TOC AG-3K15-S-10-0005
43 KB Posted
- Solicitation number
- AG-3K15-S-10-0005
About this file
Table of Contents - RFP
Text of this file
AG-3K15-S-10-0005
i
TABLE OF CONTENTS
PART I - THE SCHEDULE
SECTION A - SOLICITATION, OFFER, AND AWARD 1
SECTION B - SUPPLIES OR SERVICES AND PRICE/COSTS
B.1 SCOPE OF CONTRACT 3
B.2 SCHEDULE OF ITEMS 4
B.3 PERFORMANCE TIME 5
B.4 EXERCISE OF OPTIONS 5
SECTION C - DESCRIPTION/SPECIFICATION/WORK STATEMENT
C.1 STATEMENT OF WORK/SPECIFICATIONS 6
C.2 ATTACHMENTS TO STATEMENTS OF WORK/SPECIFICATIONS 6
C.3 CLARIFICATION OF LANGUAGE CONTAINING BID/PROPOSAL 6
SECTION D - PACKAGING AND MARKING 7
[For this solicitation, there are NO clauses in this Section.]
SECTION E - INSPECTION AND ACCEPTANCE
E.1 CLAUSES INCORPORATED BY REFERENCE 8
E.2 FINAL INSPECTION 8
E.3 FINAL ACCEPTANCE 9
SECTION F - DELIVERIES OR PERFORMANCE
F.1 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK 10
F.2 LIQUIDATED DAMAGES - CONSTRUCTION 10
F.3 TIME EXTENSIONS 10
F.4 PERFORMANCE OF WORK BY THE CONTRACTOR 10
F.5 SUSPENSION OF WORK 11
SECTION G - CONTRACT ADMINISTRATION DATA
G.1 CONTRACTING OFFICER’S REPRESENTATIVE 12
G.2 CONTRACT CLOSEOUT 12
G.3 AS-BUILT DRAWINGS 13
G.4 RELEASE FROM CLAIMS 14
G.5 SUPPLEMENT TO CHANGES CLAUSE 14
G.6 POST AWARD EVALUATION OF CONTRACTOR PERFORMANCE 16
G.7 INVOICE PREPARATION AND SUBMISSION 17
ii
SECTION H - SPECIAL CONTRACT REQUIREMENTS
H.1 DIFFERING SITE CONDITIONS 18
H.2 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK 18
H.3 MATERIAL AND WORKMANSHIP 19
H.4 SUPERINTENDENCE BY THE CONTRACTOR 19
H.5 PERMITS AND RESPONSIBILITIES 20
H.6 OTHER CONTRACTS 20
H.7 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT,
UTILITIES, AND IMPROVEMENTS 20
H.8 OPERATIONS AND STORAGE AREAS 21
H.9 USE AND POSSESSION PRIOR TO COMPLETION 21
H.10 CLEANING UP 22
H.11 ACCIDENT PREVENTION 22
H.12 AVAILABILITY AND USE OF UTILITY SERVICES 23
H.13 SCHEDULES FOR CONSTRUCTION CONTRACTS 23
H.14 SCHEDULES FOR CONSTRUCTION CONTRACTS – SUPPLEMENT 24
H.15 LAYOUT OF WORK 24
H.16 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION 24
H.17 INSURANCE COVERAGE - ALTERNATE I 25
H.18 PROHIBITION AGAINST THE USE OF LEAD-BASED PAINT 26
H.19 USE OF PREMISES 26
H.20 ARCHAEOLOGICAL OR HISTORIC SITES 27
H.21 CONTROL OF EROSION, SEDIMENTATION, AND POLLUTION 27
H.22 MAXIMUM WORKWEEK - CONSTRUCTION SCHEDULE 27
H.23 MAXIMUM WORKWEEK - CONSTRUCTION SCHEDULE (SUPPLEMENT) 28
H.24 SAMPLES AND CERTIFICATES 29
H.25 KEY PERSONNEL 29
H.26 CONSTRUCTION PROGRESS AND PAYMENT SCHEDULE 30
H.27 WAGE DETERMINATION 30
H.28 UTILITIES OUTAGE 30
H.29 COOPERATION WITH OTHER CONTRACTORS 31
