AoI 5.4 KCS Tier 1 Phase 2 Electrical.pdf
PDF 16 MB Posted
- Solicitation number
- Not on record
- Issued by
-
Defense Commissary Agency
About this file
This is a Commercial Solution Opportunity (presolicitation) issued by the Defense Commissary Agency (DeCA) for electrical distribution equipment and installation services.
DeCA seeks innovative commercial solutions from European Union registered firms to supply and install nine main electrical distribution boards (panelboards) at the Central Distribution Center on Ramstein Air Base, Germany. The requirement supports operations within the European area and emphasizes industry best practices, modern technologies, and creative commercial service models to improve reliability, accountability, and service quality for electrical systems. The equipment and installation approach will undergo rigorous inspections at all stages—including installation methodology, material delivery, material installation, and commissioning—by Technischer Überwachungsverein (TUEV Saarland) in accordance with standards established by Deutsches Institut für Normung (German Institute for Standardization). Vendors must submit Commercial Solution Proposals (Phase 3) structured according to Commercial Construction Index Standards with a recommended DIVISION format. The proposal closing date is Tuesday, 15 September 2026 at 14:00 Central European Time, with contract award anticipated on or around 17 September 2026. TUEV Saarland will review the selected approach on 18 September 2026, with physical installation performance commencing 1 October 2026. The recommended performance period is four months from contract award to final TUEV commissioning. Questions should be directed to Suzette San Juan (Suzette.Sanjuan@deca.mil) or Anna Gulewich (anna.gulewich@deca.mil).
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Commercial Solution Opportunity – Defense Commissary Agency (DECA)
In accordance with the Commercial Opportunity Solution – Defense Commissary Agency (DeCA), dated 04.10.2026, paragraph 5.0, the following specific requirement in support of AoI
5.4 Lower Costs is attached.
The Defense Commissary Agency (DeCA) is seeking innovative, commercial approaches from European Union registered firms to supply and install nine (9) main electrical distribution boards (panelboards) at the Central Distribution Center on Ramstein Air Base, Germany supporting operations within the European area. The goal is to leverage industry best practices, modern technologies, and creative commercial service models to improve reliability, accountability, and overall service quality for CDC electrical systems. Equipment and approach will undergo vigorous inspections at all stages (installation methodology prior to work performance, material delivery, material install, commissioning) by the Technischer Überwachungsverein (TUEV Saarland) in alignment with commercial practices followed by the Deutsches Institut für Normung. The recommended performance period is four months from contract award to final TUEV commissioning. Attachment 1 contains technical data that will provide assistance in understanding current conditions that commercial solution proposal will need to meet.
Our objective is to build and install nine main electrical distribution boards. Interested vendors with proven expertise in providing industrial electrical equipment with installation should submit their Commercial Solution Proposal (Phase 3) in accordance with section 3.4 Commercial Solution Proposals.
A Phase 3 submittal built to Commercial Construction Index Standards is recommended for ease of review and execution. (Example DIVISION table of contents provided as Attachment 2).
The closing date for this opportunity is Tuesday, 15 September 2026 at 14:00 Central European Time (CET). Award is contemplated on or around 17 SEP 2026 as the host nation overseeing Agency (TUEV Saarland) expects to review approach on 18 SEP with physical installation to start performance on 1 OCT.
All communications to include questions pertaining to this opportunity shall be sent via email to the following Points of Contact:
Suzette San Juan (Suzette.Sanjuan@deca.mil)
Anna Gulewich (anna.gulewich@deca.mil) mailto:Suzette.Sanjuan@deca.mil mailto:anna.gulewich@deca.mil bremerdg Highlight
| Current Site Conditions: |
| Expected Proposal to provide information on the technical solution: |
| Untersuchungsbericht Funktionsprüfung der NEA |
| Blank Page |
DEFENSE COMMISSARY AGENCY (DeCA)
EQUIPMENT & INSTALLATION SPECIFICATIONS
PROJECT: Electrical Panelboard Replacement & System Remediation (Tier 1 Part 2)
LOCATION: Central Distribution Center Kaiserslautern, Germany
SUBMITTAL DATE: 3 SEP 2026
PROJECT PERFORMANCE: 15 SEP 2026 Clearance to Work (1 OCT 2026 MOBILIZATION-
29 JAN 2027 COMPLETEION)
(PROJECT PERFORMANCE ON-SITE AT CDC-K IS CONTINGENT ON TIER 1 PART 2 CABLE
PACKAGE PROJECT COMPLETED THROUGH THE INSTALL PROCESS)
DOCUMENT STATUS: 100% (Final) Specification Package
TABLE OF CONTENTS
DIVISION 00 — PROCUREMENT AND CONTRACTING REQUIREMENTS
Section 00 01 15 — List of Drawing Sheets Section 00 31 00 — Available Project Information
DIVISION 00 — PROCUREMENT AND CONTRACTING REQUIREMENTS
Section 00 01 15 — List of Drawing Sheets
LIST OF DRAWINGS
List of Drawings: Drawings consist of the following Contract Drawings and other drawings of type indicated:
Attachment 1 — Cold Storage Zone List Attachment 2 — Load Calculations for Panel Installation Integration Attachment 3 — PAS for Electrical Bonding for New Distribution Panels Attachment 4 — Planning Drawing for New Distribution Panel (After Install) (DESIRED END STATE)
SECTION 00 31 00 — AVAILABLE PROJECT INFORMATION
1.1 GENERAL EXISTING CONDITIONS
Certain information relating to existing surface, subsurface, and structural electrical conditions is available to Bidders for use in preparing their bids and performing the work on this project. This information is based on the German Technical Inspection Association (TÜV) audit and the Bestandsaufnahme (inventory inspection) drawings.
1.2 TECHNICAL DOCUMENTATION & DRAWINGS
A. Attachment 1 — Cold Storage_HV-UV Zonen — Panel Replacement (Drawing Index 101):
Bidders shall review the schematic distributor stock plan.
This plan identifies:
• The feeding lines from Building 51 and main transformers.
• The exact structural locations of the distribution panels (CDK series) inside the Cold
Storage Area, corridors, and adjacent rooms.
• Network layout parameters (TN-C and TN-S networks).
Attachment 4 — Planning Drawing for New Distribution Panel (DESIRED END STATE)
Attachment 5-13 Current Deficiency List with Existing Distribution Panels:
• Attachment 5 - Prüfbericht KCS CDK-357
• Attachment 6 -Prüfbericht KCS CDK-398
• Attachment 7 -Prüfbericht KCS CDK-399
• Attachment 8 -Prüfbericht KCS CDK-400 in Arbeit
• Attachment 9 -Prüfbericht KCS CDK-401
• Attachment 10 -Prüfbericht KCS CDK-402
• Attachment 11 -Prüfbericht KCS CDK-415
• Attachment 12 -Prüfbericht KCS CDK-421
• Attachment 13 -Prüfbericht KCS CDK-431
Attachment 14 — Expected Material List
B. Bilingual Terminology Note (Verteiler / Manifold / Board):
Bidders and Contractors are advised that German Host Nation technical plans use the term "Verteiler" (distributor/distribution board), which is translated in some project documents as "manifold" or "distribution manifold." For the purposes of this electrical contract, all references to "nine main manifolds" or "distribution manifolds" shall be understood as referring to the nine
(9) main electrical distribution boards (panelboards) listed in the PWS and detailed in Section 26 24 16.
C. Inspection Findings & System Deficiencies: The existing panels suffer from:
• Severe moisture condensation due to direct contact with temperature-controlled cold storage walls.
• Zero remaining physical capacity or electrical reserves for future loads.
• Missing Residual Current Device (RCD / FI) protection, in direct violation of current Host Nation VDE standards.
• Unprotected sub-distributors lacking critical back-up fuses, leaving FI switches unprotected.
• Incompatibilities in the main busbar rated at 2800A in Building 56, where the three current transformers risk overloading the busbar configuration.
1.3 HAZARDOUS MATERIALS
A. Asbestos and Lead-Based Paint: Bidders may conduct their own surveys for asbestos-containing materials (ACM) and lead-based paint (LBP) in the areas affected by the panel replacements.
B. Host Nation Disposal: Removal and disposal of any hazardous components shall comply with Host Nation and EU environmental regulations.
DIVISION 01 — GENERAL REQUIREMENTS
SECTION 01 11 00 — SUMMARY OF WORK
PART 1 — GENERAL
1.1 SECTION INCLUDES
A. Project Information and Site Location.
B. Work sequence, phasing, and operational hours under continuous facility occupancy.
C. General Scope of Work.
D. Host Nation Coordination and TÜV Auditing.
1.2 PROJECT INFORMATION
A. Project Name: Electrical Panelboard Replacement & System Remediation (Tier 1 Part 2)
B. Project Location: Kaiserslautern CDC Facility, Germany.
C. Governing Codes: Unified Facilities Criteria (UFC), National Electrical Code (NEC), German Host Nation VDE standards, and TÜV standards.
