RFP Pre-Proposal Briefing

View the file

Other files

File Type Posted
01310 Progress Schedules_Rev2_w-Bar.pdf PDF
Clarifications.xlsx XLSX spreadsheet
13040 Plant Growth Chambers Growth Rms Tissue Culture R .pdf PDF
Geotechnical Report_Sept 15-2000.pdf PDF
01805 Commissioning of Mech Systems_Rev1_changes w-Bar.pdf PDF
SF 30 Amendment 00005.pdf PDF
sample_bid_format —
SF 30 - Amend 00004.pdf PDF
Sf1442 WRRC Rev 1.docx DOCX document
Q007-REV2.pdf PDF
Q006-REV2.pdf PDF
Drawing Changes List.docx DOCX document
Bidders Questions_2-19-10 —
01310 Progress Schedules_Rev1.pdf PDF
Q302-3 REV2.pdf PDF
Q004-REV2.pdf PDF
_All Rev Drawing PDFs WRRC Rev1 12-10-10.pdf PDF
SF 30 - Amend 00003.pdf PDF
Jacobs Pre-proposal Brief 1-27-10.pptx PPTX presentation
PN-020_Pre-Bid Conf_01-27-10 —
SF 30 - Amend 00002.pdf PDF
Hazmat Briefing 1-27-10.pptx PPTX presentation
SF 30.pdf PDF
TELECOMMUNICATIONS.pdf PDF
FIRE PROTECTION.pdf PDF
_Index sht-USDA-IFB 12-16-09.xls XLS spreadsheet
CALCS.pdf PDF
EQUIPMENT-GPR.pdf PDF
ENVIRONMENTAL.pdf PDF
STRUCTURAL.pdf PDF
ARCHITECTURAL.pdf PDF
PLUMBING.pdf PDF
MECHANICAL.pdf PDF
ELECTRICAL.pdf PDF
_Index sht-USDA-IFB 12-16-09.xls XLS spreadsheet
Ars371.pdf PDF
sf25a Payment Bond.pdf PDF
SPECS.pdf PDF
CALCS.pdf PDF
Wage Determination.pdf PDF
SUMMARY DWGS.pdf PDF
RFP AG-3K15-S-10-0005 Sections B-M —
SF 24 Bid Bond.pdf PDF
SF 1442 Solicitation AG-3K15-S-10-0010 —
Ars372.pdf PDF
SF 1420 Performance Evaluation.pdf PDF
sf25 Performance Bond.pdf PDF
TOC AG-3K15-S-10-0005 —
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Western Regional Research Center

(WRRC)

Major Renovations – South Wing Pre-Proposal Conference

27 January 2010

Admin Remarks

Silence all Cell phones and pagers
No recording devices allowed
Photographs may be taken during the site visit
Rest Room Facilities
Site Visit Etiquette
This presentation and an attendee list will be posted on the FedBizOps website

AGENDA

Arrival/Sign-In

Admin Remarks/Agenda/Introductions

Project/RFP Overview (Sections A-K)

Program & Technical Overview

Site Visit

Adjourn

Key Personnel Ronda Ford – Contract Specialist (Beltsville, MD)

Ken Cook – Engineering Project Mgr (Beltsville)

Tom Moreno – Facility Engineer (WRRC – Albany)

Adam Salvadalena – PWA Engineer (Albany)

Dr. Howard Zhang – WRRC Director (Albany)

Greg Owens – Jacobs Engineering (A&E Firm)

WRRC Mission To enhance healthfulness of foods by creating crop plants and food products that promote health, and by developing systems and methods that ensure the safety of the food supply.

To develop new food and industrial products using biotechnology to develop improved, tailored agricultural crops and bioengineering to create new products from agricultural crops and processing co-products.

To protect and enhance the quality of the environment by developing ecologically sound methods for pest control and environmentally sound systems for efficient food and industrial processes.

To ensure the effective transfer of new and innovative technologies by integrating technology transfer into program and project design and developing partnerships with private and public sector clients.

Improve the understanding of the Government’s requirement

Allow potential offerors to judge whether or how they can satisfy the Government’s requirements

Enhance the Government’s ability to obtain quality construction at reasonable prices

Increase efficiency in proposal preparation, proposal evaluation, negotiation and contract award

Purpose of Conference/Site Visit

Questions raised at this conference must be submitted in writing (utilizing the provided form) or via email to kathy.scheel@jacobs.com with a copy to ronda.ford@ars.usda.gov and the solicitation number referenced in the subject line

Deadline for submission of questions is NLT 4 February 2010

All questions will be answered via an amendment to the solicitation and posted on FedBizOps

In order to maintain procurement integrity please avoid one on one conversations with Government/A&E personnel

Questions

Disclaimer In the event that there is a conflict between the RFP terms and conditions and the information that is disseminated during today’s conference, the RFP terms and conditions takes precedence.

The formal RFP is the only document that should be relied upon in determining the Government’s requirements.

Any changes to the RFP will be with a formal amendment.

Project Overview

Background The original WRRC structure was constructed in the 1930’s and 1940’s.

The original project modernization design consisted of 6 phases of construction. Phase 1 and 2 construction was completed in May 2004. Phase 3A construction was completed in November 2008.

This project includes the renovation of four floors (45,000 GSF) of the existing south wing, renovations in the existing administrative wing basement, upgrades to an existing exterior steam line, and renovations in the existing overpass building.

Project Overview

The proposed renovations include lead and asbestos abatement, architectural, mechanical, plumbing, electrical, the provision and movement of large, fixed scientific equipment and life safety system for the remaining design phases, known as Phase 3B, 4A, 4B, 5, and 6, in addition to other miscellaneous renovations. In addition, the work includes the re-commissioning of Phases 1, 2, and 3A.

The work shall be conducted in four sequences, numbered 1 thru 4, as indicated in the contract drawings and specifications. Each sequence will be inspected, commissioned, and accepted separately.

The schedule of items will include a base item and 2 optional items. The base item will encompass work primarily associated with sequences 1-3, option item 1 work is primarily associated with sequence 4 and option item 2 includes work to complete a new roofing system for the south wing.

RFP Overview

RFP OVERVIEW

Section A - Proposal
Standard Form 1442 - Complete blocks 14, 15, 16, 17, 19, 20a, 20b, 20c (Note: Refer to block 13D before completing block 17)
Section B – Schedule of Items
B.2 Identifies the base item and 2 option line items. Prospective offerors must propose on all items (base and option)
B.3 Identifies performance time at 900 calendar days

Section C - Specifications

Attachment in Section J – Identifies work disciplines (mechanical, electrical, etc.) by divisions

Section F - Deliveries or Performance
F.2 Liquidated Damages is $1,250.00 for each calendar day of delay
F.4 Performance of Work by the contractor shall be at lease 15 percent
Section H – Special Contract Requirements
H.25 Key Personnel, insert names of proposed key personnel
Section I – Contract Clauses
I.1 FAR 52.203-15 Whistleblower Protections Under American Recovery and Reinvestment Act
I.1 FAR 52.204-11 American Recovery and Reinvestment Act – Reporting Requirements
I.1 FAR 52.215-2 Audit and Records – Negotiation, Alternate I
I.6 FAR 52.225-23 – Required use of American iron, steel, and other manufactured goods – Buy American Act – Construction

Section J (Attachments)

1 Wage Determination(s), CA 20070029, mod 40, Dated 11/13/2009

2 Bid Bond, SF-24

3 Performance & Payment Bonds, SF-25 & 25a

4 Disclosure of Lobbying Activities, SF-LLL & LLLa

5 Construction Progress and Payment Schedule, ARS-371

6 Contractor’s Request for Payment Transmittal, ARS-372

7 Past Performance Evaluation Form

8 Specifications

9 Drawings

Section K (Representations and Certifications)
Online Representations and Certifications Application (ORCA)
Section L – Instructions, Conditions and Notices to Offerors
L.2 Data Universal Numbering System (DUNS NUMBER) – Enter DUNS number in block 14 of SF 1442 (company name/address)
L.3 Instructions to Offerors – Competitive Acquisition – Provides instructions concerning the procedures relative to this type of procurement
L.10 Bid Guarantee (FAR 52.228-1) – Failure to furnish a bid guarantee in the proper form and amount , by the time set for submission of proposal may be cause for rejection of the proposal.
Section M – Evaluation Factors for Award
M.2 Criteria for Evaluation Proposals – Provides values assessed to specific evaluation factors and sub-factors. When all evaluation factors are combined they are approximately equal to cost or price
M.3 Award will be made to the responsible offeror whose proposal presents the “best value” to the Government, which may not necessarily be the proposal offering the lowest price nor the highest technical score

Overview of Sections L & M, Evaluation Process

Sections L and M Understanding and following Section L&M are the keys to developing a good proposal; a mutually beneficial goal for award

Proposal Instructions – Section L of the RFP:

Tells Offerors what to include in the proposal

Evaluation Factors – Section M of the RFP:

Identifies how Offerors will be evaluated

TECHNICAL PROPOSAL

Technical Proposal – evaluate and determine whether a proposal will meet Government requirements, includes;

(1) Relevant Project Experience and Past Performance

(2) Key Personnel

(3) Contract Administration

(4) Schedule and Resources

(5) Small Disadvantaged Participation Program

EXPERIENCE

Prime Contractor experience on 5 projects within the last 5 years of similar size, scope, function, and complexity

Experience with new construction and renovations, ability to manage multiple projects - emphasis on research laboratory type facilities

Government experience is desired but not required.

PAST PERFORMANCE (reference Form SF 1420)

Conformance to specifications and standard of workmanship

Adherence to contract schedules

History of reasonable, cooperative behavior and responsiveness to customer needs

Coordination and management of subcontractors

Note: Government Past Performance databases will also be utilized

KEY PERSONNEL (Staffing Plan)

Identify key construction and management personnel - their level authority - relationship to the company - their roles in recent relevant projects

Distinguish between in-house staff and subcontractors

Identify number of present employees and their roles

Identify number of new hires

KEY PERSONNEL (Personnel Qualifications)

Resumes for;

Project Manager

Site Superintendent

Quality Control Manager

Safety Officer

CONTRACT ADMINISTRATION – Administrative Approach

Administration of contract /subcontract

CPM scheduling

Maintaining records

Administration of quality control program and related inspection

Commissioning

Close out/turn over

Quality Control Plan/Commissioning

Description of the plan and process methodology

Personnel qualifications and reporting requirements

Approach to meeting commissioning requirements

Subcontractor –

Provide names of 1-3 potential contractors specifically for;

Mechanical ControlsTest and Balance
PlumbingElectrical
Fire AlarmHazardous Abatement
StuccoWindow
RoofingConcrete
Structural SteelScientific Equipment Vendors

Subcontractor (cont’d) –

- address subcontractor management with respect to work schedule, change order requests, quality of work, adherence of labor standards

- methods to select subcontractors/number of prior projects with each

Note: For any resultant contract, subcontractors utilized shall be those presented in the offer

Schedule –
Define project scheduling capabilities
Provide schedule for proposed project (50-100 activities)
Identify significant work segments and critical path items, including material & equipment

Work Plan Approach – Narrative of approach, identifying assumptions made to develop schedule

-Describe understanding of construction sequencing
Describe alternate strategies to mitigate schedule problems
Resources -
Facility information
Technological information
Office automation capabilities
Software capabilities (must be compatible with gov’t)

Manufacturers -

Provide names of 1-3 potential manufactures for;
growth chambersgrowth roomscold rooms
proctor dryerchillerroofing system
direct digital control systemfire detection & alarm system

Note: For any resultant contract, equipment shall be provided from the manufacturers presented in the offer

Cost Proposal – Shall be submitted separate from the Technical Proposal in order for the Technical Proposal to be evaluated solely upon the basis of technical merit, independent of dollars values

Each Offeror’s cost proposal shall be evaluated to determine if it is complete, consistent and reasonable with the Offeror’s technical approach, reflects a clear understanding of the solicitation requirements and contains no material imbalances.

Supporting Documentation – Cost Proposal shall list all required tasks, labor categories and fully burdened hourly rates; a breakdown of all direct costs, or any other indirect cost; travel and material costs; and contractor’s overhead and profit

COST /BUSINESS PROPOSAL

Section M - Evaluation Criteria Value

1. RELEVENT PROJECTEXPERIENCE AND PAST PERFORMANCE40
a. Experience (20)
b. Past performance (20)
KEY PERSONNEL20
a. Staffing Plan (10)
b. Personnel Qualifications (10)
3. CONTRACT ADMINISTRATION15
a. Administrative Approach (5)
b. Quality Control/Commissioning Plan (5)
c. Subcontractor (5)
SCHEDULE AND RESOURCES20
a. Schedule (5)
b. Work Plan Approach (5)
c. Resources (5)
d. Manufacturers (5)
5. SMALL DISADVANTAGED BUSINESS PARTICIPATION PROGRAM5

TOTAL POSSIBLE TECHNICAL POINTS 100

UNKNOWN-0.bin

UNKNOWN-1.bin

File details come from the government source that posted it. Updated .