Appendix A - Equip Enroll Matrix_SILC Catalog 2024.xlsx
XLSX spreadsheet 403 KB Posted
- Attached to
- Design/Build Construction for Recapitalize Central Steam Distribution System at USCG Academy, New London, CT
- Solicitation number
- 70Z04724RPCNI0009
About this file
This document is a detailed equipment enrollment matrix related to a federal contract opportunity for the recapitalization of the central steam distribution system at the U.S. Coast Guard Academy in New London, CT.
The matrix provides a comprehensive list of equipment that will need to be enrolled as part of the design-build project. It includes standard and special foundation types, basement construction, floor construction, roof construction, exterior walls, windows, and doors. For each type of equipment, the matrix specifies the Uniformat II classification, equipment description, physical location, manufacturer details, installation information, and replacement cost. The matrix also includes data fields for maintenance requirements, job plan numbers, and other asset management information. This detailed equipment information will be critical for the contractor selected to execute the design-build project to replace the steam and condensate piping systems across the academy campus.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 Equipment Enrollment Form
To be filled out by Contractor (white blocks) Completed by Govt
| Note NEW, or EQ# if decommissioning1 | Uniformat II Level 4 (See Current Equipment Enrollment Catalog, Column K) | Equipment Description (See Current Maintenance Requirements List, Column AC) | Physical Location | Manufacturer | |||||
| Name | Model # | Serial # | Install Date | Purchase Price2 | Replacement Cost3 | Equipment Attributes | |||
| (Name Plate Information/See Current Maintenance Requirements List, Columns AI thru AV) | CG SAM "JOB PLAN" Number: | ||||||||
| (See Current Maintenance Requirements List, Column U) | Data Entry Use Only | ||||||||
| Bldg # | Floor | Room # | Equip # | PM # |
Master Listing (OSC-Project) CC_ID Level I Level I Description Level I Definition Level II System Level II Definition Level III Component Level III Definition Level IV Material/Equipment Category Level IV Definition Component Type Level V Class Definition & Component Type UOM E-M-C PM RS Means/Reference Number RS Means/Reference Description Source Existing SAM Job Plan Numbers Frequency OPFAC Design Life EE Capture? Comment List Order DC Description DE Description DC UOM DC E-M-C DE Job Plan(s) DE Freq DE RSM Desc Attr_Size (Req'd?)
St. Charles, Robin W.: St. Charles, Robin W.:
Yes = Size active for UII classification
| No = Size inactive for UII classification, either because it is redundant or because it is not appropriate for the component. | Attr_Size UOM | Attr1 | Attr1 Description | Attr1 UOM | Attr1 Value | Attr2 | Attr2 Description | Attr2 UOM | Attr2 Value | Attr3 | Attr3 Description | Attr3 UOM | Attr3 Value | CE Manual Chap 14 Safety Inspection Required? |
| 10 | A | SUBSTRUCTURE | This system includes all work below the lowest floor construction |
(including slab-on-grade) and the enclosing horizontal and vertical elements required to form a basement, together with the necessary mass excavation and backfill. A10 FOUNDATIONS Foundations include the following Standard Foundations: wall and column foundations; foundation walls up to level of top of slab on grade; pile caps; foundation excavation, backfill, and compaction; footings and bases; perimeter insulation; perimeter drainage; anchor plates; and dewatering. Special Foundations include pile foundations, caissons, underpinning, dewatering, raft foundations, and pressure injected grouting. Slab on grade includes standard slab on grade, structural slab on grade, inclined slab on grade, trenches, pits and bases, and foundation
| drainage. | A1010 | STANDARD FOUNDATIONS | Continuous footings, spread footings, grade beams, foundation |
| walls, pile caps, and column piers. | A101001 | WALL FOUNDATIONS | Continuous Footings: Assemblies include excavation, hand shaped |
bottom, compacted backfill, formwork and keyway, reinforcing steel, concrete and screed finish.
Foundation Walls: Include work items associated with CIP foundation walls, grade beams, or CMU walls. Assemblies include excavation, compacted backfill, perimeter insulation, perimeter drainage, formwork, reinforcing steel, concrete or
| CMU, and wall finish. | General | LF | UE | N | Wall Foundation | 100 | N | 1 | A101001 Wall Foundation | Wall Foundation | LF | UE | LF | ||
| 20 | A | SUBSTRUCTURE | This system includes all work below the lowest floor construction |
(including slab-on-grade) and the enclosing horizontal and vertical elements required to form a basement, together with the necessary mass excavation and backfill. A10 FOUNDATIONS Foundations include the following Standard Foundations: wall and column foundations; foundation walls up to level of top of slab on grade; pile caps; foundation excavation, backfill, and compaction; footings and bases; perimeter insulation; perimeter drainage; anchor plates; and dewatering. Special Foundations include pile foundations, caissons, underpinning, dewatering, raft foundations, and pressure injected grouting. Slab on grade includes standard slab on grade, structural slab on grade, inclined slab on grade, trenches, pits and bases, and foundation
| drainage. | A1010 | STANDARD FOUNDATIONS | Continuous footings, spread footings, grade beams, foundation |
| walls, pile caps, and column piers. | A101002 | COLUMN FOUNDATIONS AND PILE CAPS | Spread Footings: Individual or part of continuous pier footings. |
Assemblies include excavation, backfill and compaction, formwork, reinforcing steel, and concrete and screed finish. If structural steel columns set directly on spread footings, anchor bolts are included in this assembly.
Pile Caps: Assemblies include excavation if required (normally due to installation of piles, the subgrade is at desired level for pile cap), hand-shaped bottom, compacted backfill, formwork, reinforcing steel, and concrete and screed finish. If structural steel columns set directly on spread footings, anchor bolts are included in this assembly.
Column Piers: Assemblies include formwork, reinforcing steel, concrete or CMU, finish, break ties and patch, and set anchor
| bolts. | General | EA | UE | N | Column Foundation & Pile Cap | 100 | N | 2 | A101002 Column Foundation & Pile Cap | Column Foundation & Pile Cap | EA | UE | EA | ||
| 30 | A | SUBSTRUCTURE | This system includes all work below the lowest floor construction |
(including slab-on-grade) and the enclosing horizontal and vertical elements required to form a basement, together with the necessary mass excavation and backfill. A10 FOUNDATIONS Foundations include the following Standard Foundations: wall and column foundations; foundation walls up to level of top of slab on grade; pile caps; foundation excavation, backfill, and compaction; footings and bases; perimeter insulation; perimeter drainage; anchor plates; and dewatering. Special Foundations include pile foundations, caissons, underpinning, dewatering, raft foundations, and pressure injected grouting. Slab on grade includes standard slab on grade, structural slab on grade, inclined slab on grade, trenches, pits and bases, and foundation
| drainage. | A1010 | STANDARD FOUNDATIONS | Continuous footings, spread footings, grade beams, foundation |
| walls, pile caps, and column piers. | A101003 | DEWATERING | Dewatering is the removal of water from excavations. The two |
principle methods of dewatering are by pump or by a system involving the sinking of a series of well-points around the area and extracting the water by suction pump. Assemblies would include pumps or well points and all associated dewatering
| materials and equipment. | General | SF | UE | N | Dewatering | 100 | N | 3 | A101003 Dewatering | Dewatering | SF | UE | SF | ||
| 40 | A | SUBSTRUCTURE | This system includes all work below the lowest floor construction |
(including slab-on-grade) and the enclosing horizontal and vertical elements required to form a basement, together with the necessary mass excavation and backfill. A10 FOUNDATIONS Foundations include the following Standard Foundations: wall and column foundations; foundation walls up to level of top of slab on grade; pile caps; foundation excavation, backfill, and compaction; footings and bases; perimeter insulation; perimeter drainage; anchor plates; and dewatering. Special Foundations include pile foundations, caissons, underpinning, dewatering, raft foundations, and pressure injected grouting. Slab on grade includes standard slab on grade, structural slab on grade, inclined slab on grade, trenches, pits and bases, and foundation
| drainage. | A1010 | STANDARD FOUNDATIONS | Continuous footings, spread footings, grade beams, foundation | ||||||||||||
| walls, pile caps, and column piers. | A101099 | OTHER STANDARD FOUNDATIONS | Standard foundations not described by the assembly categories | ||||||||||||
| listed above. | General | SF | UE | N | Other Standard Foundation | 100 | N | 4 | A101099 Other Standard Foundation | Other Standard Foundation | SF | UE | SF | ||
| 50 | A | SUBSTRUCTURE | This system includes all work below the lowest floor construction |
(including slab-on-grade) and the enclosing horizontal and vertical elements required to form a basement, together with the necessary mass excavation and backfill. A10 FOUNDATIONS Foundations include the following Standard Foundations: wall and column foundations; foundation walls up to level of top of slab on grade; pile caps; foundation excavation, backfill, and compaction; footings and bases; perimeter insulation; perimeter drainage; anchor plates; and dewatering. Special Foundations include pile foundations, caissons, underpinning, dewatering, raft foundations, and pressure injected grouting. Slab on grade includes standard slab on grade, structural slab on grade, inclined slab on grade, trenches, pits and bases, and foundation
| drainage. | A1020 | SPECIAL FOUNDATIONS | All work associated with special foundations including piles, |
| caissons, and any other special foundation situation. | A102001 | PILE FOUNDATIONS | CIP concrete piles, precast concrete piles, steel pipe piles, steel |
H-piles, step-tapered steel piles, and treated wood piles.
Applicable assemblies would include the material for piles, pile
| driving, and pile cut-offs if required. | General | SF | UE | N | Pile Foundation | 100 | N | 5 | A102001 Pile Foundation | Pile Foundation | SF | UE | SF | ||
| 60 | A | SUBSTRUCTURE | This system includes all work below the lowest floor construction |
(including slab-on-grade) and the enclosing horizontal and vertical elements required to form a basement, together with the necessary mass excavation and backfill. A10 FOUNDATIONS Foundations include the following Standard Foundations: wall and column foundations; foundation walls up to level of top of slab on grade; pile caps; foundation excavation, backfill, and compaction; footings and bases; perimeter insulation; perimeter drainage; anchor plates; and dewatering. Special Foundations include pile foundations, caissons, underpinning, dewatering, raft foundations, and pressure injected grouting. Slab on grade includes standard slab on grade, structural slab on grade, inclined slab on grade, trenches, pits and bases, and foundation
| drainage. | A1020 | SPECIAL FOUNDATIONS | All work associated with special foundations including piles, |
| caissons, and any other special foundation situation. | A102002 | CAISSONS | Drilled Caissons: Assemblies include drilled caissons, steel |
casings if required, reinforcing steel, bell bottom excavation,
| concrete, and loading and hauling of excavated material. | General | SF | UE | N | Caisson | 100 | N | 6 | A102002 Caisson | Caisson | SF | UE | SF | ||
| 70 | A | SUBSTRUCTURE | This system includes all work below the lowest floor construction |
(including slab-on-grade) and the enclosing horizontal and vertical elements required to form a basement, together with the necessary mass excavation and backfill. A10 FOUNDATIONS Foundations include the following Standard Foundations: wall and column foundations; foundation walls up to level of top of slab on grade; pile caps; foundation excavation, backfill, and compaction; footings and bases; perimeter insulation; perimeter drainage; anchor plates; and dewatering. Special Foundations include pile foundations, caissons, underpinning, dewatering, raft foundations, and pressure injected grouting. Slab on grade includes standard slab on grade, structural slab on grade, inclined slab on grade, trenches, pits and bases, and foundation
| drainage. | A1020 | SPECIAL FOUNDATIONS | All work associated with special foundations including piles, |
| caissons, and any other special foundation situation. | A102003 | UNDERPINNING | Underpinning is the provision of permanent support for existing |
buildings by extending their foundations to a new, lower level containing the desired bearing stratum. Assemblies include
| excavation, backfill, and underpinning materials. | General | LF | UE | N | Underpinning | 100 | N | 7 | A102003 Underpinning | Underpinning | LF | UE | LF | ||
| 80 | A | SUBSTRUCTURE | This system includes all work below the lowest floor construction |
(including slab-on-grade) and the enclosing horizontal and vertical elements required to form a basement, together with the necessary mass excavation and backfill. A10 FOUNDATIONS Foundations include the following Standard Foundations: wall and column foundations; foundation walls up to level of top of slab on grade; pile caps; foundation excavation, backfill, and compaction; footings and bases; perimeter insulation; perimeter drainage; anchor plates; and dewatering. Special Foundations include pile foundations, caissons, underpinning, dewatering, raft foundations, and pressure injected grouting. Slab on grade includes standard slab on grade, structural slab on grade, inclined slab on grade, trenches, pits and bases, and foundation
| drainage. | A1020 | SPECIAL FOUNDATIONS | All work associated with special foundations including piles, |
| caissons, and any other special foundation situation. | A102004 | DEWATERING | Dewatering is the removal of water from excavations. The two |
principle methods of dewatering are by pump or by a system involving the sinking of a series of well-points around the area and extracting the water by suction pump. Assemblies would include pumps or well points and all associated dewatering
| materials and equipment. | General | SF | UE | N | Dewatering | 100 | N | 8 | A102004 Dewatering | Dewatering | SF | UE | SF | ||
| 90 | A | SUBSTRUCTURE | This system includes all work below the lowest floor construction |
(including slab-on-grade) and the enclosing horizontal and vertical elements required to form a basement, together with the necessary mass excavation and backfill. A10 FOUNDATIONS Foundations include the following Standard Foundations: wall and column foundations; foundation walls up to level of top of slab on grade; pile caps; foundation excavation, backfill, and compaction; footings and bases; perimeter insulation; perimeter drainage; anchor plates; and dewatering. Special Foundations include pile foundations, caissons, underpinning, dewatering, raft foundations, and pressure injected grouting. Slab on grade includes standard slab on grade, structural slab on grade, inclined slab on grade, trenches, pits and bases, and foundation
| drainage. | A1020 | SPECIAL FOUNDATIONS | All work associated with special foundations including piles, |
| caissons, and any other special foundation situation. | A102005 | RAFT FOUNDATIONS | Raft foundations or spread foundations consist of a solid slab of |
heavily reinforced concrete covering the entire building footprint
| area. | General | SF | UE | N | Raft Foundation | 100 | N | 9 | A102005 Raft Foundation | Raft Foundation | SF | UE | SF | ||
| 100 | A | SUBSTRUCTURE | This system includes all work below the lowest floor construction |
(including slab-on-grade) and the enclosing horizontal and vertical elements required to form a basement, together with the necessary mass excavation and backfill. A10 FOUNDATIONS Foundations include the following Standard Foundations: wall and column foundations; foundation walls up to level of top of slab on grade; pile caps; foundation excavation, backfill, and compaction; footings and bases; perimeter insulation; perimeter drainage; anchor plates; and dewatering. Special Foundations include pile foundations, caissons, underpinning, dewatering, raft foundations, and pressure injected grouting. Slab on grade includes standard slab on grade, structural slab on grade, inclined slab on grade, trenches, pits and bases, and foundation
| drainage. | A1020 | SPECIAL FOUNDATIONS | All work associated with special foundations including piles, | ||||||||||||
| caissons, and any other special foundation situation. | A102006 | PRESSURE INJECTED GROUTING | Assemblies provide for injecting cement grout for foundation | ||||||||||||
| stabilization. | General | SF | UE | N | Pressure Injected Grouting | 100 | N | 10 | A102006 Pressure Injected Grouting | Pressure Injected Grouting | SF | UE | SF | ||
| 110 | A | SUBSTRUCTURE | This system includes all work below the lowest floor construction |
(including slab-on-grade) and the enclosing horizontal and vertical elements required to form a basement, together with the necessary mass excavation and backfill. A10 FOUNDATIONS Foundations include the following Standard Foundations: wall and column foundations; foundation walls up to level of top of slab on grade; pile caps; foundation excavation, backfill, and compaction; footings and bases; perimeter insulation; perimeter drainage; anchor plates; and dewatering. Special Foundations include pile foundations, caissons, underpinning, dewatering, raft foundations, and pressure injected grouting. Slab on grade includes standard slab on grade, structural slab on grade, inclined slab on grade, trenches, pits and bases, and foundation
| drainage. | A1020 | SPECIAL FOUNDATIONS | All work associated with special foundations including piles, |
| caissons, and any other special foundation situation. | A102099 | OTHER SPECIAL FOUNDATIONS | These could include cofferdams, soil compaction foundations, |
and other special foundations. Assemblies would include all material and labor necessary to perform the work for the special
| foundation condition. | General | SF | UE | N | Other Special Foundation | 100 | N | 11 | A102099 Other Special Foundation | Other Special Foundation | SF | UE | SF | ||
| 120 | A | SUBSTRUCTURE | This system includes all work below the lowest floor construction |
(including slab-on-grade) and the enclosing horizontal and vertical elements required to form a basement, together with the necessary mass excavation and backfill. A10 FOUNDATIONS Foundations include the following Standard Foundations: wall and column foundations; foundation walls up to level of top of slab on grade; pile caps; foundation excavation, backfill, and compaction; footings and bases; perimeter insulation; perimeter drainage; anchor plates; and dewatering. Special Foundations include pile foundations, caissons, underpinning, dewatering, raft foundations, and pressure injected grouting. Slab on grade includes standard slab on grade, structural slab on grade, inclined slab on grade, trenches, pits and bases, and foundation drainage. A1030 SLAB ON GRADE A slab poured on earth, whether on undisturbed or fill soil. A103001 STANDARD SLAB ON GRADE Standard slab-on-grade is supported by compacted earth or gravel fill. The soil bearing capacity is sufficient to support the slab. Assemblies include fine grade, gravel fill, underslab insulation, edge forms, termite treatment (interior slabs only), vapor retarder, reinforcing, expansion joints, control joints, and
| finish and curing. Assemblies are based on thickness of slab. | General | SF | UE | N | Standard Slab On Grade | 100 | N | 12 | A103001 Standard Slab On Grade | Standard Slab On Grade | SF | UE | SF | ||
| 130 | A | SUBSTRUCTURE | This system includes all work below the lowest floor construction |
(including slab-on-grade) and the enclosing horizontal and vertical elements required to form a basement, together with the necessary mass excavation and backfill. A10 FOUNDATIONS Foundations include the following Standard Foundations: wall and column foundations; foundation walls up to level of top of slab on grade; pile caps; foundation excavation, backfill, and compaction; footings and bases; perimeter insulation; perimeter drainage; anchor plates; and dewatering. Special Foundations include pile foundations, caissons, underpinning, dewatering, raft foundations, and pressure injected grouting. Slab on grade includes standard slab on grade, structural slab on grade, inclined slab on grade, trenches, pits and bases, and foundation drainage. A1030 SLAB ON GRADE A slab poured on earth, whether on undisturbed or fill soil. A103002 STRUCTURAL SLAB ON GRADE A structural slab-on-grade is not supported by compacted earth or gravel fill. The soil bearing capacity is insufficient to support the slab. A structural slab is generally a minimum of eight inches thick and will be reinforced with reinforcing bars rather than welded wire fabric. Assemblies include fine grade, gravel fill, underslab insulation, edge forms, termite treatment, (interior slabs only), vapor retarder, reinforcing, expansion joints, control joints, and finish and curing. Assemblies are based on thickness
| of slab. | General | SF | UE | N | Structural Slab On Grade | 100 | N | 13 | A103002 Structural Slab On Grade | Structural Slab On Grade | SF | UE | SF | ||
| 140 | A | SUBSTRUCTURE | This system includes all work below the lowest floor construction |
(including slab-on-grade) and the enclosing horizontal and vertical elements required to form a basement, together with the necessary mass excavation and backfill. A10 FOUNDATIONS Foundations include the following Standard Foundations: wall and column foundations; foundation walls up to level of top of slab on grade; pile caps; foundation excavation, backfill, and compaction; footings and bases; perimeter insulation; perimeter drainage; anchor plates; and dewatering. Special Foundations include pile foundations, caissons, underpinning, dewatering, raft foundations, and pressure injected grouting. Slab on grade includes standard slab on grade, structural slab on grade, inclined slab on grade, trenches, pits and bases, and foundation drainage. A1030 SLAB ON GRADE A slab poured on earth, whether on undisturbed or fill soil. A103003 INCLINED SLAB ON GRADE An inclined slab-on-grade is a slab that is poured on an incline.
An example would be an inclined loading dock slab and associated ramps. Assemblies include fine grade, gravel fill, underslab insulation, edge forms, termite treatment (interior slabs only), vapor retarder, reinforcing, expansion joints, control joints, and finish and curing. Assemblies are based on thickness
| of slab. | General | SF | UE | N | Inclined Slab On Grade | 100 | N | 14 | A103003 Inclined Slab On Grade | Inclined Slab On Grade | SF | UE | SF | ||
| 150 | A | SUBSTRUCTURE | This system includes all work below the lowest floor construction |
(including slab-on-grade) and the enclosing horizontal and vertical elements required to form a basement, together with the necessary mass excavation and backfill. A10 FOUNDATIONS Foundations include the following Standard Foundations: wall and column foundations; foundation walls up to level of top of slab on grade; pile caps; foundation excavation, backfill, and compaction; footings and bases; perimeter insulation; perimeter drainage; anchor plates; and dewatering. Special Foundations include pile foundations, caissons, underpinning, dewatering, raft foundations, and pressure injected grouting. Slab on grade includes standard slab on grade, structural slab on grade, inclined slab on grade, trenches, pits and bases, and foundation drainage. A1030 SLAB ON GRADE A slab poured on earth, whether on undisturbed or fill soil. A103004 TRENCHES Cast-in-place trenches. Assemblies include excavation, hand shaped bottoms, compacted backfill, formwork, reinforcing steel, concrete, and concrete finish. Examples include trench drains
| and dust trenches. | General | LF | UE | N | Trenches | 100 | N | 15 | A103004 Trenches | Trenches | LF | UE | LF | ||
| 160 | A | SUBSTRUCTURE | This system includes all work below the lowest floor construction |
(including slab-on-grade) and the enclosing horizontal and vertical elements required to form a basement, together with the necessary mass excavation and backfill. A10 FOUNDATIONS Foundations include the following Standard Foundations: wall and column foundations; foundation walls up to level of top of slab on grade; pile caps; foundation excavation, backfill, and compaction; footings and bases; perimeter insulation; perimeter drainage; anchor plates; and dewatering. Special Foundations include pile foundations, caissons, underpinning, dewatering, raft foundations, and pressure injected grouting. Slab on grade includes standard slab on grade, structural slab on grade, inclined slab on grade, trenches, pits and bases, and foundation drainage. A1030 SLAB ON GRADE A slab poured on earth, whether on undisturbed or fill soil. A103005 PITS AND BASES Cast-in-place pits and bases. Assemblies include excavation, hand-shaped bottoms, compacted backfill, formwork, reinforcing steel, concrete, and concrete finish. Examples include elevator
| pits, dock leveler pits, oil change pits, and bases for equipment. | General | EA | UE | N | Pits And Bases | 100 | N | 16 | A103005 Pits And Bases | Pits And Bases | EA | UE | EA | ||
| 170 | A | SUBSTRUCTURE | This system includes all work below the lowest floor construction |
(including slab-on-grade) and the enclosing horizontal and vertical elements required to form a basement, together with the necessary mass excavation and backfill. A10 FOUNDATIONS Foundations include the following Standard Foundations: wall and column foundations; foundation walls up to level of top of slab on grade; pile caps; foundation excavation, backfill, and compaction; footings and bases; perimeter insulation; perimeter drainage; anchor plates; and dewatering. Special Foundations include pile foundations, caissons, underpinning, dewatering, raft foundations, and pressure injected grouting. Slab on grade includes standard slab on grade, structural slab on grade, inclined slab on grade, trenches, pits and bases, and foundation drainage. A1030 SLAB ON GRADE A slab poured on earth, whether on undisturbed or fill soil. A103006 FOUNDATION DRAINAGE Foundation drainage directly associated with draining the foundation. This category does not include storm drainage piping for site. It would include drain pipe or drain tile at foundation or basement for specific purposes of draining foundation or basement. Assemblies would include excavation, hand-shaped bottoms, gravel, compacted backfill, and drain pipe, including
| accessories. | General | LF | UE | N | Foundation Drainage | 100 | N | 17 | A103006 Foundation Drainage | Foundation Drainage | LF | UE | LF | ||
| 180 | A | SUBSTRUCTURE | This system includes all work below the lowest floor construction |
(including slab-on-grade) and the enclosing horizontal and vertical elements required to form a basement, together with the necessary mass excavation and backfill. A10 FOUNDATIONS Foundations include the following Standard Foundations: wall and column foundations; foundation walls up to level of top of slab on grade; pile caps; foundation excavation, backfill, and compaction; footings and bases; perimeter insulation; perimeter drainage; anchor plates; and dewatering. Special Foundations include pile foundations, caissons, underpinning, dewatering, raft foundations, and pressure injected grouting. Slab on grade includes standard slab on grade, structural slab on grade, inclined slab on grade, trenches, pits and bases, and foundation
| drainage. | A1030 | SLAB ON GRADE | A slab poured on earth, whether on undisturbed or fill soil. | A103099 | OTHER SLAB ON GRADE | Slab-on-grade not described by the assembly categories listed | |||||||||
| above. | General | SF | UE | N | Other Slab On Grade | 100 | N | 18 | A103099 Other Slab On Grade | Other Slab On Grade | SF | UE | SF | ||
| 190 | A | SUBSTRUCTURE | This system includes all work below the lowest floor construction |
(including slab-on-grade) and the enclosing horizontal and vertical elements required to form a basement, together with the
| necessary mass excavation and backfill. | A20 | BASEMENT CONSTRUCTION | Work Includes basement excavation, and basement walls. | A2010 | BASEMENT EXCAVATION | Excavation work associated with constructing a basement. | A201001 | EXCAVATION FOR BASEMENTS | All excavation, stockpiling, and hauling associated with | ||||||||
| basement excavations are included in this assembly. | General | CY | UE | N | Excavation For Basement | NA | N | 19 | A201001 Excavation For Basement | Excavation For Basement | CY | UE | CY | ||||
| 200 | A | SUBSTRUCTURE | This system includes all work below the lowest floor construction |
(including slab-on-grade) and the enclosing horizontal and vertical elements required to form a basement, together with the
| necessary mass excavation and backfill. | A20 | BASEMENT CONSTRUCTION | Work Includes basement excavation, and basement walls. | A2010 | BASEMENT EXCAVATION | Excavation work associated with constructing a basement. | A201002 | STRUCTURE BACKFILL AND COMPACTION | All backfill including hauling in of suitable soils and all necessary | ||||||||
| compaction is included in this assembly. | General | CY | UE | N | Structure Backfill & Compaction | 100 | N | 20 | A201002 Structure Backfill & Compaction | Structure Backfill & Compaction | CY | UE | CY | ||||
| 210 | A | SUBSTRUCTURE | This system includes all work below the lowest floor construction |
(including slab-on-grade) and the enclosing horizontal and vertical elements required to form a basement, together with the necessary mass excavation and backfill. A20 BASEMENT CONSTRUCTION Work Includes basement excavation, and basement walls. A2010 BASEMENT EXCAVATION Excavation work associated with constructing a basement. A201003 SHORING This type of shoring is to resist horizontal pressure and not intended to carry vertical loads. Assemblies would include sheet piling or other material and labor used to hold back earth around
| the perimeter of an excavation. | General | SF | UE | N | Shoring | 100 | N | 21 | A201003 Shoring | Shoring | SF | UE | SF | ||
| 220 | A | SUBSTRUCTURE | This system includes all work below the lowest floor construction |
(including slab-on-grade) and the enclosing horizontal and vertical elements required to form a basement, together with the
| necessary mass excavation and backfill. | A20 | BASEMENT CONSTRUCTION | Work Includes basement excavation, and basement walls. | A2010 | BASEMENT EXCAVATION | Excavation work associated with constructing a basement. | A201099 | OTHER BASEMENT EXCAVATION | Basement excavation not described by the assembly categories | ||||||||
| listed above. | General | CY | UE | N | Other Basement Excavation | 100 | N | 22 | A201099 Other Basement Excavation | Other Basement Excavation | CY | UE | CY | ||||
| 230 | A | SUBSTRUCTURE | This system includes all work below the lowest floor construction |
(including slab-on-grade) and the enclosing horizontal and vertical elements required to form a basement, together with the necessary mass excavation and backfill. A20 BASEMENT CONSTRUCTION Work Includes basement excavation, and basement walls. A2020 BASEMENT WALLS Assembly includes basement perimeter walls that are below grade and below the ground floor level of the building; this also includes elevator pits and other pits. A202001 BASEMENT WALL CONSTRUCTION This includes work items associated with CIP foundation walls or CMU walls and penetrations. Assemblies include formwork,
| reinforcing steel, concrete or CMU, and wall finish and curing. | General | SF | UE | N | Basement Wall Construction | 100 | N | 23 | A202001 Basement Wall Construction | Basement Wall Construction | SF | UE | SF | ||
| 240 | A | SUBSTRUCTURE | This system includes all work below the lowest floor construction |
(including slab-on-grade) and the enclosing horizontal and vertical elements required to form a basement, together with the necessary mass excavation and backfill. A20 BASEMENT CONSTRUCTION Work Includes basement excavation, and basement walls. A2020 BASEMENT WALLS Assembly includes basement perimeter walls that are below grade and below the ground floor level of the building; this also
| includes elevator pits and other pits. | A202002 | MOISTURE PROTECTION | This assembly would be based on the type and square footage | ||||||||||||
| of waterproofing used on the foundation wall. | General | SF | UE | N | Moisture Protection | 100 | N | 24 | A202002 Moisture Protection | Moisture Protection | SF | UE | SF | ||
| 250 | A | SUBSTRUCTURE | This system includes all work below the lowest floor construction |
(including slab-on-grade) and the enclosing horizontal and vertical elements required to form a basement, together with the necessary mass excavation and backfill. A20 BASEMENT CONSTRUCTION Work Includes basement excavation, and basement walls. A2020 BASEMENT WALLS Assembly includes basement perimeter walls that are below grade and below the ground floor level of the building; this also
| includes elevator pits and other pits. | A202003 | BASEMENT WALL INSULATION | This assembly would be based on the type and square footage | ||||||||||||
| of insulation used on the foundation wall. | General | SF | UE | N | Basement Wall Insulation | 100 | N | 25 | A202003 Basement Wall Insulation | Basement Wall Insulation | SF | UE | SF | ||
| 260 | A | SUBSTRUCTURE | This system includes all work below the lowest floor construction |
(including slab-on-grade) and the enclosing horizontal and vertical elements required to form a basement, together with the necessary mass excavation and backfill. A20 BASEMENT CONSTRUCTION Work Includes basement excavation, and basement walls. A2020 BASEMENT WALLS Assembly includes basement perimeter walls that are below grade and below the ground floor level of the building; this also
| includes elevator pits and other pits. | A202099 | OTHER BASEMENT WALLS | Basement walls not described by the assembly categories listed | ||||||||||||
| above. | General | SF | UE | N | Other Basement Wall | 100 | N | 26 | A202099 Other Basement Wall | Other Basement Wall | SF | UE | SF | ||
| 270 | B | SHELL | This system includes all structural slabs, and decks and |
supports within basements and above grade. Note that the structural work will include both horizontal items (slabs, decks, etc.) and vertical structural components (columns and interior structural walls). Exterior load bearing walls are not included in this system but in System B2010, Exterior Walls. B10 SUPERSTRUCTURE Work includes floor construction and roof construction. B1010 FLOOR CONSTRUCTION This construction can be wood, concrete, CMU, steel frame, etc. B101001 STRUCTURAL FRAME The structural frame could consist of structural steel including columns, beams, joists, and all associated items. It could be a concrete frame utilizing concrete or masonry columns and concrete girders and beams. The structural frame could be wood columns with wood beams or wood trusses. The structural frame could be a combination of the above. For example, concrete or masonry columns with structural steel beams and joists. All associated work items should be included in each assembly.
Separate assemblies would be used for different types of construction. The unit of measure at the assembly level is the square footage of the supported area. Decks and slabs are not
| included in this assembly. | General | SF | UE | N | Structural Frame | 100 | N | 27 | B101001 Structural Frame | Structural Frame | SF | UE | SF | ||
| 280 | B | SHELL | This system includes all structural slabs, and decks and |
supports within basements and above grade. Note that the structural work will include both horizontal items (slabs, decks, etc.) and vertical structural components (columns and interior structural walls). Exterior load bearing walls are not included in this system but in System B2010, Exterior Walls. B10 SUPERSTRUCTURE Work includes floor construction and roof construction. B1010 FLOOR CONSTRUCTION This construction can be wood, concrete, CMU, steel frame, etc. B101002 STRUCTURAL INTERIOR WALLS Assemblies would be CIP or CMU walls or other structural interior walls. The assemblies would include the labor and material required to perform the construction tasks associated
| with this type of wall. | General | SF | UE | N | Structural Interior Wall | 100 | N | 28 | B101002 Structural Interior Wall | Structural Interior Wall | SF | UE | SF | ||
| 290 | B | SHELL | This system includes all structural slabs, and decks and |
supports within basements and above grade. Note that the structural work will include both horizontal items (slabs, decks, etc.) and vertical structural components (columns and interior structural walls). Exterior load bearing walls are not included in this system but in System B2010, Exterior Walls. B10 SUPERSTRUCTURE Work includes floor construction and roof construction. B1010 FLOOR CONSTRUCTION This construction can be wood, concrete, CMU, steel frame, etc. B101003 FLOOR DECKS AND SLABS Slabs above grade should be broken into assemblies according to their particular type of construction (that is, flat slab, pan slab, precast or pre-stressed slab, four-way slab, slabs on metal or wood decking with concrete fill, etc.). All associated work items should be included in each assembly, such as expansion and
| contraction joints. | General | SF | UE | N | Floor Decks And Slab | 100 | N | 29 | B101003 Floor Decks And Slab | Floor Decks And Slab | SF | UE | SF | ||
| 300 | B | SHELL | This system includes all structural slabs, and decks and |
supports within basements and above grade. Note that the structural work will include both horizontal items (slabs, decks, etc.) and vertical structural components (columns and interior structural walls). Exterior load bearing walls are not included in this system but in System B2010, Exterior Walls. B10 SUPERSTRUCTURE Work includes floor construction and roof construction. B1010 FLOOR CONSTRUCTION This construction can be wood, concrete, CMU, steel frame, etc. B101004 BALCONY CONSTRUCTION Balconies above grade should be broken into assemblies according to their particular type of construction. All associated
| items including handrails should be included in the assembly. | General | SF | UE | N | Balcony Construction | 100 | N | 30 | B101004 Balcony Construction | Balcony Construction | SF | UE | SF | ||
| 310 | B | SHELL | This system includes all structural slabs, and decks and |
supports within basements and above grade. Note that the structural work will include both horizontal items (slabs, decks, etc.) and vertical structural components (columns and interior structural walls). Exterior load bearing walls are not included in this system but in System B2010, Exterior Walls. B10 SUPERSTRUCTURE Work includes floor construction and roof construction. B1010 FLOOR CONSTRUCTION This construction can be wood, concrete, CMU, steel frame, etc. B101005 RAMPS Ramps above grade should be broken into assemblies according to their type of construction. All associated items including
| handrails should be included in the assembly. | General | SF | E | N | Ramp | 80 | N | 31 | B101005 Ramp | Ramp | SF | E | SF | ||
| 320 | B | SHELL | This system includes all structural slabs, and decks and |
supports within basements and above grade. Note that the structural work will include both horizontal items (slabs, decks, etc.) and vertical structural components (columns and interior structural walls). Exterior load bearing walls are not included in
| this system but in System B2010, Exterior Walls. | B10 | SUPERSTRUCTURE | Work includes floor construction and roof construction. | B1010 | FLOOR CONSTRUCTION | This construction can be wood, concrete, CMU, steel frame, etc. | B101006 | FLOOR RACEWAY SYSTEMS | Under floor or in-slab conduit including conduit and all | ||||||||
| associated devices. | General | SF | E | N | Floor Raceway System | 40 | N | 32 | B101006 Floor Raceway System | Floor Raceway System | SF | E | SF | ||||
| 330 | B | SHELL | This system includes all structural slabs, and decks and |
supports within basements and above grade. Note that the structural work will include both horizontal items (slabs, decks, etc.) and vertical structural components (columns and interior structural walls). Exterior load bearing walls are not included in this system but in System B2010, Exterior Walls. B10 SUPERSTRUCTURE Work includes floor construction and roof construction. B1010 FLOOR CONSTRUCTION This construction can be wood, concrete, CMU, steel frame, etc. B101007 INCLINED AND STEPPED FLOORS This assembly should be broken down according to their particular type of construction (that is, flat slab, pan slab, precast or pre-stressed slab, four-way slab, slabs on metal or wood decking with concrete fill, etc.). All associated work items should be included in each assembly, such as expansion and
| contraction joints. | General | SF | UE | N | Inclined And Stepped Floor | 40 | N | 33 | B101007 Inclined And Stepped Floor | Inclined And Stepped Floor | SF | UE | SF | ||
| 340 | B | SHELL | This system includes all structural slabs, and decks and |
supports within basements and above grade. Note that the structural work will include both horizontal items (slabs, decks, etc.) and vertical structural components (columns and interior structural walls). Exterior load bearing walls are not included in this system but in System B2010, Exterior Walls. B10 SUPERSTRUCTURE Work includes floor construction and roof construction. B1010 FLOOR CONSTRUCTION This construction can be wood, concrete, CMU, steel frame, etc. B101099 OTHER FLOOR CONSTRUCTION Any type of special floor construction not included above would fall in this category, such as catwalks, space frames, etc. All
| associated work items would be included in the assembly. | General | SF | UE | N | Other Floor Construction | 100 | N | 34 | B101099 Other Floor Construction | Other Floor Construction | SF | UE | SF | ||
| 350 | B | SHELL | This system includes all structural slabs, and decks and |
supports within basements and above grade. Note that the structural work will include both horizontal items (slabs, decks, etc.) and vertical structural components (columns and interior structural walls). Exterior load bearing walls are not included in this system but in System B2010, Exterior Walls. B10 SUPERSTRUCTURE Work includes floor construction and roof construction. B1020 ROOF CONSTRUCTION This construction is similar to floor construction except that is applies to the framework supporting the roof and roof decks.
(See also System B30, Roofing.) B102001 STRUCTURAL FRAME The structural frame could consist of structural steel including columns, beams, joists, and all associated items. It could be a concrete frame utilizing concrete or masonry columns and concrete girders and beams. The structural frame could be wood columns with wood beams or wood trusses. The structural frame could be a combination of the above. For example, concrete or masonry columns with structural steel beams and joists. All associated work items should be included in each assembly.
Separate assemblies would be used for different types of construction. The unit of measure at the assembly level is the square footage of the supported area. Decks and slabs are not
| included in this assembly. | General | SF | E | N | Structural Frame | 100 | N | 35 | B102001 Structural Frame | Structural Frame | SF | E | SF | ||
| 360 | B | SHELL | This system includes all structural slabs, and decks and |
supports within basements and above grade. Note that the structural work will include both horizontal items (slabs, decks, etc.) and vertical structural components (columns and interior structural walls). Exterior load bearing walls are not included in this system but in System B2010, Exterior Walls. B10 SUPERSTRUCTURE Work includes floor construction and roof construction. B1020 ROOF CONSTRUCTION This construction is similar to floor construction except that is applies to the framework supporting the roof and roof decks.
(See also System B30, Roofing.) B102002 STRUCTURAL INTERIOR WALLS Assemblies would be CIP or CMU walls or other structural interior walls. The assemblies would include the labor and material required to perform the construction tasks associated
| with this type of wall. | General | SF | E | N | Structural Interior Wall | 100 | N | 36 | B102002 Structural Interior Wall | Structural Interior Wall | SF | E | SF | ||
| 370 | B | SHELL | This system includes all structural slabs, and decks and |
supports within basements and above grade. Note that the structural work will include both horizontal items (slabs, decks, etc.) and vertical structural components (columns and interior structural walls). Exterior load bearing walls are not included in this system but in System B2010, Exterior Walls. B10 SUPERSTRUCTURE Work includes floor construction and roof construction. B1020 ROOF CONSTRUCTION This construction is similar to floor construction except that is applies to the framework supporting the roof and roof decks.
(See also System B30, Roofing.) B102003 ROOF DECKS AND SLABS Roof decks and slabs should be broken into assemblies according to their particular type of construction (that is, flat slab, pan slab, precast or pre-stressed slab, four-way slab, slabs on metal or wood decking with concrete fill, etc.). All associated
| work items should be included in each assembly. | General | SF | E | N | Roof Decks And Slab | 85 | N | 37 | B102003 Roof Decks And Slab | Roof Decks And Slab | SF | E | SF | ||
| 380 | B | SHELL | This system includes all structural slabs, and decks and |
supports within basements and above grade. Note that the structural work will include both horizontal items (slabs, decks, etc.) and vertical structural components (columns and interior structural walls). Exterior load bearing walls are not included in this system but in System B2010, Exterior Walls. B10 SUPERSTRUCTURE Work includes floor construction and roof construction. B1020 ROOF CONSTRUCTION This construction is similar to floor construction except that is applies to the framework supporting the roof and roof decks.
(See also System B30, Roofing.) B102004 CANOPIES Canopies should be broken into assemblies according to their particular type of construction (that is, flat slab, pan slab, precast or pre-stressed slab, four-way slab, slabs on metal or wood decking with concrete fill, etc.). All associated work items should
| be included in each assembly. | General | SF | E | N | Canopy | 30 | N | 38 | B102004 Canopy | Canopy | SF | E | SF | ||
| 390 | B | SHELL | This system includes all structural slabs, and decks and |
supports within basements and above grade. Note that the structural work will include both horizontal items (slabs, decks, etc.) and vertical structural components (columns and interior structural walls). Exterior load bearing walls are not included in this system but in System B2010, Exterior Walls. B10 SUPERSTRUCTURE Work includes floor construction and roof construction. B1020 ROOF CONSTRUCTION This construction is similar to floor construction except that is applies to the framework supporting the roof and roof decks.
(See also System B30, Roofing.) B102099 OTHER ROOF CONSTRUCTION Any type of special roof construction not included above would fall into this category. All associated work items would be
| included in this assembly. | General | SF | E | N | Other Roof Construction | 40 | N | 39 | B102099 Other Roof Construction | Other Roof Construction | SF | E | SF | ||
| 400 | B | SHELL | This system includes all structural slabs, and decks and |
supports within basements and above grade. Note that the structural work will include both horizontal items (slabs, decks, etc.) and vertical structural components (columns and interior structural walls). Exterior load bearing walls are not included in this system but in System B2010, Exterior Walls. B20 EXTERIOR ENCLOSURE This system consists of the exterior facing of the facility, which includes all vertical and horizontal exterior closure such as exterior walls, exterior windows, and exterior doors. This system excludes roofing (See System B30, Roof). Load bearing exterior walls will be included here, and not in System B10, Superstructure. Structural frame elements at exterior such as columns, beams, spandrels, etc., would be included in Superstructure with only the applied exterior finishes (that is, paint, stucco, etc.) being included here. Finishes to the inside face of walls which are not an integral part of the wall construction will be included in System C30, Interior Finishes. B2010 EXTERIOR WALLS All materials associated with the following construction: exterior load-bearing walls, insulation and vapor retarder, parapets, exterior louvers and screens, sun control devices (exterior), balcony walls and handrails, exterior soffits, screen walls, and exterior coatings. B201001 EXTERIOR CLOSURE Assemblies would include material contained in exterior closure wall, such as masonry with brick veneer. Materials used for interior finishes on exterior walls are not included in this assembly. For example, if the interior side of this masonry wall is sheetrock applied on metal furring strips, the masonry wall is included in this assembly, but the furring strips and sheetrock
| are categorized as System C3010, Wall Finishes. | General | SF | E | N | Exterior Wall | 55 | N | 40 | B201001 Exterior Wall | Exterior Wall | SF | E | SF | ||
| 410 | B | SHELL | This system includes all structural slabs, and decks and |
supports within basements and above grade. Note that the structural work will include both horizontal items (slabs, decks, etc.) and vertical structural components (columns and interior structural walls). Exterior load bearing walls are not included in this system but in System B2010, Exterior Walls. B20 EXTERIOR ENCLOSURE This system consists of the exterior facing of the facility, which includes all vertical and horizontal exterior closure such as exterior walls, exterior windows, and exterior doors. This system excludes roofing (See System B30, Roof). Load bearing exterior walls will be included here, and not in System B10, Superstructure. Structural frame elements at exterior such as columns, beams, spandrels, etc., would be included in Superstructure with only the applied exterior finishes (that is, paint, stucco, etc.) being included here. Finishes to the inside face of walls which are not an integral part of the wall construction will be included in System C30, Interior Finishes. B2010 EXTERIOR WALLS All materials associated with the following construction: exterior load-bearing walls, insulation and vapor retarder, parapets, exterior louvers and screens, sun control devices (exterior), balcony walls and handrails, exterior soffits, screen walls, and exterior coatings. B201002 EXTERIOR WALL BACKUP CONSTRUCTION Assemblies include the support structure for the exterior skin or provide load bearing walls for the facility, or both. Materials used for interior finishes on exterior walls are not included in this assembly. For example, if the interior side of the masonry wall is sheetrock applied on metal furring strips, the masonry wall is included in this assembly, but the furring strips and sheetrock
| are categorized as System C3010, Wall Finishes. | General | SF | UE | N | Exterior Wall Backup Construction | 40 | N | 41 | B201002 Exterior Wall Backup Construction | Exterior Wall Backup Construction | SF | UE | SF | ||
| 420 | B | SHELL | This system includes all structural slabs, and decks and |
supports within basements and above grade. Note that the structural work will include both horizontal items (slabs, decks, etc.) and vertical structural components (columns and interior structural walls). Exterior load bearing walls are not included in this system but in System B2010, Exterior Walls. B20 EXTERIOR ENCLOSURE This system consists of the exterior facing of the facility, which includes all vertical and horizontal exterior closure such as exterior walls, exterior windows, and exterior doors. This system excludes roofing (See System B30, Roof).