Appendix C - Final Lead and Asbestos Survey.pdf
PDF 4 MB Posted
- Attached to
- Design/Build Construction for Recapitalize Central Steam Distribution System at USCG Academy, New London, CT
- Solicitation number
- 70Z04724RPCNI0009
About this file
This document is a hazardous materials survey report for the Central Steam Distribution System Recapitalization project at the U.S. Coast Guard Academy in New London, Connecticut. The survey was conducted by Tetra Tech, Inc. to identify the presence, quantity, and locations of asbestos-containing materials (ACM), lead-containing paint (LCP), and hazardous waste (HW) that may require abatement or special handling prior to renovation activities.
The report identifies ACM in various materials including black tar coat, pipe elbows/fittings, pipe insulation, floor debris, and pipe fittings located throughout the mechanical rooms and tunnels. The quantity and condition of the ACM is detailed. The report also documents the screening and results for LCP, which was found in multiple painted surfaces throughout the facility. Additionally, the report lists various HW and other hazardous materials observed, such as fluorescent bulbs and chemical containers, that require proper disposal or recycling. The survey findings and recommendations are provided to guide the contractor selected for the design/build construction project to recapitalize the central steam distribution system.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Hazardous Materials Survey Central Steam Distribution System Recapitalization U.S. Coast Guard Academy 31 Mohegan Avenue New London, Connecticut 06320
September 23, 2024
PRESENTED TO PRESENTED BY
United States Coast Guard 5505 Robin Hood Road, Suite K Norfolk, Virginia 23513
(757) 852-3415
Tetra Tech, Inc.
415 Oak Street Kansas City, Missouri 64106
(816) 412-1741
Edward C. Sherry Connecticut Licensed Asbestos Inspector License No. 000407
Jeffrey Mitchell Vice President / Operations Manager
Central Steam Distribution System Recapitalization Project i U.S. Coast Guard Academy New London, CT
103IG9582
EXECUTIVE SUMMARY
The United States Coast Guard (USCG) tasked Tetra Tech, Inc. (Tetra Tech) to conduct a hazardous materials survey at the USCG Academy at 31 Mohegan Avenue in New London, Connecticut (the subject property) for the Central Steam Distribution System Recapitalization project. The primary purpose of the survey was to assess effects of possibly present asbestos, lead-containing paint (LCP), hazardous waste
(HW), and other hazardous materials on the subject property. Per guidance from USCG, the scope of the survey focused on piping in the steam and condensate distribution system and three mechanical rooms for presence of asbestos-containing materials (ACM), LCP, and other HW.
The following ACM, LCP, and HW findings and recommendations are based on observations during the survey and analytical results from samples collected at the subject property building:
Asbestos-Containing Material
• ACM was identified within the subject property building in black tar coat (approximately 400 square feet [SF]) on the walls in Michel Mechanical Room. The tar coat was represented by samples
USCG-M-BTC-01 and -0.2. Laboratory results indicated that the tar coat contained 10 percent chrysotile asbestos.
• ACM was identified within the subject property building in pipe elbows/fittings (approximately
75 fittings) in the Hamilton Hall Basement. The fittings were represented by samples USCG-7-PE-
01, -02, and -03. Laboratory results indicated that the fittings contained 2% amosite asbestos and up to 10% chrysotile asbestos.
• ACM was identified within the subject property building in pipe insulation (approximately 90 linear feet [LF]) in the Hamilton Hall Basement). The insulation was represented by samples
USCG-7-PI-01, -02, -03, -04, -05, and -06. Laboratory results indicated that the insulation contained
30% chrysotile asbestos, 15% amosite asbestos, and 1% crocidolite asbestos.
• ACM was identified within the subject property building in floor debris (approximately 1,400 SF) in the tunnel from McAllister Hall to Michel Hall. The debris was represented by samples USCG-7A-
DB-01, -02, -03, -04, -05, and -06. Laboratory results indicated that the debris contained up to 20% chrysotile asbestos and 10% amosite asbestos.
• ACM was identified within the subject property building in pipe insulation (approximately 410 LF) in the tunnel from McAllister Hall to Michel Hall (the two lower pipe runs). The insulation was represented by samples USCG-7A-PI-01 through -27. Laboratory results indicated that the insulation contained up to 60% chrysotile asbestos and 10% amosite asbestos.
• ACM was identified within the subject property building in pipe fittings (approximately 60 fittings) in the tunnel from McAllister Hall to Michel Hall. The fittings were represented by samples USCG-7A-ii U.S. Coast Guard Academy
103IG9582
PF-01 through -08. Laboratory results indicated that the fittings contained 15% chrysotile asbestos.
• ACM was identified within the subject property building in pipe fittings (6- to 8-inch diameter) (two fittings) in the Chase B Hall Crawl Space. The fittings were represented by samples USCG-10C-
PF-01 and -02. Laboratory results indicated that the fittings contained 20% chrysotile asbestos.
• ACM was identified within the subject property building in pipe fittings (1-inch diameter) (two fittings) in the Chase B Hall Crawl Space. The fittings were represented by samples
USCG-10C-PF2-01, -02, and -03. Laboratory results indicated that the fittings contained
60% chrysotile asbestos.
• ACM was identified within the subject property building in pipe insulation (approximately 32 LF) in
Tunnel 2C-2D. The insulation was represented by samples USCG-2C2D-PI-01, -02, and -03.
Laboratory results indicated that the fittings contained up to 15% chrysotile asbestos and
10% amosite asbestos.
• ACM was identified within the subject property building in pipe insulation (two pipes approximately
250 LF each) in Tunnel 5A-5B. The insulation was represented by samples
USCG-5A5B-PI-01, -through -18. Laboratory results indicated that the insulation contained up to
15% chrysotile asbestos and up to 20% amosite asbestos.
• ACM was identified within the subject property building in one pipe fitting in Section Bypass 2. The fitting was represented by sample USCG-S2B-PF2-01. Laboratory results indicated that the fitting contained 10% chrysotile asbestos.
• ACM was identified within the subject property building in floor debris (approximately 300 SF) in
Section Bypass 2. The debris was represented by sample USCG-S2B-DB-01. Laboratory results indicated that the debris contained 15% chrysotile asbestos.
• Approximately 20 LF of corrugated pipe insulation and 20 SF of ACM pipe debris were observed behind a locked cage with asbestos signage in Tunnel 7. This area was inaccessible for sampling and therefore this material is assumed ACM.
• Approximately 560 LF of fiberglass pipe insulation in Tunnel 7A from McAllister Hall to Michel Hall was observed as contaminated with ACM dust.
Materials containing asbestos should be removed by a licensed asbestos abatement contractor before any renovation work disturbs the materials. Damaged friable materials should be repaired or removed before further damage can occur. The removed waste must be transported to a disposal site able to accept friable and nonfriable ACM. If the subject property is to be renovated and the nonfriable materials are not to be disturbed, these materials may remain in place.
iii U.S. Coast Guard Academy
103IG9582
Lead-Containing Paint
X-ray fluorescence (XRF) readings from suspected LCP on surfaces indicated reportable lead concentrations of 0. 1 milligram per square centimeter (mg/cm2) or greater throughout the subject property.
The Occupational Safety and Health Administration (OSHA) considers LCP as paint with any detectable lead level. If LCP surfaces are to be affected during renovations, the contractor conducting the renovations must comply with OSHA Lead in Construction Standard, Title 29 of Code of Federal Regulations (CFR), Part 1926.62. If the materials containing LCP are removed during renovation activities, a sample should be collected from the debris pile for a toxicity characteristic leaching procedure analysis (40 CFR 261.24);
representative samples should be collected and analyzed for all eight metals specified in 40 CFR
Part 261.24 (arsenic, barium, cadmium, chromium, lead, mercury, selenium, and silver). This would allow determination of the proper method of disposal of the LCP materials.
