About this file
This document is an architectural bid package for Fort Lyon Life Safety Corrections - Building 8, prepared by T.A. Duke & Associates and McShea Consulting LLC for the Fort Lyon Campus in Bent County, Colorado. The project involves life safety upgrades and code improvements for Building 8, which is part of a larger multi-building renovation effort. The comprehensive architectural drawings and specifications cover detailed modifications including restroom renovations, door and hardware replacements, accessibility improvements, fire sprinkler system updates, and various structural and finish upgrades. The project documents are dated October 18, 2022, with multiple revision dates through October 3, 2023, indicating an ongoing refinement process.
The project is funded through state appropriations and is part of a broader initiative to modernize the Fort Lyon Campus, which has historically served various institutional purposes including a Navy Hospital, a Colorado Department of Corrections facility, and currently provides supportive housing and services for homeless veterans. The renovation scope includes replacing hardware, modifying restrooms for ADA compliance, updating fire safety systems, installing new lighting and exit signs, and making structural improvements to meet current building codes. The total building area for Building 8 is approximately 49,507 square feet, spanning basement, first, and second floors, with specific attention to life safety, accessibility, and code compliance across different occupancy types including institutional, business, and assembly spaces.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MARK DATE DESCRIPTION
SHEET TITLE
CONSULTANTS
MODEL FILE:
Fort Lyon Bldg 8 Final final LS version 24.pln
DRAWN BY: TAD
COPYRIGHT:
G-001
A
B
C
D
E
/U se rs /ta du ke
/D oc um en ts /A rc hi ca d
Fi le s/ Fo rt Ly on B ld g
Fi na l f in al
L S v er si on
4.
pl n
COVER SHEET
Fort Lyon Life Safety Corrections - Building
DATE: OCTOBER 18, 2022
FORT LYON, CO
T.A. DUKE & ASSOCIATES, Inc.
4220 Brigadoon Lane
Colorado Springs, CO 80906 719 648 7722 taduke@earthlink.net
McShea Consulting LLC 4445 Northpark Dr., Suite 200 Colorado Springs, CO 80907
719 358 8208
PROJECT NUMBER: 2021-035M21/HB 1408
4/13/23 ISSUED FOR STATE REVIEW
5/2/23 CODE REVIEW COMMENTS
6/14/23 ISSUED FOR STATE REVIEW
9/21/2023
7/19/23
ISSUED FOR CODE
CONSULTANT REVIEW
8/23/23
ISSUED FOR CODE
CONSULTANT REVIEW
9/12/23
ISSUED FOR CODE
CONSULTANT REVIEW
9/21/23
ISSUED FOR PERMIT
10/3/23
ISSUED FOR PRICING
Fort Lyon Life Safety Corrections - Building 8
CONSULTANTS
MODEL FILE:
Fort Lyon Bldg 8 Final final LS version 24.pln
DRAWN BY: TAD
COPYRIGHT:
G-002
A
B
C
D
E
/U se rs /ta du ke
/D oc um en ts /A rc hi ca d
Fi le s/ Fo rt Ly on B ld g
Fi na l f in al
L S v er si on
4.
pl n
NOTES & ACM REPORT
Fort Lyon Life Safety Corrections - Building
DATE: OCTOBER 18, 2022
FORT LYON, CO
T.A. DUKE & ASSOCIATES, Inc.
4220 Brigadoon Lane
Colorado Springs, CO 80906 719 648 7722 taduke@earthlink.net
McShea Consulting LLC 4445 Northpark Dr., Suite 200 Colorado Springs, CO 80907
719 358 8208
PROJECT NUMBER: 2021-035M21/HB 1408
4/13/23 ISSUED FOR STATE REVIEW
5/2/23 CODE REVIEW COMMENTS
6/14/23 ISSUED FOR STATE REVIEW
9/21/2023
7/19/23
ISSUED FOR CODE
CONSULTANT REVIEW
8/23/23
ISSUED FOR CODE
CONSULTANT REVIEW
9/12/23
ISSUED FOR CODE
CONSULTANT REVIEW
9/21/23
ISSUED FOR PERMIT
10/3/23
ISSUED FOR PRICING
Asbestos Inspection Report Page 19
B-06505.01-169 Gypsum board with joint compound - Sample acquired in Building 7 on the first floor above suspended ceiling between rooms 120 and 121.
None Detected
B-06505.01-170 Wall plaster - Sample acquired in Building 7 on first floor on the west side of room 121, four feet high between west windows.
None Detected
B-06505.01-171 Wall plaster - Sample acquired in Building 7 on first floor in room 113, between windows on east wall.
None Detected
B-06505.01-172 Wall plaster - Sample acquired in Building 7 on the second floor to the right side of door leading to attic.
None Detected
B-06505.01-173 Gypsum board with joint compound - Sample acquired in Building 7 on second floor in room225, on the southeast corner, four feet up from floor.
None Detected
B-06505.01-174 Ceiling plaster - Sample acquired in Building 7 on second floor in room 225 above suspended ceiling, southeast of window.
None Detected
B-06505.01-175 Ceiling plaster - Sampled acquired in Building 7 on second floor in room 225 above suspended ceiling, southwest of window.
None Detected
B-06505.01-176 Gypsum board with joint compound - Sample acquired in Building 7 on second floor in room 217, on the left hand side of door, four feet up from floor.
None Detected
NOTES:_________________________________________________________________
Building 8
Approximately 20,000 sq. ft. of various colored/patterned ACM sheet vinyl floor coverings exist throughout various locations of the building, (see drawings for locations), (25% Chrysotile). This material was in good condition at the time of this inspection exhibiting only minor marks and wearing.
Approximately 5,839 sq. ft. of various colored/patterned, 9” x 9” and 12” x 12” ACM floor tiles and associated adhesives exist throughout various location of the building, (see drawings for locations), (4-21% Chrysotile). This material was in good condition at the time of this inspection exhibiting only minor breakage and wearing.
Floor tiles and sheet vinyl are normally considered non-friable if the material is in good condition and repair could be performed during routine operations and maintenance activities assuring that the material is not cut, abraded, or in any other way damaged causing release of asbestos fibers or the material must be properly abated prior to renovation/demolition activities.
Approximately 3,000 l.f. of ACM baseboard adhesives exist throughout the building, (see drawings for locations), (2% Chrysotile). This material was in good condition at the time of this inspection. This material should be managed following the facilities Operation &
Asbestos Inspection Report Page 21
B-06505.01-141 Wall plaster – Sample acquired from Building 8, room 05, located on the north wall above suspended ceiling.
Trace Chrysotile
B-06505.01-142 12”X12” white floor tile w/clear adhesive – Sample acquired from Building 8 in back of room #04, in middle of room.
7% Chrysotile
B-06505.01-143 Gypsum board joint compound – Sample acquired from Building 8, room 3-B, southeast corner in area 03.
None Detected
B-06505.01-144 Fiber board ceiling – Sample acquired from Building 8, room 21-B, north end of room.
None Detected
B-06505.01-145 Ceiling plaster – Sample acquired from Building 8, 1st floor, located above suspended ceiling, 10” north of room 120.
Trace Chrysotile
B-06505.01-146 Gypsum board with joint compound – Sample acquired from Building 8, 1st floor, located northwest upper corner of office station 107, outside near phone.
None Detected
B-06505.01-147 Gypsum board with joint compound – Sample acquired from Building 8, 1st floor, above suspended ceiling over doorway 155A.
None Detected
B-06505.01-148 12”X12” brown marble floor tile – Sample acquired from Building 8, 1st floor threshold of door 155B.
Trace Chrysotile in adhesive
B-06505.01-149 White 2’x2’ ceiling tile – Sample acquired from Building 8, 1st floor, above door 155A.
None Detected
B-06505.01-150 Gypsum board with joint compound – Sample acquired from Building 8, 1st floor, in room 248 in corner above suspended ceiling.
None Detected
B-06505.01-151 Wall plaster – Sample acquired from Building 8, 1st floor, southwest corner in room 240 above suspended ceiling.
Trace Chrysotile
B-06505.01-152 Wall plaster – Sample acquired from Building 8, 1st floor, in room 205, north column in middle of room above suspended ceiling.
Trace Chrysotile
B-06505.01-153 Air handler vibration cloth – Sample acquired from Building 8 in center of northeast wing of attic.
None Detected
B-06505.01-154 Wall plaster – Sample acquired from Building 8, 1st floor, in fire closet across from room 207 men’s room.
Trace Chrysotile
See GHP report 06505.06-Building 8 Partial Abatement (Mechanical Room).
Abatement Project included the abatement of Building 8 Mechanical Room (No Room #) in a “gross removal” enclosure that encompassed/abated the two tanks that were present, (approximately 625 sq. ft. ACM TSI), erected several negative pressure secondary containments, and used “glove bag” removal procedures to abate all remaining ACM TSI from all pipes and pipe fittings, (approximately 225 l.f. of 4”-12” OD TSI). AC removed/disposed of loose LCP where this condition existed within their immediate work areas and impacted by asbestos abatement activities.
NOTES:_________________________________________________________________
Building 17
Asbestos Inspection Report Page 20
Maintenance Program. The material should be properly abated by a State of Colorado licensed General Abatement Contractor prior to renovation or if the material becomes damaged.
Approximately 22,000 sq. ft. of ACM wall plaster exists throughout the building, (see drawings for locations), (Trace % Chrysotile). The material was in good condition at the time of this inspection. This material remains regulated by the EPA and State of Colorado until determined otherwise by point count analysis. This material should be managed following the facilities Operations & Maintenance Program. The material should be properly abated by a State of Colorado licensed General Abatement Contractor prior to renovation/demolition or if the material becomes damaged. If the material is determined to be less than 1% asbestos by point count at a later time. The material shall be managed by properly trained (OSHA training) personnel.
Approximately 2,000 l.f. of ACM Thermal Systems Pipe Insulation exists throughout the building, (see drawings for locations), (8-70% Chrysotile). This material was in good to poor condition at the time of this inspection. GHP inspected/assessed only those materials that were accessible. Access panels were not available for performing a thorough survey of pipe insulation inside wall cavities and/or pipe chases. Pipe insulation inside walls/pipe chases should be assumed to be asbestos containing until determined otherwise. GHP determined that fiberglass insulation is obscuring remnant TSI on pipes. All fiberglass insulation should be assumed to be covering ACM material.