• DIN EN IEC 61439-1 (VDE 0660-600-1):2021-10 – general specifications,
• DIN EN IEC 61439-2 (VDE 0660-600-2):2021-10 – Energy switchgear and control gear assemblies,
• DIN EN IEC 61439-3 (VDE 0660-600-3):2025-06 – Installation distributors that are intended for operation by laymen and are within the limits of their application.
• DIN VDE 0100-729:2010-02 and DIN VDE 0100 – installation rooms, operating and maintenance corridors
1.3 CONTINUOUS SUPPLY CHAIN DIRECTORATE OPERATIONS & WORKING HOURS
A. Continuous Government Occupancy: The facility will remain in complete and continuous operation during the entire supply and installation process. The Contractor shall perform the work in a manner that prevents any disruption to daily CDC storage, material handling, or cold chain logistics.
B. Working Hours: Standard hours of operation are Monday through Friday, 07:00 to 15:45.
C. After-Hours/Shutdown Work: Any work requiring electrical outages, service interruptions, or excessively noisy operations (e.g., CMU drilling, wall anchors) must be performed after 15:45 or during weekend shifts, and must be scheduled with the Contracting Officer Representative (COR) and Facility Operator at least 7 calendar days in advance. (Note that the Facility Operator are willing to work with the team around non-office space areas during operating hours pending no electricity loss. Office spaces that will require exposed noise or more than temporary power loss (0-10 minutes) need prior coordination but will follow the after-hours instructions. If longer, connections or electrical loss will need to be planned and executed after hours and Facility Operator will support.
D. German National and Rhineland-Pfalz Holidays: No work is required or permitted on recognized local German holidays. The Contractor must coordinate site access around both US and German holiday schedules.
E. Safety Submittals: Prior to mobilization, the Contractor shall submit the following for Government review and approval. No on-site work shall commence until these submittals are approved in writing by the COR.
• Accident Prevention Plan (APP) / Site-Specific Safety Plan (SSSP): A comprehensive safety plan tailored to the active cold-storage and commissary environment, complying with EM 385-1-1 and Host Nation regulations.
• Activity Hazard Analysis (AHA) & Risk Assessment: Detailed, phase-by-phase AHAs for all major work activities, including but not limited to demolition, panel installation, cable pulling, energization, and testing. Each AHA shall identify specific hazards, risk ratings, and mitigation measures.
• Emergency Action & Response Plan (ERP): Site-specific procedures for medical emergencies, electrical shock response, fire prevention, and emergency evacuation.
The plan must include contact information and coordination protocols for facility management, base emergency services, and local Host Nation medical facilities.
• Lockout/Tagout (LOTO) Procedures: Written hazardous energy control procedures for all circuit de-energization and service cut-overs, coordinated with the COR and facility management. The submittal shall include key custody logs and isolation verification protocols.
• Hazardous Materials Mitigation & Disposal Plan: Submit any testing reports, handling procedures, and waste disposal manifests for potential Asbestos-Containing Materials (ACM) and Lead-Based Paint (LBP) in accordance with Host Nation/EU environmental regulations.
• Personnel Certifications: Submit proof of current qualifications for the designated Site Safety and Health Officer (SSHO), CPR/First-Aid certified personnel, and all electricians, including evidence of Elektrofachkraft certification per DIN VDE 0105-100 / DGUV Vorschrift 3.
• Dust and Food Safety Protection Plan: A detailed plan outlining procedures for erecting airtight containment partitions (e.g., 6 mil polyethylene sheeting or hard-wall barriers), utilizing HEPA filtration, and ongoing air monitoring to protect adjacent cold-storage products from potential dust and debris.
1.4 GENERAL SCOPE OF WORK
The Contractor shall provide all personnel, equipment, supplies, transportation, tools, materials, supervision, and professional engineering services to:
A. Procure, install, and connect nine (9) new electrical distribution panels.
B. Perform circuit-by-circuit verification, labeling, and load balancing.
C. Remodel, paint, and restore wall surfaces, metal cladding, and structural elements damaged during panel extraction.
D. Install heavy-duty structural guardrails and concrete curbs to isolate and protect the panels from material handling equipment (MHE).
E. Execute final system testing, commissioning, and secure third-party TÜV certification.
1.5 SPECIFIC PANELBOARD SCHEDULE
The following distribution panels shall be removed and replaced with new, VDE-compliant, IP-rated, zero-condensation panelboard assemblies:
Panel Number Location / Drawing Zone Key Technical Notes (Attachment 1)
CDK000357 Main Corridor / South Wall Main distribution feed from Building 51.
CDK000398 Corridor adjacent to Freeze Room 2-S
Sub-panel UV IIa Süd; fed from UV II.
bremerdg
Sticky Note
Rejected set by bremerdg
CDK000399 Corridor adjacent to Freeze Room 2-S
Sub-panel UV II Süd; requires RCD integration.
CDK000400 Chill Room / Corridor Vestibule
Sub-panel UV I; requires circuit trace and back-up fuse protection.
CDK000401 Admin Offices / Building 50 Sub-panel UV 1 Verwaltung; fed via D02 35A.
CDK000402 Admin Offices / Building 50 Sub-panel UV II Verwaltung; fed via D02 35A.
CDK000415 Workshop / MHE Shop (Building 49)
Workshop sub-panel.
CDK000421 External Zone / Charging Station
UV Siemens 37 CT; feeds 15 CEE external receptacles (5x10qmm).
CDK000431 South Wall Vestibule Sub-panel EUV II / UV 2 Süd; requires complete grounding verification.
SECTION 01 31 00 — PROJECT MEETINGS
PART 1 — GENERAL
1.1 ADMINISTRATIVE & SCHEDULING REQUIREMENTS
A. The Contractor shall administer, schedule, and host all required meetings on-site at the facility unless otherwise directed by the Contracting Officer's Representative (COR).
1.2 MANDATORY KICK-OFF MEETING
A. Prior to the commencement of any physical work, mobilization, or delivery of materials to the job site, the Contractor shall schedule and attend a mandatory on-site Pre-Performance Kick-Off Meeting.
B. Required Attendees: Contractor’s Project Manager, Quality Control Manager (QCM), Site Safety and Health Officer (SSHO), A-E Construction Advisory Representative, DECA Facility Manager, and the Contracting Officer's Representative (COR).
C. Agenda: The agenda shall include:
• Final review and acceptance verification of all Section 1.3 E Safety Submittals (APP, AHAs, ERP, LOTO, Personnel Certifications).
• Coordination of planned electrical utility outages, off-hours schedules, and cut-over windows.
• Confirmation of 24/7 emergency notification chains and local emergency medical service (EMS) routes.
• Physical site walkthrough to verify dust containment barrier layouts, floor protection, and food defense integrity.
• Review of forklift / Material Handling Equipment (MHE) traffic corridors and temporary physical barrier locations.
• No physical disturbance, demolition, or installation work shall begin until all action items from this meeting are approved in writing by the COR.
(PROJECT PERFORMANCE ON-SITE AT CDC-K IS CONTINGENT ON TIER 1 PART 2 CABLE PACKAGE PROJECT COMPLETED THROUGH THE INSTALL PROCESS)
TABLE OF CONTENTS
DIVISION 00 — PROCUREMENT AND CONTRACTING REQUIREMENTS
Attachment 1 — Cold Storage Zone List
Attachment 4 — Planning Drawing for New Distribution Panel (DESIRED END STATE) Attachment 5-13 Current Deficiency List with Existing Distribution Panels:
Attachment 14 — Expected Material List
DIVISION 01 — GENERAL REQUIREMENTS
GHV Feld 3 / 5
710kW /LS 1600A
4x(3x NYY 1x 300)
2 0 m
Generator 2
GHV - Feld 2 / 4
710kW / LS 1600A
Generator 1
GHV Feld 6
800kVA/ LS 1250A
4x( 3x 240/120) Cu NY CW Y
6 0 m
Trafo 1 UV VI Nord
D02 63 A
NYY-J 4x16
CDK 000 427
COLD STORAGE AREA
Freeze Room 5 - V Kühlhaus 5- V
4 - G
4- G
3- T
2 - S
2- S
Chill Room
6 - N
6- N
7 - M
7- M
NORD
SÜD
Build. 50
Build. 51
Admin Offices Buil. 50
900 k V A
1 3 0 0 A
7 2 0 K W
0, 8
T1 2 0 k V
4 0 0 V
8 0 0 k V A
11 5 0 A
GHV Fe ld 1
1 0 m
Stromsch iene / Busbar
T2
T3
GHV Fe ld 7
Trafo 2
GHV Fe ld 8
Trafo 3
Stromsc h ien e
L D A 7 4 1 3 =
A L , 2800 A , 4Lei ter , 1 /2 L
P E N , IP 3 4
GHV Fe ld 11
LS 100 A
4x16 gem Netz ber ec hnung
4 0
M HE UV 2
GHV - Feld 10
LS 2000 A
R E S E R V E
Hauptscha l te r NSHV ?