HW and Other Hazardous Materials
Tetra Tech observed the following hazardous materials:
• 24 4-foot fluorescent bulbs in Billard Mechanical Room
• Four 4-foot fluorescent bulbs in Michel Hall Mechanical Room
• Four 4-foot fluorescent bulbs in Tunnel 10
• 10 4-foot fluorescent bulbs in Tunnel 9
• 60 4-foot fluorescent bulbs in Tunnel 7
• Two 5-gallon buckets of spill-kit chemical solution in Tunnel 7
• Two 55-gallon drums of sorbent waste in Tunnel 7
• One 5-gallon container of spent aerosol cans in Tunnel 7.
Tetra Tech recommends proper disposal or recycling of hazardous waste and other hazardous materials recorded. This disposal or recycling should occur prior to renovation of the subject property, based on characteristics of those materials.
iv U.S. Coast Guard Academy
103IG9582
TABLE OF CONTENTS
1.0 INTRODUCTION
2.0 SUBJECT PROPERTY STRUCTURE
3.0 ASBESTOS-CONTAINING MATERIAL FIELD SURVEY AND ANALYTICAL PROTOCOLS
4.0 LEAD-CONTAINING PAINT SCREENING AND ANALYTICAL PROTOCOLS
5.0 ASBESTOS-CONTAINING MATERIAL FINDINGS
6.0 LEAD-CONTAINING PAINT FINDINGS
7.0 HW AND OTHER HAZARDOUS MATERIALS
8.0 CONCLUSIONS AND RECOMMENDATIONS
8.1 ASBESTOS-CONTAINING MATERIAL
8.2 LEAD-CONTAINING PAINT
8.3 HW and Other Hazardous Materials
9.0 ASSUMPTIONS AND DEVIATIONS
10.0 REFERENCES
APPENDICES
Appendix A Photolog Appendix B Inspector Certifications Appendix C Figures
Appendix D ACM Analytical Results and Chain-of-Custody Forms
TABLES
Table 1 Summary of Suspect ACM Laboratory Analysis
Table 2 Summary of LCP Screening Locations
Central Steam Distribution System Recapitalization
1 U.S. Coast Guard Academy
103IG9582
1.0 INTRODUCTION
The United States Coast Guard (USCG) tasked Tetra Tech, Inc. (Tetra Tech) to conduct a hazardous materials survey at the USCG Academy at 31 Mohegan Avenue in New London, Connecticut (the subject property) for the Central Steam Distribution System Recapitalization project. The primary purpose of the survey was to assess effects of possibly present asbestos, lead-containing paint (LCP), hazardous waste
(HW), and other hazardous materials on the subject property. Per guidance from USCG, the scope of the survey focused on piping in the steam and condensate distribution system and three mechanical rooms for presence of asbestos-containing materials (ACM), LCP, and HW. Appendix A contains a photolog of observations during the survey.
Tetra Tech’s Project Manager for the survey team was Mr. Jeffrey Mitchell, a certified asbestos inspector.
The survey team also included Mr. Edward Sherry, a licensed Connecticut asbestos inspector, and Mr.
Greg Screws, an U.S. Environmental Protection Agency (EPA)-certified lead inspector. Inspector certifications are in Appendix B. Because of limitations on destructive sampling methods, additional suspect materials may be present within walls, voids, or other concealed areas. Assumptions and deviations regarding the subject property survey are conveyed in Section 9.0. Before renovation of the subject property building, further survey work may be needed to comply with all local, state, and federal requirements regulating ACM, LCP, and HW.
Tetra Tech conducted the hazardous materials survey during August 19 through 22, 2024. The purpose of the survey was to evaluate the subject property for presence, quantity, locations, and characterization of
ACM that may require abatement before renovation activities in accordance with National Emissions
Standards for Hazardous Air Pollutants (NESHAP) regulations as adopted by EPA. The intent of the asbestos NESHAP regulations is to protect the public (and workers) by minimizing release of asbestos fibers during activities involving processing, handling, and disposal of ACM. Inhalation of asbestos fibers can cause cancer and other lung diseases (Agency for Toxic Substances and Disease Registry 2016). The survey accorded with industry standard practice for hazardous materials surveys. Asbestos sampling accorded with NESHAP regulations as adopted by EPA.
Tetra Tech also conducted a screening for presence, quantity, and locations of LCP exceeding lead hazard levels, which would require Occupational Safety and Health Administration (OSHA) worker safety precautions during remodeling activities. The subject property building was constructed before 1978, and
LCP likely was used in the build-out of this structure. The LCP screening proceeded according to protocols similar to the single-family housing inspection procedures in U.S. Department of Housing and Urban
Development (HUD) guidelines (HUD 2012). Tetra Tech screened paint-covered surfaces using an Viken
Heuresis Pb200e (Viken Heuresis) X-ray fluorescence (XRF) spectrometer. The Viken Heuresis is an XRF spectrum analyzing system for quantitative measurement of lead in paint on various substrates.
2 U.S. Coast Guard Academy
103IG9582
Tetra Tech prepared this report in accordance with generally accepted industrial hygiene practice and procedures, the project scope of work, and the terms and conditions in the project agreement. In addition, preparation of this report accorded with guidelines established at the time of the work, including those of the Connecticut Department of Public Health, the American Industrial Hygiene Association, and EPA, among others. This report does not cover or comment on structural areas not assessed either visibly or by sample collection. The data evaluation and assessment stated herein constitute a professional opinion; no other warranty is expressed or implied.
Tetra Tech provided these services consistent with the level and skill ordinarily exercised by members of the profession currently practicing under similar conditions. This statement is in lieu of other statements either expressed or implied. The scope of services performed in execution of this evaluation may not be appropriate to satisfy the needs of other users, and use or re-use of this document, findings, conclusions, or recommendations is at the risk of said user. This report does not warrant against future operations or conditions that could affect its recommendations. Moreover, because of some limitations on destructive sampling during the survey, completion of the survey does not guarantee identification of all ACM or LCP— hazardous materials may be present in voids of walls or ceilings.
Section 2.0 of this report describes the subject property structure. Section 3.0 specifies field and analytical protocols for the asbestos survey. Section 4.0 presents the screening and analytical protocols for the LCP inspection. Section 5.0 presents asbestos findings. Section 6.0 presents LCP findings. Section 7.0 presents hazardous waste (HW) and other hazardous materials findings. Section 8.0 specifies conclusions and offers recommendations. Section 9.0 conveys assumptions and deviations regarding the subject property building surveyed. Section 10.0 lists sources referenced during development of this report.
3 U.S. Coast Guard Academy
2.0 SUBJECT PROPERTY STRUCTURE
The subject property is a campus hosting several structures at USCG Academy in New London, Connecticut. The survey focused on three mechanical rooms and steam and condensate system sections and tunnels. Brief discussions of these areas are as follows:
• Chase Building Mechanical Room 7B: The Chase Building Mechanical Room 7B was built around
1960 and encompasses approximately 1,000 square feet (SF). The room is finished with a concrete slab floor, cinder block and concrete walls, and a concrete ceiling. Piping consists of fiberglass pipe insulation with tan and white sealant applications.
• Billards Mechanical Room: The Billards Mechanical Room was built around 1930 and encompasses approximately 1,100 SF. The room is finished with a concrete slab floor. Walls are textured plaster or concrete. The ceiling is concrete. Piping consists of fiberglass pipe insulation with white sealant applications.
• Michel Hall Mechanical Room: The Michel Hall Mechanical Room was built around 1940 and encompasses approximately 1,200 SF. The room is finished with a concrete slab floor. Walls consist of cinder block, concrete masonry unit, and concrete. Piping consists of fiberglass pipe insulation.
