Appendix A - Installation Design Guide Rev. 3.pdf

PDF 3 MB Posted

Attached to
Installation of HVAC Shutdown and Fire Alarm Repair - Bldg. 230
Solicitation number
AEW-0170-0561
Issued by
Macomb County, Westland City, Michigan

About this file

The document is the Installation Design Guide (IDG) Revision 3, dated 30 October 2023, developed by the U.S. Army Garrison - Detroit Arsenal (DTA), Directorate of Public Works (DPW). This comprehensive design manual provides detailed architectural, engineering, and construction guidelines for facilities at the Detroit Arsenal, covering 58 divisions of design and construction standards. The guide establishes uniform requirements for design professionals, architects, engineers, and contractors working on installation projects, offering specific technical specifications, material requirements, installation methods, and compliance standards across disciplines including architectural, structural, mechanical, electrical, plumbing, fire protection, and site utilities.

The IDG serves as a standardization document that ensures consistency, quality, and functionality in construction projects at the Detroit Arsenal. It includes technical specifications for everything from building materials and system installations to CAD standards, environmental compliance, and landscaping requirements. The document provides explicit guidance on design principles, material selections, installation techniques, and compliance with various federal, state, and military codes and standards, including Unified Facilities Criteria (UFC), National Fire Protection Association (NFPA) standards, and Army regulations. The guide is designed to support sustainable, economical, and practical facility development while considering future growth potential and adhering to comprehensive engineering and design best practices.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Directorate of Public Works Detroit Arsenal

APPENDIX A

Appendix A - Installation Design Guide Rev. 3 (30-Oct-2023) a [lilf:l;Mi] brian.g.saintonge Cross-Out

Detroit Arsenal Installation Design Guide

DPW ENGINEERING DIVISION TEAM

Installation Design Guide (IDG) Revision 3, 30 October 2023

Table of Contents

Table of Contents

Record of Changes

General Requirements

Existing Conditions

Concrete

Masonry

Metals

Wood, Plastics and Composites

Thermal and Moisture Protection

Openings

Finishes

Specialties

Equipment

Furnishings

Special Construction

Conveying Equipment

Fire Protection Design

Plumbing

Heating, Ventilation, and AC

Utility Monitoring Control System

Electrical

Communications

Electronic Safety and Security

Earthwork

Exterior Improvements

Utilities

Transportation

Waterway and Marine

Pollution Control Equipment

Water and Wastewater Equipment

Electric Power Generation

CAD Standards

Construction Requirements

Energy Standards

Environmental Compliance

Landscaping Selection

Variance Process

Appendices

Record of changes

This IDG supersedes IDG Rev.2, dated 22-Mar-2023

Change No. Date Location IDG Revision Number

1 30-Oct-23 Replaced Division 27 – “Communications” in its entirety 3

2 30-Oct-23 Revised Dig Permit requirements 3

PREVIOUS CHANGES

1 22-Mar-23 Added Division 21 - Fire Protection Design in its entirety. 2

2 22-Mar-23 Revised Division 22 – “Plumbing” Metering sections 2

3 22-Mar-23 Added generator design requirements to Division 26 2

4 22-Mar-23 Revised Division 51 – “CAD Standards” in its entirety. 2

5 22-Mar-23 Revised Division 52 – “Construction Requirements” to align with Detroit Arsenal 2

6 22-Mar-23 Revised Division 54 – “Environmental Compliance” to remove reference to Division 12 2

7 22-Mar-23 Revised Division 55 – “Landscaping Selection” to align with Area Development Plan 2

Division 01 – General Requirements

General Requirements Page

1-1.1 Introduction 1-1.2 Common Work Results for Multiple Divisions 1-1.3 General Information 1-1.4 Architecture Design 1-1.5 Civil/Structural Design 1-1.6 Fire Protection Design 1-1.7 Mechanical and Plumbing Design 1-1.8 Electrical Design 1-1.9 Communications Design

1-1.1 Introduction The design guide requirements are to be used in compliance with all applicable professional standards and code requirements by the Professional Architect/Engineer (A/E) and Contractors performing services at Detroit Arsenal. It is the responsibility of the designer to ensure the work complies with all current or accepted applicable codes as well as the installation design guide’s requirements. It is the intent of Detroit Arsenal’s design, construction, and maintenance team to aim for functional capabilities in products that are sustainable, economical, and practical. By utilizing the projected future growth depicted in the Real Property Master Plan, designers can make smarter decisions when selecting size, quantity, and quality of materials that may impact projects outside the scope of their current project and will assist in the long-term growth of the installation.

The primary objective of these guidelines is to achieve consistency and accuracy in facility design through awareness and standardization. These guidelines are intended to establish the installation standard of quality and is not a specification. They are general in nature and shall be supplemented by applicable codes, standards, and guides referenced in this manual.

Requirements in this division apply to all divisions. Individual divisions may have additional information and/or requirements to supplement this one.

In some instances, a product is named to represent a minimum acceptable quality standard as a basis for the A/E. The intent is for the A/E to specify/schedule at least three manufacturers/ models of similar style, appearance & performance characteristics as the named product.

Materials and items not contained in this guide shall be selected by the A/E based on application and as allowed by the Unified Facilities Criteria (UFC). The A/E shall develop the construction documents in accordance with the intent of this guideline and as necessary to comply with the given project scope and/or program.

Substitution requests shall be in writing to the Government Project Manager. Notification of substitution acceptance will be in writing; otherwise, the substitute is not accepted.

1-1.2 Common Work Results for Multiple Divisions Permits and Inspections

1. Follow Garrison requirements for permitting and scheduling inspections as stated in Division 52. Common permits include dig permits, soil erosion/sediment control permits, and crane permit. Coordinate with the Government Project Manager.

a. Minor Projects (Task Order Contracts, Credit Card etc.) - Contractor is responsible for all permitting and inspecting fees.

b. Major Projects (MILCON, MCA etc.) - Coordinate with Government Project

Manager for responsible party for permitting fees.

c. Minor Projects with Garrison approved Construction Manager (CM) - Coordinate with Government Project Manager and assigned Construction Manager for responsible party for permitting fees.

2. The Government Project Manager, Contracting Officer Representative (COR), and Construction Control Representative reserve the right to witness all qualification testing.

The Contractor shall notify the Government Inspector in advance and shall not proceed with testing until the witnesses are present or until the right to witness has been waived.

3. Work shall not be enclosed, covered, or insulated until it has been inspected, tested, and approved. Any work that is enclosed, covered, or insulated before such inspection and test shall be uncovered and, after it has been inspected and approved, restored to its prior condition at no additional cost to the Government.

Coordination

1. Review and coordinate between all construction documents, all project specifications, and all sections of the Installation Design Guide. Notify Government Project Manager of conflicts or discrepancies prior to proceeding with work.

2. If it becomes necessary to interrupt work activities in buildings, roads, parking lots, etc.

for construction purposes, permission to do so must be requested in writing using a Construction Impact Notification (CIN) form supplied by the government. The CIN must be submitted to the Government Project Manager fourteen (14) calendar days prior to commencing work and shall be subject to Government Project Manager approval.

Coordinate with Government Project Manager for required lane closures and parking space closures a minimum of 14 calendar day prior to closures. Contractor is responsible for all closure barriers and signs subject to Garrison review and approval. Any changes to the traffic pattern to include parking must be coordinated with the DTA Fire Department and Police Department. This coordination can be done through the Government Project Manager.

3. Where work will impact existing facilities or utility outages are required, the contractor must notify the Directorate of Public Works (DPW) a minimum of two

(2) weeks prior to the anticipated work. For utility outages the contractor must submit an outage request to the Base Operations Division of DPW. When approved, Base Operations will notify the base maintenance contractor so they can facilitate the outage.

4. On renovation projects coordinate all construction activities with users to minimize or eliminate disruptions of operations in occupied portions of the buildings.

5. The Contractor shall plan work activities in a manner such that there will be minimal interference and inconvenience to ongoing traffic and daily operations in the facility and local areas.

6. The Contractor shall coordinate work efforts with all affected utility companies. This includes initial contact to each utility company and coordination prior to and during construction.

Contract Documents

1. As part of the contract documents package the designer shall develop drawings, specifications, and a Design Analysis.

2. Designers shall use approved templates within the Division 51, CAD Design Standards, of this document. Designers shall use approved levels within drawings to ensure cohesive design files are being developed. All building designs shall conform to this standard for any new build, modification to existing, and all other designs of buildings and/or surrounding support shelters.

a. Room name and numbers must appear on all plans of all disciplines. If space is not available for room names within the plan footprint, show room number in plan and provide table with room name. Refer to Table 1-1.2-1.

b. Column lines and column numbers or letters shall appear on all plan sheets.

c. Show all construction details on the drawings not bound in the specifications.

d. Performance data for all equipment must be shown in schedules on the drawings. This data may also be included in the specifications but shall be carefully edited for conflicts.

e. The A/E shall identify on the drawings all areas that may be classified as hazardous in accordance with the latest edition of applicable NFPA standards or that may pose a health hazard due to noise levels, radiation, chemical fumes, etc. The A/E shall describe how each such area will be treated in the building design.

Table 1-1.2-1 Example Showing Alternate Means of Indicating Room Names

3. The specifications shall be a separate bound volume or volumes and shall be separated by divisions using CSI MasterFormat standards. Each division shall provide the minimum acceptable level of quality for that particular division. All equipment and material

A-100 OFFICE

A-101 WOMEN'S RESTROOM

A-102 MECHANICAL ROOM

ROOM LEGEND

ROOM

LEGEND ROOM NAME

specifications shall be bound in the specifications book and shall not be shown on the drawings.

4. The Design Analysis shall include the user’s project requirements, reports on site testing that has been done, design narratives of the various disciplines, energy models that have been performed and design calculations. Other information may be inserted as necessary.

Submittals

1. Submit at least one hard copy of the drawings, specifications and design analysis for review.

2. Submit an electronic copy of all submittals as a single bookmarked pdf via a government approved file sharing site. Include a table of contents, bookmark/tab manual based on specification chapters or sections.

3. Submit catalog data sufficient to indicate that material or product conforms to, or exceeds, specified requirements.

4. Refer to individual sections for additional submittal requirements.

Site Requirements

1. Provide an erosion control plan addressing prevention, control, and abatement of water pollution to Government Project Manager for approval prior to proceeding with work.

2. Areas where work is performed shall be kept clean of debris and materials and shall be cleaned at the end of each work day. Contractor is responsible to secure all tools and materials at all times.

3. Locate all underground utilities prior to proceeding with work. Contact Government Project Manager to obtain latest Installation Utilities Map for the area in scope of work prior to proceeding.

