER TABLE 506.2: A-1 OCCUPANCY: 16,500 SF
B OCCUPANCY: 27,000 SF
S-1 OCCUPANCY: 27,000 SF
FRONTAGE INCREASE FACTOR: 75-100% OF BUILDING PERIMETER AND
30' OR GREATER OPEN SPACE = .75
ALLOWABLE AREA THIS STORY:
A-1 OCCUPANCY: Aa = 16,500 SF + (5,500 SF X .75) = 20,625 SF B OCCUPANCY: Aa = 27,000 SF + (9,000 SF X .75) = 33,750 SF S-1 OCCUPANCY: Aa = 27,000 SF + (9,000 SF x .75) = 33,750 SF
MIXED OCCUPANCY FACTOR: 5,406 SF/20,625 SF = .26
313 SF/33,750 SF = .01
130 SF/33,750 SF = .00
TOTAL = .27 = LESS THAN 1
ACTUAL FLOOR AREA: 1ST FLOOR: 6,632 GSF
OCCUPANCY CALCS: 1ST FLOOR:
A-1 OCCUPANCY (FIXED SEATING): = 95
A-1 OCCUPANCY (MOVEABLE CHAIRS): 1,428 SF/7 = 204
B OCCUPANCY: 313 SF/150 = 2.09
S-1 OCCUPANCY: 130 SF/300 = .43
STAGE OCCUPANCY: 894 SF/15 = 59.6
TOTAL FLOOR OCCUPANCY: 361.12 = 362
EXITS :
(EXITING WIDTH) 362 * .15 = 54.3"
REQUIRED EGRESS CORRIDOR WIDTH: 54.3"
ACTUAL EGRESS CORRIDOR WIDTH: 4'-11" (NARROWEST POINT)
(STAIR WIDTH) 362 * .20 = 72.4"
(2) STAIRS PROVIDED : (1) @ 50" WIDTH
NOTE: EXITING FROM THE 1ST FLOOR IS PROVIDED DIRECTLY TO
THE EXTERIOR AT (5) LOCATIONS - (3) @ 72" WIDTH AND (2) AT 42" WIDTH
LEGEND
EGRESS
EGRESS
NOTES
GROUP S-2 OCCUPANCY - STORAGE
GROUP B OCCUPANCY - BUSINESS
GROUP A-3 OCCUPANCY - ASSEMBLY
UNASSIGNED OCCUPANCY - MECHANICAL/
ELECTRICAL
GROUP A-1 OCCUPANCY - ASSEMBLY
(1) HOUR WALL CONSTRUCTION (NEW WALL
CONSTRUCTION)
GROUP S-1 OCCUPANCY - STORAGE
6" CLAY TILE CONSTRUCTION WITH FINSH
ON ONE SIDE (UP TO 1 HOUR FIRE RATING) -
PENETRATIONS HAVE NOT BEEN VERIFIED
FOR (1) HOUR COMPLIANCE
6" CLAY TILE CONSTRUCTION WITH FINSH
BOTH SIDES (UP TO 2 HOUR FIRE RATING) -
PENETRATIONS HAVE NOT BEEN VERIFIED
FOR (2) HOUR COMPLIANCE
4" CLAY TILE CONSTRUCTION WITH FINSH
BOTH SIDES (UP TO 1 HOUR 34 MINUTES
FIRE RATING) - PENETRATIONS HAVE NOT
BEEN VERIFIED FOR (1) HOUR COMPLIANCE
12 1/2" CLAY TILE CONSTRUCTION WITH
BRICK AT EXTERIOR AND PLASTER AT
INTERIOR (UP TO 6 HOUR FIRE RATING) -
PENETRATIONS HAVE NOT BEEN VERIFIED
FOR (1) HOUR COMPLIANCE
2 x 4 WOOD STUD AT 16" OC WITH 5/8"
PLASTER ON METAL LATHE EACH SIDE- (1)
HOUR FIRE RATING - PENETRATIONS HAVE
NOT BEEN VERIFIED FOR (1) HOUR
COMPLIANCE
8" DOUBLE WYTHE BRICK CONSTRUCTION
WITH FINSH ON ONE SIDE (UP TO 6 HOUR
FIRE RATING) - PENETRATIONS HAVE NOT
BEEN VERIFIED FOR (1) HOUR COMPLIANCE
UTILITY
104D
A: 52 sq ft
HALL
104F
A: 43 sq ft
VESTIBULE
104E
A: 110 sq ft
STORAGE
104B
A: 58 sq ft
VESTIBULE
104A
A: 107 sq ft
STAGE
104C
A: 894 sq ft
RESTRM
101A
A: 71 sq ft
UTILITY
101B
A: 43 sq ft
OFFICE
A: 199 sq ft
LOBBY
A: 560 sq ft
RESTRM
A: 174 sq ft
RESTRM
A: 244 sq ft
AUDITORIUM
A: 3,630 sq ft
STAIR
STAIR
1ST FLOOR AREA
A: 6,632 sq ft
HALL
104G
A: 61 sq ft N
SCALE: 1/8" = 1'-0"2A 1st FLOOR - CODE STUDY PLAN 0 4' 8' 16'
B B
C C
D D
SHEET TITLE
CONSULTANTS
PROJECT NO: #Project Code
MODEL FILE:
Fort Lyon Bldg 3 V26.pln
DRAWN BY: #CAD Technician Full Name
G-006
DATE: 12/9/2022
/U se rs /ta du ke
/D oc um en ts /A rc hi ca d
Fi le s/ Fo rt Ly on B ld g
V
.p ln
CODE STUDY - 2ND FLOOR
Fort Lyon Life Safety Corrections - Building
T.A. DUKE & ASSOCIATES, Inc.
4220 Brigadoon Lane
Colorado Springs, CO 80906 719 648 7722 taduke@earthlink.net
McShea Consulting LLC 4445 Northpark Dr., Suite 200 Colorado Springs, CO 80907
719 358 8208
Building 3 Fort Lyon, 81054
12/9/22 ISSUED FOR PRICING AND
PERMIT
3/20/23 CODE REVIEW COMMENTS
4/13/23 ISSUED FOR STATE REVIEW
5/4/23 ISSUED FOR STATE REVIEW
6/7/23 ISSUED FOR STATE REVIEW
7/19/23 ISSUED FOR CODE
CONSULTANT REVIEW
9/21/2023
8/23/23 ISSUED FOR CODE
CONSULTANT REVIEW
STATE PROJECT #2024-110M23
9/21/23 ISSUED FOR BIDS
204A
214 216
209A
208A
200A
E G
R E
S S
E G
R E
S S
EGRESS
EGRESS
EGRESS
LEGEND
PROJECT NAME: FORT LYON LIFE SAFETY IMPROVEMENTS - BUILDING 3
STATE PROJECT NUMBER: 2021-035M21/HB 1408
LOCATION: FORT LYON, COLORADO
BUILDING AREA: 16,916 GSF
CONSTRUCTION TYPE: TYPE VB, SPRINKLERED
ALLOWABLE HEIGHT: B OCCUPANCY: 60'
S-1 OCCUPANCY: 60'
ACTUAL HEIGHT: 54'-11" (AT NORTH ELEVATION - TO TOP OF ROOF)
ALLOWABLE STORIES: B OCCUPANCY: 3
S-…
This is the start of the file's text. The full file is on GovTribe.