• Steam Condensate Sections and tunnels consist of a concrete slab floor. Wall composition varies among concrete masonry unit, cinder block, brick and mortar, textured and untextured drywall, and wood. Ceiling composition varies among textured and untextured plaster and concrete. Steam and condensate piping consists of fiberglass pipe insulation, mineral wool pipe insulation, corrugated pipe insulation, and pipe fitting joint insulation.
4 U.S. Coast Guard Academy
103IG9582
3.0 ASBESTOS-CONTAINING MATERIAL FIELD SURVEY AND
ANALYTICAL PROTOCOLS
Tetra Tech made every effort to inspect all areas of the subject property building for ACM. Minor demolition of materials (destructive sampling) was required during the survey effort. The inspector took care to ensure that the subject property remained unoccupied during sample collection. Asbestos sampling accorded with
NESHAP as adopted by EPA and with protocols of the Asbestos Hazard Emergency Response Act
(AHERA) of 1986. AHERA defines ACM as any material or product that contains more than 1 percent asbestos. Suspected ACMs were grouped as homogeneous areas if similar in appearance and texture;
however, if the inspector decided that a material (for example, wall texturing) was not similar in appearance and texture to other materials in the subject property building, the inspector distinguished the material as unique and collected samples of each unique material accordingly. Because of limitations on destructive sampling methods, additional suspect materials not detected may be present in walls, voids, or other concealed areas. Assumptions and deviations regarding the building surveyed are conveyed in Section 9.0.
Each bulk sample of suspected ACM was collected in a manner ensuring representation of each distinct layer of material in the sample. A wetting agent was applied to friable surfaces before sample collection to reduce potential for fiber release. All samples collected were placed in plastic bags, labeled, and sealed immediately upon collection. To avoid cross-contamination between samples, the sampling instruments were wiped clean by use of a wet, lint-free cloth after collection of each sample. A unique sample identification number was assigned to each sample.
The samples remained in the inspector’s custody until sent to the laboratory. Upon completion of sampling activities, the bulk samples were sent, along with Tetra Tech’s chain-of-custody documentation, to Eurofins
EPK Built Environmental Testing, LLC (EPK) in Mount Laurel, New Jersey. Suspect ACM samples were analyzed per EPA Method 600/R-93/116 by EPK via polarized light microscopy (PLM) analysis. EPK is a
National Voluntary Laboratory Accreditation Program-certified laboratory, certification number 101165-0.
Section 5.0 summarizes ACM analytical results. Sample locations are shown on Figures 3 and 4 in
Appendix C. Appendix D provides ACM analytical results and chain-of-custody forms for bulk samples.
5 U.S. Coast Guard Academy
103IG9582
4.0 LEAD-CONTAINING PAINT SCREENING AND ANALYTICAL
PROTOCOLS
Tetra Tech made every effort to inspect all areas of the subject property. HUD (2012) guidelines suggest that paint applied before 1978 could contain lead.
An XRF screening of suspected LCP accorded with protocols similar to the single-family housing inspection procedures in the HUD (2012) guidelines. Tetra Tech used a Viken Heuresis to perform the LCP screening.
The Viken Heuresis is an XRF spectrum analyzing system for quantitative measurement of lead in paint on various substrates. Tetra Tech performed XRF screening of suspect painted surfaces that possibly would be affected during renovation activities.
Tetra Tech used the XRF “Lead Paint Mode” for testing, standardized per the equipment instruction manual, and programmed the unit with an action level of 1.0 milligram per square centimeter (mg/cm2). The Viken
Heuresis automatically adjusts the measurement time to be the least time needed to make a definitive measurement based on the action level. Paint containing greater than or equal to 1.0 mg/cm2 lead by XRF screening is considered lead-based paint. Paint with a detectable concentration of lead containing less than
1.0 mg/cm2 lead by XRF screening is considered LCP.
Tetra Tech performed XRF calibration checks on the Viken Heuresis generally according with Viken’s recommended protocol. These quality control readings were used to monitor performance of the Viken
Heuresis. The calibration-check readings were taken from a standard reference material paint film developed by the National Institute of Standards and Technology, and were within the acceptable deviation range for each standard. Section 6.0 summarizes results from XRF screening of samples of painted surfaces collected at the subject property.
6 U.S. Coast Guard Academy
103IG9582
5.0 ASBESTOS-CONTAINING MATERIAL FINDINGS
The laboratory report in Appendix D presents the PLM results from samples of suspect ACM collected at the subject property building. Based on analytical results, ACM was identified within the areas inspected and sampled in the subject property building. Table 1 summarizes results of laboratory analysis of the suspect ACM.
7 U.S. Coast Guard Academy
TABLE 1
SUMMARY OF SUSPECT ACM LABORATORY ANALYSIS
31 MOHEGAN AVENUE, NEW LONDON, CONNECTICUT
Figure Key Sample ID Material Description Material Locations
PLM-Analytical Result
(%ACM1) 2
Quantity Condition3
1 USCG-M-PECM-
01 White pipe end cap mud Michel Mechanical Room ND NA NA
2 USCG-M-PECM-
02 White pipe end cap mud Michel Mechanical Room ND NA NA
3 USCG-M-PECM-
03 White pipe end cap mud Michel Mechanical Room ND NA NA
4 USCG-M-
FGPW-01
Silver/black foil wrap around fiberglass pipe Michel Mechanical Room ND NA NA
5 USCG-M-
FGPW-02
Silver/black foil wrap around fiberglass pipe Michel Mechanical Room ND NA NA
6 USCG-M-
FGPW-03