GHV Fe ld 12
Reserv e
GHV Fe ld 9
Stromsch iene / Busbar
GHV Fe ld 13
GHV Fe ld 14
LS 400 A
2x(4x 185)
1 2 0
37 C T
Genera tor 1
900 k V A
1 3 0 0 A
7 2 0 K W
0, 8
?? NYY 4x25
Tr inkwasser
2x NYCWY ( 3x150 /70 )
MR1, Verd . 1 / CP1.1
MR1, Verd . 2 / CP1.2
4x150/70 N Y C W Y
1 0 0
KV 1 KH 7 Lag er
2x NYCWY (3x185/95 )
1 5 0
MR2, Verd . 1 / CP2.1
2x NYCWY (3x185 /95 )
MR2, Verd . 2 / CP2.2
NYY 5x 6 ( 5x 16?)
Geb 5 6
NY Y - O 4x 1 5 0
1 2 0 m
HV II, Ring Nord KH4
NY Y - O 4x 1 5 0
1 4 0
HV I, R ing Süd KH 4
LS 200 A
NYY 4x35 ?? 2x ( 4x 10)
8 0
Löschwas s e r
NY C W Y 4 x 3 5
M HE Sh o p
LS 160 A
Reserve (Defekt)
LS 250 A
NYY 4x 120 ( 4x 95)
HV Batteri e raum/Ladesta t i on
LS 630 A
2x NYCWY (3x185 /95 )
MR3, Verd . 1 / CP3.1
LS 630 A
MR3, Verd . 2 / CP3.2
4x16 gem . B er ec hnung
UV Lager -432
LS 6 3 A
min B er ec hnung NY Y 4x 16??
Wache / St rassenbe l
NY Y 4 x 1 0
8 0
Gri l lhütte/Yorkconta iner
NY Y 4 x 1 6
Kläran lage
HV II Nord
LS 400A (250A)
NYY-O 4x15 0
CDK 000 426
UV IIa Süd
NH00 80 A
NYY.O 4x3 5 von UV II F3
CDK 000 398
HV I Süd
NYY-O 4x15 0
1 4 0 m
CDK 000 357
UV 1 Büro keine Vors icherung
NYM ? ?
CDK 000 409
UV II Süd
5 0
CDK 000 399
U S V
CDK 000 567
UV 4
D 0 3 5 A
NYM -J 5x16
CDK 000 419
UV IV Nord
NH00/125A/125A
NYY-O 4x 50 /NY Y - O 4x 35
CDK 000 454
UV VI I NORD
NH00/80 A
NYY-O 4x3 5
CDK 000 423
MR3, Verd. 2 / CP3.2
LS 630A
CD K 0 0 0
MR3, Verd . 1 / CP3.1
2xNYCWY(3x185/95)
C D K
UV 33 NOR D
NH00 100 A
NYY 4x50/35
2 0
CDK 000 512
UV 1 Nord
NH00 35 A
NYM 5x10
CDK 000 461
UV 2 Nord
NYM 5x 1 6
CDK 000 462
MR1, Verd. 2 / CP1.2
MR1, Verd. 1 / CP1.1
MR2, Verd. 2 / CP2.2
CDK 0 0 0
MR2, Verd. 1 / CP2.1
2x NY CW Y ( 3x 150/70)
UV 6 Nord
NH00 / 50A
NYM 5x 2 5
CDK 000 756
G a n g
L d e sta tio
UV 3 Süd
NYY 4 x 3 5 von UV 2 Süd F4
CDK 000 403
UV 1 Süd 73 Kl im a
CDK 000 437
g d sta tio
Feld 2 Verbraucher
CDK 000 415
UV 1 EDV
(D02 35A)
CDK 000 420
UV 5
von UV 4
CDK 000 623
UV 1 Verwal tung
D02 35 A
NYY-J 5x16
CDK 000 401
UV Küch e
NYY 4x50 (4x25)?
CDK 000 458
UV II Verwal tung
CDK 000 402
Vertei lernam e/ Nam e Panel
Vors icherung Typ/Nennstrom
Kabel typ /Type Cab le
Länge/Length (m )
CDK Num m er/ Num b er
Legende / Legend
UV Strassenbe leuchtung
LS 63A ?
1 m
TN-C Netz
UV Be leuchtung Ramp e
B 2 5 A
NYM 5x2,5
1 0
CDK 000 463
R ing H V I-II
L S 2 5 0 A H V I
L S 2 5 0 A H V II
N Y Y 4x 9 5
Kälte Masch inenraum 4
NYY-O 4x ( 1x240 ) 1x120PE
3 0 m
CDK ke i n e
EVU 1 Box VII
4x50/25 NYCW Y
CDK 000 4 0 4
Build. 45 Candy
UV Cand y
NH00 80 A
CDK 000 425
C D K 0 0 0 5 8 5 C D K 0 0 0 5 8 4 C D K 0 0 0 5 8 3 C D K 0 0 0 5 8 2 C D K 0 0 0 5 8 1 C D K 0 0 0 5 8 0
Schrank Feld 15
LS ? A
UV A l l gemein Geb 51
UV 7 Nord von UV V F4
CDK 000 428
UV II I Nord
NH00 8 0
NYY-O 4x3 5
CDK 000 430
UV V Nord
NH00 / 125A
NYY-O 4x5 0
CDK 000 429
UV Toi lette neu
NYY-J 5x16q m m von Stat ion 43
CDK 000 3 9 7
UV Büro 1+2
CDK 000 4 3 4
Ver tei lung 4
NH3 500 A
NYY-O 3x 1x 240 + 1x 240
6 0
CDK 000 407
Vertei lung 3
6 0
Vorsicherung NH2 400A leer
KV 1 (Kabelver tei ler )
NH2 400A leer
NYCW Y 4x150/70
CDK 000 4 0 5
KV 1 (Kabelver tei ler )
NH2 400A
NYY-O 4x1x240 u . 1x120 PE
CDK 000 4 0 5
Vorsicherung NH2 250A
USV UV 3
1 5 0 m
CDK 000 4 0 6
Trafostation Geb 54
6 3 0 k V A
9 1 0 A
GHV Feld x
LS 1250 A
2x ( 4x 240)
USV UV 2
D02 ?
CDK 000 4 0 8
U V
CDK 000 4 6 6
EUV II ?? / UV 2 Süd
3x95/50 u. 1x50
CDK 000 431
Vertei lung 2
CDK 000 410
Vertei lung 1
Abl 1 zu UV I KH 6 4x35, LS 160A
Abl 1zu UV2 KH2 4x50, Vorsicherung LS 160A
Abl 2 zu UV2 KH2 4x50, Vorsicherung LS 160A
Abl 2 zu UV I KH 6 4x50, LS 160A
UV I
LS 160A (128A)
NYY 4x35, NYY 4x5 0
CDK 000 400
UV 1 l inks
LS 630A (300A)
CDK 000 374
UV 1 rechts
Build. 49 Werkstatt/ MHE SHOP
UV W erkstatt
LTS D02 63A
NYCW Y 4x 3 5
UV Büro
NYM -J 5x6
CDK 000 ke ine
UV 2 Süd
NYM 5x 1 6
Zul UV 1 F26/NH00 50A
CDK 000 411
UV 2 l inks
CDK 000 382
UV 2 rechts
UV 3 l inks
NYCW Y 4x120/70
1 8 0
CDK 000 391
UV 3 rechts
NYCW Y 4x120/70
1 8 0
Feld 1 Ladestat ion
NYY 4x120 (4x95)
Door/Tor
Door/Tor Door/Tor
Door/Tor Door/Tor 4 4
Door/TorDoor/Tor
1 1
Build. 56
630 k V A
Build. 43
NSV Fe ld 2
F E L D 2 A bgä n g e
NSV Feld 1
630kVA/ LS 1250A
2x(4x1x240)qmm
NSV Feld 3
Kuppelschal ter
NSV Fe ld 4
Blindleistung
K om pens at i o n
NSV Fe ld 5
LTS 10 0 A
NY M - J 5x 2 5 q m m von Feld 2
Allgem einfeld
NH000 63 A
NY Y - J 5x 16 q m m
UV Toi letten
NH000 50 A
NY Y - J 4x 10 q m m
Pför tnerhaus Geb 57
N H 0 0
NY Y - J 5x 10 q m m
OHNE SICHE R U N G
Alte Stat i on Geb 43
Allgemeinver tei ler
NY Y - J 5x 6 q m m
U V MS R a u m
NH000 80 A
NY Y - J 5x 25 q m m
Alte Stat ion Geb 43
N H 0 0
NY Y - J 5x 10 q m m
OHNE SICHE R U N G
Pför tnerhaus Geb 57
Ke ine gem. Berechnung m i n NY Y - J 4x 16qm m ??
1 0 0 m
CDK 000 6 8 3
Build. 57 Pförtnerhaus
NY M - J 5x 2 5 q m m
NH3 250 A
NY CW Y 4x 1 2 0 / 7 0
Aussenverteiler 3-Rechts
NY Y - J ? ? q m m
Geb "Al te S ta t i on"
NY Y - J 5x 25 q m m
NH3 400 A
Aussenverteiler 2-Rechts
Aussenverteiler 1-Rechts
6 3 0 k V A
2x ( 4x 240)
NH3 250 A
NY CW Y 4x 1 2 0 / 7 0
Aussenverteiler 3-L inks
N H 0 0 0
N Y Y - J
Aussenverteiler 2-L inks
Aussenverteiler 1-L inks
Hallenverteiler 1+3
Hallenverteiler 2+4
Alte Stat ion
NH000 xxA
NY Y - J ???x q m m
5 0 m x x x
Build. Alte StationNSV Fe ld 2
Lager Geb 61
RCCB 25A/0 ,03A
Kei n e
Build. 61 Lager (Notdusche)
UV neben W as c hm as c h i ne
UV Lag er
CDK 000 432
UV Werkstat t Un i mog
M HE UV 2
Keine Vors icherung
CDK 000 761
UV Tiefbehäl ter
NYY 2x (4x10)
CDK ke ine
UV Siem ens 37 CT
2xNYCY 3x185/95 nach Aussen CEEs 15St 5x10q m m
CDK 000 421
Stat ion 56
LTS 6 3 A
NYY 5x6 (5x16?)
CDK 000 ???
NSHV Feld Trafo 1
NSHV Feld Trafo 2
NSHV Feld Trafo 3
Wache AL T E
NH000 50 A
NY Y - J 4x 10 q m m
4 0 m
Lüf tung Küche
LSS 3x16A
NYM -J 5x6
CDK 000 459
UV III Küche Kant ine /Umkle ide
LS 100A/ LTS 63A
NYM -J 5x10
CDK 000 460
US V UM S CHA L T E R I N T E R N
LS 250A / LS 250A
CDK -KEINE
Abgang nach UV Compute r R . 1 0 3 C
NH00 50 A
UV Com puter R .103 C
Abgang nach UV I I V er wa l tung
UV II Verwal tung
Abgang nac h Lü f tung K üc he
Lüf tung Küche
Treppenhaus Buil. 50
N H 0 0 5 0 A
Vors i c her ung
UV Küc he/Lü f tung K üc he
Vors icherung Eins pe i s ung US V
NH00 63 A
UV Verw . I I / UV 1 USV
Vor Hauptschalter Abgriff
UV al te Heizung
NYM 5 x 6
CDK 000 456
Lüftung al te Heizung
NYM-J 5x10 (5x6??)
CDK 000 457
Alte Wache
D02 35A
D02 25A
UV WC/Umkl e i d e
L S S
CDK 000 470
D02 50A
Alte Heizung
USV Raum 005
Küche/Kantine/Umkleide
UV Büro Container
UV 1 Süd
NYM -J 5x10
Zul UV1 F25 /D02 3x 50A
CDK 000 412
Gril lhütte
NYY 4 x 1 0
CDK 000 682
Build.56 Wasser
Build. 52 Wasser- Tiefbehälter
UV Feuer löschp um p e
LTS 20 0 A
NY Y 2x ( 4x 10)
D02 35A Ab g ang
Brunnenstube
UV Tr ink-W asser
NY Y 4 x 2 5
Verschiedene Ab g äng e
Vor Hauptschalter Abgriff. SLS Schalter 100A Absicherung prüfen von Geb 51 Generatorraum Feld 12 zu Klimaverteilung EG Kühlhaus VII /Kälte Maschinenraum 4
Verteiler / Distribution Panel
Zuleitung von KH5 UVIV F36, NH00 100A
Hinweis:
Dieser Plan wurde mit Hilfe von
Verteilerplänen und Begehungen der
Bestandsaufnahme erstellt.
Teilweise sind die Kabeltypen, Absicherungen und Stromkreise nicht ersichtlich und nicht mehr bekannt. Nachrüstungen von Verteilern und Stromabgängen, die im Laufe der Jahre getätigt wurden, sind teilweise nicht in den zur
Verfügung gestellten Unterlagen verzeichnet.
Bei der Erstellung dieses Planes wurden diese
Verteiler und Abgänge, soweit bekannt, erfasst, und müssen noch im Detail überprüft werden.
Dieser Plan ist derzeit noch nicht vollständig und wird mit jedem weiteren Index aktualisiert und vervollständigt.
In den Revisionswolken sind Anmerkungen enthalten, die den Sachstand bzgl. der
Netzberechnung und Netzaufbaus bewerten.
Grundsätzlich fiel bei den Begehungen auf, dass in vielen nachgeschalteten Verteilern die
Vorsicherungen fehlen, sodass die FI Schalter nicht abgesichert sind.
Teilweise wurde das TN-C Netz mit einem
TN-S Netz vermascht. Hier ist in jedem
Verteiler noch zu prüfen, dass ein TN-C-S Netz vorliegt und nicht umgekehrt.
Die Stromschiene in der
Gebäudehauptverteilung in Geb 56 hat einen
Nennstrom von 2800A. Die Nennströme drei
Trafos überlasten die Stromschiene.
A notice:
This plan was created with the help of distribution plans and inventory inspections.
In some cases the cable types, fuses and circuits are not visible and are no longer known. Retrofitting of distributors and power outlets that were carried out over the course of the year are sometimes not recorded in the documents provided.
When this plan was drawn up, these distribution panels and additional circuits, as far as known, were recorded and still need to be checked in detail.
This plan is not yet complete and will be updated and completed with each additional index.
The revision clouds contain comments that evaluate the status of the network calculation and network structure.
During the inspections, it was generally noticed that the back-up fuses are missing in many sub distributors, so that the FI switches are not protected.
In some cases the TN-C network was meshed with a TN-S network. Here you have to check in every distributor that there is a TN-C-S network and not the other way around.
The busbar in the main building distribution in building 56 has a rated current of 2800A. The rated currents of three transformers overload the busbar.
CDK 3 7 0
2xCEE32A 2xCE E 3 2 A
NYY 5x16 NYY 5x1 6
20m 20m
CDK 3 7 0
CDK 3 7 1
CDK 3 7 1
CDK 3 7 2
1xCEE32A 2xC E E 3 2 A
NYY 5x10 NYY 5x1 6
10m 10m
CDK 3 7 2
CDK 3 7 3
1xCEE32A 1xC E E 3 2 A
NYY 5x10 NYY 5x1 0
CDK 3 7 3
CDK 3 7 5
1xCEE32A 1xC E E 3 2 A
NYY 5x10 NYY 5x1 0
CDK 3 7 5
CDK 3 7 6
CDK 3 7 6
CDK 376.2
CDK 376.2
CDK 3 7 7
30m 30m
CDK 3 7 7
CDK 3 7 8
CDK 3 7 8
CDK 3 7 9
CDK 3 7 9
CDK 3 8 0
1xCEE32A 2xC E E 3 2 A
NYY 5x10 NYY 5x1 6
CDK 3 8 0
CDK 3 8 1
CDK 3 8 1
CDK 3 8 3
CDK 3 8 3
CDK 3 8 4
CDK 3 8 4
CDK 3 8 5
CDK 3 8 5
CDK 3 8 6
CDK 3 8 6
CDK 3 8 7
CDK 3 8 7
CDK 3 8 8
CDK 3 8 8
CDK 3 8 9
CDK 3 8 9
CDK 3 9 0
CDK 3 9 0
CDK 3 9 2
CDK 3 9 2
CDK 3 9 3
CDK 3 9 3
CDK 3 9 4
CDK 3 9 4
CDK 3 9 5
CDK 3 9 5
CDK 3 9 6
CDK 3 9 6
CDK 4 3 3
30m 30m
CDK 4 3 3
IN
OUT
SSS S
F B H
CDK 000 438
CDK 000 455
CDK 000 446
CDK 000 447
CDK 000 784
CDK 000 783
CDK 000 641
UV Steckdosen
LSS 32A C
Ölf lex 5G6
CDK 000 729
CDK 000 452
UV Steckdosen
LSS 32A B
Ölf lex 5G6
CDK 000 792
CDK 000 453
CDK 000 454
UV nicht vorhanden
CDK 000 444
CDK 000 443
CDK 000 442
CDK 000 441
CDK 000 436
CDK 000 435
< Feeding line from Building 51 to CDK000357
< Feeding line UV Siemens CDK000421
< Feeding line UV Workshop CDK000415
< Feeding line UV Kitchen CDK000458
< Feeding line UV I CDK000400 < < Feeding line UV II South
CDK000399
Feeding line EUV II
CDK000431 >
Feeding line UV 3 South CDK000403
< Feeding line UV IIa South CDK000398
Panel
CDK357
v
CDK421
< Panel
CDK415
CDK458
CDK400
CDK399
CDK431 ^
Panel >
CDK403
wbrunnmeier
Engineer
Cloud+
Approved by TÜV
Approved by TÜV
ZONE 2
ZONE 1
ZONE 3
ZONE 4
ZONE 6
ZONE 7
ZONE 8
ZONE 9
Zone 10
ZONE 11
Seite 1 von 8
Name:
Straße: Straße:
Ort: Ort:
o o o o o o o o o o o o Ort, Datum Unterschrift
Verantwortlicher Prüfer (Elektrofachkraft, befähigte Person)Kundeninformation
Sonstige
Seite(n)
Prüfbericht über die Prüfung der ortsfesten elektrischen Anlage bzw. Teilanlage geprüfte elektrische Anlage / Teilanlage
Objektart (z. B. Mietwohnung):
Anschrift des prüfenden Unternehmens
Name des verantwortlichen Prüfers (Elektrofachkraft, befähigte Person): Datum der Prüfung: Auftraggeber:
Angaben zur geprüften elektrischen Anlage
Anmerkung:
Der Auftraggeber bestätigt mit seiner Unterschrift den Erhalt des Prüfberichts und verpflichtet sich, die festgestellten Mängel ent-sprechend seiner Betreiberver-antwortung fachgerecht be-seitigen zu lassen.