4. Maintain access to side streets, drives, and sidewalks at all times during construction.

5. Protective fencing shall be orange.

6. Provide protective barriers around open trenches and manholes. Provide 10 feet square barricade around manholes. Remove construction debris such as dirt, sod, ground cover, etc. No construction materials or construction tools shall be stored within the protective barricades.

7. Provide protective barricades for temporary services or equipment (such as water or electrical). Barricades shall allow 3 feet clearance on sides and rear (or required by code if greater), and 5 feet clearance in front of equipment.

8. Existing pedestrian/sidewalk lighting and roadway lighting shall remain operational during all phases of the construction until new lighting is energized.

9. Contractor shall restore back to original installation primary gear, primary feeders, utilities, irrigation, etc. damaged by the contractor in the area of demolition or construction.

10. Do not park construction vehicles or personal vehicles over manhole covers. Manhole covers shall be accessible to Garrison personnel at all times.

11. Project site design and final site constructed conditions shall include clear vehicle access to all new equipment and manholes for maintenance purposes.

Warranty

1. Contractor shall provide minimum 1 year warranty for all labor and materials, whether included or not included by equipment manufacturers. Contractor shall replace defective materials during the first year of warranty without additional compensation from Government.

2. Manufacturer warranties greater than 1 year, or where lengthier warranties are required in the project documents, or in the IDG shall extend the standard 1 year warranty.

3. Warranty period shall begin on date of substantial completion.

Miscellaneous

1. Garrison/Occupant Furnished Equipment:

a. Contractor shall be responsible for receipt from the Garrison or the future building occupant, storage after receipt and installation where required.

b. Maintain equipment until project is turned over to Garrison at Substantial Completion or BOD (Beneficial Occupancy Date).

c. Verify equipment connection requirements prior to rough-in and ordering materials.

d. Install equipment in accordance with manufacturer’s instructions.

Project Close Out

1. Submit an electronic copy of Operations Manuals as a single bookmarked pdf via a government approved file sharing site. Include a table of contents, bookmark/tab manual based on sections. Provide two hard copies of the Operations Manuals. Submit manuals to the Government Project Manager or as otherwise specified in the contract documents.

2. Provide record documents (as-built) drawings per Garrison IPC requirements. Coordinate with Government Project Manager. Record documents shall include updated as-built drawings with all revision marks removed. Submit one hard copy of the as-built drawings. Provide one copy of the as-built CAD drawings in MicroStation format with all reference files attached. Include a separate pdf copy of each as-built drawing.

Filenames shall include drawing number as reference.

3. Submit one electronic copy of the Specifications as a single bookmarked pdf. Include a table of contents, bookmark/tab specifications based on sections. Provide two hard copies of the Specifications.

4. Notify the base maintenance contractor at least 3 weeks in advance when scheduling training on the operation of the newly installed equipment.

1-1.3 General Information Codes and Standards: Comply with provisions of the following codes.

1. Unified Facilities Criteria, UFC 1-200-01, DoD Building Code (General Building Requirements)

2. Unified Facilities Criteria, UFC 1-200-02, High Performance and Sustainable Building Requirements

3. Army Regulation, AR 420-1, Army Facilities Management

4. Army Regulation, AR 200-1, Environmental Protection and Enhancement

5. National Fire Protection Association National Fire Codes, with emphasis on NFPA 101 -

2009 Edition, Life Safety Codes (LSC) and including all referenced standards.

6. International Building Code, Latest Edition

All UFCs may be found at the website:

https://www.wbdg.org/FFC/dod/unified-facilities-criteria-ufc

1-1.4 Architectural Design

1. Unified Facilities Criteria, UFC 3-101-01, Architecture

2. NFPA 45 Standard on Fire Protection for Laboratories Using Chemicals as applicable

3. Elevators and Escalators, Health & Safety Code chapter 754 and 16TAC § 74 ASME

17.1, 17.2, 17.3 and 18.1 Boilers, Health & Safety Code chapter 755 and 16TAC § 65 ASME Boiler and Pressure Vessel Code.

4. Americans with Disabilities Act, 28 CFR Part 35 Nondiscrimination on the Basis of Disability in State and Local Government Services, Final Rule, as published in the Federal Register Friday, July 26, 1991.

5. Fair Housing Act accessibility requirements for housing units.

6. FM Global Standards for roof systems

1-1.5 Civil/Structural Design

1. Unified Facilities Criteria, UFC 3-301-01, Structural Engineering

2. Unified Facilities Criteria 3-201-01, Civil Engineering

3. ACI – 318-02, building code requirements for reinforced concrete

4. AISC, American Institute of Steel Construction

5. FEMA 100-year flood plain designation

1-1.6 Fire Protection Design

1. Unified Facilities Criteria, UFC 3-600-01, Fire Protection Engineering for Facilities

2. Unified Facilities Criteria, UFC 3-601-02, Operation and Maintenance: Inspection, Testing, and Maintenance of Fire Protection Systems