Personal protective equipment should be worn by those entering wall cavities/pipe chases. Isolate the areas surrounding pipe chases when performing routine maintenance in these areas. The material in the crawlspace exhibited significant damage including dislodged material. The crawlspace soils are considered contaminated. Damaged material should be repaired immediately.
Sample Number Material and Location Asbestos Content B-06505.01-131 Pipe insulation – Sample acquired from Building 8 in chill water pump room, northwest corner of room on large pipe.
None Detected
B-06505.01-132 Floor tile with brown specks – Sample acquired from Building 8, room 12, at the door entrance.
4% Chrysotile
B-06505.01-133 Gypsum board with joint compound – Sample acquired from Building 8, located in southeast corner, 4” up from floor in old kitchen.
None Detected
B-06505.01-134 Floor tile – Sample acquired from Building 8 in old kitchen B-A, located in the middle of floor in kitchen area.
15% Chrysotile in adhesive 6% in tile
B-06505.01-135 Base cove adhesive – Sample acquired from Building 8 basement area, southeast bottom corner inside wall.
None Detected
B-06505.01-136 Cork board ceiling insulation – Sample acquired from Building 8, room #08, above door
None Detected
B-06505.01-137 Ceiling plaster – Sample acquired from Building 8 above door, room #08 in hallway, above suspended ceiling.
Trace Chrysotile
B-06505.01-138 Felt paper – Sample acquired from Building 8, room 07, south wall under orange tile in middle of room.
None Detected
B-06505.01-139 Orange tile – Sample acquired from Building 8, room 7, located 4 ft north from the middle of south wall, taken from the floor.
None Detected
B-06505.01-140 Wood grain 12”x12” tile – Sample acquired from Building 8, located in the middle of east side of wall.
None Detected
GOBBELL HAYES ACM REPORT GOBBELL HAYES ACM REPORTGOBBELL HAYES ACM REPORT
GENERAL NOTES
PROJECT: BUILDING 8 LIFE SAFETY CORRECTIONS
FORT LYON, CO
APPLICABLE CODES:
2018 INTERNATIONAL BUILDING CODE
2018 INTERNATIONAL EXISTING BUILDING CODE
2018 INTERNATIONAL MECHANICAL CODE
2018 INTERNATIONAL ENERGY CONSERVATION CODE
2018 INTERNATIONAL PLUMBING CODE
2020 NATIONAL ELECTRIC CODE
2018 INTERNATIONAL FIRE CODE
NATIONAL FIRE PROTECTION ASSOCIATION STANDARDS
ZONING: NOT APPLICABLE
SEISMIC ZONE: B
SCOPE OF WORK:
MODIFICATIONS TO HARDWARE AND RESTROOMS
TOTAL BUILDING AREA: 49,507 SF
SEPARATION OF EXITS: 1/3 THE DIAGONAL (BUILDING IS SPRINKLERED)
DIAGONAL @ BASEMENT = 242'
DISTANCE BETWEEN EXITS = 109'
DIAGONAL @ 1ST FLOOR = 242'
DISTANCE BETWEEN EXITS = 112'
DIAGONAL @ 2ND FLOOR = 242'
DISTANCE BETWEEN EXITS = 112'
CONSTRUCTION TYPE: NON CONFORMING TYPE IIB (SPRINKLERED)
NOTE: ALL NEW INTERIOR CONSTRUCTION WILL
MEET OR EXCEED FIRE RESISTIVE MATERIALS
REQUIRED BY TYPE IIB CONSTRUCTION
INTERIOR FINISH FIRE RATING:
OCCUPANCY EXIT ENCLOSURES CORRIDORS INTERIOR ROOMS
A-2 B B C B B B C I-1 C C C S C C C
CLASS A: FLAME SPREAD INDEX 0-25; SMOKE DEVELOPED INDEX 0-450
CLASS B: FLAME SPREAD INDEX 26-75; SMOKE DEVELOPED INDEX 0-450
CLASS C: FLAME SPREAD INDEX 76-200; SMOKE DEVELOPED INDEX 0-450
FIRE RESISTANCE RATING (HOURS):
PRIMARY STRUCTURAL FRAME: 0
EXTERIOR BEARING WALLS: 0
INTERIOR BEARING WALLS: 0
INTERIOR NON BEARING WALLS: 0
FLOOR CONSTRUCTION AND
SECONDARY MEMBERS: 0
ROOF CONSTRUCTION AND
SECONDARY MEMBERS: 0
DOORS IN RATED CORRIDORS ARE A
CODE NOTES PARTITION TYPES
12. DURING AND AT THE COMPLETION OF THE CONTRACTORS
DAILY WORK, CONTRACTORS ARE RESPONSIBLE FOR THE
CLEANING UP AND REMOVAL OF ALL RUBBISH AND DEBRIS
BEFORE LEAVING THE JOBSITE.
13. THE FOLLOWING ARE STRICTLY PROHIBITED WORK AND
PRACTICES:
A. ANY COMBUSTIBLE MATERIALS ABOVE FINISHED
CEILING
B. IMPOSING ANY STRUCTURAL LOAD, TEMPORARY OR
PERMANANT, ON ANY PART OF THE BUILDING
STRUCTURE WITHOUT PRIOR WRITTEN APPROVAL
C. CUTTING ANY HOLES IN FLOOR SLABS, WALLS OR ROOF
WITHOUT PROPER APPROVAL.
14. CONTRACTORS SHALL CARRY ADEQUATE LIABILITY INSURANCE
AS SET FORTH BY OWNER'S REQUIREMENTS.
15. A CERTIFICATE OF OCCUPANCY MUST BE OBTAINED UPON
COMPLETION OF ALL WORK AND FINAL INSPECTIONS. THE ORIGINAL
C.O. TO BE SUBMITTED TO OWNER
16. IN EVENT OF CONFLICT, DISCREPENCY, OBLIGATION, ETC.
CONTRACTOR TO CONTACT ARCHITECT AND OWNER
FOR CLARIFICATION PRIOR TO PROCEEDING.
17. PROVIDE ALL INSURANCE, LICENSES, BONDING AND RELEASE
OF LIENS REQUIRED BY OWNER. PROVIDE COPIES
OF ALL DOCUMENTATION UPON REQUEST.
18. PROVIDE COMPLETE OPERATING MAINTENANCE AND
SPECIFICATION MANUALS TO STAGE FOR ALL EQUIPMENT WITHIN
(15) DAYS OF FINAL COMPLETION OF JOB.
19. PROVIDE A WRITTEN LIST OF SERVICE SUB-CONTRACTORS TO
OWNER INCLUDING NAMES, ADDRESSES, PHONE NUMBERS AND
CONTACT PERSONS FOR FUTURE SERVICE NEEDS WITHIN (15) DAYS
OF COMPLETION OF JOB.
20. CONTRACTORS SHALL NOT BE ALLOWED TO USE, STORE OR
DISPOSE OF ANY HAZARDOUS, FLAMMABLE, EXPLOSIVE,
RADIOACTIVE TOXIC, CONTAMINATING, POLLUTING MATERIALS
OR SUBSTANCES RELATED TO INJUROUS OR CHEMICALLY
REGULATED MATERIALS ON THE JOB SITE.
21. ALL INTERIOR WALLS SHALL HAVE A MINIMUM OF ONE COAT OF
WHITE PRIMER INSTALLED AND TWO FINISH COATS.
22. GENERAL CONTRACTOR IS TO CONSTRUCT INTERIOR WALLS
FROM STEEL STUDS. GENERAL CONTRACTOR MUST USE FIRE
RETARDANT TREATED WOOD BLOCKING AT CRITICAL LOCATIONS
FOR THE MOUNTING OF MILLWORK, OR ACCESSORIES
23. ARCHITECTURAL SIGNAGE FOR TOILETS, EXITS, OTHER CODE
RELATED SIGNS NECESSARY SHALL BE FURNISHED AND INSTALLED
BY THE CONTRACTOR.
24. GENERAL CONTRACTOR SHALL PROVIDE ADEQUATE PROTECTION
OF ANY TENANT SUPPLIED MATERIALS, FIXTURES, ETC. ON JOB SITE.
25.GENERAL CONTRACTOR IS TO VERIFY ALL EXISTING CONDITIONS.
ANY DIMENSIONS SHOWN WHICH INDICATE AN EXISTING CONDITION
ARE APPROXIMATE AND SHOULD BE VERIFIED ON SITE.
26. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE
THE EXISTING CONDITIONS WHICH MAY AFFECT THE COMPLETION OF
THE PROJECT IN ACCORDANCE WITH THE CONSTRUCTION
DOCUMENTS. NOTIFY THE ARCHITECT IF EXISTING CONDITIONS VARY
SUCH THAT IMPLEMENTATION OF THE DOCUMENTS WILL ADVERSLY
AFFECT THE PROJECT COST OR PROJECT SCHEDULE.
27. IT IS NOT WITHIN THE SCOPE OF WORK OF THE ARCHITECT TO
DISCOVER, LOCATE, HANDLE, REMOVE OR DISPOSE OF ANY
HAZARDOUS MATERIALS INCLUDING, BIT NOT LIMITED TO: ASBESTOS,
ASBESTOS PRODUCTS, POLYCHLORINATED BIPHENYL (PCB),
HYDROCARBONS OR ANY OTHER TOXIC SUBSTANCES. SHOULD THE
G.C. OR ANY OTHER ENTITY WORKING ON BEHALF OF THE G.C. OR
THE OWNER DISCOVER OR ENCOUNTER ANY HAZARDOUS
MATERIALS, THE G.C. SHALL NOTIFY THE APPROPRIATE AUTHORITIES
IMMEDIATELY AND PROCEED IN ACCORDANCE WITH ALL APPLICABLE
LAWS AND REGULATIONS.