gesetzliche Grundlagen:
Sonstige:
technische Regeln, Normen: VDE 0100
EnWG ProdSGDGUV Vorschrift 3 / 4
VDE 0113-1VDE 0100-600
VDE 0105-100
NAV / TAB BetrSichV
Grundlagen der Prüfung
Prüfungsergebnis Der unterzeichnende verantwortliche Prüfer bestätigt, dass die geprüfte elektrische Anlage einschließlich der zugehörigen fest angeschlossenen Betriebsmittel den für sie geltenden VDE-Normen entspricht. Teile der Anlage für die diese Aussage nicht zutrifft und Änderungen, die der unterzeichnende verantwortliche Prüfer hinsichtlich der Elektrosicherheit als notwendig ansieht, sowie Empfehlung zur weiteren Verbesserung der Sicherheit und Gebrauchsfähigkeit, werden in der beigefügten Anlage "Kundeninformation" benannt. Die Prüfung der elektrischen Anlage bzw. der elektrischen Teilanlage wurde durch den unterzeichnenden verantwortlichen Prüfer nach bestem Wissen und Gewissen durchgeführt.
Bei der Prüfung der elektrischen Anlage bzw. der elektrischen Teilanlage wurden keine Mängel festgestellt.
Die geprüfte elektrische Anlage ist funktionssicher und die geforderten Schutzmaßnahmen sind wirksam.o
Die geprüfte elektrische Anlage bzw. die elektrische Teilanlage weist erhebliche Mängel auf, deren fachgerechte Abstellung bzw. Beseitigung erforderlich ist.
Die geforderten Schutzmaßnahmen sind nicht hinreichend wirksam, um den normativ geforderten Schutz von Personen, Nutztieren oder Sachen sicherzustellen.o
Die geprüfte elektrische Anlage bzw. die elektrische Teilanlage weist Mängel auf, deren fachgerechte Abstellung bzw. Beseitigung erforderlich ist.
Die geforderten Schutzmaßnahmen konnten messtechnisch nachgewiesen werden und sind wirksam.
Dieser Prüfbericht umfasst Seite(n):
Deckblatt
Prüf-/Messbericht
Wall Versorgungstechnik
Am Römerhof 22 66892 Bruchmühlbach-Miesau
Wall, Manuel
Kaiserslautern Cold Storage
Auf der Weilerbacher Brücke
67661 Kaiserslautern
Cromwell AE GmbH
CDK-402
04.07.2024
Miesau, 13.09.2024
Seite 2 von 8
TT
IT
Übergeordnet durchgeführte Messungen innerhalb der elektrischen Anlage (entsprechend Notwendigkeit):
Durchgängigkeit des Schutzpotentialausgleichs
RSPA =
Es wurden beim Besichtigen keine Mängel festgestellt.
TN-C-S
TN-C
Besichtigen nach VDE 0100-600 Abschn. 6.4.2 durchgeführt.
4. Gerätetyp / Bezeichnung:
Messbedingungen: trocken feucht nass
Besichtigen nach VDE 0105-100/A1 Abschn. 5.3.3.101.1 durchgeführt
Widerstand des Anlagenerders
W
3. Gerätetyp / Bezeichnung:
Netzspannung:
Verwendete Prüfgeräte (nach VDE 0413):
1. Gerätetyp / Bezeichnung:
3/N/PE 400 V / 230 V 50 Hz 3/PEN 400 V / 230 V 50 Hz
Stromversorgungssystem:
Erstprüfung (Neuanlage)
TN-S
Prüfanlass:
RA = W
Prüfschritt "Messen"
Prüfschritt "Erproben"
Prüfschritt "Besichtigen"
Es wurden beim Besichtigen Mängel festgestellt.
Die festgestellten Mängel sind im Mängelbericht der Anlage "Kundeninformation" aufgeführt und sind unverzüglich fachgerecht zu beseitigen.
Es wurden beim Eproben Mängel festgestellt.
Die festgestellten Mängel sind im Mängelbericht der Anlage "Kundeninformation" aufgeführt und sind unverzüglich fachgerecht zu
Kalibrierungs-Nachweis / kalibriert bis:
Inventar-Nr.:
2. Gerätetyp / Bezeichnung:
Wiederholungspüfung Erst-/Prüfung nach Erweiterung wesentlicher Änderung
Erproben nach VDE 0100-600 Abschn. 6.4.3 durchgeführt.
Erproben nach VDE 0105-100/A1 Abschn. 5.3.3.101.2 durchgeführt.
Es wurden beim Erproben keine Mängel festgestellt.
Instandsetzung
Angaben zur geprüften Anlage:
Fluke 1664 FC MGIT-001 12.2024
0 0
Seite 3 von 8
Art q Art I n Zs I k Z i I k polrichtig R pe Typ I n I DN U B I D t a I D t a U Iso
[mm²] [A] [W] [A] [W] [A] J / N [W] A / B [A] [mA] [V] [mA] [ms] [mA] [ms] [V] mit 1* IΔN mit 1* IΔN m. Verbr. o. Verbr.
Fortsetzung nächste Seite
An-schluss
PE-/
PEN
Fehlerstrom-Schutzschalter (RCD)
ÜSO / RCD
Stromkreis- Nr.
Verteilungsbezeichnung:
Leitung
Anz.
Leiter
R Iso
[MW]
Prüf-/Messbericht (Fortsetzung)
Isolations-widerstand
Überstromschutzorgan (ÜSO)Ort/Anlagenteil Pulsstrom Gleichfehlerstrom
F10 Steckdose NYM 3 2,5 B 16 0,82 274 0,82 274 0,44 A 40 30 16,5 21 >500 500
F12 Steckdose NYM 3 2,5 B 16 1,07 209 1,07 209 0,68 A 40 30 16,5 21 >500 500
F13 Steckdose NYM 3 2,5 B 16 1,46 155 1,07 209 0,68 A 40 30 16,5 21 >500 500
F15 Steckdose NYM 3 2,5 B 16 1,24 184 1,24 184 0,44 A 40 30 16,5 21 >500 500
F16 Steckdose NYM 3 2,5 B 16 1,05 213 1,07 209 0,78 A 40 30 16,5 21 >500 500
F22 Steckdose NYM 3 2,5 B 16 1,37 165 1,37 165 0,24 A 40 30 16,5 21 >500 500
F23 Steckdose NYM 3 2,5 B 16 1,40 162 1,40 162 0,34 A 40 30 16,5 21 >500 500
F24 Steckdose NYM 3 2,5 B 16 1,52 150 1,52 150 0,37 A 40 30 16,5 21 >500 500
Seite 4 von 8
Leitung Überstromschutzorgan (ÜSO) An-
Fehlerstrom-Schutzschalter (RCD) Isolations-
Nr. Ort/Anlagenteil
Seite 5 von 8
Nr. Ort/Anlagenteil Leitung Überstromschutzorgan (ÜSO) An-widerstandPulsstrom Gleichfehlerstrom
Ort, Datum Unterschrift
Ergebnis der Teilprüfung "Messen"
Bermekung(en):
o Bei der messtechnischen Prüfung der elektrischen Anlage bzw. der elektrischen Teilanlage wurden Mängel festgestellt, deren fachgerechte Abstellung bzw. Beseitigung erforderlich ist. Die Mängel sind im Detail erläuternd in der Anlage "Kundeninformation/Mängelbericht" ausgewiesen.
o Bei der messtechnischen Prüfung der elektrischen Anlage bzw. der elektrischen Teilanlage wurden keine Mängel festgestellt. Die geforderten Schutzmaßnahmen konnten messtechnisch nachgewiesen werden und sind wirksam.
Verantwortlicher Prüfer (Elektrofachkraft, befähigte Person)
Seite 6 von 8
S M B E V I A lfd.
festgestellter Mangel / empfohlene Maßnahme
Mängelbericht und Informationen über zu beseitigende Mängel sowie Empfehlungen für Veränderungen
Empfehlung zur Sicherheit gegen elektrischen Schlag, Brandschutz oder für andere Schutzmaßnahmen empfohlene Maßnahme zur Verbesserung des Wohnwerts, Komforts usw.
sonstige Information ergänzende Angabe zum Prüf-/Messbericht bzw. zu den Messwerten
Kundeninformation / Mängelbericht
Kennbuchstaben - zur Erläuterung des Mangels bzw. der Empfehlung für Veränderung
Sicherheitsmangel, der sofort (SS) oder unverzüglich (SU) zu beheben ist sicherheitsrelevanter Mangel, der demnächst behoben werden muss Mangel, der bei der Prüfung bereits behoben wurde und somit bei Abschluss der Prüfung nicht mehr existent ist
Achtung!
Für das Beseitigen der bei der Prüfung festgestellten bzw. der nachfolgend aufgeführten Mängel ist der Anlagenbetreiber verantwortlich!
K
1 SS Drahtende nicht vollständig in Klemme 2 SS doppeltbelegte Steckklemmen
3 M N-Trennung nicht ordentlich möglich 4 M 5adrige Zuleitung aus CDK-401 N nicht angeschlossen ellisdj
Seite 7 von 8
Kundeninformation / Mängelbericht (Fortsetzung)
Seite 8 von 8
Bemerkung(en):
Name des verantwortlichen Prüfers (Elektrofachkraft, befähigte Person): Datum der Prüfung: Auftraggeber:
Unterschrift den Erhalt des Prüfberichts und verpflichtet sich, die festgestellten Mängel ent-sprechend
Der unterzeichnende verantwortliche Prüfer bestätigt, dass die geprüfte elektrische Anlage einschließlich der zugehörigen fest angeschlossenen Betriebsmittel den für sie geltenden VDE-Normen entspricht. Teile der Anlage für die diese Aussage nicht zutrifft und Änderungen, die der unterzeichnende verantwortliche Prüfer hinsichtlich der Elektrosicherheit als notwendig ansieht, sowie Empfehlung zur weiteren Verbesserung der Sicherheit und Gebrauchsfähigkeit, werden in der beigefügten Anlage "Kundeninformation" benannt. Die Prüfung der elektrischen Anlage bzw. der elektrischen Teilanlage wurde durch den unterzeichnenden verantwortlichen Prüfer nach bestem Wissen und Gewissen durchgeführt.
Bei der Prüfung der elektrischen Anlage bzw. der elektrischen Teilanlage wurden keine Mängel festgestellt.
Die geprüfte elektrische Anlage ist funktionssicher und die geforderten Schutzmaßnahmen sind wirksam.o
Die geprüfte elektrische Anlage bzw. die elektrische Teilanlage weist erhebliche Mängel auf, deren fachgerechte Abstellung bzw. Beseitigung erforderlich ist.
Die geforderten Schutzmaßnahmen sind nicht hinreichend wirksam, um den normativ geforderten Schutz von Personen, Nutztieren oder Sachen sicherzustellen.o
Die geprüfte elektrische Anlage bzw. die elektrische Teilanlage weist Mängel auf, deren fachgerechte Abstellung bzw. Beseitigung erforderlich ist.
CDK-415
07.11.2024
Miesau, 18.12.2024
Die festgestellten Mängel sind im Mängelbericht der Anlage "Kundeninformation" aufgeführt und sind unverzüglich fachgerecht zu
Die festgestellten Mängel sind im Mängelbericht der Anlage "Kundeninformation" aufgeführt und sind unverzüglich fachgerecht zu
F3 CEE32A NYM 5 6 B 32 0,23 982 0,27 1,0k J 0,00 A 63 300 180 24 >500 500
F4 CEE32A NYM 5 6 B 32 0,45 500 0,44 511 J 0,04 A 63 300 180 24 >500 500
F5 CEE32A NYM 5 6 B 32 0,41 547 0,42 535 J 0,04 A 63 300 180 24 >500 500
F6 CEE32A NYM 5 6 C 32 0,48 469 0,47 480 J 0,07 A 63 300 180 24 >500 500
F7 Steckdose NYM 3 2,5 B 16 0,64 352 0,64 352 J 0,14 A 63 300 180 24 >500 500
F10 Steckdose NYM 3 2,5 B 16 0,76 297 0,76 297 J 0,22 A 63 300 180 24 >500 500
F12 Steckdose NYM 3 2,5 B 16 0,68 331 0,69 326 J 0,18 A 63 300 180 24 >500 500
F15 Steckdose NYM 3 2,5 B 16 0,74 305 0,74 305 J 0,20 A 63 300 180 24 >500 500
F16 CEE16A NYM 5 2,5 B 16 0,73 309 0,73 309 J 0,21 A 63 300 180 24 >500 500
F18 CEE16A NYM 5 2,5 C 16 0,65 347 0,64 352 J 0,17 A 63 300 210 21 >500 500
F19 CEE16A NYM 5 2,5 C 16 0,62 363 0,61 369 J 0,11 A 63 300 210 21 >500 500
F23 CEE16A NYM 5 2,5 C 16 0,33 685 0,33 683 J 0,10 A 63 300 210 21 >500 500
F27 Steckdose NYM 3 2,5 B 16 0,57 396 0,56 403 J 0,09 A 63 300 210 21 >500 500 o Bei der messtechnischen Prüfung der elektrischen Anlage bzw. der elektrischen Teilanlage wurden Mängel festgestellt, deren fachgerechte Abstellung bzw. Beseitigung erforderlich ist. Die Mängel sind im Detail erläuternd in der o Bei der messtechnischen Prüfung der elektrischen Anlage bzw. der elektrischen Teilanlage wurden keine Mängel festgestellt. Die geforderten Schutzmaßnahmen konnten messtechnisch nachgewiesen werden und sind wirksam.
B E V
Mangel, der bei der Prüfung bereits behoben wurde und somit bei Abschluss der Prüfung nicht mehr existent ist
Für das Beseitigen der bei der Prüfung festgestellten bzw. der nachfolgend aufgeführten Mängel ist der Anlagenbetreiber verantwortlich!
1 SS Doppelt belegte Klemmen
2 SS keine Absicherung der RCD´s
3 SS flasche RCD´s verbaut
4 M lose Klemmen innerhalb der Verteilung
Name des verantwortlichen Prüfers (Elektrofachkraft, befähigte Person): Datum der Prüfung: Auftraggeber:
Unterschrift den Erhalt des Prüfberichts und verpflichtet sich, die festgestellten Mängel ent-sprechend
Der unterzeichnende verantwortliche Prüfer bestätigt, dass die geprüfte elektrische Anlage einschließlich der zugehörigen fest angeschlossenen Betriebsmittel den für sie geltenden VDE-Normen entspricht. Teile der Anlage für die diese Aussage nicht zutrifft und Änderungen, die der unterzeichnende verantwortliche Prüfer hinsichtlich der Elektrosicherheit als notwendig ansieht, sowie Empfehlung zur weiteren Verbesserung der Sicherheit und Gebrauchsfähigkeit, werden in der beigefügten Anlage "Kundeninformation" benannt. Die Prüfung der elektrischen Anlage bzw. der elektrischen Teilanlage wurde durch den unterzeichnenden verantwortlichen Prüfer nach bestem Wissen und Gewissen durchgeführt.
Bei der Prüfung der elektrischen Anlage bzw. der elektrischen Teilanlage wurden keine Mängel festgestellt.
Die geprüfte elektrische Anlage ist funktionssicher und die geforderten Schutzmaßnahmen sind wirksam.o
Die geprüfte elektrische Anlage bzw. die elektrische Teilanlage weist erhebliche Mängel auf, deren fachgerechte Abstellung bzw. Beseitigung erforderlich ist.
Die geforderten Schutzmaßnahmen sind nicht hinreichend wirksam, um den normativ geforderten Schutz von Personen, Nutztieren oder Sachen sicherzustellen.o
Die geprüfte elektrische Anlage bzw. die elektrische Teilanlage weist Mängel auf, deren fachgerechte Abstellung bzw. Beseitigung erforderlich ist.
CDK-421
27.06.2024
Miesau, 25.07.2024
Die festgestellten Mängel sind im Mängelbericht der Anlage "Kundeninformation" aufgeführt und sind unverzüglich fachgerecht zu
Die festgestellten Mängel sind im Mängelbericht der Anlage "Kundeninformation" aufgeführt und sind unverzüglich fachgerecht zu
0 0
CEE-32A Rampe NYY 4 6 D2 35 0,64 629 J 0,21 A 40 500 350 17,2 >500 500
CEE-32A Rampe NYY 4 6 D2 35 0,59 682 J 0,34 A 40 500 300 17,6 >500 500
CEE-32A Rampe NYY 4 6 D2 35 0,55 734 J 0,31 A 40 500 210 17,4 >500 500
6 CEE-32A Rampe NYY 4 6 D2 35 0,64 629 J 0,19 A 40 500 330 17,2 >500 500
8 CEE-32A Rampe NYY 4 6 D2 35 0,41 981 J 0,21 A 40 500 330 27,5 >500 500
10 CEE-32A Rampe NYY 4 6 D2 35 0,43 941 J 0,31 A 40 500 350 27,5 >500 500
12 CEE-32A Rampe NYY 4 6 D2 35 0,46 880 J 0,41 A 40 500 250 27,5 >500 500
13 CEE-32A Rampe NYY 4 6 D2 35 0,44 920 J 0,22 A 40 500 330 17,2 >500 500
16 CEE-32A Rampe NYY 4 6 D2 35 0,44 920 J 0,28 A 40 500 300 27,1 >500 500
17 CEE-32A Rampe NYY 4 6 D2 35 0,46 878 J 0,32 A 40 500 300 17,4 >500 200
18 CEE-32A Rampe NYY 4 6 D2 35 0,55 730 J 0,28 A 40 500 100 28,0 >500 164
19 CEE-32A Rampe NYY 4 6 D2 35 0,44 920 J 0,32 A 40 500 400 16,9 >500 182
21 CEE-32A Rampe NYY 4 6 D2 35 0,64 629 J 0,43 A 40 500 350 17,4 >500 500
23 CEE-32A Rampe NYY 4 6 D2 35 0,65 620 J 0,18 A 40 500 350 27,5 >500 156
25 CEE-32A Rampe NYY 4 6 D2 35 0,42 961 J 0,28 A 40 500 150 27,5 >500 500 o Bei der messtechnischen Prüfung der elektrischen Anlage bzw. der elektrischen Teilanlage wurden Mängel festgestellt, deren fachgerechte Abstellung bzw. Beseitigung erforderlich ist. Die Mängel sind im Detail erläuternd in der o Bei der messtechnischen Prüfung der elektrischen Anlage bzw. der elektrischen Teilanlage wurden keine Mängel festgestellt. Die geforderten Schutzmaßnahmen konnten messtechnisch nachgewiesen werden und sind wirksam.
B E V
Mangel, der bei der Prüfung bereits behoben wurde und somit bei Abschluss der Prüfung nicht mehr existent ist
Für das Beseitigen der bei der Prüfung festgestellten bzw. der nachfolgend aufgeführten Mängel ist der Anlagenbetreiber verantwortlich!
1 SS
RCD Auslösestrom ist zu hoch 500mA statt 30mA
SS An allen 5poligen CEE-Steckdosen fehlt der Neutralleiter
M Kein Berürungsschutz innerhalb der Verteilung
SS Hauptlasttrennschalter 800A zu hoch eingestellt
5 SS Abgriff an der Sammelschine mit 50qmm ohne Absicherung
Name des verantwortlichen Prüfers (Elektrofachkraft, befähigte Person): Datum der Prüfung: Auftraggeber:
Unterschrift den Erhalt des Prüfberichts und verpflichtet sich, die festgestellten Mängel ent-sprechend
Der unterzeichnende verantwortliche Prüfer bestätigt, dass die geprüfte elektrische Anlage einschließlich der zugehörigen fest angeschlossenen Betriebsmittel den für sie geltenden VDE-Normen entspricht. Teile der Anlage für die diese Aussage nicht zutrifft und Änderungen, die der unterzeichnende verantwortliche Prüfer hinsichtlich der Elektrosicherheit als notwendig ansieht, sowie Empfehlung zur weiteren Verbesserung der Sicherheit und Gebrauchsfähigkeit, werden in der beigefügten Anlage "Kundeninformation" benannt. Die Prüfung der elektrischen Anlage bzw. der elektrischen Teilanlage wurde durch den unterzeichnenden verantwortlichen Prüfer nach bestem Wissen und Gewissen durchgeführt.
Bei der Prüfung der elektrischen Anlage bzw. der elektrischen Teilanlage wurden keine Mängel festgestellt.
Die geprüfte elektrische Anlage ist funktionssicher und die geforderten Schutzmaßnahmen sind wirksam.o
Die geprüfte elektrische Anlage bzw. die elektrische Teilanlage weist erhebliche Mängel auf, deren fachgerechte Abstellung bzw. Beseitigung erforderlich ist.
Die geforderten Schutzmaßnahmen sind nicht hinreichend wirksam, um den normativ geforderten Schutz von Personen, Nutztieren oder Sachen sicherzustellen.o
Die geprüfte elektrische Anlage bzw. die elektrische Teilanlage weist Mängel auf, deren fachgerechte Abstellung bzw. Beseitigung erforderlich ist.
22.10.2024
CDK-431
Miesau, 22.11.2024
Die festgestellten Mängel sind im Mängelbericht der Anlage "Kundeninformation" aufgeführt und sind unverzüglich fachgerecht zu
Die festgestellten Mängel sind im Mängelbericht der Anlage "Kundeninformation" aufgeführt und sind unverzüglich fachgerecht zu
F36 CEE 16A NYM 5 2,5 B 25 0,42 535 0,39 576 0,11 >500 500
F39 CEE 16A NYM 5 2,5 B 16 0,42 535 0,39 576 0,11 >500 500
F37 CEE 16A NYM 5 2,5 B 25 0,44 506 0,40 557 0,22 >500 500
F38 CEE 16A NYM 5 2,5 B 16 0,66 336 0,53 419 0,28 >500 500
F40 CEE 16A NYM 5 2,5 B 16 0,49 458 0,38 591 0,21 >500 500
F46 CEE 16A NYM 5 2,5 B 16 1,28 174 1,27 176 0,74 >500 500
F3 CEE 32 A NYM 5 4 C 32 0,49 460 0,50 451 0,23 A 40 300 210 28 >500 500
F11 CEE 32A NYM 5 4 C 32 0,64 350 0,61 368 0,15 >500 500
F16 Steckdosen NYM 3 2,5 B 16 1,66 133 1,63 135 0,74 A 63 300 180 28 >500 500
F15 Steckdosen NYM 3 2,5 B 16 1,44 153 1,40 164 0,23 A 40 300 210 28 >500 500
F18 CEE 16A 3pol. NYM 3 2,5 B 16 0,48 468 0,49 457 0,22 >500 500 o Bei der messtechnischen Prüfung der elektrischen Anlage bzw. der elektrischen Teilanlage wurden Mängel festgestellt, deren fachgerechte Abstellung bzw. Beseitigung erforderlich ist. Die Mängel sind im Detail erläuternd in der o Bei der messtechnischen Prüfung der elektrischen Anlage bzw. der elektrischen Teilanlage wurden keine Mängel festgestellt. Die geforderten Schutzmaßnahmen konnten messtechnisch nachgewiesen werden und sind wirksam.
Miesau, 22.11.2024
B E V
Mangel, der bei der Prüfung bereits behoben wurde und somit bei Abschluss der Prüfung nicht mehr existent ist
Für das Beseitigen der bei der Prüfung festgestellten bzw. der nachfolgend aufgeführten Mängel ist der Anlagenbetreiber verantwortlich!
1 M Verteiler ist stark verschmutz
2 SS doppelt belegte Klemmen
3 M lose Klemmen innerhalb der Verteilung
4 M Erdung an der Tür ist abgerissen
5 SS RCD´s können überlastet werden
6 SS Steckdosenstromkreis ohne RCD
7 SS Zuleitung unstimmig 4x95/50 Abgang im Verteiler kommt ein 3x95/50 an
Miesau 22.11.2024
CRAWL SPACE UNDER FLOOR SLAB IN EARTH
GROUNDING CONDUCTOR INSTALLATION V4A 30x3,5
ERDUNGSANLAGEN
KGR 445 GROUNDING-LIGHTNING / ERDUNG-BLITZSCHUTZ
RING GROUNDING CONDUCTOR V4A 30x3,5 INSTALLATION IN THE GROUND
ANSCHLUSSFAHNE V4A BESTAND
GROUNDING LUG EXISTING
ANSCHLUSSFAHNE V4A KRIECHKELLER UNTER BODENPLATTE
GROUNDING LUG CRAWL SPACE UNDER FLOOR SLAB
GROUNDING LUG V4A NEW
GROUNDING SYSTEMS
RINGERDER V4A 30x3,5 VERLEGUNG IM ERDREICH
ANSCHLUSSFAHNE V4A NEU
LEGENDE ERDUNG BLITZSCHUTZ POTENZIALAUSGLEICH
NUMBER GROUNDING LUG
NUMMER ANSCHLUSSFAHNE ERDUNG
LEGEND GROUNDING AND LIGHTNING PROTECTION
KRIECHKELLER UNTER BODENPLATTE IN ERDE
RINGERDER V4A 30x3,5 VERLEGUNG
ANSCHLUSSFAHNE V4A TIEFENERDER
GROUNDING LUG DEEP EARTH PILES
CRAWL SPACE UNDER FLOOR SLAB IN EARTH
GROUNDING CONDUCTOR INSTALLATION V4A 30x3,5
ERDUNGSANLAGEN
KGR 445 GROUNDING-LIGHTNING / ERDUNG-BLITZSCHUTZ
RING GROUNDING CONDUCTOR V4A 30x3,5 INSTALLATION IN THE GROUND
ANSCHLUSSFAHNE V4A BESTAND
GROUNDING LUG EXISTING
ANSCHLUSSFAHNE V4A KRIECHKELLER UNTER BODENPLATTE
GROUNDING LUG CRAWL SPACE UNDER FLOOR SLAB
GROUNDING LUG V4A NEW
GROUNDING SYSTEMS
RINGERDER V4A 30x3,5 VERLEGUNG IM ERDREICH
ANSCHLUSSFAHNE V4A NEU
LEGENDE ERDUNG BLITZSCHUTZ POTENZIALAUSGLEICH
NUMBER GROUNDING LUG
NUMMER ANSCHLUSSFAHNE ERDUNG
LEGEND GROUNDING AND LIGHTNING PROTECTION
KRIECHKELLER UNTER BODENPLATTE IN ERDE
RINGERDER V4A 30x3,5 VERLEGUNG
ANSCHLUSSFAHNE V4A TIEFENERDER
GROUNDING LUG DEEP EARTH PILES
PAS-SCHIENE MIT NUMMER
EQUIPOTENTIAL BONDING
LEGENDE POTENZIALAUSGLEICH
PAS
EQUIPOTENTIAL BONDING DEVICE
KGR 445 EQUIPOTENTIAL BONDING / POTENZIALAUSGLEICH
LEGEND EQUIPOTENTIAL BONDING
PAS POTENTIALAUSGLEICH
EQUIPOTENTIAL BONDING RAIL WITH NUMBER
POTENZIALAUSGLEICH GERÄT/ANSCHLUSS
PAS 12
PAS 72A1
PAS 08
PAS 13
PAS 30A.1
PAS 35
PAS Traffo
PAS 61
PAS Trafo
PAS 23
Hauptverteilung / MDP
31A
41A
15A13A
46B
07 09 10 11 12 13
14A
16 17 18
31 34
55 56
64A
69A
71 72
74 75 76
80 81
656667
Connection, Anbindung Trafostation
Connection, Anbindung Mast
Connection, Anbindung Mast
50 49 48 47
38 37 36 43 44A
25A
20A
42 41
Erdungsfahne Pförtnerhaus ehemalig
Lightning lug old entrance
V4A Grounding strap in earth, Erdungsband in Erde in the crawl space, im Kriechkeller V4A Grounding strap in earth, Erdungsband in Erde in the crawl space, im Kriechkeller
46A
Laid in the slope, im Hang verlegt
47A
LUG Watersystem, Fahne Wasserrohre
15.00 m
30A 30B
55A
45A
64A
51A
15 16A
39A
76A 72A
23 24
29A
48A
04A
06A
PAS 54.1 PAS 55.1
PAS 74A1 PAS 75A1 PAS 76A1 PAS 79A1 PAS 80A PAS 81A1 PAS 82A1 PAS 83A1
PAS 11A1
PAS 10A1 PAS 12A1 PAS 13A1 PAS 14A1 PAS 15A1 PAS 17A1 PAS 18A1 PAS 39A1PAS 42A1 PAS 41.1
PAS 40A1
PAS 51.1 PAS 50.1
PAS 37.1
PAS 49.1
PAS 44.1
PAS 27
PAS 30.2
PAS 30.3
PAS 52.1
PAS 52.2
PAS 52.3
PAS 52.4
PAS 20.1
PAS 40.1
PAS 16.1
PAS 11.1
9A
PAS 09.1
PAS 6.1
PAS 6A1
PAS 3.1
PAS 70.1 PAS 72.1
PAS 74.1
PAS 75
PAS 77.1 PAS 78.1
PAS 79.1 PAS 80.1
PAS 83.1
PAS 84.1
PAS 51.2
PAS 61.1
PAS 61.2
PAS 61.3
PAS 46B.2
PAS 61.3
PAS 16A.1
PAS 16A.2
PAS 35.1
PAS 35.2
PAS 30A.5
PAS 30A.4
PAS 30A.3
PAS 30A.2
PAS 30A.1
PAS 30.1
PAS 30.2.1
PAS 30.2.2
PAS 30.2.3
PAS 30.2.4
PAS 30.2.5
PAS 64.1
PAS 55.1
PAS 55.2
PAS 55.3
PAS 54.1 PAS 54.2
PAS 54.3
PAS 54.4
PAS 54.5
PAS 49.1
PAS 49.2 PAS 49.3
PAS 49.4
PAS 49.5
PAS 50.1
PAS 50.2
PAS 50.3
PAS 51.1 PAS 51.2
PAS 51.2.1
PAS 51.2.2
PAS 51.2.3
PAS 37.1 PAS 44.1
PAS 44.2
PAS 27.1
PAS 27.2
PAS 25A.1
PAS 25A.2
PAS 20.1
PAS 20.2
PAS 40.1PAS 40.2 PAS 40.3
PAS 40.4
PAS 40.5
PAS 40A1 PAS 40A2
PAS 40A3
PAS 40A4
PAS 40A5
PAS 40A6
PAS 39A1
PAS 39A2
PAS 39A3
PAS 42.1
PAS 42.2
PAS 42.3
PAS 17A1
PAS 17A2
PAS 17A1
PAS 15A1
PAS 15A2
PAS 15A3
PAS 15A4
PAS 15A5
PAS 15A6
PAS 15A1
PAS 15A2 PAS 15A3
PAS 15A4
PAS 15A5PAS 12A1
PAS 12A2
PAS 10A1 PAS 10A2
PAS 9.1
PAS 9.2
PAS 9.3
PAS 9.4
PAS 6A1
PAS 6.1
PAS 6.2
PAS 3.1
PAS 3.2
PAS 69.1/PAS 69.2
PAS 69.3
PAS 70.1
PAS 70.2
PAS 70.3
PAS 11A1
PAS 11A2
PAS 11A3
PAS 14A1 PAS 14A2 PAS 14A3
PAS 16.1
PAS 16.2
PAS 16.3
PAS 16.4 PAS 16.5
PAS 18A1
PAS 18A2
PAS 18A3 PAS 18A4
PAS 41.1 PAS 41.2
PAS 41.3
PAS 41.4
PAS 72.1
PAS 72.2
PAS 72.3
PAS 72.4
PAS 72.5
PAS 72A1
PAS 74.1
PAS 74.2
PAS 74.3 PAS 74.4
PAS 74.5
PAS 75.1
PAS 75A1 PAS 75A2
PAS 77.1
PAS 77.2
PAS 77.3
PAS 77.4
PAS 76A1
PAS 76A1 PAS 76A1
PAS 78.1
PAS 78.2
PAS 78.3
PAS 78.4
PAS 79A1
PAS 79A1
PAS 79A2
PAS 77.1 PAS 80A1
PAS 80A2
PAS 80A3
PAS 80A4
PAS 80.1
PAS 80.2
PAS 80.3
PAS 80.4
PAS 80.5
PAS 82A1 PAS 82A2
PAS 81.1
PAS 81.2
PAS 81.1
PAS 83A1
PAS 83A2
PAS 83A3
PAS 83A4
PAS 83.1 PAS 83.1 PAS 83.1
PAS 84.1
PAS 84.2
PAS 84.3
PAS 52.4.1
PAS 52.4.2
PAS 52.1
PAS 52.2
PAS 52.3
PAS 52.3.1
PAS 52.3.2
PAS 52.2.1
PAS 52.2.2
B
B
C
D
D
E
F
H
J
J
1.2
2 2
3 3
5 5
6 6
3.4
3.6
COOLING CELL - M
NORTH VESTIBULE - M
SOUTH VESTIBULE - M
T
O
R
ID
IF
COOLING CELL - L
COOLING CELL - K
STAGING - C
STAGING - C
COOLING CELL - J
COOLING CELL - S
MACHINE SHOP
NORTH VESTIBULE - 1
OFFICE
COOLING CELL - T
REFRIGERATION MACHINE
ROOM
MACHINE VESTIBULE -2
COOLING CELL - G
NORTH VESTIBULE - 2
COOLING CELL - V
NORTH VESTIBULE - 3
COOLING CELL - N
OFFICE
AIR PALLET STAGING
COOLING CELL - AIR
PALLETS
STAGING / STORAGE
BUILDING
NORTH DOCK
WOMEN'S RESTROOM
STORAGE
ID
IF
MEN'S RESTROOM
SOUTH VESTIBULE
SOUTH DOCK
MHE BUILDING
STAGING / STORAGE
MACHINE VESTIBULE - 1
2 2 . 0 0 4 .8 8
Technical Building
Trafo
10.00 m
15.00 m
ENTRANCE
PAS 46B.1
GHV Feld 3 / 5 710kW/LS 1600A
20m
GHV - Feld 2 / 4 710kW/ LS 1600A
GHV Feld 6
4x(3x240/120) Cu NYCWY
60m Trafo 1CDK-813
NH00 100A
8m alt CDK 427
COLD STORAGE AREA
5 - V
5- V
4 - G
4- G
2 - S
2- S
6 - N
6- N
7 - M
7- M
NORD
SÜD
Build. 51
Admin Offices Buil. 50
900kVA 1300A
720KW
0,8
20kV 400V 800 kVA 1150A
GHV Feld 1
10m Stromschiene / Busbar
400V
T3
400V
GHV Feld 7
GHV Feld 8
Stromschiene
LDA 7413 =
AL, 2800A,
4Leiter, 1/2L
PEN, IP34
GHV Feld 11
LS 100A
4x16 gem Netzberechnung
MHE UV 2
GHV - Feld 10
LS 2000A
RESERVE
Hauptschalter NSHV ?
GHV Feld 12
Reserve
GHV Feld 9
Stromschiene / Busbar
GHV Feld 13
GHV Feld 14
LS 400A
2x(4x185)
37 CT
900kVA 1300A
720KW
0,8
?? NYY 4x25
Trinkwasser
2x NYCWY (3x150/70)
4x150/70 NYCWY
KV 1 KH 7 Lager
2x NYCWY (3x185/95)
Geb 56
NYY-O 4x150 120m
HV II,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .