About this file

A E Pre-Proposal Briefing

View the file

Other files

File Type Posted
01310 Progress Schedules_Rev2_w-Bar.pdf PDF
Clarifications.xlsx XLSX spreadsheet
13040 Plant Growth Chambers Growth Rms Tissue Culture R .pdf PDF
Geotechnical Report_Sept 15-2000.pdf PDF
01805 Commissioning of Mech Systems_Rev1_changes w-Bar.pdf PDF
SF 30 Amendment 00005.pdf PDF
sample_bid_format —
SF 30 - Amend 00004.pdf PDF
Sf1442 WRRC Rev 1.docx DOCX document
Q007-REV2.pdf PDF
Q006-REV2.pdf PDF
Drawing Changes List.docx DOCX document
Bidders Questions_2-19-10 —
01310 Progress Schedules_Rev1.pdf PDF
Q302-3 REV2.pdf PDF
Q004-REV2.pdf PDF
_All Rev Drawing PDFs WRRC Rev1 12-10-10.pdf PDF
SF 30 - Amend 00003.pdf PDF
WRRC Pre-Proposal Briefing 1-27-10.ppt PPT presentation
PN-020_Pre-Bid Conf_01-27-10 —
SF 30 - Amend 00002.pdf PDF
Hazmat Briefing 1-27-10.pptx PPTX presentation
SF 30.pdf PDF
TELECOMMUNICATIONS.pdf PDF
FIRE PROTECTION.pdf PDF
_Index sht-USDA-IFB 12-16-09.xls XLS spreadsheet
CALCS.pdf PDF
EQUIPMENT-GPR.pdf PDF
ENVIRONMENTAL.pdf PDF
STRUCTURAL.pdf PDF
ARCHITECTURAL.pdf PDF
PLUMBING.pdf PDF
MECHANICAL.pdf PDF
ELECTRICAL.pdf PDF
_Index sht-USDA-IFB 12-16-09.xls XLS spreadsheet
Ars371.pdf PDF
sf25a Payment Bond.pdf PDF
SPECS.pdf PDF
CALCS.pdf PDF
Wage Determination.pdf PDF
SUMMARY DWGS.pdf PDF
RFP AG-3K15-S-10-0005 Sections B-M —
SF 24 Bid Bond.pdf PDF
SF 1442 Solicitation AG-3K15-S-10-0010 —
Ars372.pdf PDF
SF 1420 Performance Evaluation.pdf PDF
sf25 Performance Bond.pdf PDF
TOC AG-3K15-S-10-0005 —
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Major Renovations – South Wing Pre-Proposal Conference USDA WRRC, Albany, CA January 27, 2010

Project Team Greg Owen Project Manager Anthony DeSimone Mechanical Engineer John Westwood Electrical Engineer Paul Verbout Architect

Tom GoldsmithTelecommunications
Mike WangStructural Engineer
Thong TranLife Safety
Adam GreenI & C

Kathy Scheel Project Coordinator

Project Scope

Project Scope

Construction Sequence High Level Definition of Scope and Construction Sequence Shown on:

G004 G005

Sequence broken into four definable parts Base Bid + Two Bid Options

Contractor to provide there Construction Sequencing Approach for the Project

Sequence 1

Sequence 2

Sequence 3

Bid Option 2

Sequence 4

Bid Option 1

Design Hot Topics Research Equipment Growth Chambers and Rooms Autoclaves Cold Laboratories Tray Dryer Construction Sequence Dependent Start-up and Commissioning of Research Equipment

Commissioning As Defined in Specs and Drawings Re-Commissioning of Phase 1, 2 and 3A Required as Defined in Sequence 1 (re G004) Anthony DeSimone will Support Commissioning / Re-Commissioning at the Site

Project Coordination Working Facility Coordination with Center Personnel After Hours Work Section 01040

Project Schedule CPM Baseline Schedule Bi-Weekly Updates to Progress Schedule Schedule indicated percentage complete Section 01310

Submittals Submittal Schedule Timeliness Section 01330 Web Based Construction Management Sharepoint Web Site Section 01322

Hazardous Materials “H” Drawings in Base Bid and Optional Items Section 13281 - Asbestos Section 13283 - Lead Containing Paint Section 13286 – PCB’s and Mercury

Hazardous Material Consultant Eloy Cisneros ,ATC Associates, Inc

Keys for Success Work Sequence and Scheduling Coordination with Site Follow Specs and Drawings

Questions image1.jpeg image4.jpeg image5.jpeg image6.jpeg image7.jpeg image8.jpeg image9.jpeg image10.jpeg image2.png