32. PROVIDE OWNER WITH A MINIMUM OF ONE (1) SET OF "AS-BUILT"
DRAWINGS INDICATING ALL VARIANCES BETWEEN ORIGINAL
APPROVED CONSTRUCTION DOCUMENTS AND ACTUAL COMPLETED
CONSTRUCTION.
33. IN THE EVENT THAT CERTAIN FEATURES OF THE CONSTRUCTION
ARE NOT FULLY SHOWN ON THE DRAWINGS OR CALLED FOR IN
GENERAL NOTES, THEN THERE CONSTRUCTION SHALL BE OF THE
SAME CHARACTER AS FOR SIMILAR CONDITIONS.
34. ARCHITECT AND OWNER SHALL INSPECT THE PROJECT TO
VERIFY STATUS OF COMPLETION WITH REASONABLE PROMPTNESS
AFTER NOTIFICATION BY CONTRACTOR.
35. CONTRACTOR TO PROVIDE ALL CIVIL, ELECTRICAL, AND
MECHANICAL ASSOCIATED WITH THE DESIGN INTENT SHOWN
ON THE ARCHITECTURAL AND ENGINEERING DRAWINGS
30. CONTRACTOR SHALL MAINTAIN REQUIRED DOCUMENTS AND UP
TO DATE CONSTRUCTION PLANS ON THE JOB SITE.
31. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR FINAL
CLEANING PRIOR TO TURNING THE SPACE OVER TO THE OWNER.
CLEANING SHALL INCLUDE, BIT NOT BE LIMITED TO: REMOVAL OF
GREASE MASTIC ADHESIVES, DUST, DIRT, STAINS, FINGERPRINTS,
LABELS AND OTHER FOREIGN MATERIALS FROM EXPOSED
INTERIOR AND EXTERIOR SURFACES. PRESSURE WASH EXTERIOR
PAVED SURFACES.
28. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ANY
DAMAGE TO THE FACILITY DURING CONSTRUCTION.
29. CONTRACTOR SHALL PROPERLY DISPOSE OF ALL DEMOLISHED
MATERIALS IN ACCORDANCE WITH ALL APPLICABLE REGULATIONS.
36. SHOULD CONTRACTOR, IN PREPARING HIS BID OR AT ANY TIME
THEREAFTER, FIND ANY DISCREPANCY, INCONSISTENCY, CONFLICT
OR OMISSION IN, OR BE IN DOUBT AS TO THE EXACT MEANING
OF THE DRAWINGS OR SPECIFICATIONS HE SHALL IMMEDIATELY
AND BEFORE PROCEEDING FURTHER NOTIFY OWNER IN WRITING.
OWNER WILL IMMEDIATELY RESOLVE SUCH DISCREPANCY AND
FURNISH CONTRACTOR WITH WRITTEN INSTRUCTIONS WITH
RESPECT THERETO. IT WILL NOT BE A DISCREPANCY IF THESE SPECS
DO NOT MENTION PORTIONS OF THE WORK WHICH THE DRAWINGS
COMPETENTLY EXPLAIN.
1. ALL NEW CONSTRUCTION SHALL BE IN STRICT COMPLIANCE
WITH NATIONAL, STATE, COUNTY AND CITY BUILDING CODES AND
THE AMERICANS WITH DISABILIITIES ACT (A.D.A) REGULATIONS.
2. ALL WORK SHALL BE DONE IN COMPLIANCE WITH THE
OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA)
3. DIMENSIONS GIVEN IN FIGURES ON THE PLANS SHALL TAKE
PRECEDENCE OVER SCALED DIMENSIONS. ALL DIMENSIONS
SHALL BE VERIFIED IN FIELD. DIMENSIONS ARE NOT
ADJUSTABLE UNLESS NOTED OTHERWISE.
4. ALL DIMENSIONS ARE GIVEN FROM FACE OF DRYWALL
TO FACE OF DRYWALL UNLESS NOTED OTHERWISE.
5. "EQUAL" WHEN USED SHALL MEAN AN EQUIVALENT PRODUCT
OR MATERIAL AS APPROVED BY THE TENANT.
6. ALL HEIGHTS ARE DIMENSIONED FROM FINISHED FLOOR
UNLESS NOTED OTHERWISE.
7. THE CONTRACTOR SHALL VERIFY THAT NO CONFLICTS
EXIST IN LOCATIONS OF ANY AND ALL MECHANICAL,
TELEPHONE/DATA, ELECTRICAL, LIGHTING, PLUMBING AND
SPRINKLER EQUIPMENT (TO INCLUDE ALL PIPING, DUCTWORK
AND CONDUIT) AND THAT ALL REQUIRED CLEARANCES FOR
INSTALLATION OR MAINTENANCE OF THE ABOVE EQUIPMENT
IS PROVIDED.
8. ALL GYPSIUM BOARD PARTITIONS SHALL BE TAPED, BEDDED
AND SANDED SMOOTH WITH NO VISIBLE JOINTS. ALL CORNERS
SHALL RECEIVE METAL CORNER BEAD UNLESS OTHERWISE
NOTED
9. ALL RATED WALLS SHALL HAVE THEIR RATING MAINTAINED
AND ALL NEW PENETRATIONS SEALED TO MEET CURRENT
CODE REQUIREMENTS.
10. ALL MATERIALS FURNISHED AND INSTALLED SHALL BE FREE
FROM DEFECTS. ALL MATERIALS AND WORKMANSHIP SHALL
BE GUARANTEED FOR A PERIOD OF ONE YEAR FROM THE DATE
OF ACCEPTANCE. DURING THIS PERIOD, PROBLEMS DUE TO
DEFECTIVE MATERIALS OR FAULTY WORKMANSHIP SHALL BE
CORRECTED AT NO COST TO THE TENANT. ANY PROBLEMS
THAT OCCUR DURING CONSTRUCTION SHALL BE CORRECTED
IMMEDIATELY TO THE SATISFACTION OF THE TENANT.
11. GENERAL CONTRACTOR SHALL PROVIDE ADEQUATE BRACIING
AS REQUIRED TO SECURE WORK TO STRUCTURE ABOVE CEILING
WHERE REQUIRED AND SHALL BE TOTALLY RESPONSIBLE FOR
HIS WORK.
DRAWING LISTING
THE FOLLOWING MATERIALS REQUIRE SUBMITTALS PRIOR TO
PROCUREMENT OR INSTALLATION:
D. ALL RESTROOM SIGNAGE
E. EXHAUST FAN
F. ALL DOORS AND HARDWARE INCLUDING:
1. ALL NEW DOORS INCLUDING
A. HOLLOW METAL DOORS
B. SOLID CORE WOOD DOORS
2. LEVER LOCKSET
3. LEVER PRIVACY SET
4. LEVER PASSAGE SET
5. PANIC HARDWARE
6. AUTOMATIC CLOSER
7. HINGES
8. DOOR FRAME
G. PORTABLE FIRE EXTINGUISHER
THE FOLLOWING MATERIALS REQUIRE SUBMITTALS PRIOR TO
PROCUREMENT OR INSTALLATION:
A. ALL FINISH MATERIALS INCLUDING:
1. WALL FINISHES INCLUDING:
A. PRIMER PAINT
B. FINISH PAINT
C. CERAMIC WALL TILE
D. VINYL WALL COVERING
2. FLOOR COVERINGS INCLUDING
A. CERAMIC FLOOR TILE
B. CARPET
C. SHEET VINYL
D. VINYL TILE
3. ALL CEILING TILE INCLUDING
A. 2 X 4 TILE
B. 2 X 2 TILE
B. ALL ELECTRCAL ITEMS INCLUDING:
1. 2 X 4 LIGHT FIXTURES
2. 1 X 4 LIGHT FIXTURES
3. EMERGENCY EXIT/LIGHT COMBO UNIT
4. CEILING MOUNTED FIRE ANNUNCIATOR
5. WALL MOUNTED FIRE ANNUNCIATOR
6. ILLUMINATED EXIT SIGNAGE
7. ALL CEILING TILE INCLUDING
A. 2 X 4 TILE
B. 2 X 2 TILE
8. SMOKE DETECTOR
9. CEILING MOUNTED EXIT DIRECTIONAL SIGN
10. WALL MOUNTED EXIT DIRECTIONAL SIGN
11. WALL MOUNTED EMERGENCY LIGHT
C. ALL PLUMBING FIXTURES INCLUDING:
1. RESTROOM ACCESSORIES INCLUDING
A. MIRROR
B. GRAB BARS
C. TOILET TISSUE DISPENSER
D. TOILET SEAT COVER DISPENSER
E. BABY CHANGING STATION
F. SOAP DISPENSER
G. WASTE RECEPTACLE/PAPER TOWEL
DISPENSER
2. DRINKING FOUNTAINS
3. ALL NEW RESTROOM FIXTURES INCLUDING:
A. STANDARD TOILET
B. ADA TOILET
C. STANDARD LAVATORY
D. ADA LAVATORY
E. TOILET PARTITIONS/URINAL SCREEN
F. STANDARD URINAL
G. ADA URINAL
H. SHOWER UNIT
GENERAL NOTES GENERAL NOTES GENERAL NOTES SUBMITTAL REQUIREMENTS
SUBMITTAL REQUIREMENTS
Partition Type 1: 3 5/8" metal stud (Clark Dietrich ProStud
20) @ 24" O.C. from floor to underside of structure; provide 5/8" type X gyp board at both sides. Total wall thickness = 4 7/8"; (1) hour rated - UL Des U419
Partition Type 2: 4" metal stud (Clark Dietrich ProStud
20) @ 24" O.C. from floor to underside of structure;
provide 5/8" type X gyp board at both sides. Total wall thickness = 5 1/4"; install 3 1/2" batt insulation from floor to top of wall; (1) hour rated - UL Des U419
Partition Type 3: 4" metal stud (Clark Dietrich ProStud
20) @ 24" O.C. from floor to top of opening or adjacent wall; provide 5/8" type X gyp board at both sides. Total wall thickness = 5 1/4"; install 3 1/2" batt insulation from floor to top of wall. Infill wall is (1) hour rated assembly
Partition Type 5: 4" metal stud (Clark Dietrich ProStud
20) @ 24" O.C. from floor to underside of structure;
provide 5/8" type X gyp board at both sides. Total wall thickness = 5 1/4" (1) hour rated - UL Des U419
Partition Type 6: 4" metal stud (Clark Dietrich ProStud
20) @ 24" O.C. from floor to top of opening or adjacent wall; provide 5/8" type X gyp board at one side and 5/8" type X USG Durock Brand Glass-Mat Tile Backerboard (UL type SGX) at Restroom side. Total wall thickness = 5 1/4"; install 3 1/2" batt insulation from floor to top of wall
Partition Type 4: 4" metal stud (Clark Dietrich ProStud
20) @ 24" O.C. from floor to height of opening or adjacent wall; provide 5/8" type X gyp board at exposed side. Total wall thickness = 4 5/8"