1-1.7 Mechanical and Plumbing Design

1. Unified Facilities Criteria, UFC 3-401-01, Mechanical Engineering

2. Unified Facilities Criteria, UFC 3-420-1, Plumbing Systems

3. Code of Federal Regulations, 49 CFR 192 https://www.wbdg.org/FFC/dod/unified-facilities-criteria-ufc

4. International Mechanical Code, Latest Edition

5. International Plumbing Code, Latest Edition

6. International Fuel Gas Code, Latest Edition

7. ASHRAE 62.1 Indoor Air Quality Standard

8. ASME/ANSI B31.9 Building Service Piping.

9. FM Global Standards for fire protection systems

1-1.8 Electrical Design

1. Unified Facilities Criteria, UFC 3-501-01, Electrical Engineering

2. National Electric Code, Latest Edition

1-1.9 Communications Design

1. TIA/EIA Standards

2. I3MP Standards

Division 02 – Existing Conditions

Existing Conditions 2-1.1 General Information It is extremely important that the site limits be clearly understood and well delineated on the Site Plans. It is the intent that these limits be fenced during construction and that all construction activities be conducted therein. In defining the site limits, the A/E is to consult with the Garrison Project Manager and staff to ensure that not only programmatic needs will be met but that the entire site development will be in context with the Master Plan’s framework for land use, open space, circulation, parking, and building placement. Staging areas are to be defined and contained within the site limits if at all possible. The site’s current integration with the existing installation is also to be evaluated so adjustments to pedestrian and vehicular circulation patterns can be well planned to mitigate any negative impacts after the site is fenced.

2-1.2 Access Points of ingress/egress shall be determined for the project site. Consideration should be given to minimizing the number of access points, preferably one controlled and lockable entry. Selection shall not be based solely on ease for delivery of materials and equipment but should seek to minimize conflict with installation patrons and services.

2-1.3 Utility Needs The Government Project Manager will provide existing available utilities information. The A/E shall determine if additional data is required, which may be processed by the A/E through additional services.

A/E should contemplate and determine utility services needed to the site. Specific attention is to be directed to ensure ample notification is given, and safe, reliable, and sanitary connections are made to existing systems. The A/E shall determine and recommend for approval the points of connection to existing site utilities.

2-1.4 Survey A topographic survey will be performed for each project involving new construction and for renovation projects where necessary by a licensed surveyor.

The survey shall include information for, but not limited to, topography, existing construction (buildings, roads, sidewalks, etc.), existing utilities on site including closest point of connection if not on site, significant vegetation, easements, etc.

The survey shall be drawn using a BIM authoring program and final copy shall be plotted. The survey shall be modeled at 1:1 scale. All dimensions and elevations shall be in English units. The plotted scale shall be 1.0” = 20.00’ and the title block shall include the project name and project number. The final drawing shall be sealed by a RPLS, if requested. Upon completion of the survey provide two copies of the plotted survey containing the native CAD file, an IFC copy of the file, as well as an ASCII file of the point elevations. The package shall be professionally labeled containing project name and project number.

Specifically the Survey Shall:

Include a legend of symbols and abbreviations used on the drawing, a true north arrow and a graphic scale.

Provide contours at 1 foot intervals unless directed otherwise by the Government Project Manager with an error not to exceed 1/2 contour interval.

Provide at least two horizontal and one vertical control points with description and elevation to nearest .01'. Datum shall be NAD 83 for horizontal and NGVD 88 for vertical.

Provide spot elevations at street intersections and curb, crown of roads, sidewalks, edge of paving including far side of paving, drainage flow line, manhole rims/covers, top and bottom of retaining walls, etc. Spot elevation on paving or other hard surface shall be to the nearest .05’ and spot elevations on other surfaces to the nearest .1’ Include the location of above and below ground structures, man-made and natural features; all floor elevations and finish floor elevations at each entrance of buildings on the property, if applicable.

Include the location, size and depth of water, gas and thermal utilities. For depths, coordinate with the Government Project Manager. Include the location of fire hydrants available to the property and the size of the main serving each.

Include the location and characteristics of power and communications systems above and below grade.

Include the locations, size, depth and direction of flow of sanitary sewers, combination sewers, storm drains and culverts serving or on the property; location of catch basins, manholes, and inverts of pipe at each.

Provide the name of operating authority of each utility. Utility information can be provided by the Government Project Manager as available.

Provide the mean elevation of water in any excavation, well or nearby body of water. Provide the location of 1% annualized potential and 0.2% annualized potential (100yr & 500-yr) floodplains.

Provide the extent of watershed onto the property.

Provide the location of trees.

Provide the perimeter outline only of any thickly wooded areas unless otherwise directed.

Show boundary lines, giving length and bearing (including reference or basis) on each straight line; interior angles; radius, point of tangency and length of curved lines. Where no monument exists, set permanent iron pin (monument) or other suitable permanent monument at property corners; drive pin into ground to prevent movement, mark with wooden stake; state on the drawing(s) whether corners were found or set and describe each.

Survey shall be reviewed by Government Project Manager before being finalized.

2-1.5 Hazardous Materials Assessment Hazardous Materials Assessments will be considered on a project by project basis. The A/E may need to include in the reimbursable services portion of the A/E Services Agreement the cost for hazardous materials assessments for asbestos, lead, mold or any other materials. The hazardous materials assessment firm is to possess all of the licenses, registrations and qualifications to perform services.

2-1.6 Geotechnical Investigations

All work performed under the direction of and stamped by licensed geotechnical professional and in accordance with applicable ASTM standards.

2-1.7 Flood Protection and Stormwater Management A/E, through aid of the site survey, shall evaluate potential for localized flooding. Building elevations shall be established to ensure that the structure is protected from the 100-year base flood. Site design shall also ensure that site alterations do not artificially create a base flood threat to the building or other surrounding buildings.

Stormwater Runoff is to be controlled and managed in accordance with Macomb County and/or the City of Warren guidance. Site design is to ensure that any increases in stormwater runoff are collected, conveyed, and managed.

2-1.8 Site Preparation A. Clearing the Site All objectionable growth within the site area planned for building and landscaping improvements shall be cleared. All debris resulting from any clearing, stripping, grubbing, and demolition activities shall be removed from the site at frequent intervals to prevent unsightly accumulation.

B. Demolition All site demolition shall be indicated on a separate demolition plan indicating all items to be turned over to the Garrison and all trees and vegetation that shall remain and be protected during construction.

Perform all demolition of existing surface and underground facilities/improvements as required to construct the project. Demolition plans/details shall be included in the design drawings. Underground facilities shall be removed as required to clear construction and in accordance with good prudent practice and considering potential future construction. At a minimum all structures shall be removed to a point 3' below natural ground. All cavities left below ground shall be filled with compacted native material or a flowable fill material. The portions of piping systems remaining in place shall be neatly cut and capped/plugged. Where partial demolition occurs the remaining portions shall be left in a finished functional condition.

Fill all voids left by clearing and demolition operations with native material compacted in maximum 8" lifts to a density equal to that of the surrounding undisturbed soil.

C. Tree Protection Provide adequate tree protection around all trees in project site that are to remain. Trees designated to remain shall be documented on the plans and tagged in the field. The contractor is to be responsible for protecting the top, trunk, and root system of these trees. Protection shall be by barricading with four (4) inch x four (4) inch posts with two (2) inch x four (4) inch rails (two (2) minimum per side), installed at the drip line of the tree. No equipment, stockpiling of materials, work or parking is to be permitted within the barricades. Root zones shall be protected, where determined by arborist or Garrison representative, as necessary by root pruning at outside edge of barricades.

D. Striping Remove all organics, grasses, roots and topsoil to its full depth to the limits of the areas to be graded. Topsoil free of tree roots, brush and other debris can be stockpiled within the site for subsequent landscaping needs. All material in excess of subsequent needs shall be removed from the site.

E. Grubbing The removal of trees and shrubs shall include the removal of stumps and roots. No stump or root greater than three (3) inches in diameter shall remain in the areas where underground structures, utility lines, footings and pavements are to be constructed. Grubbing in open areas shall remove stumps and roots greater than three (3) inches in diameter to a depth of two (2) feet below finished grade.

2-1.9 Earthwork A. Site Grading Rough Grading: Slopes shall not be steeper than one (1) vertical to five (5) horizontal in general open lawn and other grassed areas. Steeper slopes will be permitted only on a case-by-case basis where special need warrants. Tops and bottoms of banks and other break points shall be rounded to provide smooth and graceful transitions.

In areas of walks without ramps, slopes shall not be steeper than one (1) vertical to twenty

(20) horizontal. Ensure ramped areas comply with the ADA requirements.

Finish Grading: This operation shall consist of the final dressing to provide a uniform layer of either the topsoil or nutrients required for the placement of plant materials or of the subgrade in preparation of pavement construction. This work shall achieve elevations within

0.1 inches of required elevation so that the proper thicknesses of over-layments can be provided.

B. Excavating General For Site: Excavation is to be unclassified and is to be performed as Authorized Excavation regardless of type, nature or condition of the material encountered as necessary to establish the lines and grades to be shown on the drawings. Once subgrade elevations have been reached, A/E is to inspect and determine suitability of subgrade material for intended purpose. If unsuitable, additional excavation can proceed the same as authorized and paid for at the same unit price established in the bid. It is to be stipulated that excavations beyond the limits needed to establish required grades without the specific direction of the A/E will be regarded as unauthorized. Unauthorized excavations and any required remedial work will be at the contractor’s expense.

Excess excavation and material not suitable for backfill and embankment operations shall be removed from the site with the exception that the Garrison reserves the right to select and claim up to the first 2,000 cubic yards. It is to be stipulated that the contractor shall deposit said material, if owner elects, to a location on the installation designated by the Owner at no additional cost. Provisions for maintaining workmen safety within excavations is the sole responsibility of the Contractor.

Trenching: Trench excavations shall be the same as that for general site excavation except that width shall be only to the extent normal for the utility system being installed. A/E is to define normal trench widths and restoration limits paid for with appropriate details in the plans. For excavation beyond normal widths, A/E is to define special backfill requirements at contractor’s expense. Trenching shall establish bottoms to the required lines and grades such that proper bedding of the utility can be accomplished in accordance with the material manufacturer’s recommendations. All trench bottoms are to be maintained dry until properly backfilled and compacted.

A/E is to ensure all applicable safety codes are followed for sheeting, shoring and side slope requirements. Trench excavations shall be guarded at all times. It is to be stipulated that if trenches are to be left open while unattended for any reason, or beyond work hours, they shall be barricaded with orange safety net staked with two (2) inch x four (4) inch posts four

(4) feet from the trench edges.

C. Backfill General for Site and Structures: A non-plastic, clean, granular material composed of sand, fractured rock or gravel obtained from the excavation activities or, if necessary, from offsite borrow shall be provided. The material shall be substantially free of clays, organics including loam, peats and wooden materials and trash, which may be compressible. Quality backfill shall also be void of masonry, rubble and roadway products. Blending of admixtures to improve gradation uniformity and stability is permissible. Provide laboratory verification that intended backfill materials are suitable for the intended purpose. Backfill materials shall be generally placed in 12-inch maximum lifts, loose measure. Specify thinner lifts under structures, pads and pavements as appropriate.

Trenches: Specify select backfill material of equal quality or better stipulated for general site.

Initial placement of material in trenches should be limited to 6-inch lifts to ensure that adequate compaction and support is achieved under the haunches of the pipe to the springline. Placement should then proceed in 6-inch lifts to facilitate proper compaction to 1 foot above the pipe. The remainder of the trench can usually be backfilled and amply compacted in 12-inch lifts. However, the ability to achieve density requirements must be maintained.

D. Excess Material Disposal Excess excavation, backfill, and other construction wastes shall be disposed of offsite to a site secured by the contractor. No on-site burning or burying of wastes will be permitted and no additional cost to the Owner for disposal is to be charged. Excess earth materials not needed for other work shall not be stockpiled temporarily on the site and construction rubble and debris shall be placed in Contractor supplied dumpsters to be picked up on regular intervals.

E. Soil Compaction Quality control testing is to be provided to ensure that fill materials are properly placed and compacted to yield the necessary densities for the support capabilities needed. The A/E is to determine the testing program suitable for the work to be pursued and make recommendation to the Owner. A/E is to assist Owner in selecting a qualified testing laboratory to perform the testing activities and evaluation of the contractor’s work. The Owner will pay for all initial tests conducted. It is to be stipulated that where tests indicate work fails to meet the requirements specified, the contractor, at his expense, shall perform remedial work and retest to verify that the material placement meets the specification requirements.

Compaction Requirements: Specify that soil compaction be evaluated based on the densities determined by Standard Proctor Tests.

General Site: Cuts and embankments not intended to support subsequent work or structures should be compacted to a firmness equal to the adjacent undisturbed soils.

Under Structures: Soil preparations intended to support site related structures shall be compacted to a density of at least 100% of the maximum laboratory density as determined by AASHTO T-99. Compaction under building foundations and structures shall achieve the density requirements established in the geotechnical evaluations and recommendations.

Utility Trenches: Compaction of trench backfill shall achieve the density as stipulated for site structures in paragraph 02240.2.2 above.

Pavements: Areas subject to vehicular traffic shall be prepared in accordance with the provisions of UFC 3-250-18FA, MUTCD, AASHTO Roadside Design Guide, and MDOT standards, latest edition. Densities to be achieved shall be at least 98% of the maximum density as determined by AASHTO T-180.

F. Soil Treatment Ensure applicator is a professional pest control operator licensed in accordance with the regulations governing the application of soil treatment solutions.

Treatment materials applied shall be EPA approved for the application of effective termite control. The product shall be applied in accordance with the manufacturer’s recommendations and the technical data and application instructions are to be submitted to the Garrison prior to commencing. Ensure that the soil treatment is not applied until all excavation, filling, compacting, and grading operations are complete in the areas to be treated.

Treatment warranty shall be for a period of not less than five (5) years from the date applied.

A/E is to ensure warranty includes provisions for re-treatment and repair or replacement of any damage caused by infestation or evidence of infestation within the warranty period without cost to the Garrison.

2-1.10 Foundations The Installation’s building construction has experienced a wide array of foundation systems to address the various soil and subsurface conditions for cost effective support of the building loads. These systems comprise spread footing, grade beams, mat foundations, precast driven piles, and auger cast piles. No wooden pile systems are allowed except in appropriate marine applications.

Division 03 – Concrete

Concrete 3-1.1 General Information Concrete foundation systems are to be recommended by a geotechnical engineer in consultation with a structural engineer. Driven steel or wood pilings are not to be used without prior approval.

The structural engineer must submit a letter to the Project Architect and Government Project Manager certifying that the structural engineer has read the geotechnical report and consulted with the geotechnical engineer regarding the foundation system.

The Designer shall submit to the Project Architect a written statement of the design rationale for the foundation system chosen.

The floor on the inside and the outside of each doorway shall be level for a distance of no less than five (5) feet in each direction. A 2% slope and cross slope is acceptable outside for drainage purposes and ADA compliance.

Sharp inclines and abrupt changes in level shall be avoided at doorsills. Allow for drainage at the outside of exterior doors.

At an out-swinging door, the platform shall be not less than five (5) feet by five (5) feet and shall extend not less than one (1) foot beyond each side of the door.

At an in-swinging door, the platform shall be not less than three (3) feet by five (5) feet and shall extend not less than 1-foot beyond each side of the door.

Codes and Standards: Comply with provisions of the following codes.

• American Concrete Institute (ACI) 301, “Specifications for Structural Buildings.”

• American Concrete Institute (ACI) 318, “Building Code Requirements for Reinforced Concrete.”

• Concrete Reinforcing Steel Institute (CRSI), “Placing Reinforcing Bars – Recommended Practices.”

• American Concrete Institute (ACI) 306, “Cold Weather Concrete “

• American Concrete Institute (ACI) 308, “Standard Practice for Curing Concrete”

• American Concrete Institute (ACI) 309, “Guide for Consolidation of Concrete”

• Unified Facilities Criteria (UFC) 1-200-01 DoD Building Code

• Unified Facilities Criteria (UFC) 3-301-01 Structural Engineering

3-1.2 Concrete All concrete shall be designed, transported, placed, finished and cured in accordance with American Concrete Institute (ACI) requirements. Components of the concrete mix shall meet applicable ANSI/ASTM requirements. Mix requirements and strength shall be specified by the Designer for each item of construction. Limit the number of mix strengths specified as much as practical.

Concrete mix designs shall be submitted by the contractor to the structural engineer for approval so as not to delay construction. The minimum standard concrete mix shall be 3,000 psi, unless otherwise specified in the contract documents.

Concrete reinforcement material, design and placement shall meet the applicable requirements of ACI and the Concrete Reinforcing Steel Institute (CRSI) along with associated ASTM requirements. Reinforcing bars shall typically be Grade 60. No welded wire fabric reinforcing is allowed except in topping slabs or unique situations as approved by the Government Project Manager. Main reinforcing bars to be minimum No. 4 in size. Limit No. 3 bars (Grade 40) to ties and dowels.

Admixtures to the concrete mix meeting applicable ANSI/ASTM specifications may be used as recommended by the structural engineer to improve concrete workability, wear/weather resistance characteristics, etc., to better meet project conditions. The designer shall submit to the Project Architect a written statement of the design rationale for any admixtures that are specified.

Pozzolan Admixtures should be used only within the limits recommended by the structural engineer and approved by the Government Project Manager. Calcium chloride or admixtures containing chlorides shall not be used. An approved air-entraining admixture shall be used for all concrete exposed to weather. When used, the concrete must be tested at the site immediately prior to placement to verify the proper amount of air-entrainment is present.

The project specifications shall clearly establish finish measurement tolerances/standards suitable to the intended use of the surface and its exposure along with other quality control requirements needed to verify the concrete meets the specifications.

Proper transporting, conveying, depositing, and curing methods for concrete shall be clearly specified by the designer. It is not acceptable to incorporate them by reference.

The CM/GC is responsible for creating a drawing of the cast-in-place concrete building structure from which shop, fabrication, and as-built drawings shall be derived.

Hot and cold weather requirements shall be defined or clearly referenced.

Aluminum conduits and pipes shall not be embedded in any concrete.

Concrete wash out procedures shall be clearly defined and approved of by the Government Project Manager prior to placement of concrete.

No later than 30 calendar days after Contract Award, the Contracting Officer will schedule a pre-installation meeting. Contractor shall bring to attention of the Contracting Officer any discrepancies found in the architectural and structural drawings.

3-1.3 Testing and Laboratory Analysis Compression Strength and other required laboratory analyses shall be performed by a qualified independent laboratory (conforming to American Society for Testing and Materials standards) selected and paid for by the contractor requesting the analyses.

A minimum of four (4) test cylinders prepared in accordance with ASTM C31/C31M "Standard Test Practice for Making and Curing Concrete Test Specimens in the Field" for the preparation of the cylinders and ASTM C39/C39M "Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens" for the testing requirements shall be taken during each day’s placement and every 50 cubic yard thereafter. Tests shall be made by a testing laboratory employed and approved by the Consultant. Written reports of the tests shall be sent directly to the Consultant with a copy to the Government Project Manager. Laboratory shall make tests for wet density, dry density, and compressive strength of each specimen.

The Contractor shall notify the Government Project Manager when testing is to be performed and must report the results of testing immediately to the Government Project Manager.

3-1.3 Void Space Below Grade Beams Provide soil retainers at face of grade beams below grade to form a void of sufficient depth to prevent expansion of earth to cause pressure on bottom of beams.

3-1.4 General Floor Loading Design floor live loads on all institutional buildings to carry a minimum of 100lbs/sf unless greater is required by Code and/or use for a particular space such as library shelving. This allows flexibility of future design when the building is renovated. Floors must be designed sufficiently rigid to prevent objectionable vibration. All other buildings the design live loads shall be by the building code.

3-1.5 Porches and Steps All stoops, porches, ramps, docks and steps, exterior and interior should have non-slip surfaces and nosings where applicable. Slope exterior porches and treads where allowed by National Accessibility Standards to drain water. Ponding of water in these areas is unacceptable. Exposed concrete finished work shall be accomplished in two pours: the first structural and the second being a two-inch minimum finish topping placed near completion of project.

Primary entry floors may not be constructed using brick or pavers since these surfaces are excessively noisy when carts are rolled across them.

3-1.6 Cement Finished Floors Generally, cement finished floors are to receive hardener with colorant. Positive protection is to be provided to prevent staining and chipping during construction work. Slick finishes shall be avoided.

3-1.7 Crawl Space Under Suspended Structural Foundations Where a crawl space is included in the design provide a two-inch thick, 2500 psi unreinforced mud slab, properly sloped and drained. (For further information see General Information “Crawl Space Under Suspended Structural Foundations").

3-1.8 Concrete Reinforcing No welded wire fabric shall be used for reinforcing concrete except in topping slabs. All other reinforcing shall be by bars.

3-1.9 Precast, Tilt-up and/or Special Finished Concrete On projects designed for precast, tilt-up and/or special finished concrete, the Specification shall require a sample panel, constructed all as specified, or at least 42 square feet to be erected at the jobsite for approval consideration by the Director of Project Delivery. The approved panel shall remain on the jobsite as a visual criterion which the final construction must match.

Precast Structural Concrete: Base design and specifications on recommendations of the American Concrete Institute, ASTM tests.

Precast Concrete Panels: Base design and specifications on recommendations of the American Concrete Institute, ASTM tests.

3-1.10 Left Intentionally Blank

3-1.11 Mow Strips If the project requirements state to include a building mow strip, as approved by the Government Project Manager. Include a 2' wide x 4" thick continuous reinforced concrete mow strips around the building in grassed areas which will require mowing. The mow strip shall be doweled to the building foundation at all door locations. At all other locations the mow strip shall not be doweled to the building foundation unless approved otherwise by the Civil Engineer.

