About this file

Clarifications

View the file

Other files

File Type Posted
01310 Progress Schedules_Rev2_w-Bar.pdf PDF
13040 Plant Growth Chambers Growth Rms Tissue Culture R .pdf PDF
Geotechnical Report_Sept 15-2000.pdf PDF
01805 Commissioning of Mech Systems_Rev1_changes w-Bar.pdf PDF
SF 30 Amendment 00005.pdf PDF
sample_bid_format —
SF 30 - Amend 00004.pdf PDF
Sf1442 WRRC Rev 1.docx DOCX document
Q007-REV2.pdf PDF
Q006-REV2.pdf PDF
Drawing Changes List.docx DOCX document
Bidders Questions_2-19-10 —
01310 Progress Schedules_Rev1.pdf PDF
Q302-3 REV2.pdf PDF
Q004-REV2.pdf PDF
_All Rev Drawing PDFs WRRC Rev1 12-10-10.pdf PDF
SF 30 - Amend 00003.pdf PDF
WRRC Pre-Proposal Briefing 1-27-10.ppt PPT presentation
Jacobs Pre-proposal Brief 1-27-10.pptx PPTX presentation
PN-020_Pre-Bid Conf_01-27-10 —
SF 30 - Amend 00002.pdf PDF
Hazmat Briefing 1-27-10.pptx PPTX presentation
SF 30.pdf PDF
TELECOMMUNICATIONS.pdf PDF
FIRE PROTECTION.pdf PDF
_Index sht-USDA-IFB 12-16-09.xls XLS spreadsheet
CALCS.pdf PDF
EQUIPMENT-GPR.pdf PDF
ENVIRONMENTAL.pdf PDF
STRUCTURAL.pdf PDF
ARCHITECTURAL.pdf PDF
PLUMBING.pdf PDF
MECHANICAL.pdf PDF
ELECTRICAL.pdf PDF
_Index sht-USDA-IFB 12-16-09.xls XLS spreadsheet
Ars371.pdf PDF
sf25a Payment Bond.pdf PDF
SPECS.pdf PDF
CALCS.pdf PDF
Wage Determination.pdf PDF
SUMMARY DWGS.pdf PDF
RFP AG-3K15-S-10-0005 Sections B-M —
SF 24 Bid Bond.pdf PDF
SF 1442 Solicitation AG-3K15-S-10-0010 —
Ars372.pdf PDF
SF 1420 Performance Evaluation.pdf PDF
sf25 Performance Bond.pdf PDF
TOC AG-3K15-S-10-0005 —
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Question No.ReferenceSubjectClarification
24Equipment B-5Workbench ShelvingCorrected version of Section 13040 provided in Amendment 0005 includes sketches

25 Data Sheet 2-17 Shelving Lighting Corrected version of Section 13040 provided in Amendment 0005 includes sketches/photo

45 Q0002 Item B-42 Confirm Equipment Item B-42 is a Conviron unit

89 RFP Cost Breakdown Sample format provided in Amend 0005

104RFPSupporting Cost DocumentationSample format provided in Amend 0005
Electrical Specs and DrawingsElectrical DevicesThe electrical drawings and supporting specifications delineate the new equipment and devices to be installed. Where devices are being added to existing equipment, the solicitation documents provide ratings that will be adequate for bidding purposes on the basis that the existing equipment is standard commercial/light industrial grade, of major U.S. electrical manufacturer and built per NEMA and ANSI standards. Existing equipment in the facility is of varying vintage installed from the mid 1900s through recent installations. The equipment in the facility is 60 cycle and uses standard U. S. voltages.

Section 01600 Section 3.1.D Relocating of Equipment The specification requires the contractor to have the OEM (Original Equipment Manufacturer) verify that the equipment is functioning properly before and after relocation. This requirement is intended to protect both the Government and the contractor when relocating critical scientific equipment. The OEM name and description are indicated on the Q drawings. Utility requirements for either temporary or permanently relocated equipment are indicated on the appropriate discipline drawings.

Solicitation AG-3K15-S-10-0005 Amendment 00005

Sheet2

Sheet3

File details come from the government source that posted it. Updated .