Silver/black foil wrap around fiberglass pipe Michel Mechanical Room ND NA NA
7 USCG-M-
FGPW-04
Silver/black foil wrap around fiberglass pipe Michel Mechanical Room ND NA NA
8 USCG-M-
FGPW-05
Silver/black foil wrap around fiberglass pipe Michel Mechanical Room ND NA NA
9 USCG-M-
FGPW-06
Silver/black foil wrap around fiberglass pipe Michel Mechanical Room ND NA NA
10 USCG-M-
FGPW-07
Silver/black foil wrap around fiberglass pipe Michel Mechanical Room ND NA NA
11 USCG-M-
FGPW-08
Silver/black foil wrap around fiberglass pipe Michel Mechanical Room ND NA NA
12 USCG-M-
FGPW-09
Silver/black foil wrap around fiberglass pipe Michel Mechanical Room ND NA NA
13 USCG-M-
FGPW-10
Silver/black foil wrap around fiberglass pipe Michel Mechanical Room ND NA NA
TABLE 1 (Continued)
8 U.S. Coast Guard Academy New London, CT
103IG9582
Figure Key Sample ID Material Description Material Locations
PLM-Analytical Result
(%ACM1) 2
Quantity Condition3
14 USCG-M-
FGPW-11
Silver/black foil wrap around fiberglass pipe Michel Mechanical Room ND NA NA
15 USCG-M-
FGPW-12
Silver/black foil wrap around fiberglass pipe Michel Mechanical Room ND NA NA
16 USCG-M-
FGPW-13
Silver/black foil wrap around fiberglass pipe Michel Mechanical Room ND NA NA
17 USCG-M-
FGPW-14
Silver/black foil wrap around fiberglass pipe Michel Mechanical Room ND NA NA
18 USCG-M-
FGPW-15
Silver/black foil wrap around fiberglass pipe Michel Mechanical Room ND NA NA
19 USCG-M-
FGPW-16
Silver/black foil wrap around fiberglass pipe Michel Mechanical Room ND NA NA
20 USCG-M-
FGPW-17
Silver/black foil wrap around fiberglass pipe Michel Mechanical Room ND NA NA
21 USCG-M-
FGPW-18
Silver/black foil wrap around fiberglass pipe Michel Mechanical Room ND NA NA
22 USCG-M-
FGPW-19
Silver/black foil wrap around fiberglass pipe Michel Mechanical Room ND NA NA
23 USCG-M-
FGPW-20
Silver/black foil wrap around fiberglass pipe Michel Mechanical Room ND NA NA
24 USCG-M-
FGPW-21
Silver/black foil wrap around fiberglass pipe Michel Mechanical Room ND NA NA
25 USCG-M-
FGPW-22
Silver/black foil wrap around fiberglass pipe Michel Mechanical Room ND NA NA
26 USCG-M-
FGPW-23
Silver/black foil wrap around
9 U.S. Coast Guard Academy New London, CT
103IG9582
Figure Key Sample ID Material Description Material Locations
PLM-Analytical Result
(%ACM1) 2
Quantity Condition3
27 USCG-M-
FGPW-24
Silver/black foil wrap around fiberglass pipe Michel Mechanical Room ND NA NA
28 USCG-M-
FGPW-25
Silver/black foil wrap around fiberglass pipe Michel Mechanical Room ND NA NA
29 USCG-M-MPW-
Tan mesh pipe wrap around fiberglass pipe Michel Mechanical Room ND NA NA
30 USCG-M-MPW-
Tan mesh pipe wrap around fiberglass pipe Michel Mechanical Room ND NA NA
31 USCG-M-MPW-
Tan mesh pipe wrap around fiberglass pipe Michel Mechanical Room ND NA NA
32 USCG-M-MPW-
Tan mesh pipe wrap around fiberglass pipe Michel Mechanical Room ND NA NA
33 USCG-M-MPW-
Tan mesh pipe wrap around fiberglass pipe Michel Mechanical Room ND NA NA
34 USCG-M-MPW-
Tan mesh pipe wrap around fiberglass pipe Michel Mechanical Room ND NA NA
35 USCG-M-MPW-
Tan mesh pipe wrap around fiberglass pipe Michel Mechanical Room ND NA NA
36 USCG-M-MPW-
Tan mesh pipe wrap around fiberglass pipe Michel Mechanical Room ND NA NA
37 USCG-M-MPW-
Tan mesh pipe wrap around fiberglass pipe Michel Mechanical Room ND NA NA
38 USCG-M-MPW-
Tan mesh pipe wrap around fiberglass pipe Michel Mechanical Room ND NA NA
39 USCG-M-MPW-
Tan mesh pipe wrap around
10 U.S. Coast Guard Academy New London, CT
103IG9582
Figure Key Sample ID Material Description Material Locations
PLM-Analytical Result
(%ACM1) 2
Quantity Condition3
40 USCG-M-MPW-
Tan mesh pipe wrap around fiberglass pipe Michel Mechanical Room ND NA NA
41 USCG-M-MPW-
Tan mesh pipe wrap around fiberglass pipe Michel Mechanical Room ND NA NA
42 USCG-M-MPW-
Tan mesh pipe wrap around fiberglass pipe Michel Mechanical Room ND NA NA
43 USCG-M-MPW-
Tan mesh pipe wrap around fiberglass pipe Michel Mechanical Room ND NA NA
44 USCG-M-MPW-
Tan mesh pipe wrap around fiberglass pipe Michel Mechanical Room ND NA NA
45 USCG-M-MPW-
Tan mesh pipe wrap around fiberglass pipe Michel Mechanical Room ND NA NA
46 USCG-M-MPW-
Tan mesh pipe wrap around fiberglass pipe Michel Mechanical Room ND NA NA
47 USCG-M-MPW-
Tan mesh pipe wrap around fiberglass pipe Michel Mechanical Room ND NA NA
48 USCG-M-MPW-
Tan mesh pipe wrap around fiberglass pipe Michel Mechanical Room ND NA NA
49 USCG-M-MPW-
Tan mesh pipe wrap around fiberglass pipe Michel Mechanical Room ND NA NA
50 USCG-M-MPW-
Tan mesh pipe wrap around fiberglass pipe Michel Mechanical Room ND NA NA
51 USCG-M-MPW-
Tan mesh pipe wrap around fiberglass pipe Michel Mechanical Room ND NA NA
52 USCG-M-MPW-
Tan mesh pipe wrap around
11 U.S. Coast Guard Academy New London, CT
103IG9582
Figure Key Sample ID Material Description Material Locations
PLM-Analytical Result
(%ACM1) 2
Quantity Condition3
53 USCG-M-BTC-
01 Black Tar Coat On walls in Michel
Mechanical Room 10% Chrysotile 400 SF Minor
Damage
54 USCG-M-BTC-
02 Black Tar Coat On walls in Michel Mechanical Room 10% Chrysotile
55 USCG-C-PECM-
01 Pipe End Cap Mud Chase B Mechanical Room ND NA NA
56 USCG-C-PECM-
02 Pipe End Cap Mud Chase B Mechanical Room ND NA NA
57 USCG-C-PECM-
03 Pipe End Cap Mud Chase B Mechanical Room ND NA NA
58 USCG-C-T-01 Tar Coat Around Pipe in Chase B Mechanical Room ND NA NA
59 USCG-C-T-02 Tar Coat Around Pipe in Chase B Mechanical Room ND NA NA
60 USCG-B-PECM-
01 Pipe End Cap Mud Billard Mechanical Room ND NA NA
61 USCG-B-PECM-
02 Pipe End Cap Mud Billard Mechanical Room ND NA NA
62 USCG-B-PECM-
03 Pipe End Cap Mud Billard Mechanical Room ND NA NA
63 USCG-B-WTX-
01 Wall Texture (comb) Billard Mechanical Room Walls ND NA NA
64 USCG-B-WTX-
02 Wall Texture (comb) Billard Mechanical Room Walls ND NA NA
65 USCG-B-WTX-
03 Wall Texture (comb) Billard Mechanical Room Walls ND NA NA
12 U.S. Coast Guard Academy New London, CT
103IG9582
Figure Key Sample ID Material Description Material Locations
PLM-Analytical Result
(%ACM1) 2
Quantity Condition3
66 USCG-B-WTX-
04 Wall Texture (comb) Billard Mechanical Room Walls ND NA NA
67 USCG-B-WTX-
05 Wall Texture (comb) Billard Mechanical Room Walls ND NA NA
68 USCG-B-WTX-
06 Wall Texture (comb) Billard Mechanical Room Walls ND NA NA
69 USCG-B-WTX-
07 Wall Texture (comb) Billard Mechanical Room Walls ND NA NA
70 USCG-B-WTX-
08 Wall Texture (comb) Billard Mechanical Room Walls ND NA NA
71 USCG-B-WTX-
09 Wall Texture (comb) Billard Mechanical Room Walls ND NA NA
72 USCG-B-PL-01 Plaster Billard Mechanical Room Walls ND NA NA 73 USCG-B-PL-02 Plaster Billard Mechanical Room Walls ND NA NA 74 USCG-B-PL-03 Plaster Billard Mechanical Room Walls ND NA NA 75 USCG-B-PL-04 Plaster Billard Mechanical Room Walls ND NA NA 76 USCG-B-PL-05 Plaster Billard Mechanical Room Walls ND NA NA 77 USCG-B-PL-06 Plaster Billard Mechanical Room Walls ND NA NA 78 USCG-B-PL-07 Plaster Billard Mechanical Room Walls ND NA NA 79 USCG-B-PL-08 Plaster Billard Mechanical Room Walls ND NA NA 80 USCG-B-PL-09 Plaster Billard Mechanical Room Walls ND NA NA
81 USCG-10-BM-01 Brick Mortar Tunnel from Hamilton Hall to Chase Hall ND NA NA
13 U.S. Coast Guard Academy New London, CT
103IG9582
Figure Key Sample ID Material Description Material Locations
PLM-Analytical Result
(%ACM1) 2
Quantity Condition3
82 USCG-10-BM-02 Brick Mortar Tunnel from Hamilton Hall to Chase Hall ND NA NA
83 USCG-10-BM-03 Brick Mortar Tunnel from Hamilton Hall to Chase Hall ND NA NA
84 USCG-10-PL-01 Plaster On Ceiling of Tunnel from Hamilton Hall to Chase Hall ND NA NA
85 USCG-10-PL-02 Plaster On Ceiling of Tunnel from Hamilton Hall to Chase Hall ND NA NA
86 USCG-10-PL-03 Plaster On Ceiling of Tunnel from Hamilton Hall to Chase Hall ND NA NA
87 USCG-10-PL-04 Plaster On Ceiling of Tunnel from Hamilton Hall to Chase Hall ND NA NA
88 USCG-10-PL-05 Plaster On Ceiling of Tunnel from Hamilton Hall to Chase Hall ND NA NA
89 USCG-9-PL-01 Plaster On Ceiling of Tunnel from Hamilton Hall to Satterlee Hall ND NA NA
90 USCG-9-PL-02 Plaster On Ceiling of Tunnel from Hamilton Hall to Satterlee Hall ND NA NA
91 USCG-9-PL-03 Plaster On Ceiling of Tunnel from Hamilton Hall to Satterlee Hall ND NA NA
92 USCG-9-PL-04 Plaster On Ceiling of Tunnel from Hamilton Hall to Satterlee Hall ND NA NA
93 USCG-9-PL-05 Plaster On Ceiling of Tunnel from Hamilton Hall to Satterlee Hall ND NA NA
94 USCG-9-BM-01 Brick Mortar Walls of Tunnel from Hamilton Hall to Satterlee Hall ND NA NA
14 U.S. Coast Guard Academy New London, CT
103IG9582
Figure Key Sample ID Material Description Material Locations
PLM-Analytical Result
(%ACM1) 2
Quantity Condition3
95 USCG-9-BM-02 Brick Mortar Walls of Tunnel from Hamilton Hall to Satterlee Hall ND NA NA
96 USCG-9-BM-03 Brick Mortar Walls of Tunnel from Hamilton Hall to Satterlee Hall ND NA NA
97 USCG-7-PE-01 Pipe Elbow/Fittings Hamilton Hall Basement 2% Amosite
Fittings
High Damage
98 USCG-7-PE-02 Pipe Elbow/Fittings Hamilton Hall Basement ND
99 USCG-7-PE-03 Pipe Elbow/Fittings Hamilton Hall Basement 10% Chrysotile 2% Amosite
100 USCG-7-PI-01 Pipe Insulation Hamilton Hall Basement
30% Chrysotile 15% Amosite
1% Crocidolite 90 LF High
Damage
101 USCG-7-PI-02 Pipe Insulation Hamilton Hall Basement 102 USCG-7-PI-03 Pipe Insulation Hamilton Hall Basement 103 USCG-7-PI-04 Pipe Insulation Hamilton Hall Basement 104 USCG-7-PI-05 Pipe Insulation Hamilton Hall Basement 105 USCG-7-PI-06 Pipe Insulation Hamilton Hall Basement 106 USCG-7-DW-01 Drywall Tunnel 7 ND NA NA 107 USCG-7-DW-02 Drywall Tunnel 7 ND NA NA 108 USCG-7-DW-03 Drywall Tunnel 7 ND NA NA
109 USCG-7A-DB-
01 Floor Debris Tunnel from McAllister Hall to Michel Hall 5% Chrysotile < 1% Amosite
1,400 SF High Damage 110 USCG-7A-DB-
02 Floor Debris Tunnel from McAllister Hall to Michel Hall
2% Chrysotile < 1% Amosite
111 USCG-7A-DB-
03 Floor Debris Tunnel from McAllister Hall to Michel Hall ND
15 U.S. Coast Guard Academy New London, CT
103IG9582
Figure Key Sample ID Material Description Material Locations
PLM-Analytical Result
(%ACM1) 2
Quantity Condition3
112 USCG-7A-DB-
04 Floor Debris Tunnel from McAllister Hall to Michel Hall 3% Chrysotile 2% Amosite
113 USCG-7A-DB-
05 Floor Debris Tunnel from McAllister Hall to Michel Hall ND 1,400 SF High
Damage
114 USCG-7A-DB-
06 Floor Debris Tunnel from McAllister Hall to Michel Hall
20% Chrysotile 10% Amosite
115 USCG-7A-PI-01 Pipe Insulation Tunnel from McAllister Hall to Michel Hall (The Two Lower Pipe Runs)
15% Chrysotile 10% Amosite 410 LF High
Damage
116 USCG-7A-PI-02 Pipe Insulation Tunnel from McAllister Hall to Michel Hall (The Two Lower Pipe Runs)
117 USCG-7A-PI-03 Pipe Insulation Tunnel from McAllister Hall to Michel Hall (The Two Lower Pipe Runs)
118 USCG-7A-PI-04 Pipe Insulation Tunnel from McAllister Hall to Michel Hall (The Two Lower Pipe Runs)
119 USCG-7A-PI-05 Pipe Insulation Tunnel from McAllister Hall to Michel Hall (The Two Lower Pipe Runs)
120 USCG-7A-PI-06 Pipe Insulation Tunnel from McAllister Hall to Michel Hall (The Two Lower Pipe Runs)
121 USCG-7A-PI-07 Pipe Insulation Tunnel from McAllister Hall to Michel Hall (The Two Lower Pipe Runs)
16 U.S. Coast Guard Academy New London, CT
103IG9582
Figure Key Sample ID Material Description Material Locations
PLM-Analytical Result
(%ACM1) 2
Quantity Condition3
122 USCG-7A-PI-08 Pipe Insulation Tunnel from McAllister Hall to Michel Hall (The Two Lower Pipe Runs)
123 USCG-7A-PI-09 Pipe Insulation Tunnel from McAllister Hall to Michel Hall (The Two Lower Pipe Runs)
15% Chrysotile 10% Amosite 410 LF High
Damage
124 USCG-7A-PI-10 Pipe Insulation Tunnel from McAllister Hall to Michel Hall (The Two Lower Pipe Runs)
125 USCG-7A-PI-11 Pipe Insulation Tunnel from McAllister Hall to Michel Hall (The Two Lower Pipe Runs)
126 USCG-7A-PI-12 Pipe Insulation Tunnel from McAllister Hall to Michel Hall (The Two Lower Pipe Runs)
127 USCG-7A-PI-13 Pipe Insulation Tunnel from McAllister Hall to Michel Hall (The Two Lower Pipe Runs)
128 USCG-7A-PI-14 Pipe Insulation Tunnel from McAllister Hall to Michel Hall (The Two Lower Pipe Runs)
129 USCG-7A-PI-15 Pipe Insulation Tunnel from McAllister Hall to Michel Hall (The Two Lower Pipe Runs)
130 USCG-7A-PI-16 Pipe Insulation Tunnel from McAllister Hall
17 U.S. Coast Guard Academy New London, CT
103IG9582
Figure Key Sample ID Material Description Material Locations
PLM-Analytical Result
(%ACM1) 2
Quantity Condition3
131 USCG-7A-PI-17 Pipe Insulation Tunnel from McAllister Hall to Michel Hall (The Two Lower Pipe Runs)
132 USCG-7A-PI-18 Pipe Insulation Tunnel from McAllister Hall to Michel Hall (The Two Lower Pipe Runs)
15% Chrysotile 10% Amosite
410 LF High Damage
133 USCG-7A-PI-19 Pipe Insulation Tunnel from McAllister Hall to Michel Hall (The Two Lower Pipe Runs)
134 USCG-7A-PI-20 Pipe Insulation Tunnel from McAllister Hall to Michel Hall (The Two Lower Pipe Runs)
135 USCG-7A-PI-21 Pipe Insulation Tunnel from McAllister Hall to Michel Hall (The Two Lower Pipe Runs)
136 USCG-7A-PI-22 Pipe Insulation Tunnel from McAllister Hall to Michel Hall (The Two Lower Pipe Runs)
137 USCG-7A-PI-23 Pipe Insulation Tunnel from McAllister Hall to Michel Hall (The Two Lower Pipe Runs)
60% Chrysotile
138 USCG-7A-PI-24 Pipe Insulation Tunnel from McAllister Hall to Michel Hall (The Two Lower Pipe Runs) 15% Chrysotile
10% Amosite 139 USCG-7A-PI-25 Pipe Insulation
Tunnel from McAllister Hall
18 U.S. Coast Guard Academy New London, CT
103IG9582
Figure Key Sample ID Material Description Material Locations
PLM-Analytical Result
(%ACM1) 2
Quantity Condition3
140 USCG-7A-PI-26 Pipe Insulation Tunnel from McAllister Hall to Michel Hall (The Two Lower Pipe Runs)
141 USCG-7A-PI-27 Pipe Insulation Tunnel from McAllister Hall to Michel Hall (The Two Lower Pipe Runs)
15% Chrysotile 10% Amosite 410 LF High
Damage
142 USCG-7A-
FGPW-01
Silver/Black Foil Pipe Wrap Around Fiberglass
1-inch Pipe Near Ceiling of Tunnel from McAllister to
Michel Hall
ND NA NA
143 USCG-7A-
FGPW-02
Silver/Black Foil Pipe Wrap Around Fiberglass
1-inch Pipe Near Ceiling of Tunnel from McAllister to
Michel Hall
ND NA NA
144 USCG-7A-
FGPW-03
Silver/Black Foil Pipe Wrap Around Fiberglass
1-inch Pipe Near Ceiling of Tunnel from McAllister to
Michel Hall
ND NA NA
145 USCG-7A-
FGPW-04
Silver/Black Foil Pipe Wrap Around Fiberglass
1-inch Pipe Near Ceiling of Tunnel from McAllister to
Michel Hall
ND NA NA
146 USCG-7A-
FGPW-05
Silver/Black Foil Pipe Wrap Around Fiberglass
1-inch Pipe Near Ceiling of Tunnel from McAllister to
Michel Hall
ND NA NA
147 USCG-7A-
FGPW-06
Silver/Black Foil Pipe Wrap Around Fiberglass
1-inch Pipe Near Ceiling of Tunnel from McAllister to
Michel Hall
ND NA NA
148 USCG-7A-PF-01 Pipe Fittings Tunnel from McAllister Hall to Michel Hall 15% Chrysotile 60
Fittings High
Damage
19 U.S. Coast Guard Academy New London, CT
103IG9582
Figure Key Sample ID Material Description Material Locations
PLM-Analytical Result
(%ACM1) 2
Quantity Condition3
149 USCG-7A-PF-02 Pipe Fittings Tunnel from McAllister Hall to Michel Hall 15% Chrysotile (1/2 SF
Each)
Fittings
(1/2 SF
Each)
150 USCG-7A-PF-03 Pipe Fittings Tunnel from McAllister Hall to Michel Hall
White Pipe Insulation – 15%
Chrysotile Tan Wrap: ND
High Damage
151 USCG-7A-PF-04 Pipe Fittings Tunnel from McAllister Hall to Michel Hall
15% Chrysotile
152 USCG-7A-PF-05 Pipe Fittings Tunnel from McAllister Hall to Michel Hall
153 USCG-7A-PF-06 Pipe Fittings Tunnel from McAllister Hall to Michel Hall
154 USCG-7A-PF-07 Pipe Fittings Tunnel from McAllister Hall to Michel Hall
155 USCG-7A-PF-08 Pipe Fittings Tunnel from McAllister Hall to Michel Hall
156 USCG-7A-SPG-
01 Stick Pin Glue Ceiling of Tunnel from
McAllister Hall to Michel Hall ND NA NA
157 USCG-7A-SPG-
02 Stick Pin Glue Ceiling of Tunnel from
McAllister Hall to Michel Hall ND NA NA
158 USCG-6-PECM-
01 Pipe End Cap Mud Tunnel Under the Football Field
(The West End) ND NA NA
159 USCG-6-PECM-
02 Pipe End Cap Mud Tunnel Under the Football Field
(The West End) ND NA NA
160 USCG-6-PECM-
03 Pipe End Cap Mud Tunnel Under the Football Field
(The West End) ND NA NA
20 U.S. Coast Guard Academy New London, CT
103IG9582
Figure Key Sample ID Material Description Material Locations
PLM-Analytical Result
(%ACM1) 2
Quantity Condition3
161 USCG-6-DB-01 Floor Debris Tunnel Under the Football Field (The East End) Adjacent to the
Grounds Garage
ND NA NA
162 USCG-6-DB-02 Floor Debris Tunnel Under the Football Field (The East End) Adjacent to the
Grounds Garage
ND NA NA
163 USCG-6-VI-01 Valve insulation (1-ft Diameter Valve)
Near East End Entrance to Tunnel Under the Football Field ND NA NA
164 USCG-6-VI-02 Valve insulation (1-ft Diameter Valve)
Near East End Entrance to Tunnel Under the Football Field ND NA NA
165 USCG-10C-PF-
Pipe Fittings (6-8 inch Diameter) Chase B Hall Crawl Space
20% Chrysotile 2 Fittings High Damage
166 USCG-10C-PF-
Pipe Fittings (6-8 inch Diameter) Chase B Hall Crawl Space
167 USCG-10C-PF2-
Pipe Fittings (1-inch Diameter) Chase B Hall Crawl Space
60% Chrysotile 5 Fittings High Damage 168 USCG-10C-PF2-
Pipe Fittings (1-inch
Diameter) Chase B Hall Crawl Space
169 USCG-10C-PF2-
Pipe Fittings (1-inch Diameter) Chase B Hall Crawl Space
170 USCG-2C2D-PI-
Pipe Insulation (6-8 inch Diameter) Tunnel 2C-2D
15% Chrysotile 10% Amosite 32 LF Good
Condition 171 USCG-2C2D-PI-
Pipe Insulation (6-8 inch Diameter) Tunnel 2C-2D
172 USCG-2C2D-PI-
Pipe Insulation (6-8 inch Diameter) Tunnel 2C-2D
21 U.S. Coast Guard Academy New London, CT
103IG9582
Figure Key Sample ID Material Description Material Locations
PLM-Analytical Result
(%ACM1) 2
Quantity Condition3
173 USCG-5A5B-PI-
Pipe Fitting (5-10 inch Diameter) Tunnel 5A-5B
15% Chrysotile 10% Amosite
2 Pipes
(250 LF
Each)
Good Condition
174 USCG-5A5B-PI-
Pipe Fitting (5-10 inch Diameter) Tunnel 5A-5B
175 USCG-5A5B-PI-
Pipe Fitting (5-10 inch Diameter) Tunnel 5A-5B
2 Pipes
(250 LF
Each)
Good Condition
176 USCG-5A5B-PI-
Pipe Fitting (5-10 inch Diameter) Tunnel 5A-5B
177 USCG-5A5B-PI-
Pipe Fitting (5-10 inch Diameter) Tunnel 5A-5B 15% Chrysotile
3% Amosite
178 USCG-5A5B-PI-
Pipe Fitting (5-10 inch Diameter) Tunnel 5A-5B 6% Chrysotile
5% Amosite
179 USCG-5A5B-PI-
Pipe Fitting (5-10 inch Diameter) Tunnel 5A-5B
10% Amosite 2% Chrysotile
180 USCG-5A5B-PI-
Pipe Fitting (5-10 inch Diameter) Tunnel 5A-5B
181 USCG-5A5B-PI-
Pipe Fitting (5-10 inch Diameter) Tunnel 5A-5B
10% Amosite 3% Chrysotile
182 USCG-5A5B-PI-
Pipe Fitting (5-10 inch Diameter) Tunnel 5A-5B
183 USCG-5A5B-PI-
Pipe Fitting (5-10 inch Diameter) Tunnel 5A-5B 6% Amosite
4% Chrysotile
184 USCG-5A5B-PI-
Pipe Fitting (5-10 inch Diameter) Tunnel 5A-5B 7% Amosite
4% Chrysotile
185 USCG-5A5B-PI-
Pipe Fitting (5-10 inch Diameter) Tunnel 5A-5B 10% Amosite
4% Chrysotile
22 U.S. Coast Guard Academy New London, CT
103IG9582
Figure Key Sample ID Material Description Material Locations
PLM-Analytical Result
(%ACM1) 2
Quantity Condition3
186 USCG-5A5B-PI-
Pipe Fitting (5-10 inch Diameter) Tunnel 5A-5B 20% Amosite
6% Chrysotile
187 USCG-5A5B-PI-
Pipe Fitting (5-10 inch Diameter) Tunnel 5A-5B 8% Amosite
4% Chrysotile
188 USCG-5A5B-PI-
Pipe Fitting (5-10 inch Diameter) Tunnel 5A-5B 10% Amosite
4% Chrysotile 2 Pipes
(250 LF
Each)
Good Condition 189 USCG-5A5B-PI-
Pipe Fitting (5-10 inch
Diameter) Tunnel 5A-5B 8% Amosite 4% Chrysotile
190 USCG-5A5B-PI-
Pipe Fitting (5-10 inch Diameter) Tunnel 5A-5B 10% Amosite
3% Chrysotile
191 USCG-S2B-PF-
Pipe Fitting (2-inch Diameter Gray) Section Bypass 2 ND NA NA
192 USCG-S2B-PF2-
Pipe Fitting (8-inch Diameter White) Section Bypass 2 10% Chrysotile 1 Fitting High
Damage
193 USCG-S2B-DB-
01 Floor Debris Section Bypass 2 15% Chrysotile 300 SF High
Damage Notes:
In Tunnel 7, 20 LF of corrugated pipe insulation was observed behind a locked cage with asbestos signage (inaccessible to sample). Twenty-five SF of asbestos pipe debris was observed on the ground behind the cage (inaccessible).
The fiberglass pipe insulation in Tunnel 7A from McAllister Hall to Michel Hall was observed as contaminated with dust (a total of 560 LF of fiberglass pipe insulation).
1 AHERA defines ACM as any material or product that contains more than 1 percent asbestos.
2 Result includes all layers unless otherwise specified.
3 ACM materials are assigned a condition status as follows:
• Good Condition – No visible damage
• Minor Damage – Few scratches or surface marks; broken edges on boards, tiles, etc.
• Medium Damage – Significant breakage of materials or several small areas where material has been damaged, revealing loose asbestos fibers not found on TSI or other friable ACMs.
23 U.S. Coast Guard Academy New London, CT
103IG9582
• High Damage – Sprayed-on asbestos surfacing or TSI with visible asbestos breaches or debris.
ACM Asbestos-containing material AHERA Asbestos Hazard and Emergency Response Act of 1986 EPA U.S. Environmental Protection Agency ft Foot SF Square foot LF Linear foot NA Not applicable ND Not detected TSI Thermal system insulation
24 U.S. Coast Guard Academy
6.0 LEAD-CONTAINING PAINT FINDINGS
LCP locations identified via XRF screening at the subject property are listed in Table 2. Bolded results in
Table 2 indicate where lead-based paint was detected (concentration exceeding 1.0 mg/cm2). Italicized results in Table 2 indicate positive identification of LCP (less than 1.0 mg/cm2).
25 U.S. Coast Guard Academy
TABLE 2
SUMMARY OF LCP SCREENING LOCATIONS
Paint Color Location Component Substrate XRF Reading (mg/cm2) Damaged
Calibration Blank 0.1 Calibration Blank 0.2 Calibration Blank 0.1 Calibration Positive 0.9 Calibration Positive 1.0 Calibration Positive 0.9
White Michels Mechanical Room Wall CMU 0.5 Yes Green Michels Mechanical Room Door Jamb Metal 1.0 Yes Red Michels Mechanical Room Door Frame Metal 0.1 Yes
Calibration Blank 0.1 Calibration Blank 0.1 Calibration Blank 0.0 Calibration Positive 1.0 Calibration Positive 1.0 Calibration Positive 1.0 Calibration Blank 0.1 Calibration Positive 1.0
White Chase Mechanical Room Wall A Wall Concrete 0.2 Yes
White Chase Mechanical Room Wall C Wall Cinder Block 0.0 NA
Gray Chase Mechanical Room Wall D Door Metal 0.2 Yes
TABLE 2 (Continued)
26 U.S. Coast Guard Academy
Paint Color Location Component Substrate XRF Reading (mg/cm2) Damaged
White Chase Mechanical Room Wall C Pipe Metal 0.2 Yes
Calibration Blank 0.1 Calibration Blank 0.2 Calibration Positive 0.2,1.0
Cream Billard Mechanical Room Wall A Wall Plaster 0.1 Yes
White Billard Mechanical Room Wall D Wall Plaster 0.3 Yes
Cream Billard Mechanical Room Wall D Wall Plaster 0.2 Yes
Calibration Blank 0.2 Calibration Positive 1.1 Calibration Blank 0.1 Calibration Positive 0.9
Black Tunnel Hamilton to Chase Rail Metal 0.4 Yes White Tunnel Hamilton to Chase Window Frame wood 0.0 NA White Tunnel Hamilton to Chase Pipe Metal 0.3 Yes Gray Tunnel Hamilton to Chase Support Beam Metal 0.3 Yes White Tunnel Hamilton to Chase Support Beam Metal 0.1 Yes White Tunnel Hamilton to Chase Ceiling Plaster 0.6 Yes
Calibration Blank 0.1 Calibration Positive 0.9
Yellow Tunnel 9 Pipe Metal 0.1 Yes
27 U.S. Coast Guard Academy
Gray Tunnel 9 Ceiling Plaster 0.2 Yes Black Tunnel 9 Rail Metal 0.4 Yes White Tunnel 9 Window Frame Wood 0.2 Yes White Tunnel 7 Wall A Wall Concrete 0.1 Yes White Tunnel 7 Wall B Wall Drywall 0.2 Yes White Tunnel 7 Wall C Wall CMU 0.3 Yes White Tunnel 7 Ceiling Pipe Metal 0.1 Yes White Tunnel 7 Wall D Wall Wood 0.0 NA White Tunnel 7 Wall B Wall Drywall 0.2 Yes Gray Tunnel 7 Hallway Door Frame Metal 0.1 Yes Black Tunnel 7 Hallway Pipe Metal 0.4 Yes
Calibration Blank 0.1 Calibration Blank 0.1 Calibration Blank 0.1 Calibration Positive 1.0 Calibration Positive 0.9 Calibration Positive 0.9 Calibration Blank 0.1 Calibration Blank 0.1 Calibration Blank 0.1