7 Partition Type 7: 4" metal stud (Clark Dietrich ProStud
20) @ 24" O.C. from floor to height of adjacent wall;
provide 5/8" type X USG Durock Brand Glass-Mat Tile Backerboard at exposed side. 3 1/2" batt Insulation; Total wall thickness = 4 5/8" Partition Type 8: 6" metal stud (Clark Dietrich ProStud
20) @ 24" O.C. from floor to top of opening or adjacent wall; provide 5/8" type X gyp board at one side and 5/8" type X USG Durock Brand Glass-Mat Tile Backerboard at Restroom side. Total wall thickness = 7 1/4"; install 5 1/2" batt insulation from floor to top of wall
Partition Type 9: 4" CT metal stud (Clark Dietrich 400CT-33) @ 24" O.C. from floor to structure above;
provide (2) layers 1/2" type X gyp board at exposed side and (1) layer of 1" shaftliner panels at shaft side. 3 1/2" batt Insulation; Total wall thickness = 6". (2) Hour rated - UL Des U438
Partition Type 10: 4" metal stud (Clark Dietrich ProStud
20) @ 24" O.C. from floor to underside of structure;
provide (2) layers 5/8" type X gyp board at each side. 3 1/2" batt Insulation; Total wall thickness = 6 1/2"
(2) hour rated - UL Des U438
PARTITION TYPES
Partition Type 13: 4" metal stud (Clark Dietrich ProStud 20) @ 24" O.C. from floor to underside of structure; (1) layer of 5/8" Sheetrock Brand Mold Tough Firecode X Panel at Restroom/Wet/EDF side and 5/8" type X gyp board at opposite side. Total wall thickness = 5 1/4"; install 3 1/2" batt insulation from floor to top of wall; (1) hour rated - UL Des U419
Partition Type 14: Chase Wall - (2) rows of 4" metal stud (Clark Dietrich ProStud 20) @ 24" O.C. from floor to underside structure with (2) layers of 5/8" type X gyp board at each exposed side. Total wall thickness =8 1/2" miniumum; install 3 1/2" batt insulation from floor to top of wall. (2) hour rated - UL Des U493
Partition Type 15: 4" metal stud (Clark Dietrich ProStud
20) @ 24" O.C. from floor to underside of structure; provide 5/8" type X USG Durock Brand Glass-Mat Tile Backerboard at both sides. Install 3 1/2" batt insulation from floor to top of wall. Total wall thickness = 5 1/4"
Partition Type 16: 2 1/2" metal stud (Clark Dietrich ProStud 20) @ 24" O.C. from floor to height of adjacent wall; provide 5/8" type X gyp board at exposed side. 2 1/2" batt Insulation; Total wall thickness = 3 1/8"
Partition Type 12: 4" metal stud (Clark Dietrich ProStud 20) @ 24" O.C. from floor to underside of structure; provide 5/8" type X gyp board at one side and
(1) layer of 5/8" type X USG Durock Brand Glass-Mat Tile Backerboard (UL Type SGX) at Restroom side. Total wall thickness = 5 1/4"; install 3 1/2" batt insulation from floor to top of wall. (1) hour rated - UL Des U419
Partition Type 17: 4" metal stud (Clark Dietrich ProStud 20) @ 24" O.C. from floor to underside of structure; provide (2) layers of 5/8" type X gyp board at each side. Total wall thickness = 6 1/2"; install 3 1/2" batt insulation from floor to top of wall. (2) hour rated - UL Des U419
Partition Type 18: 2 1/2" metal stud (Clark Dietrich ProStud 20) @ 24" O.C. from floor to height of adjacent wall; (1) layer of 5/8" type X USG Durock Brand Glass-Mat Tile Backerboard at Restroom side. 2 1/2" batt Insulation;
Total wall thickness = 3 1/8"
Partition Type 11: 4" metal stud (Clark Dietrich ProStud 20) @ 24" O.C. from floor to underside of structure; provide 5/8" Sheetrock Brand Mold Tough Firecode X Panel at each side Total wall thickness = 5 1/4"
Partition Type 19: 4" metal stud (Clark Dietrich ProStud 20) @ 24" O.C. from floor to underside of structure; provide (1) layer of 5/8" type x gyp board at exposed side. Total wall thickness = 4 5/8"; install 3 1/2" batt insulation from floor to top of wall
Partition Type 20: 6" metal stud (Clark Dietrich ProStud
20) @ 24" O.C. from floor to top of opening or adjacent wall; provide 5/8" type X USG Durock Brand Glass-Mat Tile Backerboard at Restroom side. Total wall thickness = 6 5/8"; install 5 1/2" batt insulation from floor to top of wall
Partition Type 21: 4" metal stud (Clark Dietrich ProStud 20) @ 24" O.C. from floor to underside of opening or adjacent wall; 5/8" type X USG Durock Brand Glass-Mat Tile Backerboard at Restroom/Wet/EDF side and 5/8" type X gyp board at opposite side. Total wall thickness = 5 1/4"; install 3 1/2" batt insulation from floor to top of wall
Partition Type 22: 6" metal stud (Clark Dietrich ProStud
20) @ 24" O.C. from floor to top of opening or adjacent wall; provide 5/8" type X USG Durock Brand Glass-Mat Tile Backerboard at each side. Total wall thickness = 7 1/4"; install 5 1/2" batt insulation from floor to top of wall
Partition Type 23: 4" CT metal stud (Clark Dietrich 400CT-33) @ 24" O.C. from floor to structure above;
provide (1) layer 1/2" type X gyp board plus (1) layer of 1/2" type X USG Durock Brand Glass-Mat Tile Backerboard at exposed side and (1) layer of 1" shaftliner panels at shaft side. 3 1/2" batt Insulation; Total wall thickness = 6". (2) Hour rated - UL Des U438
ARCHITECTURAL DRAWINGS:
SHEET # NAME
G-001 COVER SHEET
G-002 NOTE SHEET
G-003 PLUMBING CLACULATIONS
G-004 BASEMENT LEVEL CODE STUDY PLAN
G-005 1ST FLOOR CODE STUDY PLAN
G-006 2ND FLOOR CODE STUDY PLAN
AS-001 VICINITY PLAN
AS-002 LOCATION PLAN
AS-003 SURVEY/PLAT MAP
A-101 BASEMENT DEMOLITION PLAN
A-102 1ST FLOOR DEMOLITION PLAN
A-103 2ND FLOOR DEMOLITION PLAN
A-104 BASEMENT FLOOR PLAN
A-105 1ST FLOOR PLAN
A-106 2ND FLOOR PLAN
A-107 BASEMENT RCP DEMO
A-108 1ST FLOOR RCP DEMO
A-109 2ND FLOOR RCP DEMO
A-110 BASEMENT REFLECTED CEILING PLAN
A-111 1ST FLOOR REFLECTED CEILING PLAN
A-112 2ND FLOOR REFLECTED CEILING PLAN
A-201 INTERIOR ELEVATIONS
A-202 INTERIOR ELEVATIONS- RESTROOM & STAIR SIGNS
A-203 INTERIOR ELEVATIONS AT EDF'S
A-401 ENLARGED PLANS
A-501 ACCESSORIES
A-502 PHOTO SHEET
A-503 ACCESSORIES/SMOKE DETECTOR/FIRE ANNUNCIATOR
SPECS
A-504 FIRE SPRINKLER SYSTEM DEFICIENCIES & EDF SPEC
A-505 FIRESTOP DETAILS
A-601 DOOR SCHEDULE
A-602 DOOR SCHEDULE
A-603 DOOR SCHEDULE
A-604 DOOR SCHEDULE
A-605 DOOR SCHEDULE
A-606 DOOR SCHEDULE
A-701 BASEMENT FINISH PLAN
A-702 1ST FLOOR FINISH PLAN
A-703 2ND FLOOR FINISH PLAN
A-704 5TH FLOOR FINISH PLAN
A-705 FINISH SPECS
MEP DRAWINGS
M0.1 MECHANICAL NOTES AND SCHEDULES
M1.1 BASEMENT MECHANICAL PLAN
M2.1 1ST FLOOR MECHANICAL PLAN
M3.1 2ND FLOOR MECHANICAL PLAN
P0.1 PLUMBING NOTES, SCHEDULES AND DETAILS
P1.1 BASEMENT PLUMBING PLAN
P2.1 1ST FLOOR PLUMBING PLAN
P3.1 2ND FLOOR PLUMBING PLAN
E0.1 ELECTRICAL NOTES
E0.2 ELECTRICAL ONE LINE & SCHEDULES
E1.1 BASEMENT ELECTRICAL PLAN
E2.1 1ST FLOOR ELECTRICAL PLAN
E3.1 2ND FLOOR ELECTRICAL PLAN
37. ALL PIPING PENETRATIONS THROUGH FLOORS SHALL BE
SEALED WATER TIGHT BY GROUTING PERIMETER GAP BETWEEN
PIPE AND FLOOR STRUCTURE OR BY USING APPROVED UL SLEEVE
AND SEALER SYSTEM. PENETRATIONS OF RATED WALLS SHALL
USE SLEEVE WITH UL APPROVED FIRE SEALANT PER SECTION
714.4.1.1 OF THE 2021 IBC. PENETRATIONS THROUGH FLOORS
SHALL COMPLY WITH SECTION 714.5.1.1 OR 714.5.1.2” .
38. FLOOR PENETRATIONS CONTAINED AND LOCATED WITHIN THE
CAVITY OF A WALL ABOVE OR BELOW THE FLOOR DO NOT REQUIRE
A T RATING PER SECTION 714.5.1.2 EXCEPTION 1. FLOOR
PENETRATIONS BY FLOOR DRAINS, TUB DRAINS OR SHOWER
DRAINS CONTAINED AND LOCATED WITHIN THE CONCEALED SPACE
OF A HORIZONTAL ASSSEMBLY DO NOT REQUIRE A T RATING PER
SECTION 714.5.1.2 EXCEPTION 2
Partition Type 1: 3 5/8" metal stud (Clark Dietrich ProStud
20) @ 24" O.C. from floor to underside of structure; provide 5/8" type X gyp board at both sides. Total wall thickness = 4 7/8"; install 3 1/2" batt insulation from floor to top of wall;
(1) hour rated - UL Des U419
ACM NOTES
1. IT IS NOT WITHIN THE SCOPE OF WORK OF THE ARCHITECT TO
DISCOVER, LOCATE, HANDLE, REMOVE OR DISPOSE OF ANY
HAZARDOUS MATERIALS INCLUDING, BUT NOT LIMITED TO: ASBESTOS,
ASBESTOS PRODUCTS, POLYCHLORINATED BIPHENYL (PCB),
HYDROCARBONS OR ANY OTHER TOXIC SUBSTANCES. SHOULD THE
G.C. OR ANY OTHER ENTITY WORKING ON BEHALF OF THE G.C. OR
THE OWNER DISCOVER OR ENCOUNTER ANY HAZARDOUS
MATERIALS, THE G.C. SHALL NOTIFY THE APPROPRIATE AUTHORITIES
IMMEDIATELY AND PROCEED IN ACCORDANCE WITH ALL APPLICABLE
LAWS AND REGULATIONS.
2. ALL MATERIALS BEING REMOVED FROM THE SITE SHALL BE
TESTED FOR ACM PRIOR TO ANY DEMOLITION WORK. IF MATERIAL
TESTS POSITIVE FOR ACM (ASBESTOS CONTAINING MATERIALS),
AREA MUST BE CLEARED OF ALL ACM CONTAINING MATERIALS
AFFECTED BY CONSTRUCTION PRIOR TO DEMOLITION
OR CONSTRUCTION
3. ANY ABATEMENT OF ACM SHALL BE ACCOMPLISHED BY A
CONTRACTOR LICENSED BY THE STATE OF COLORADO
FOR ACM REMOVAL.
4. ALL ACM SHALL BE PROPERLY REMOVED AND DISPOSED OF ACCORDING
TO REGULATIONS DEFINED BY THE STATE OF COLORADO
5. ALL MATERIAL BEING INSTALLED IN THE PROJECT,
INCLUDING GYP BOARD, JOINT COMPOUND, VINYL TILE,
SHEET VINYL, CEILING TILE, PLASTER, CARPET, BASE
ADHESIVE OR ANY OTHER MATERIAL BEING PROPOSED
SHALL BE TESTED FOR ACM. A REPORT SHALL BE GIVEN
TO THE OWNER INDICATING RESULTS OF ACM TESTING
CONSULTANTS
MODEL FILE:
Fort Lyon Bldg 8 Final final LS version 24.pln
DRAWN BY: TAD
COPYRIGHT:
G-003
A
B
C
D
E
/U se rs /ta du ke
/D oc um en ts /A rc hi ca d
Fi le s/ Fo rt Ly on B ld g
Fi na l f in al
L S v er si on
4.
pl n
PLUMBING CALCULATIONS
Fort Lyon Life Safety Corrections - Building
DATE: OCTOBER 18, 2022
FORT LYON, CO
T.A. DUKE & ASSOCIATES, Inc.
4220 Brigadoon Lane
Colorado Springs, CO 80906 719 648 7722 taduke@earthlink.net
McShea Consulting LLC 4445 Northpark Dr., Suite 200 Colorado Springs, CO 80907
719 358 8208
PROJECT NUMBER: 2021-035M21/HB 1408
4/13/23 ISSUED FOR STATE REVIEW
5/2/23 CODE REVIEW COMMENTS
6/14/23 ISSUED FOR STATE REVIEW
9/21/2023
7/19/23
ISSUED FOR CODE
CONSULTANT REVIEW
8/23/23
ISSUED FOR CODE
CONSULTANT REVIEW
9/12/23
ISSUED FOR CODE
CONSULTANT REVIEW
9/21/23
ISSUED FOR PERMIT
10/3/23
ISSUED FOR PRICING
PLUMBING CALCULATIONS PLUMBING CALCULATIONS PLUMBING CALCULATIONS
PLUMBING FIXTURES REQUIRED:
OCCUPANT LOAD CALCULATION:
1ST FLOOR:
A-3 OCCUPANCY: 1,167 NSF/15 NSF = 77.8 OCCUPANTS
77.8 OCCUPANTS / 2 = 38.9 OCCUPANT LOAD PER SEX
PER IBC TABLE 2902.1: ASSEMBLY OCCUPANCY:
MINIMUM REQUIRED PLUMBING FIXTURES:
MALE WC FEMALE WC LAVS
1/125 1/65 1/200
A-3 (READING ROOMS) MINIMUM REQUIRED FIXTURES:
38.9 OCCUPANT LOAD/125 OCCUPANTS PER WC = .311 MALE
38.9 OCCUPANT LOAD/65 OCCUPANTS PER WC = .598 FEMALE
38.9 OCCUPANT LOAD/200 OCCUPANTS PER LAV =.195 MALE
38.9 OCCUPANT LOAD/200 OCCUPANTS PER LAV =.195 FEMALE
B OCCUPANCY: 791 GSF/150 GSF = 4.27 OCCUPANTS
5.27 OCCUPANTS / 2 = 2.635 OCCUPANT LOAD PER SEX
PER IBC TABLE 2902.1: BUSINESS OCCUPANCY:
MINIMUM REQUIRED PLUMBING FIXTURES:
MALE WC FEMALE WC LAVS
1/25 FOR 1ST 50 1/25 FOR 1ST 50 1/40 FOR 1ST 80
AND 1 PER 50 FOR AND 1 PER 50 FOR AND 1 PER 80 FOR
THE REMAINDER THE REMAINDER THE REMAINDER
EXCEEDING 50 EXCEEDING 50 EXCEEDING 80
B MINIMUM REQUIRED FIXTURES:
2.635 OCCUPANT LOAD/25 OCCUPANTS PER WC = .105 MALE
2.635 OCCUPANT LOAD/25 OCCUPANTS PER WC = .105 FEMALE
2.635 OCCUPANT LOAD/40 OCCUPANTS PER LAV = .066 MALE
2.635 OCCUPANT LOAD/40 OCCUPANTS PER LAV = .066 FEMALE
I-1 OCCUPANCY: 10,330 GSF/120 GSF = 86.083 OCCUPANTS
PER IBC TABLE 2902.1: INSTITUTIONAL OCCUPANCY:
MINIMUM REQUIRED PLUMBING FIXTURES:
MALE WC FEMALE WC LAVS
1/10 1/10 1/10
I-1 MINIMUM REQUIRED FIXTURES:
86.083 OCCUPANT LOAD/10 OCCUPANTS PER WC = 8.608 MALE
86.083 OCCUPANT LOAD/10 OCCUPANTS PER LAV = 8.608 MALE
S-1 OCCUPANCY: 223 GSF/300 GSF = .743 OCCUPANTS
U OCCUPANCY: 235 GSF/300 GSF = .783 OCCUPANTS
(.743 OCCUPANTS + .783 OCCUPANTS) / 2 = .763 OCCUPANT LOAD PER SEX
PER IBC TABLE 2902.1: STORAGE OCCUPANCY:
MINIMUM REQUIRED PLUMBING FIXTURES:
MALE WC FEMALE WC LAVS
1/100 1/100 1/100
S-1/U MINIMUM REQUIRED FIXTURES:
.763 OCCUPANT LOAD/100 OCCUPANTS PER WC = .008 MALE
.763 OCCUPANT LOAD/100 OCCUPANTS PER WC = .008 FEMALE
.763 OCCUPANT LOAD/100 OCCUPANTS PER LAV = .008 MALE
.763 OCCUPANT LOAD/100 OCCUPANTS PER LAV = .008 FEMALE
NOTE:
PER 2902.1.1: TO DETERMINE OCCUPANT LOAD OF EACH SEX, THE TOTAL
OCCUPANT LOAD SHALL BE DIVIDED IN HALF. …. FOR CALCULATIONS
INVOLVING MULTIPLE OCCUPANCIES, SUCH FRACTIONAL NUMBERS FOR
EACH OCCUPANCY SHALL BE FIRST SUMMED AND THEN ROUNDED UP TO
THE NEXT WHOLE NUMBER
BUILDING 8 HAS MEN ONLY IN RESIDENT AREAS
THE MAXIMUM POPULATION OF RESIDENTS IS CURRENTLY
CONTRACTUALLY LIMITED TO LESS THAN 245 FOR THE ENTIRE FACILITY.
