This document is a Certified Testing and Balancing Report for the United States Coast Guard Academy Water TAB project. It includes instrument calibration details, a glossary, and remarks related to the testing of water pumps and heat exchangers. The report presents the measurements and data obtained in accordance with NEBB standards for the project's HVAC systems.
The related federal contract opportunity is for a Design/Build project to replace the existing steam and condensate piping throughout the U.S. Coast Guard Academy campus in New London, CT. The solicitation is posted exclusively for contractors on the current DHS/USCG National Multiple Award Construction Contract III (NMACC III- Pool 1). The project requires replacing steam and condensate piping, as well as hot water supply and return piping within various mechanical rooms. The selected contractor will provide all labor, material, equipment, and related services for the design-build effort.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Environmental Testing & Balancing, Inc.
154 State Street Suite 204
North Haven Connecticut 06473
(203) 234-2089 Fax (203) 234-2147
CERTIFIED TESTING and BALANCING REPORT
Date: Revised September 20, 2024
September 5, 2024
Project: United States Coast Guard Academy
Water TAB
Address: 31 Mohegan Avenue Parkway
New London
Connecticut
HVAC Contractor: Tetra Tech
The data presented in this report is a record of system measurements and final adjustment that have been obtained in accordance with the current edition of the NEBB Procedure Standard for Testing, Adjusting and Balancing of Environmental Systems . The measurements shown, and the information presented in this report, are certified to be accurate and complete, at the time and date information was gathered. Any variances from design quantities, which exceed NEBB tolerances, are noted in the TAB report project summary.
Submitted and Certified by:
NEBB Professional John E Burgess
Registration No.: 2968
TABLE OF CONTENTS
Sheet Title Page Numbers
Instrument Calibration Sheet, Certificates Glossary / Notes (two pages) Remarks 1 Pump Test Sheets 2 - 4 Heat Exchanger Test Sheet 5
Abbreviation Meaning Abbreviation Meaning
" W.G. (measured in) Inches Water Gauge MBH Thousand BTUs per Hour
A/C Air Changes per Hour MIN Minimum
AF Air Foil MVD Manual Volume Damper
AFMS Air Flow Monitoring (Measuring) Station N/A Not Applicable, Not Available
AHU Air Handling Unit N/ACC No Reasonable Access
AMP(S) Amperage(s) NDI No Damper Installed
BD Balancing Damper NF No Flow
BHP Brake Horsepower NG Not Given
BLNC Balance No. Number
BTU British Thermal Unit NPSH Net Positive Suction Head
BTUh BTU per Hour NPSHA Net Positive Suction Head Available
BV Balancing Valve NPSHR Net Positive Suction Head Required
CD Ceiling Diffuser OA Outside Air
CEF Ceiling Exhaust Fan OBD Opposed Blade Damper
CF Correction Factor OD Outside Diameter
CF for DDC BMS Correction Factor OED Open End Duct
CFLA Corrected Full Load Amperage P Pump
CFM Cubic Feet per Minute PD Pressure Drop
CH Chiller PH Phase
CHWC, CC Chilled Water Coil, Cooling Coil PP Pressure Port
CONFIG Configuration PSI Pounds per Square Inch
CS Circuit Setter PSIA Pounds per Square Inch Absolute
CT Cooling Tower PSIG Pounds per Square Inch Guage
CV Constant Volume QTY Quantity dB Decibel RA Return Air
DB Dry Bulb RAF Return Air Fan
DFC Damper Fully Closed RCP Radiant Ceiling Panel
Dia Diameter RECT Rectangular dP, DP Differential Pressure Req'd Required
DWO Damper Wide Open RG Return Grille
EA Exhaust Air RGD(s) Register(s), Grille(s), Diffuser(s)
EADB Entering Air Dry Bulb RHC Reheat Coil
EAT Entering Air Temperature Rm Press Room Pressure
EAWB Entering Air Wet Bulb RND Round
EF Exhaust Fan RP Radiant Panel
EG Exhaust Grille RPM Revolutions per Minute
ER Exhaust Register RR Return Register
ESP External Static Pressure RTU Roof Top Unit
EWT Entering Water Temperature RVA, RV Rotating Vane Anemometer
EX / EXH Exhaust SA Supply Air
F Fahrenheit SD Supply Diffuser
Glossary
FCU Fan Coil Unit SL Slot
FD Fire Damper SNRKL Snorkel
FH Flow Hood SP Static Pressure
FLA Full Load Amperage TADBF Total Air Delivered by Fan
FPM Feet per Minute TB Terminal Box
GPM Gallons per Minute TD Temperature Differential
HP Horsepower TDH Total Dynamic Head
HWC, HC Hot Water Coil, Heating Coil TEMP Temperature
HX Heat Exchanger TF Thermafuser
HZ Hertz TP Thermally Protected kW Kilowatt TRAV/TRV Traverse
LADB Leaving Air Dry Bulb TSP Total Static Pressure
LAT Leaving Air Temperature V Volt(s) / Voltage
LAWB Leaving Air Wet Bulb VAV Variable Air Volume
LD Linear Diffuser VD Volume Damper
LS Linear Slot VEL Velocity
LWT Leaving Water Temperature VFD Variable Frequency Drive
MA Mixed Air VG Velgrid
MAU, MUA Make-Up Air Unit WB Wet Bulb
MAX Maximum
Measuring in Velocity (referencing Air Outlet Test Sheets and Grille, Register & Diffuser Test Sheets):
Notes
Ak Factor indicates actual area of registers, following multiplying the Ak by the area equals the actual free area;
If codes are not listed here, please reference design drawings.
Measuring with Flow Hood (referencing Air Outlet Test Sheets and Grille, Register & Diffuser Test Sheets):
Registers, diffusers and grilles are read directly in CFM. (Report program indicates 1.00 in Ak Factor column.)
therefore CFM is calculated and based on this factor (FPM x Ak).
Codes (referencing Air Outlet Test Sheets and Grille, Register & Diffuser Test Sheets):
Page - 1
ENVIRONMENTAL TESTING & BALANCING, INC.
United States Coast Guard Academy Water TAB
Remarks September 20, 2024 - Revised
This report has been revised in response to Engineer's comments.
EP-1A, EP-1B
No impeller data on pump tag.
EP-2A, EP-2B
No impeller data on pump tag.
EP-9A, EP-9B
No impeller data on pump tag.
EHX-1, EHX-2
No design data.
EHX-5, EHX-7
No model tag.
No design data.
EHX-9
No design data.
September 5, 2024
Scheduled out of season; no pumps were operational.
Page - 2
PUMP TEST SHEET
Job Name: United States Coast Guard Academy Water TAB Tested by: Bill Cooney September 5, 2024 (24281) Revised September 20, 2024
PUMP DATA Chase B (EHX-1) Chase B (EHX-2) Pump Number EP-1A EP-1B EP-2A EP-2B Pump Manufacturer Armstrong Armstrong B&G B&G Model Number 4302IVS-04-06-10 4302IVS-04-06-10 a-1510-SSF8 a-1510-SSF8 Impeller Size N/A N/A N/A N/A Rpm 31.9 Hertz 31.9 Hertz 1800 1800 Specified gpm 200.0 200.0 45.0 45.0 Specified Head 80 80 65 65
MOTOR DATA
Motor Manufacturer / Frame WEG / 213/5TC WEG / 213/5TC Baldor / 145T Baldor / 145T Horsepower 3 3 2 2 Rpm 3520 3520 1755 1755 Voltage 460 460 230//460 230//460 Phase 3 3 3 3 Amperage Rated 11.9 11.9 5.8//2.9 5.8//2.9 Corrected for Voltage
TEST RESULTS - CLOSE OFF
Suction Not Operating Not Operating Not Operating Not Operating Discharge Pressure Differential Head in Feet
TEST RESULTS - OPERATING
Suction Discharge Pressure Differential Head in Feet Final gpm Test Voltage
Operating Amperage
Calculated Horsepower Brake Water Pump Efficiency Triple Duty Valve Setting
Page - 3