If the project requirements state to include a building mow strip, as approved by the Government Project Manager. Include a mow strip along and doweled to the back of curb in grassed areas adjoining head in parking areas which are subject to car bumper overhang. Mow strip to be sloped in the direction of drainage. Jointing shall be provided to match that in the adjoining curb.

3-1.12 Cast-In-Place Concrete Test Reports: A copy of all concrete test reports shall be furnished to the Government Project Manager.

Miscellaneous Requirements:

A. Strengths: All concrete designs strength shall be determined by the project architect/engineer

(A/E), however, in no case shall the compressive strength be less than 3,000 psi in 28-days;

except that 2,500 psi concrete may be specified for filling over excavations for footings or otherwise approved by the Government Project Manager.

B. Air Entrained Concrete: An approved air-entraining admixture shall be used for all concrete exposed to weather. Minimum strength shall be 3,000 psi.

C. Hardener Treatment: All finished floors, which will be left exposed, shall receive hardener treatment applied when concrete is still green.

D. Protection for Nosings on concrete steps shall be provided by imbedded rounded metal cast nosing with non-slip surface.

E. Non-Slip Surfacing: Ramps, treads, and platform of stairs shall have nonslip surface when not covered with finish flooring materials.

Architectural Concrete: A sample four (4) feet by eight (8) feet in size shall be erected at the site when cast-in-place architectural concrete is to be used. Panel shall be protected from construction operations but shall be left exposed to the elements. Panel shall be left in place until all architectural concrete has been approved by the Government Project Manager. Include samples of exposed built-in materials and finished openings.

Insulating Concrete Roof Decks: Concrete shall have the following characteristics:

• Wet Density: 40-60 lbs. Per cu. ft.

• Dry Density: 20-30 lbs. Per cu. ft.

• Compressive Strength: 125-225 psi

3-1.13 Concrete Toppings This section includes concrete floor toppings applied over previously placed concrete slabs (hardened concrete).

Comply with requirements of Cast-in-Place Concrete.

A. Cement and Aggregates

Portland Cement: ASTM C150, Type 1.

Normal Weight Aggregate: ASTM C33.

Reinforcement: ASTM A185, Welded Steel Wire Fabric.

B. Standard Topping: Design mix to produce topping materials with the following characteristics.

Compressive Strength: 3000 PSI at 28 days, unless otherwise approved by the Government Project Manager.

Slump: Eight (8) inches maximum with water reducing admixture.

Three (3) inches maximum for other concrete.

Use ready-mixed topping complying with ASTM C94.

Performances: Failure of concrete topping to bond to substrate, disintegration or other failure of topping to perform as a floor finish will be considered failure of materials and workmanship. The Contractor shall replace toppings in areas of such failures, as directed.

3-1.14 Concrete Curing

Curing Compounds: Specify only non-staining type. It has been found that clear chlorinated rubber compounds cause staining, which cannot be removed. The Structural Engineer shall delineate specific methods of curing concrete.

Curing compound manufacturer is to provide certification that their product is compatible with the finish flooring scheduled for the space.

3-1.15 Cementitious Decks Include the following general requirements in the specifications.

Certificate from Manufacturer of Materials: Upon completion of the installation, a certificate from the manufacturer of insulating materials used, stating that materials were installed by an approved applicator and that materials were installed in accordance with the drawings and specifications, shall be furnished to the Consultant and Government Project Manager.

The following Sections are referenced with this Division.

03 01 Maintenance of Concrete 03 05 Common Work Results for Concrete 03 11 Concrete Forming 03 15 Concrete Accessories 03 21 Reinforcement Bars 03 22 Fabric and Grid Reinforcement 03 23 Stressed Tendon Reinforcing 03 24 Fibrous Reinforcing 03 30 Cast-In-Place Concrete 03 31 Structural Concrete 03 35 Concrete Finishing 03 37 Specialty Placed Concrete 03 39 Concrete Curing 03 41 Precast Structural Concrete 03 45 Precast Architectural Concrete 03 47 Site-Cast Concrete 03 48 Precast Concrete Specialties 03 51 Cast Roof Decks 03 52 Lightweight Concrete Roof Insulation 03 53 Concrete Topping 03 54 Cast Underlayment 03 62 Non-Shrink Grouting 03 63 Epoxy Grouting 03 81 Concrete Cutting 03 82 Concrete Boring

Division 04 – Masonry

Masonry 4-1.1 General Information Use of ink marking pens on surfaces of any kind of material is prohibited. Experience has shown that such marks bleed through paint and other finishes.

Treating of brick surface with stain or other surface treatment or simulation to obtain a color blend is prohibited.

Codes and Standards: Comply with provisions of the following building codes:

• UFC 1-200-01, DoD Building Code

• UFC 3-301-01, Structural Engineering

• American Concrete Institute (ACI) 530, “Building Code Requirements for Masonry Structures.”

• American Concrete Institute (ACI) 530.1, “Specifications for Masonry Structures.”

Quality Assurance: Engage a masonry work certified technical inspector to supervise, on a full-time basis, all masonry work.

4-1.2 Brick Brick masonry shall be designed and constructed per the standards of the Brick Industry Association.

Sample Panel: Include the following paragraph in the specifications: Before starting work, build one sample panel for inspection…