H.30 SUBMITTALS AND SHOP DRAWINGS 31
H.31 LIST OF MATERIALS 31
H.32 PROPERTY DAMAGE LIABILITY INSURANCE 32
H.33 PARTNERING SESSION 33
H.34 SUBCONTRACTORS, OUTSIDE ASSOCIATES AND CONSULTANTS 33
PART II - CONTRACT CLAUSES
SECTION I - CONTRACT CLAUSES
I.1 CLAUSES INCORPORATED BY REFERENCE 34
I.2 OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM 37
I.3 NOTICE OF PRICE EVALUATION PREFERENCE FOR HUBZONE
SMALL BUSINESS CONCERNS 37
I.4 SMALL BUSINESS SUBCONTRACTING PLAN 38
I.5 LIQUIDATED DAMAGES - SUBCONTRACTING PLAN 46
iii
I.6 REQUIRED USE OF AMERICAN IRON, STEEL, AND OTHER MANUFACTURED
GOODS--BUY AMERICAN ACT--CONSTRUCTION MATERIALS 47
I.7 INSURANCE-WORK ON A GOVERNMENT INSTALLATION 51
I.8 PERFORMANCE AND PAYMENT BONDS – CONSTRUCTION 51
I.9 PAYMENTS UNDER FIXED PRICE CONSTRUCTION CONTRACTS 52
I.10 PAYMENT BY ELECTRONIC FUNDS TRANSFER-CENTRAL CONTRACTOR
REGISTRATION 54
I.11 PRECONSTRUCTION CONFERENCE 56
I.12 REIMBURSEMENT FOR BOND PREMIUMS -- FIXED-PRICE
CONSTRUCTION CONTRACTS 56
I.13 ORDER OF PRECEDENCE 56
PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J - LIST OF ATTACHMENTS
J.1 LIST OF ATTACHMENTS 58
PART IV - REPRESENTATIONS AND INSTRUCTIONS
SECTION K - REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF
OFFERORS
K.1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE 59
K.2 ANNUAL REPRESENTATIONS AND CERTIFICATIONS 59
K.3 DUPLICATION OF COST 63
SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
L.1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE 64
L.2 DATA UNIVERSAL NUMBERING SYSTEM (DUNS) NUMBER 65
L.3 INSTRUCTIONS TO OFFERORS-COMPETITIVE ACQUISITION 65
L.4 REQUIREMENTS FOR COST OR PRICING DATA OR INFORMATION
OTHER THAN COST OR PRICING DATA 69
L.5 TYPE OF CONTRACT 70
L.6 SMALL DISADVANTAGED BUSINESS PARTICIPATION PROGRAM TARGETS 70
L.7 DAVIS-BACON ACT—SECONDARY SITE OF THE WORK 70
L.8 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE
EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION 70
L.9 NOTICE OF REQUIRED USE OF AMERICAN IRON, STEEL, AND OTHER
MANUFACTURED GOODS – BUY AMERICAN ACT – CONSTRUCTION
MATERIALS 72
L.10 BID GUARANTEE 73
L.11 SERVICE OF PROTEST 74
L.12 SITE VISIT (CONSTRUCTION) 74
L.13 INQUIRIES 74
iv
L.14 INSTRUCTIONS FOR THE PREPARATION OF TECHNICAL AND BUSINESS
PROPOSALS 74
L.15 AMENDMENTS TO PROPOSALS 81
L.16 ALTERNATIVE FORMS OF SECURITY 81
L.17 PRE BID/PRE PROPOSAL CONFERENCE 81
SECTION M - EVALUATION FACTORS FOR AWARD
M.1 EVALUATION OF OPTIONS 82
M.2 CRITERIA FOR EVALUATING PROPOSALS 82
M.3 BASIS FOR AWARD 83
Other files
Show all 48
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .