Amendment 5 - 47PC0319R0003
View the file
Other files for this federal contract opportunity
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
2PQC
Winnie Eng, Senior Contracting Officer
Please see attached.
General Services Administration Public Buildings Service One World Trade Center, 55th Floor New York, NY 10007
General Services Administration Public Buildings Service One World Trade Center, 55th Floor New York, NY 10007
47PC0319R0003
1 2
05/14/2019
04/11/2019
PUERTO RICO HURRICANE RECOVERY PROJECT
SAN JUAN, PR GSA-PBS, REGION 2
SOLICITATION NO. 47PC0319R0003
AMENDMENT NO. 5
Amendment No. 5 is hereby issued as follows:
1. To respond to the following RFI’s:
40. As per drawing A-440, a noise attenuating ceiling system shall be installed inside the new generator enclouse. Please provide ceiling system specifications.
Response: See attached new sheet A-144 for details. Ceiling type is ACT-2 as specified in “095113 – Acoustical Panel Ceilings.”
41. As per specification 01 31 00, A list of Partnering Facilitators is available from GSA. Please provide facilitators list.
Response: Section 013100 1.7.E "Partnering Meetings" is deleted in its entirety. Please see the instructions in the Partnering_-_PR_Hurricane_Recovery_Project attachment posted under the original Solicitation.
42. In Rainforest Kids Child Development Center, drawing E-010 denotes 2/E-101 and 3/E-101 but on drawing E-101 there are no works that correspond to entrance and electrical room.
Response: Incorrect drawing reference is shown on plans. Refer to 2/E-010 and 3/E-010 for correct drawing references. See attached revised E-010.
43. In Amendment 2, page 3 indicates Substantial Completion time for all tasks. But Options does not coincides with previous documents: 012400 Options and Contract_Pricing_Form_47PC0319R0003_2019_04_16. Should we disregard page 3 for pricing purposes?
Response: Follow Amendment 2 for task durations. Replace the CONTRACT PRICING FORM dated April 16, 2019 with the attached revised CONTRACT PRICING FORM dated May 14.
2019 with task durations removed.
2. In regards to RFI Question #37, under Amendment No. 4, to provide a technical specification for the pavement marking lines, please see attached revised Specification 321723 Painted Pavement Markings and attached Drawing CS-100, which corresponds with the specification.
The date and time for receipt of proposals remains unchanged.
END OF AMENDMENT NO. 5