Job Name: United States Coast Guard Academy Water TAB Tested by: Bill Cooney September 5, 2024 (24281) Revised September 20, 2024
PUMP DATA Billiard Hall (EHX-5) Billiard Hall (EHX-7) Pump Number EP-5A EP-5B EP-7A EP-7B Pump Manufacturer Crane Crane Crane Crane Model Number 3K75P14 3K75P14 41-3 41-3 Impeller Size 6.38 6.38 7.37 7.37 Rpm 1750 1750 1750 1750 Specified gpm 400.0 400.0 350.0 350.0 Specified Head 55 55 50 50
MOTOR DATA
Motor Manufacturer / Frame Baldor / 213TCZ Baldor / 213TCZ Baldor / 213T Baldor / 213T Horsepower 7.5 7.5 7.5 7.5 Rpm 1735 1735 1770 1770 Voltage 230//460 230//460 230//460 230//460 Phase 3 3 3 3 Amperage Rated 20.8//10.4 20.8//10.4 19.2//9.6 19.2//9.6 Corrected for Voltage
TEST RESULTS - CLOSE OFF
Suction Not Operating Not Operating Not Operating Not Operating Discharge Pressure Differential Head in Feet
TEST RESULTS - OPERATING
Suction Discharge Pressure Differential Head in Feet Final gpm Test Voltage
Operating Amperage
Calculated Horsepower Brake Water
Page - 4
Job Name: United States Coast Guard Academy Water TAB Tested by: Bill Cooney September 5, 2024 (24281) Revised September 20, 2024
PUMP DATA Michel (EHX-9) Pump Number EP-9A EP-9B Pump Manufacturer Armstrong Armstrong Model Number 2.2.8-4380 2.2.8-4380 Impeller Size N/A N/A Rpm 1750 1750 Specified gpm 140.0 140.0 Specified Head 60 60
MOTOR DATA
Motor Manufacturer / Frame Baldor / 145 JM Baldor / 145 JM Horsepower 5 5 Rpm 1750 1750 Voltage 200 200 Phase 3 3 Amperage Rated 14.9 14.9 Corrected for Voltage
TEST RESULTS - CLOSE OFF
Suction Not Operating Not Operating Discharge Pressure Differential Head in Feet
TEST RESULTS - OPERATING
Suction Discharge Pressure Differential Head in Feet Final gpm Test Voltage
Operating Amperage
Calculated Horsepower Brake Water
Page - 5
HEAT EXCHANGER TEST SHEET
Job Name: United States Coast Guard Academy Water TAB Tested by: Bill Cooney September 5, 2024 (24281) Revised September 20, 2024
HX Number EHX-1 EHX-2 EHX-5 EHX-7 EHX-9 Location Chase B Chase B Billard Hall Billard Hall Michel Hall Service Bldg Heat 1 Bldg Heat 2 Pool Bldg Heat Bldg Heat
Design Data
EWT No Data No Data No Data No Data No Data LWT No Data No Data No Data No Data No Data Water Delta P No Data No Data No Data No Data No Data
GPM No Data No Data No Data No Data No Data
Test Data
EWT System System System System System LWT Not Not Not Not Not Water Delta P Operating Operating Operating Operating Operating
GPM
Total Water MBH
Temperature is in Degrees Fahrenheit EWT = Entering Water Temperature GPM = Gallons per Minute Water Delta P is in Feet of Water LWT = Entering Water Temperature
Remarks:
Date Calibrated Instrument Model No. Serial No. Manufacturer
Air Test Equipment
February 2024 Air Data Multimeter ADM 860 M94179 Shortridge
December 2023 Digital Anemometer RVA801 A02670 Alnor
December 2023 Digital Ampmeter 324 True RMS 25620561 Fluke
April 2024 Digital Laser Tachometer PLT200 1823199 Monarch
October 2023 Digital Thermometer 51/II 88180003 Fluke
October 2023 Humidity Meter TH300 03137177 Dickson
Hydronic Test Equipment
December 2023 Hydrodata Multimeter HDM‐250 W16040 Shortridge
Instrument Calibration Sheet
| 2024n |
| conts |
| glossary |
| remarks |
| pump |
| hx |
| ETB Instrument Calibration Full Size September 2024 |
| ETB Instrument Calibration Full Size May 2024 |
| Report Calibration Sheet2 |
| 1airdata j |
| 2anemometer_l |
| 3ampmeter |
| 4tachometer s |
| 5thermometer s |
| 6dickson 23 |
| 7hydrodata_ m |
fuji
File details come from the government source that posted it. Updated .