THE ACTUAL I-1 OCCUPANCY IS LIMITED BY THE NUMBER OF
RESIDENT ROOMS TO APPROXIMATELY 64 RESIDENTS
ON THIS FLOOR
TOTAL NUMBER OF MALE WC REQUIRED:
A-3 .311 B .105 I-1 8.608 U .008
TOTAL: 9.032= 10 WC
TOTAL NUMBER OF FEMALE WC REQUIRED:
B .105 U .008
TOTAL: .113 = 1 WC
TOTAL NUMBER OF MALE LAVS REQUIRED:
A-3 .195 B .066 I-1 8.608 U .008
TOTAL: 8.877 = 9 LAVS
TOTAL NUMBER OF FEMALE LAVS REQUIRED:
B .066 U .008
TOTAL: .074 = 1 LAV
WC'S PROVIDED (PUBLIC)
WOMEN: 2
MEN: 1 + 1 URINAL
UNISEX 0
WC'S PROVIDED (NON-PUBLIC))
WOMEN: 0
MEN: 5 + 2 URINALS
UNISEX: 2
WC'S PROVIDED (WITHIN SLEEPING ROOMS OR OFFICES)
WOMEN: 0
MEN: 19
UNISEX: 0
LAV'S PROVIDED (PUBLIC):
WOMEN: 1
MEN: 1
UNISEX 0
LAV'S PROVIDED (NON-PUBLIC):
WOMEN: 0
MEN: 8
UNISEX: 2
LAV'S PROVIDED (WITHIN SLEEPING ROOM OR OFFICE)
WOMEN: 0
MEN: 21
UNISEX: 0
SHOWER/TUB REQUIREMENTS I-1 OCCUPANCY:
TOTAL NUMBER OF POTENTIAL RESIDENTS =
I-1 OCCUPANTS 86.083
REQUIRED SHOWER UNITS = 1 SHOWER PER 8 RESIDENTS
86.083/8 = 10.760 = 11 SHOWERS REQUIRED
TOTAL NUMBER OF SHOWER UNITS PROVIDED = 12
PLUMBING FIXTURES REQUIRED:
OCCUPANT LOAD CALCULATION:
BASEMENT:
A-3 OCCUPANCY
B OCCUPANCY (OFFICE AREA):
1,607 GSF/150 GSF = 10.71 OCCUPANTS
10.71 OCCUPANTS / 2 = 5.36 OCCUPANT LOAD PER SEX
PER IBC TABLE 2902.1: BUSINESS OCCUPANCY:
MINIMUM REQUIRED PLUMBING FIXTURES:
MALE WC FEMALE WC LAVS
1/25 FOR 1ST 50 1/25 FOR 1ST 50 1/40 FOR 1ST 80
AND 1 PER 50 FOR AND 1 PER 50 FOR AND 1 PER 80 FOR
THE REMAINDER THE REMAINDER THE REMAINDER
EXCEEDING 50 EXCEEDING 50 EXCEEDING 80
B OCCUPANCY (OFFICE AREA) MINIMUM REQUIRED FIXTURES:
5.36 OCCUPANT LOAD/25 OCCUPANTS PER WC = .214 MALE
5.36 OCCUPANT LOAD/25 OCCUPANTS PER WC = .214 FEMALE
5.36 OCCUPANT LOAD/40 OCCUPANTS PER LAV = .134 MALE
5.36 OCCUPANT LOAD/40 OCCUPANTS PER LAV = .134 FEMALE
B OCCUPANCY (LECTURE HALL AREAS):
5,010 GSF/20 GSF = 250.5 OCCUPANTS
250.5 OCCUPANTS / 2 = 125.25 OCCUPANT LOAD PER SEX
PER IBC TABLE 2902.1: LECTURE HALL OCCUPANCY:
MINIMUM REQUIRED PLUMBING FIXTURES:
MALE WC FEMALE WC LAVS
1/125 1/65 1/200
B (LECTURE HALL AREAS) MINIMUM REQUIRED FIXTURES:
125.25 OCCUPANT LOAD =
(50/25 +75.25/50) OCCUPANTS PER WC = 3.5 MALE
125.25 OCCUPANT LOAD =
(50/25 + 75.25/50) OCCUPANTS PER WC = 3.5 FEMALE
125.25 OCCUPANT LOAD =
(80/40 +45.25/80) OCCUPANTS PER LAV = 2.57 MALE
125.25 OCCUPANT LOAD =
(80/40 +45.25/80) OCCUPANTS PER LAV = 2.57 FEMALE
S-1 OCCUPANCY: 4,092 GSF/300 GSF = 13.64 OCCUPANTS
U OCCUPANCY: 1,489 GSF/300 GSF = 4.96 OCCUPANTS
(13.645 OCCUPANTS + 4.96 OCCUPANTS) / 2 = 9.30 OCCUPANT LOAD PER SEX
PER IBC TABLE 2902.1: STORAGE OCCUPANCY:
MINIMUM REQUIRED PLUMBING FIXTURES:
MALE WC FEMALE WC LAVS
1/100 1/100 1/100
S-1/U MINIMUM REQUIRED FIXTURES:
9.30 OCCUPANT LOAD/100 OCCUPANTS PER WC = .093 MALE
9.30 OCCUPANT LOAD/100 OCCUPANTS PER WC = .093 FEMALE
9.30 OCCUPANT LOAD/100 OCCUPANTS PER LAV = .093 MALE
9.30 OCCUPANT LOAD/100 OCCUPANTS PER LAV = .093 FEMALE
NOTE:
PER 2902.1.1: TO DETERMINE OCCUPANT LOAD OF EACH SEX, THE TOTAL
OCCUPANT LOAD SHALL BE DIVIDED IN HALF. …. FOR CALCULATIONS
INVOLVING MULTIPLE OCCUPANCIES, SUCH FRACTIONAL NUMBERS FOR
EACH OCCUPANCY SHALL BE FIRST SUMMED AND THEN ROUNDED UP TO
THE NEXT WHOLE NUMBER
TOTAL NUMBER OF MALE WC REQUIRED:
B .214
B (LECTURE HALL) 3.50
S-1/U .093
TOTAL: 3.807 = 4 WC
TOTAL NUMBER OF FEMALE WC REQUIRED:
B .214
B (LECTURE HALL) 3.50
S-1/U .093
TOTAL: 3.807 = 4 WC
TOTAL NUMBER OF MALE LAVS REQUIRED:
B .134
B (LECTURE HALL) 2.57
S-1/U .093
TOTAL: 2.797 = 3 LAV
TOTAL NUMBER OF FEMALE LAVS REQUIRED:
B .134
B (LECTURE HALL) 2.57
S-1/U .093
TOTAL: 2.797 = 3 LAV
WC'S PROVIDED (PUBLIC)
WOMEN: 4
MEN: 3 + 1 URINAL
UNISEX 0
LAV'S PROVIDED (PUBLIC)
WOMEN: 3
MEN: 3
UNISEX 0
THE MAXIMUM POPULATION OF RESIDENTS IS CURRENTLY
CONTRACTUALLY LIMITED TO LESS THAN 245 FOR THE ENTIRE FACILITY
TOTAL FLOOR AREA = 16,633 GSF
PLUMBING FIXTURES REQUIRED:
OCCUPANT LOAD CALCULATION:
2ND FLOOR:
A-3 OCCUPANCY: 1,301 NSF/15 NSF = 86.73 OCCUPANTS
86.73 OCCUPANTS / 2 = 43.365 OCCUPANT LOAD PER SEX
PER IBC TABLE 2902.1: ASSEMBLY OCCUPANCY:
MINIMUM REQUIRED PLUMBING FIXTURES:
MALE WC FEMALE WC LAVS
1/125 1/65 1/200
A-3 (READING ROOMS) MINIMUM REQUIRED FIXTURES:
43.365 OCCUPANT LOAD/125 OCCUPANTS PER WC = .311 MALE
43.365 OCCUPANT LOAD/65 OCCUPANTS PER WC = .598 FEMALE
43.365 OCCUPANT LOAD/200 OCCUPANTS PER LAV =.195 MALE
43.365 OCCUPANT LOAD/200 OCCUPANTS PER LAV =.195 FEMALE
B OCCUPANCY: 416 GSF/150 GSF = 2.77 OCCUPANTS
2.77 OCCUPANTS / 2 = 1.385 OCCUPANT LOAD PER SEX
PER IBC TABLE 2902.1: BUSINESS OCCUPANCY:
MINIMUM REQUIRED PLUMBING FIXTURES:
MALE WC FEMALE WC LAVS
1/25 FOR 1ST 50 1/25 FOR 1ST 50 1/40 FOR 1ST 80
AND 1 PER 50 FOR AND 1 PER 50 FOR AND 1 PER 80 FOR
THE REMAINDER THE REMAINDER THE REMAINDER
EXCEEDING 50 EXCEEDING 50 EXCEEDING 80
B MINIMUM REQUIRED FIXTURES:
1.385 OCCUPANT LOAD/25 OCCUPANTS PER WC = .055 MALE
1.385 OCCUPANT LOAD/25 OCCUPANTS PER WC = .055 FEMALE
1.385 OCCUPANT LOAD/40 OCCUPANTS PER LAV = .035 MALE
1.385 OCCUPANT LOAD/40 OCCUPANTS PER LAV = .035 FEMALE
I-1 OCCUPANCY: 10,555 GSF/120 GSF = 87.96 OCCUPANTS
PER IBC TABLE 2902.1: INSTITUTIONAL OCCUPANCY:
MINIMUM REQUIRED PLUMBING FIXTURES:
MALE WC FEMALE WC LAVS
1/10 1/10 1/10
I-1 MINIMUM REQUIRED FIXTURES:
87.96 OCCUPANT LOAD/10 OCCUPANTS PER WC = 8.796 MALE
87.96 OCCUPANT LOAD/10 OCCUPANTS PER LAV = 8.796 MALE
S-1 OCCUPANCY: 395 GSF/300 GSF = 1.317 OCCUPANTS
U OCCUPANCY: 177 GSF/300 GSF = .59 OCCUPANTS
(1.317 OCCUPANTS + .59 OCCUPANTS) / 2 = .954 OCCUPANT LOAD PER SEX
PER IBC TABLE 2902.1: STORAGE OCCUPANCY:
MINIMUM REQUIRED PLUMBING FIXTURES:
MALE WC FEMALE WC LAVS
1/100 1/100 1/100
S-1/U MINIMUM REQUIRED FIXTURES:
.954 OCCUPANT LOAD/100 OCCUPANTS PER WC = .01 MALE
.954 OCCUPANT LOAD/100 OCCUPANTS PER WC = .01 FEMALE
.954 OCCUPANT LOAD/100 OCCUPANTS PER LAV = .01 MALE
.954 OCCUPANT LOAD/100 OCCUPANTS PER LAV = .01 FEMALE
NOTE:
PER 2902.1.1: TO DETERMINE OCCUPANT LOAD OF EACH SEX, THE TOTAL
OCCUPANT LOAD SHALL BE DIVIDED IN HALF. …. FOR CALCULATIONS
INVOLVING MULTIPLE OCCUPANCIES, SUCH FRACTIONAL NUMBERS FOR
EACH OCCUPANCY SHALL BE FIRST SUMMED AND THEN ROUNDED UP TO
THE NEXT WHOLE NUMBER
BUILDING 8 HAS MEN ONLY IN RESIDENT AREAS
THE MAXIMUM POPULATION OF RESIDENTS IS CURRENTLY
CONTRACTUALLY LIMITED TO LESS THAN 245 FOR THE ENTIRE FACILITY.
THE ACTUAL I-1 OCCUPANCY IS LIMITED BY THE NUMBER OF
RESIDENT ROOMS TO APPROXIMATELY 64 RESIDENTS
ON THIS FLOOR
TOTAL NUMBER OF MALE WC REQUIRED:
A-3 .311 B .055 I-1 8.796 S-1/U .01
TOTAL: 9.172 = 10 WC
TOTAL NUMBER OF FEMALE WC REQUIRED:
B .055 S-1/U .01
TOTAL: .065 = 1 WC
TOTAL NUMBER OF MALE LAVS REQUIRED:
A-3 .195 B .035 I-1 8.796 S-1/U .01
TOTAL: 9.439 = 10 LAVS
TOTAL NUMBER OF FEMALE LAVS REQUIRED:
B .055 S-1/U .010
TOTAL: .065 = 1 LAV
WC'S PROVIDED (PUBLIC)
WOMEN: 2
MEN: 1 + 1 URINAL
UNISEX 0
WC'S PROVIDED (NON-PUBLIC))
WOMEN: 0
MEN: 6 + 8 URINALS
UNISEX: 0
WC'S PROVIDED (WITHIN SLEEPING ROOMS OR OFFICES)
WOMEN: 0
MEN: 1
UNISEX: 2
LAV'S PROVIDED (PUBLIC):
WOMEN: 1
MEN: 1
UNISEX 0
LAV'S PROVIDED (NON-PUBLIC):
WOMEN: 0
MEN: 13
UNISEX: 2
LAV'S PROVIDED (WITHIN SLEEPING ROOM OR OFFICE)
WOMEN: 0
MEN: 1
UNISEX: 2
SHOWER/TUB REQUIREMENTS I-1 OCCUPANCY:
TOTAL NUMBER OF POTENTIAL RESIDENTS =
I-1 OCCUPANTS 87.96
REQUIRED SHOWER UNITS = 1 SHOWER PER 8 RESIDENTS
87.96/8 = 10.995 = 11 SHOWERS REQUIRED
TOTAL NUMBER OF SHOWER UNITS PROVIDED = 12
CONSULTANTS
MODEL FILE:
Fort Lyon Bldg 8 Final final LS version 24.pln
DRAWN BY: TAD
COPYRIGHT:
G-004
A
B
C
D
E
/U se rs /ta du ke
/D oc um en ts /A rc hi ca d
Fi le s/ Fo rt Ly on B ld g
Fi na l f in al
L S v er si on
4.
pl n
BASEMENT CODE STUDY
PLAN
Fort Lyon Life Safety Corrections - Building
DATE: OCTOBER 18, 2022
FORT LYON, CO
T.A. DUKE & ASSOCIATES, Inc.
4220 Brigadoon Lane
Colorado Springs, CO 80906 719 648 7722 taduke@earthlink.net
McShea Consulting LLC 4445 Northpark Dr., Suite 200 Colorado Springs, CO 80907
719 358 8208
PROJECT NUMBER: 2021-035M21/HB 1408
4/13/23 ISSUED FOR STATE REVIEW
5/2/23 CODE REVIEW COMMENTS
6/14/23 ISSUED FOR STATE REVIEW
9/21/2023
7/19/23
ISSUED FOR CODE
CONSULTANT REVIEW
8/23/23
ISSUED FOR CODE
CONSULTANT REVIEW
9/12/23
ISSUED FOR CODE
CONSULTANT REVIEW
9/21/23
ISSUED FOR PERMIT
10/3/23
ISSUED FOR PRICING
007A
006 006A
006B
007 007C
007B
002 001B
033A
033 008
001C
001A
008A
010A
013A
014A
024025
032A
023A
022R
015A
009A
030A
021A
020026
002A
018A 019
E G
R E
S S
EGRESS
E G
R E
S S
E G
R E
S S
EGRESS
EGRESS
EGRESS
E G
R E
S S
E G
R E
S S
EGRESSEGRESS
E G
R E
S S
E G
R E
S S
EGRESS
D
IS
TA
N
C E
O F
C O
M M
O N
P
AT
H
D
IS
TA
N
C E
O F
C O
M M
O N
P
AT
H
31' = DISTANCE OF
COMMON PATH
'-6
D
IS
TA
N C
E O
F C
O M
M O
N P
AT
H
'-2
D
IS
TA
N C
E O
F C
O M
M O
N P
AT
H
46' = DISTANCE OF
COMMON PATH
'-1
0"
D
IS
TA
N
C E
O F
C O
M M
O N
P
AT
H
27'-9" = DISTANCE OF
COMMON PATH
CLASSRM
A: 904 sq ft
OFFICE
002A
A: 169 sq ft
CLASSRM
A: 666 sq ft
STORAGE
A: 246 sq ft
OFFICE
A: 222 sq ft
CLASSRM
A: 1,410 sq ft
STORAGE
007A
A: 19 sq ft
STORAGE
007B
A: 196 sq ft
CLASSRM
A: 441 sq ft
CLASSRM
001A A: 856 sq ft
MECHANICAL
A: 495 sq ft
STORAGE
010A
A: 172 sq ft
STORAGE
A: 395 sq ft
STORAGE
A: 180 sq ft
OFFICE
A: 141 sq ft
OFFICE
A: 231 sq ft
STORAGE
013A
A: 123 sq ft
OFFICE
A: 174 sq ft
STORAGE
014A
A: 92 sq ft
OFFICE
A: 140 sq ft
OFFICE
015A
A: 136 sq ft
CLASSRM
A: 733 sq ft
UTILITY
A: 135 sq ft
UTILITY
A: 131 sq ft
RESTRM
018A
A: 201 sq ft
UTILITY
A: 79 sq ft
RESTRM
021A
A: 252 sq ft
STORAGE
A: 131 sq ft
STORAGE
A: 2,386 sq ft
ELECT. RM
023A
A: 78 sq ft
STORAGE
A: 145 sq ft
LAUNDRY
A: 143 sq ft
ELEV. RM
A: 179 sq ft
CORRIDOR
A: 146 sq ft
CORRIDOR
A: 1,287 sq ft
EGRESS STAIR
A: 219 sq ft
EGRESS STAIR
A: 208 sq ft
OFFICE
A: 154 sq ft
UTILITY
001B
A: 72 sq ft
MECHANICAL
A: 138 sq ft
CHASE
A: 25 sq ft
ELECT. RM
A: 71 sq ft
CORRIDOR
A: 361 sq ft
CORRIDOR
A: 832 sq ft
CORRIDOR
A: 239 sq ft
N
SCALE: 1/8" = 1'-0"A1 BASEMENT CODE STUDY PLAN
0 4' 8' 16'
GROUP S-2 OCCUPANCY - LOW
HAZARD STORAGE
GROUP B OCCUPANCY - BUSINESS
GROUP I-1 OCCUPANCY - INSTITUTIONAL;
CONDITION 1
GROUP A-3 OCCUPANCY - ASSEMBLY
UNASSIGNED OCCUPANCY - MECHANICAL/
ELECTRICAL/UTILITY
GROUP A-1 OCCUPANCY - ASSEMBLY
GROUP S-1 OCCUPANCY - MODERATE
STORAGE
PROJECT NAME: FORT LYON LIFE SAFETY IMPROVEMENTS -
BUILDING 8
STATE PROJECT NUMBER: 2021-035M21/HB 1408
LOCATION: FORT LYON, COLORADO
FLOOR AREA: BASEMENT - 16,646 GSF
CONSTRUCTION TYPE: NON CONFORMING TYPE IIB
(SPRINKLERED) NOTE: ALL NEW INTERIOR
CONSTRUCTION WILL MEET OR EXCEED
FIRE RESISTIVE MATERIALS REQUIRED BY
TYPE IIB CONSTRUCTION
ALLOWABLE HEIGHT: B OCCUPANCY: 75'
S-1 OCCUPANCY: 75'
ACTUAL HEIGHT: 44'-6" (AT SOUTH ELEVATION - TO TOP OF
ROOF)
ALLOWABLE STORIES: B OCCUPANCY: 4
(ABOVE GRADE) S-1 OCCUPANCY: 4
ACTUAL STORIES: 2 STORIES ABOVE GRADE ( PLUS ATTIC);
1 STORY BELOW GRADE
ALLOWABLE FLOOR AREA
PER TABLE 506.2: B OCCUPANCY: 69,000 SF
S-1 OCCUPANCY: 52,500 SF
FRONTAGE INCREASE FACTOR: 50-75% OF BUILDING PERIMETER AND
30' OR GREATER OPEN SPACE = .50
ALLOWABLE AREA THIS STORY:
B OCCUPANCY: Aa = 69,000 SF + (23,000 SF X .5) = 80,500 SF S-1 OCCUPANCY: Aa = 52,500 SF + (17,500 SF x .5) = 61,250 SF
MIXED OCCUPANCY FACTOR: 1,607 SF/80,500 SF = .02
5,013 SF/80,500 SF = .06
3,945 SF/61,250 SF = .06
TOTAL = .14 = LESS THAN 1
ACTUAL BUILDING AREA: 49,552 GSF
OCCUPANCY CALCS: BASEMENT:
B OCCUPANCY: 1,607 SF/150 = 10.71
B OCCUPANCY
(CLASSROOM): 5,010 NSF/20 = 250.5
S-1 OCCUPANCY: 3,794 SF/300 = 12.65
MECH/ELECT RM.