Calibration Positive 1.0
28 U.S. Coast Guard Academy
Calibration Positive 0.9 Gray Tunnel 7A Entrance Door Wood 3.5 Yes White Tunnel 7A Wall A Wall Concrete 0.2 Yes
Gray/Green Tunnel 7A Door Frame Metal 6.8 Yes White Tunnel 7A Wall B Wall Concrete 0.4 Yes White Tunnel 7A Wall C Wall Concrete 0.3 Yes Red Tunnel 7A Stair Rail Metal 0.1 Yes
White Tunnel 6 West Door Metal 0.1 Yes White Tunnel 6 West Wall Concrete 0.4 Yes White Tunnel 6 West Wall Concrete 9.1 Yes White Tunnel 6 West Wall Concrete 2.8 Yes White Tunnel 6 West Wall Concrete 0.9 Yes Gray Tunnel 6 East Door Jamb Metal 0.1 Yes Gray Tunnel 6 East Door Metal 0.0 NA White Tunnel 6 East Wall Concrete 0.2 Yes White Tunnel 6 Bathroom Wall B Wall CMU 0.2 Yes White Tunnel 6 Bathroom Wall A Door Frame Wood 0.1 Yes White Tunnel 6 Bathroom Wall C Wall Concrete 0.2 Yes Beige Tunnel 6 Bathroom Wall C Wall Concrete 0.1 Yes White Tunnel 6 Bathroom Wall C Pipe Metal 0.0 NA White Tunnel 6 Bathroom Wall D Wall Brick 0.1 Yes
Calibration Blank 0.2
29 U.S. Coast Guard Academy
Calibration Positive 1.1 Black Tunnel 5A-5B Tunnel Ring Metal 3.4 Yes Gray Tunnel 5A-5B Support Beam Metal 0.3 Yes Black Tunnel 5A-5B Tunnel Ring Metal 4.0 Yes Gray Tunnel 5A-5B Support Beam Metal 0.3 Yes
Calibration Blank 0.1 Calibration Blank 0.1 Calibration Blank 0.1 Calibration Positive 1.1 Calibration Positive 1.1 Calibration Positive 1.1 Calibration Blank 0.1 Calibration Blank 0.1 Calibration Blank 0.1 Calibration Positive 1.0 Calibration Positive 1.0 Calibration Positive 1.0
Black Tunnel 5A-5b Tunnel Ring Metal 3.4 Yes Silver Tunnel 5A-5B Pipe Metal 0.1 Yes Gray Tunnel 5A-5B Support Beam Metal 0.3 Yes Gray Tunnel 5A-5B Support Beam Metal 0.3 Yes Black Tunnel 5A-5B Tunnel Ring Metal 2.9 Yes
30 U.S. Coast Guard Academy
Gray Tunnel 5A-5B Support Beam Metal 0.4 Yes Gray Tunnel 5A-5B Support Beam Metal 0.5 Yes Gray Tunnel 5A-5B Support Beam Metal 0.3 Yes Gray Tunnel 5A-5B Support Beam Metal 0.2 Yes Gray Tunnel 5A-5B Support Beam Metal 0.2 Yes Gray Tunnel 5A-5B Support Beam Metal 0.3 Yes Gray Tunnel 5A-5B Support Beam Metal 0.2 Yes Gray Tunnel 5A-5B Support Beam Metal 0.3 Yes Gray Tunnel 5A-5B Support Beam Metal 0.0 NA White Tunnel 7 Wall CMU 0.4 Yes White Tunnel 7 Wall Drywall 0.0 NA White Tunnel 7 Wall Drywall 0.2 Yes
Calibration Blank 0.1 Calibration Positive 0.9
White Tunnel 7A Pipe Metal 0.3 Yes White Tunnel 7A Pipe Metal 0.3 Yes White Tunnel 7A Pipe Metal 0.2 Yes White Tunnel 7A Pipe Metal 0.3 Yes Black Tunnel 7A Pipe Metal 0.2 Yes White Tunnel 7A Pipe Metal 0.0 NA Black Tunnel 7A Pipe Metal 0.2 Yes Black Tunnel 7A Pipe Metal 0.0 NA
31 U.S. Coast Guard Academy
Orange Tunnel 7A Pipe Metal 0.2 Yes Black Tunnel 7A Pipe Metal 0.1 Yes Gray Tunnel 7A Support Metal 0.0 NA Gray Tunnel 7A Support Metal 0.0 NA White Tunnel 7A Pipe Metal 0.1 Yes
Calibration Blank 0.1 Calibration Blank 0.1 Calibration Blank 0.1 Calibration Positive 0.9 Calibration Positive 0.9 Calibration Positive 0.9 Calibration Blank 0.1 Calibration Blank 0.1 Calibration Blank 0.1 Calibration Positive 1.0 Calibration Positive 1.0 Calibration Positive 1.0
Unpainted Michel Mechanical Room Pipe Mesh 0.1 Yes White Michel Mechanical Room Wall Concrete 0.1 Yes White Michel Mechanical Room Wall Concrete 0.1 Yes White Michel Mechanical Room Wall Concrete 0.1 Yes White Michel Mechanical Room Pipe Mesh 0.0 NA
32 U.S. Coast Guard Academy
Tan Michel Mechanical Room Wall Brick 0.2 Yes White Michel Mechanical Room Wall Brick 0.5 Yes Tan Michel Mechanical Room Wall Brick 0.6 Yes
White Michel Mechanical Room Ceiling Wood 0.7 Yes Red Michel Mechanical Room Door Jamb Metal 0.3 Yes Tan Billard Mechanical Room Wall Plaster 0.2 Yes Tan Billard Mechanical Room Wall Plaster 0.2 Yes Tan Billard Mechanical Room Wall Plaster 0.2 Yes
White Billard Mechanical Room Wall Plaster 0.0 NA White Billard Mechanical Room Wall Plaster 0.2 Yes Tan Billard Mechanical Room Wall Plaster 0.2 Yes
Calibration Blank 0.1 Calibration Blank 0.1 Calibration Blank 0.1 Calibration Positive 1.0
33 U.S. Coast Guard Academy
Notes:
Bolded result indicates positive identification of lead-based paint (>1 mg/cm2).
Italicized result indicates positive identification of LCP (<1 mg/cm2).
CMU Concrete masonry unit LCP Lead-containing paint mg/cm2 Milligrams per square centimeter XRF X-ray fluorescence
34 U.S. Coast Guard Academy
7.0 HW AND OTHER HAZARDOUS MATERIALS
Tetra Tech observed the following hazardous materials:
• 24 4-foot fluorescent bulbs in Billard Mechanical Room
• Four 4-foot fluorescent bulbs in Michel Hall Mechanical Room
• Four 4-foot fluorescent bulbs in Tunnel 10
• 10 4-foot fluorescent bulbs in Tunnel 9
• 60 4-foot fluorescent bulbs in Tunnel 7
• Two 5-gallon buckets of spill-kit chemical solution in Tunnel 7
• Two 55-gallon drums of sorbent waste in Tunnel 7
• One 5-gallon container of spent aerosol cans in Tunnel 7.
Tetra Tech recommends proper disposal or recycling of hazardous waste and other hazardous materials recorded. This disposal or recycling should occur prior to renovation of the subject property, based on
35 U.S. Coast Guard Academy
8.0 CONCLUSIONS AND RECOMMENDATIONS
Based on survey observations and sample analytical results, Tetra Tech presents the following conclusions and offers the following recommendations for actions before renovation of the subject property building:
8.1 ASBESTOS-CONTAINING MATERIAL
The following ACM findings are based on observations during the survey and analytical results from samples collected at the subject property building:
• ACM was identified within the subject property building in black tar coat (approximately 400 square feet [SF]) on the walls in Michel Mechanical Room. The tar coat was represented by samples
USCG-M-BTC-01 and -0.2. Laboratory results indicated that the tar coat contained 10 percent chrysotile asbestos.
• ACM was identified within the subject property building in pipe elbows/fittings (approximately
75…