Appendix 2 - Service Call Categories.docx

DOCX document 35 KB Posted

Attached to
Military Family Housing, Osan AB, ROK
Solicitation number
W91QVN-22-R-0001
Issued by

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX 2

SERVICE CALL CATEGORIES

SYSTEM
CATEGORY
RESPONSE TIME
COMPLETION TIME

ELECTRICAL:

- Loss of electricity
Emergency
1 Hours
4 Hours

- Direct or sparking short that could cause a fire (Call OSAN, Fire Dept immediately)

Emergency
1 Hours
4 Hours
- Recurring breaker/fuse problems
Emergency
1 Hours
4 Hours
- Arching or exposed energized circuit
Emergency
1 Hours
4 Hours
- Room light switch inoperative
Urgent
24 Hours
5 Calendar days
- Receptacle inoperative
Routine
3 Calendar Days
5 Calendar days
- Fixture repair
Routine
3 Calendar Days
5 Calendar days
- Circuit breakers defective
Urgent
4 Hours
2 Calendar days
- Smoke/Carbon Monoxide Detectors
Emergency
2 Hours
4 Hours

HEATING/AIR CONDITIONING**:

- Loss of heat when outside temperature is below 55 degrees

Emergency
2 Hours
6 Hours
- Loss of heat (other than above)
Urgent
24 Hours
5 Calendar days

- No cooling when outside temperature is above 85 degrees

Emergency
2 Hours
4 Hours
- No cooling (other than above)
Urgent
24 Hours
3 Calendar days
- Clogged drainage line
Urgent
12 Hours
24 Hours

- One of Heating or hot water boilers for each tower defect

Urgent
4 Hours
2 Calendar days

- All Heating or hot water boilers for each tower

Emergency
2 Hours
24 Hours

- One of chillers for each tower defect

Urgent
12Hours
36 Hours

- All chillers for each tower defect

Emergency
2 Hours
6 Hours

PLUMBING

Gas:

- Gas leak (Call OSAN Fire Dept immediately)
Emergency
30 Minutes
4 Hours

Water:

- Water line breaks/no water
Emergency
2 Hours
24 Hour
- No hot water
Emergency
2 Hours
24 Hours
- Faucets running full that cannot be shut off
Emergency
2 Hours
24 Hours
- Replace defective shower head
Routine
3 Calendar Days
5 Calendar days

- Leaky faucets/show heads (replace washers or valve seats)

Urgent
24 hours
5 Calendar days

- Replace toilet bowl floats, rods, etc.

(leaking/dripping)

Urgent
24 Hours
5 Calendar days

Sewage:

- Overflow of sewage system
Emergency
2 Hours
6 Hours

- Stopped up drainage (washer, bath sinks, tubs, kitchen sink)

Emergency
2 Hours
24 Hours
- All toilets in unit are plugged
Emergency
2 Hours
4 Hours
- Sluggish drainage
Urgent
24 Hours
3 Calendar days

- Plugged toilet where units have more than one toilet and only one is plugged

Urgent
24 Hours
3 Calendar days

GROUNDS

- Damaged/Broken Fence
Routine
5 Calendar Days
15 Calendar days
- Tree Limbs Touching Roof/Broken
Emergency
2 Hours
24 Hours
- Tree Limbs Down
Emergency
2 Hours
24 Hours

MISCELLANEOUS

- Unit modifications for handicap
Routine
5 Calendar Days
15 Calendar days
- Condemned Units:
Urgent
2 Hours
5 Calendar days
- Roof leaks
Emergency
2 Hours
Stop leak 24 Hours

Urgent (after leak stopped) - Repair 5 Calendar Days Routine (after leak stopped)– Repair 15 Calendar days

- Door Trim damage
Routine
5 Calendar Days
15 Calendar days
- Exterior Frame damage - door won’t secure (casing, jamb, etc.) ***
Emergency
2 Hours
24 Hours
- Exterior Frame damage - door will secure
Routine
5 Calendar Days
15 Calendar days
- Interior Frame Damage (casing, jamb, etc.)
Routine
5 Calendar Days
15 Calendar days
- Door hinges, latches need repair
Routine
5 Calendar Days
15 Calendar days
- Closure repair/replacement
Routine
5 Calendar Days
15 Calendar days
- Patch holes in doors
Routine
5 Calendar Days
15 Calendar days
- Replace weather stripping (interior/exterior)
Routine
5 Calendar Days
7 Calendar days
- Screen repairs
Routine
5 Calendar Days
15 Calendar days

- Exterior door lock repairs, including sliding glass Door

Emergency
2 Hours
24 Hours

- Resident lockout, if small child is locked in unit, stove is left on or other imminent danger

Emergency
30 Minutes
Immediate
- Resident Lockout Other
Emergency
2 Hours
4 Hours
- Fence/gate repair
Routine
5 Calendar Days
15 Calendar days
- Concrete Repair
Routine
5 Calendar Days
15 Calendar days
- Cracked windows
Routine
5 Calendar Days
15 Calendar days

- Broken windows if loss of energy or security/safety Hazard

Emergency
2 Hours
24 Hours
- Missing or disintegrated putty or caulking
Routine
5 Calendar Days
15 Calendar days

- Structural damage or any other unsafe condition affecting health, safety, security

Emergency
2 Hours
24 Hours
- Caulk or Grout in tub or shower
Urgent
24 Hours
3 Calendar days
- Patch holes in walls and paint
Routine
5 Calendar Days
15 Calendar days
- Repair cabinet doors or drawers
Routine
5 Calendar Days
15 Calendar days
- Repair storage room
Routine
5 Calendar Days
15 Calendar days
- Signs (name, housing area entrance)
Routine
5 Calendar Days
15 Calendar days
- Refuse pickup and disposal
Urgent
24 hours
5 Calendar days
- Replace garbage chute door
Routine
5 Calendar Days
15 Calendar days

NOTE: This list is not intended to be all-inclusive, but those categories and times shown will be representative for performance of like tasks and in measuring timeliness.

** Quarters occupied by personnel who have medical requirements for air conditioning or heat shall be treated on an emergency category basis, regardless of season (30 minutes response, complete in one Calendar day). In the event of more than one emergency, priority shall be given to the medically exempt.

*** If damage prevents securing the facility, work shall be treated as an emergency.

**** When emergency or urgent work is in progress and completion prior to the end of normal business hours is impossible, it shall be the responsibility of the Contractor to continue the work to a point of safe utilization regardless of the time required, at no additional cost to the Government. The housing occupant will be fully apprised of the situation and the Contractor shall proceed with the work in coordination with and in regard for the welfare of the occupants. Completion of work required beyond the point of safe utilization shall be continued by the Contractor the following day as an urgent or routine service call, as applicable.

**** All materials used to fix discrepancies or upgrade MFH must be approved by at least COR or HM personnel (COR, housing QA Inspector, or Housing Manager), prior to installation at all times.

File details come from the government source that posted it. Updated .