About this file

ARS 372

View the file

Other files

File Type Posted
01310 Progress Schedules_Rev2_w-Bar.pdf PDF
Clarifications.xlsx XLSX spreadsheet
13040 Plant Growth Chambers Growth Rms Tissue Culture R .pdf PDF
Geotechnical Report_Sept 15-2000.pdf PDF
01805 Commissioning of Mech Systems_Rev1_changes w-Bar.pdf PDF
SF 30 Amendment 00005.pdf PDF
sample_bid_format —
SF 30 - Amend 00004.pdf PDF
Sf1442 WRRC Rev 1.docx DOCX document
Q007-REV2.pdf PDF
Q006-REV2.pdf PDF
Drawing Changes List.docx DOCX document
Bidders Questions_2-19-10 —
01310 Progress Schedules_Rev1.pdf PDF
Q302-3 REV2.pdf PDF
Q004-REV2.pdf PDF
_All Rev Drawing PDFs WRRC Rev1 12-10-10.pdf PDF
SF 30 - Amend 00003.pdf PDF
WRRC Pre-Proposal Briefing 1-27-10.ppt PPT presentation
Jacobs Pre-proposal Brief 1-27-10.pptx PPTX presentation
PN-020_Pre-Bid Conf_01-27-10 —
SF 30 - Amend 00002.pdf PDF
Hazmat Briefing 1-27-10.pptx PPTX presentation
SF 30.pdf PDF
TELECOMMUNICATIONS.pdf PDF
FIRE PROTECTION.pdf PDF
_Index sht-USDA-IFB 12-16-09.xls XLS spreadsheet
CALCS.pdf PDF
EQUIPMENT-GPR.pdf PDF
ENVIRONMENTAL.pdf PDF
STRUCTURAL.pdf PDF
ARCHITECTURAL.pdf PDF
PLUMBING.pdf PDF
MECHANICAL.pdf PDF
ELECTRICAL.pdf PDF
_Index sht-USDA-IFB 12-16-09.xls XLS spreadsheet
Ars371.pdf PDF
sf25a Payment Bond.pdf PDF
SPECS.pdf PDF
CALCS.pdf PDF
Wage Determination.pdf PDF
SUMMARY DWGS.pdf PDF
RFP AG-3K15-S-10-0005 Sections B-M —
SF 24 Bid Bond.pdf PDF
SF 1442 Solicitation AG-3K15-S-10-0010 —
SF 1420 Performance Evaluation.pdf PDF
sf25 Performance Bond.pdf PDF
TOC AG-3K15-S-10-0005 —
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT NO. PARTIAL PAYMENT NO. FINAL PAYMENT

PROJECT REQUISITION NO.

LOCATION FOR PERIOD BEGINNING

ITEM

1. Amount of original contract $

2. Change orders and/or amendments $

3. Total adjusted contract prices $

7. Less % retainage

USDA-ARSFORM ARS-372 (11/84) Replaces SEA-372 (1/79) which may not be used.

CONTRACTOR'S REQUEST FOR PAYMENT TRANSMITTAL

DATE SIGNED

DATE SIGNED

RECOMMENDED FOR PAYMENT (Signature of EPM, COR, CM, or A.E. as appropriate)

CONCUR (Signature of EPM or COR as appropriate) timely payment from the proceeds of this payment, of amounts due my subcontractors and suppliers in accordance with my contractual arrangements with them.

SIGNATURE OF CONTRACTOR'S AUTHORIZED REPRESENTATIVE DATE SIGNED

CONTRACTOR'S CERTIFICATION OF PAYMENT

By signing this request for payment, I certify that I have made payment from the proceeds of prior payments, and that I will make

MATERIAL STORED AT THE SITE (See Item 5 above)

Description Value

10. Net amount due contractor this payment

6. Total value of work completed and stored material (Line 4 plus Line 5)

8. Total due contractor through end of this period

9. Less previous requests

AMOUNT

4. Value of work completed to end of period

5. Value of material stored at the site (Itemize below)

ENDING

Sheet1

File details come from the government source that posted it. Updated .