OCCUPANCY: 1,489 SF/300 = 4.96
TOTAL FLOOR OCCUPANCY: 278.82 =
EXITS :
(EXITING WIDTH) 279 * .15 = 41.85"
REQUIRED EGRESS CORRIDOR WIDTH: 44"
ACTUAL EGRESS CORRIDOR WIDTH: 9'-0"
(STAIR WIDTH) 279 * .20 = 55.8"
(2) STAIRS PROVIDED : (2) @ 48" WIDTH EACH
NOTE: THE MAXIMUM POPULATION OF RESIDENTS IS CURRENTLY
CONTRACTUALLY LIMITED TO LESS THAN 245 FOR THE ENTIRE FACILITY
GROUP B OCCUPANCY - RESIDENT
TEACHING/TRAINING
LEGEND
OCCUPANCY CALCULATIONS
LEVEL 2 ALTERATIONS:
IEBC COMMENTS
SHOWN AS (1) HR RATED CONSTRUCTION
ON PREVIOUS CONSTRUCTION
DOCUMENTS) - PENETRATIONS HAVE NOT
BEEN VERIFIED FOR (1) HOUR COMPLIANCE
6" CLAY TILE CONSTRUCTION WITH FINSH
ON ONE SIDE (UP TO 1 HOUR FIRE RATING) -
PENETRATIONS HAVE NOT BEEN VERIFIED
FOR (1) HOUR COMPLIANCE
6" CLAY TILE CONSTRUCTION WITH FINSH
BOTH SIDES (UP TO 2 HOUR FIRE RATING) -
PENETRATIONS HAVE NOT BEEN VERIFIED
FOR (2) HOUR COMPLIANCE
8" DOUBLE WYTHE BRICK CONSTRUCTION
WITH FINSH ON ONE SIDE (UP TO 6 HOUR
FIRE RATING) - PENETRATIONS HAVE NOT
BEEN VERIFIED FOR (1) HOUR COMPLIANCE
12 1/2" CLAY TILE CONSTRUCTION WITH
BRICK AT EXTERIOR AND PLASTER AT
INTERIOR (UP TO 6 HOUR FIRE RATING) -
PENETRATIONS HAVE NOT BEEN VERIFIED
FOR (1) HOUR COMPLIANCE
(1) HOUR WALL CONSTRUCTION (NEW WALL
CONSTRUCTION)
2 x 4 WOOD STUD AT 16" OC WITH 5/8"
PLASTER ON METAL LATHE EACH SIDE- (1)
HOUR FIRE RATING - PENETRATIONS HAVE
NOT BEEN VERIFIED FOR (1) HOUR
COMPLIANCE
4" CLAY TILE CONSTRUCTION WITH FINSH
BOTH SIDES (UP TO 1 HOUR 34 MINUTES
FIRE RATING) - PENETRATIONS HAVE NOT
BEEN VERIFIED FOR (1) HOUR COMPLIANCE
SHOWN AS (2) HR RATED CONSTRUCTION
ON PREVIOUS CONSTRUCTION
DOCUMENTS) - PENETRATIONS HAVE NOT
BEEN VERIFIED FOR (2) HOUR COMPLIANCE
PROJECT NAME: FORT LYON LIFE SAFETY IMPROVEMENTS -
BUILDING 8
CONSULTANTS
MODEL FILE:
Fort Lyon Bldg 8 Final final LS version 24.pln
DRAWN BY: TAD
COPYRIGHT:
G-005
A
B
C
D
E
/U se rs /ta du ke
/D oc um en ts /A rc hi ca d
Fi le s/ Fo rt Ly on B ld g
Fi na l f in al
L S v er si on
4.
pl n
1ST CODE STUDY PLAN
Fort Lyon Life Safety Corrections - Building
DATE: OCTOBER 18, 2022
FORT LYON, CO
T.A. DUKE & ASSOCIATES, Inc.
4220 Brigadoon Lane
Colorado Springs, CO 80906 719 648 7722 taduke@earthlink.net
McShea Consulting LLC 4445 Northpark Dr., Suite 200 Colorado Springs, CO 80907
719 358 8208
PROJECT NUMBER: 2021-035M21/HB 1408
4/13/23 ISSUED FOR STATE REVIEW
5/2/23 CODE REVIEW COMMENTS
6/14/23 ISSUED FOR STATE REVIEW
9/21/2023
7/19/23
ISSUED FOR CODE
CONSULTANT REVIEW
8/23/23
ISSUED FOR CODE
CONSULTANT REVIEW
9/12/23
ISSUED FOR CODE
CONSULTANT REVIEW
9/21/23
ISSUED FOR PERMIT
10/3/23
ISSUED FOR PRICING
112A
109A
108A
119A
106 105
105A
123A 124A
124 125
101A
126A 126
128 130
133 134
151 150
140A
141A
155A
164135
132163
115A
111A
110A
154102107R
152R
NOTE: THE DISTANCE FROM THE EXIT TO THE END
OF THE HALL EXCEEDS 50' . THIS CONDITION DOES
NOT MEET CURRENT CODE REQUIREMENTS. IT IS
ANTICIPATED THAT THIS WILL BE ADDRESSED
DURING THE TRAUMA INFORMED DESIGN PROJECT;
DURING PAST RENOVATIONS, THE DEAD END
CORRIDOR HAS BEEN ADDRESSED WITH A RATED
CROSS DOOR/WALL, LIMITING THE DISTANCE TO UNDER 50'.
NOTE: THE DISTANCE FROM THE EXIT TO THE END
OF THE HALL EXCEEDS 50' . THIS CONDITION DOES
NOT MEET CURRENT CODE REQUIREMENTS. IT IS
ANTICIPATED THAT THIS WILL BE ADDRESSED
DURING THE TRAUMA INFORMED DESIGN PROJECT;
DURING PAST RENOVATIONS, THE DEAD END
CORRIDOR HAS BEEN ADDRESSED WITH A RATED
CROSS DOOR/WALL, LIMITING THE DISTANCE TO UNDER 50'.
NOTE: THE DISTANCE FROM THE EXIT TO THE END
OF THE HALL EXCEEDS 50' . THIS CONDITION DOES
NOT MEET CURRENT CODE REQUIREMENTS. IT IS
ANTICIPATED THAT THIS WILL BE ADDRESSED
DURING THE TRAUMA INFORMED DESIGN PROJECT;
DURING PAST RENOVATIONS, THE DEAD END
CORRIDOR HAS BEEN ADDRESSED WITH A RATED
CROSS DOOR/WALL, LIMITING THE DISTANCE TO UNDER 50'.
NOTE: THE DISTANCE FROM THE EXIT TO THE END
OF THE HALL EXCEEDS 50' . THIS CONDITION DOES
NOT MEET CURRENT CODE REQUIREMENTS. IT IS
ANTICIPATED THAT THIS WILL BE ADDRESSED
DURING THE TRAUMA INFORMED DESIGN PROJECT;
DURING PAST RENOVATIONS, THE DEAD END
CORRIDOR HAS BEEN ADDRESSED WITH A RATED
CROSS DOOR/WALL, LIMITING THE DISTANCE TO UNDER 50'.
E G
R E
S S
E G
R E
S S
EGRESSEGRESS
E G
R E
S S
E G
R E
S S
EGRESS
E G
R E
S S
EGRESS
E
G R
E S
S
E G
R E
S S
E G
R E
S S
D
IS
TA
N
C E
O F
C O
M M
O N
P
AT
H
RESTRM
A: 124 sq ft
UTILITY
A: 73 sq ft
UTILITY
A: 25 sq ft
CONFERENCE
A: 319 sq ft
BEDRM
A: 100 sq ft
RESTRM
108A
A: 56 sq ft
BEDRM
A: 108 sq ft
BEDRM
A: 124 sq ft
RESTRM
110A
A: 53 sq ft
BEDRM
A: 203 sq ft
ADA BEDRM
A: 191 sq ft
ADA RESTRM
112A
A: 58 sq ft
BEDRM
A: 126 sq ft
BEDRM
A: 201 sq ft
ADA RESTRM
114A
A: 55 sq ft
ADA BEDRM
A: 105 sq ft
BEDRM
A: 160 sq ft
BEDRM
A: 416 sq ft
RESTRM
A: 275 sq ft
BEDRM
A: 335 sq ft
BEDRM
A: 340 sq ft BEDRM
A: 264 sq ft
BEDRM
A: 278 sq ft
BEDRM
A: 186 sq ft
RESTRM
123A
A: 58 sq ft
BEDRM
A: 124 sq ft
BEDRM
A: 94 sq ft
UTLITY
126A
A: 10 sq ft
UTILITY
A: 39 sq ft
STORAGE
A: 81 sq ft
OFFICE
A: 127 sq ft
DAYRM
A: 848 sq ft
OFFICE
A: 133 sq ft
STORAGE
A: 67 sq ft
BEDRM
A: 178 sq ft
UTILITY
A: 88 sq ft
BEDRM
A: 109 sq ft
BEDRM
A: 276 sq ft
BEDRM
A: 267 sq ft
BEDRM
A: 340 sq ft
BEDRM
A: 336 sq ft
CHASE
140A
A: 37 sq ft
RESTRM
A: 335 sq ft
RESTRM
A: 240 sq ft
BEDRM
A: 159 sq ft
BEDRM
A: 309 sq ft
BEDRM
A: 202 sq ft
BEDRM
A: 442 sq ft
BEDRM
A: 202 sq ft
BEDRM
A: 309 sq ft
STORAGE
A: 36 sq ft
STORAGE
A: 34 sq ft
BEDRM
A: 223 sq ft
RESTRM
A: 144 sq ft
OFFICE
A: 200 sq ft
RESTRM
155A
A: 57 sq ft
CORRIDOR
107N
A: 340 sq ft
CORRIDOR
102E
A: 971 sq ft
CORRIDOR
118S
A: 218 sq ft
CORRIDOR
A: 638 sq ft
CORRIDOR
126A
A: 1,125 sq ft
CORRIDOR
136S
A: 228 sq ft
CORRIDOR
144N
A: 316 sq ft
EGRESS STAIR
S1A
A: 209 sq ft
EGRESS STAIR
A: 202 sq ft
RESTRM
A: 47 sq ft
RESTRM
105A
A: 39 sq ft
BEDRM
A:…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .