USDA - Albany, CA Recovery-Major Renovations, Phases 3 through 6
FINAL SUBMITTAL PACKAGE
SPECIFICATIONS
Jacobs/25KT8810 ISSUED FOR FINAL SUBMITTAL December 17, 2009 USDA Recovery-Major Renovations, Phases 3-6 Specifications Table of Contents
TABLE OF CONTENTS
Spec No. Title Rev Date
DIV 1 GENERAL REQUIREMENTS
01010 Summary of Work 0 12-17-09 01016 Safety During Construction 0 12-17-09 01040 Project Coordination 0 12-17-09 01045 Cutting and Patching 0 12-17-09 01050 Field Engineering 0 12-17-09 01105 Special Conditions 0 12-17-09 01200 Project Meetings 0 12-17-09 01310 Progress Schedules 0 12-17-09 01322 Web-Based Construction Management 0 12-17-09 01330 Submittal Procedures 0 12-17-09 01351 Sustainable Project Requirements 0 12-17-09 01370 Schedule of Values 0 12-17-09 01400 Quality Control 0 12-17-09 01420 Sources for Reference Publications 0 12-17-09 01500 Temporary Facilities & Controls 0 12-17-09 01560 Environmental Protection 0 12-17-09 01580 Project Signage 0 12-17-09 01600 Materials and Equipment 0 12-17-09 01631 Products and Substitutions 0 12-17-09 01700 Contract Closeout 0 12-17-09 01730 Operation and Maintenance Data 0 12-17-09 01740 Warranties and Bonds 0 12-17-09 01781 Project Record Documents 0 12-17-09 01805 Commissioning of Mechanical Systems 0 12-17-09
DIV 2 SITEWORK
02220 Site Demolition 0 12-17-09 02315 Excavation and Fill 0 12-17-09
DIV 3 CONCRETE
03300 Cast-in-Place Concrete 0 12-17-09
DIV 5 METALS
05120 Structural Steel 0 12-17-09 05310 Steel Decks 0 12-17-09 05400 Cold-Formed Metal Framing 0 12-17-09 05500 Metal Fabrications 0 12-17-09
DIV 6 WOOD & PLASTICS
06100 Rough Carpentry 0 12-17-09
FINAL SUBMITTAL PACKAGE
SPECIFICATIONS
DIV 7 THERMAL & MOISTURE PROTECTION
07132 Elastomeric Sheet Waterproofing 0 12-17-09 07512 Cold Process Roofing 0 12-17-09 07540 TPA Membrane Roofing 0 12-17-09 07543 Roof Restoration 0 12-17-09 07600 Flashing & Sheet Metal 0 12-17-09 07720 Roof Accessories 0 12-17-09 07812 Intumescent Fireproofing 0 12-17-09 07840 Firestopping 0 12-17-09 07920 Joint Sealants 0 12-17-09
DIV 8 DOORS & WINDOWS
08110 Steel Doors and Frames 0 12-17-09 08520 Aluminum Windows 0 12-17-09 08710 Door Hardware 0 12-17-09 08800 Glazing 0 12-17-09
DIV 9 FINISHES
09205 Furring and Lathing 0 12-17-09 09212 Plaster and Stucco 0 12-17-09 09250 Gypsum Board 0 12-17-09 09510 Acoustical Ceilings 0 12-17-09 09651 Resilient -Applied Flooring 0 12-17-09 09670 Fluid-Applied Flooring 0 12-17-09 09900 Paints and Coatings 0 12-17-09
DIV 10 SPECIALTIES
10201 Metal Wall and Door Louvers 0 12-17-09 10242 Plastic Strip Doors 0 12-17-09 10260 Wall and Corner Guards 0 12-17-09 10425 Identification Signs 0 12-17-09 10522 Fire Protection Specialties 0 12-17-09
DIV 11 EQUIPMENT
11600 Laboratory Equipment 0 12-17-09 11601 Fume Hoods 0 12-17-09
DIV 12 FURNISHINGS
12351 Laboratory Casework 0 12-17-09 12490 Blinds-Venetian 0 12-17-09
DIV 13 SPECIAL CONSTRUCTION
13038 Cold Storage Rooms (Prefabricated Panel Type) 0 12-17-09
13040 Growth Chambers, Growth Rooms, Tissue Culture Rooms (and data sheets) 0 12-17-09
13043 Gas-Fired Variable Circulation Lab Dryer 0 12-17-09 13281 Engineering Control of Asbestos-Containing Material 0 12-17-09 13283 Removal & Disposal of Lead-Containing Paint 0 12-17-09
FINAL SUBMITTAL PACKAGE
SPECIFICATIONS
13286 Handling of Lighting Ballasts & Lamps Containing PCBs and
Mercury 0 12-17-09
13852 Interior Fire Detection and Alarm System 0 12-17-09 13930 Wet-Pipe Fire Suppression Sprinklers 0 12-17-09
DIV 14 CONVEYING SYSTEMS
14601 Top Running Bridge Crane, 5-Ton Maximum Capacity 0 12-17-09
DIV 15 MECHANICAL
15050 Basic Mechanical Materials and Methods 0 12-17-09 15070 Mechanical Sound, Vibration and Seismic Control 0 12-17-09 15080 Mechanical Insulation 0 12-17-09 15081 Exterior Piping Insulation 0 12-17-09 15130 Hydronic Pumps 0 12-17-09 15170 Motors 0 12-17-09 15181 Chilled and Condenser Water Piping 0 12-17-09 15182 Steam and Condensate Piping 0 12-17-09 15185 Low Temperature Water Heating System 0 12-17-09 15195 Natural Gas Piping 0 12-17-09 15217 Nitrogen and Vacuum Systems 0 12-17-09 15400 Plumbing Systems 0 12-17-09 15481 Compressed Air Systems 0 12-17-09 15640 Fluid Coolers 0 12-17-09 15660 Evaporative Coolers 0 12-17-09 15682 Air-Cooled Water Chiller 0 12-17-09 15720 Air Handling Units 0 12-17-09 15745 Water Source Heat Pump 0 12-17-09 15750 Steam Humidifiers 0 12-17-09 15801 Industrial Ventilation & Exhaust 0 12-17-09 15810 Ductwork and Ductwork Accessories 0 12-17-09 15893 Stainless Steel Fume Hood Exhaust Ductwork 0 12-17-09 15910 Direct Digital Control Systems 0 12-17-09 15950 HVAC Testing, Adjusting, Balancing 0 12-17-09 15951 Testing Industrial Ventilation Systems 0 12-17-09 15970 Laboratory Fume Hood Monitor System 0 12-17-09
DIV 16 ELECTRICAL
16050 Basic Electrical Materials and Methods 0 12-17-09 16081 Apparatus Inspection and Testing 0 12-17-09 16082 Follow-Up Testing for Electrical Equipment 0 12-17-09 16261 Variable Frequency Drive Systems (Under 600 Volts 0 12-17-09 16402 Interior Distribution System 0 12-17-09 16510 Interior Lighting 0 12-17-09
FINAL SUBMITTAL PACKAGE
SPECIFICATIONS
16700 Communications 0 12-17-09 16701 Grounding and Bonding for Communications Systems 0 12-17-09 16702 Hangers and Supports for Communications Systems 0 12-17-09 16703 Conduits and Backboxes for Communications Systems 0 12-17-09 16704 Cable Tray for Communications Systems 0 12-17-09 16705 Identification for Communications Systems 0 12-17-09 16706 Schedules for Data Communications 0 12-17-09 16707 Schedules for Voice Communications 0 12-17-09 16708 Commissioning of Communications 0 12-17-09 16709 Communications Equipment Room Fittings 0 12-17-09 16710 Communications Cabinets, Racks, Frames and Enclosures 0 12-17-09 16711 Communications Termination Blocks and Patch Panels 0 12-17-09 16712 Communications Cable Management and Ladder Rack 0 12-17-09 16713 Voice Communications Horizontal Cabling 0 12-17-09 16714 Data Communications Horizontal Cabling 0 12-17-09 16715 Communications Faceplates and Connectors 0 12-17-09
USDA R&D FACILITY – ALBANY, CA JACOBS No. 25KT8810 TASK ORDER No. 53-3K15-1-0616 RECOVERY-MAJOR RENOVATIONS, PHASES 3-6
Jacobs ISSUED FOR FINAL SUBMITTAL December 17, 2009 USDA, Recovery-Major Renovations, Phases 3-6 Page 1 of 13 Rev. 0 Section 01010, Summary of Work
SECTION 01010
SUMMARY OF WORK
PART 1 GENERAL
1.1 WORK COVERED BY CONTRACT DOCUMENTS
A. Project Identification: Project consists of additions to and renovation of the existing Research & Development Facility, USDA Western Regional Research Center, Albany, California.
1. Project Location: Western Regional Research Center, Albany, California
2. Government: United States Department of Agriculture
3. Architect Identification: The Contract Documents were prepared for Project by:
Jacobs 5005 SW Meadows Road, Suite 100 Lake Oswego, OR 97035 Tel: (503) 624-3000 Fax: (503) 624-3001
B. The Work consists of selective demolition, renovation and additions to an existing laboratory building as defined in this Section.
1.2 CONTRACT
A. Project will be constructed under a general construction contract.
1.3 PROJECT DESCRIPTION:
A. The following is a scope of work for the Recovery-Major Renovations, Phases 3-6, at the USDA Western Regional Research Center (WRRC) facility in Albany, California.
B. The Contract Documents for this project were originally prepared assuming that construction would be sequential with each “Phase” being completed before the next phase was Bid. With the availability of ARRA funding, USDA has directed that the project be re-packaged and bid as one consolidated work package that, due to the operational nature of the facility, must be implemented sequentially. A summary of the Contract Documents for this project is provided below:
1. Project Specifications - All specifications for the project are incorporated into one Project Specification Manual.
USDA, Recovery-Major Renovations, Phases 3-6 Page 2 of 13 Rev. 0 Section 01010, Summary of Work
2. Project Drawings - Due to the original phased, sequential nature of the multiple projects that have now been incorporated into one project, the drawings have been assembled into one composite set. The drawing numbers for this project is as defined below:
X-YYY-Z
X is the discipline of the work as defined below:
G General A Architectural Q Research Equipment Lay-out H Hazardous Materials S Structural M Mechanical P Plumbing FP Fire Protection E Electrical T Telecommunications
YYY is a sequential non-unique drawing number
Z is a letter or number suffix is used to uniquely identify the design and construction area of the project. The areas of work are as defined below:
Suffix Description of Work Area 3 Work activities on the Second Floor, Third Floor and Roof of the FPL
4A Work activities to isolate and space condition the First Floor, Second Floor and Third Floor IPL east balconies during construction of Phase 4B and 5. Work activities are on the Basement Level, First Floor, Second Floor, Third Floor and Roof Levels of the IPL and in the Courtyard as indicated on the Contract Documents
4 Work activities are on the Basement Level, First Floor, Second Floor, Third Floor and Roof Levels of the IPL and in the Courtyard as indicated on the contract documents
5 Work activities are on the Second Floor, Third Floor and Roof Levels of the IPL as indicated on the contract documents
6 Work activities are on the Basement Level, First Floor, Second Floor, Third Floor and Roof Levels of the IPL as indicated on the contract documents
R Work activities are on the Basement Level of the Administrative wing and in the Courtyard as indicated on the contract documents (RERA)
S Work Activities in the Basement Level of the South Wing (Spare Electrical Capacity upgrade)
T Work activities in the Service Building and adjacent paved area (Steam & Condensate Trench)
BH Work activities on the Basement First Floor, and Roof of the FPL (Biosolvent Hood) OP Work activities in the Overpass Building C Work activities for Commissioning the whole FPL, IPL wet/dry side systems
Notes:
• The full drawing number must be used to identify the proper drawings to be used for construction in any work area.
• Drawings without the “Z” identifier are applicable to ALL work areas.
USDA, Recovery-Major Renovations, Phases 3-6 Page 3 of 13 Rev. 0
1.4 WORK SEQUENCE
A. The WRRC facility is a working scientific research facility that must maintain full operation during the construction of this project. This requires a phased construction sequence with constraints as defined on Drawing G004 and G005, Sequence of Construction.
1.5 SUMMARY OF WORK BY DRAWING SUFFIX
SUFFIX 3
Architectural:
• All demolition, hazardous material abatement, and new construction necessary to refinish and upgrade the FPL. Construction work in an operating facility is not without risk (or at least potential inconvenience). The areas undergoing modernization should be isolated from the balance of the building and a strong coordination effort between the contracting team and USDA will be required to ensure a minimum of disruption.
• Special attention will be required regarding the abatement of hazardous materials in the building (lead-based paint, asbestos insulation, etc.). This is an ongoing effort at the Albany facility, and cannot be avoided or postponed from Suffix 3.
• Suffix 3 renovates the remainder of FPL. Equipment is moved from the FPL open Work Room to Lab F302 and Lab F306 prior to demolition and construction and returns when the work is complete. New floor, wall and ceiling coatings are planned for the second and third floors. A new guard railing system is included to separate mezzanines from the open high bay. Additionally, a bridge is added to connect the third floor north and south mezzanines.
Structural:
• Extruder support, platform and monorail.
• Pedestrian bridge connecting North and South balconies at 3rd floor.
• Modification of existing window opening in concrete wall at line 1, 2nd floor.
• Supports for EF 3-3 and AHU 3-2 at roof level.
• Openings and supports for ducts and pipes.
Mechanical
• Provide exhaust tap for the new raised ceiling area above the extruder.
Plumbing
• Provide new floor sinks with strainer around Clextral extruder at Third Floor South Mezzanine F-303.
This is a new request based on the Center’s experience operating this equipment.
• Move floor drain FD-1 from under Clextral extruder to front of unit, due to equipment size.
• FPL Second Floor drain trough system to be reworked to repair any concrete spalling or cracking per
Architectural Drawings. Complete trench system made watertight and recoated concurrently with the floor.
Electrical:
• Unused and obsolete electrical systems on the FPL Second and Third Floors will be demolished along with their conduits back to their source.
• Lighting will be replaced. High bay lighting will be lowerable.
• Four existing panelboards #4, #5, #6 and #7 will be replaced with new. These will serve existing loads being retained and new loads.
USDA, Recovery-Major Renovations, Phases 3-6 Page 4 of 13 Rev. 0 Section 01010, Summary of Work
• Two exhaust fans will be demolished and their VFD’s salvaged.
• Normal and emergency lighting will be served from existing 277/480V panelboards also on the ground or first floors.
• Roof-mounted mechanical equipment will be served from new starters or circuit breakers added to the existing roof MCC.
• Additional outlets will be provided in labs F-302 and F-306 to serve additional process equipment.
• Occupancy sensors will be added for the control of lighting.
• A 480V transformer will be added for the relocated extruder.
Life Safety Systems:
Area will be connected to the existing addressable fire alarm system, which was designed to include this work.
Information Transport Systems:
• Demo or relocate, as required, existing horizontal voice, data and REES Scientific system cabling and associated appurtenances in support of project construction.
• Install two new layers of “Basket style” cable tray to serve as primary conveyance of horizontal distribution cable. Cable trays to be covered and voice and data cables will be separated by trays.
Voice and data cables can share the final conduit from tray to outlet location only.
• Category 6 rated horizontal distribution cables for voice and/or data will be installed from each designated user outlet location to the existing ITS Room or zone distribution cabinet.
• Category 6 rated horizontal distribution cables for voice will be installed from each designated wallphone user outlet location to the existing ITS Room or zone distribution cabinet.
• Provide upgraded Rees monitoring system.
SUFFIX 4
Architectural:
• All demolition, hazardous material abatement, and new construction necessary to refinish and upgrade within the IPL. The areas undergoing modernization should be isolated from the balance of the building and a strong coordination effort between the contracting team and USDA will be required to ensure a minimum of disruption. Temporary walls will be erected to maintain operational flexibility during demolition and construction.
• Special attention will be required regarding the abatement of hazardous materials in the building (lead-based paint, asbestos insulation, etc.). New floor, wall and ceiling coatings are planned for the affected levels.
• Suffix 4 work includes demolition of the Basement level, high bay, concrete slab for replacement with a new floor slab. A new First Floor level isolated floor structure is added to the high bay to provide a new Wet Chemistry Lab and a open work area within the high bay. The concrete floor, for future research equipment at the Second Floor level above the Wet Chemistry lab will be provided with a perimeter guardrail. Also a new guard railing system is included to separate mezzanines from the open high bay.
• The existing rooftop greenhouse will have the existing floor coating system removed and the floor recoated in stages to using a temporary barrier to stage installation and maintain ongoing science projects.
USDA, Recovery-Major Renovations, Phases 3-6 Page 5 of 13 Rev. 0 Section 01010, Summary of Work
Structural:
• Two level new Infill structure.
• New infill steel framing and floor at North balcony, first floor.
• Support for EF 4-1A/B, EF 4-2 through 4-6, and AHU 4-5 and associated pipes and ducts on roof level.
• Foundation and pipe support for chiller 4-1 in court yard.
Mechanical
HVAC
• Modify air handling unit 4-2 equipment since offices on the Second Floor were removed from this zone during previous work
• Add new 6” snorkel drop in Lab I-101.
• Add two steam drops from steam piping loop down to Basement for equipment hookups.
• Add new chiller and piping system to diversify FPL and IPL loads
• Extend existing Trane Building Automation System (BAS) network to the new chiller.
Plumbing
• Change two sinks in First Floor lab to 16” deep.
• Provide nine new floor sinks with strainer at Basement.
Electrical:
• Unused and obsolete electrical systems in the FPL along with their conduits back to their source.
• Occupancy sensors will be added for the control of lighting.
• Certain existing panelboards will be replaced with new. These will serve existing loads being retained and new loads.
• Lighting will be replaced. A system of lighting fixtures on emergency power and battery packs will provide for minimum egress lighting levels.
• A standard configuration of electrical outlets will be provided throughout.
• Electrical feeders will be provided to new mechanical and plumbing.
Life Safety Systems:
• Area will be connected to the existing addressable fire alarm system, which was designed to include this work.
Information Transport Systems:
• Demo or relocate, as required, existing horizontal voice, data and REES Scientific system cabling and associated appurtenances in support of project construction.
• Install two new layers of “Basket style” cable tray to serve as primary conveyance of horizontal distribution cable. Cable trays to be covered and voice and data cables will be separated by trays.
Voice and data cables can share the final conduit from tray to outlet location only.
• Category 6 rated horizontal distribution cables for voice and/or data will be installed from each designated user outlet location to the existing ITS Room or zone distribution cabinet.
• Category 6 rated horizontal distribution cables for voice will be installed from each designated wallphone user outlet location to the existing ITS Room or zone distribution cabinet.
• Provide upgraded Rees monitoring system.
USDA, Recovery-Major Renovations, Phases 3-6 Page 6 of 13 Rev. 0 Section 01010, Summary of Work
SUFFIX 5
Architectural:
• All demolition, hazardous material abatement, and new construction necessary to refinish and upgrade the remaining IPL. The areas undergoing modernization should be isolated from the balance of the building and a strong coordination effort between the contracting team and USDA will be required to ensure a minimum of disruption. Temporary walls will be erected to maintain operational flexibility during demolition and construction.
• Special attention will be required regarding the abatement of hazardous materials in the building (lead-based paint, asbestos insulation, etc.). New floor, wall and ceiling coatings are planned for the affected levels.
• Suffix 5 work includes demolition of the steel grated Third Floor north mezzanine, and replacement with a new concrete floor slab. A new guard railing system is included to separate mezzanines from the open high bay.
• New stair from Second Floor to Third Floor at North balcony.
• New grating floor and modification to steel framing at Third Floor , North balcony.
• Duct chase tower at North wall near line 13.
• Support for heat pump HP 5-1 above Third Floor , South balcony.
Mechanical:
HVAC
• Provide for two new autoclaves.
• Provide canopy hoods for two new autoclaves. Tie exhaust into general room exhaust system.
• Replace air handler with new heat pump.
• Provide new condenser water piping system for growth chambers, cold rooms, and heat pump.
• Extend existing Trane Building Automation System (BAS) network to the new heat pump controller.
Provide BAS control for the exhaust fans.
Plumbing
• Provide floor sink for autoclaves and drain cooler. This is a new request based on the Center’s experience operating this equipment.
Electrical:
• Unused and obsolete electrical systems in IPL will be demolished along with their conduits back to their source.
• Occupancy sensors will be added for the control of lighting.
• Certain existing panelboards will be replaced with new. These will serve existing loads being retained and new loads.
• Lighting will be replaced. A system of lighting fixtures on emergency power and battery packs will provide for minimum egress lighting levels.
• A standard configuration of electrical outlets will be provided throughout.
• Electrical feeders will be provided to new mechanical and plumbing.
Life Safety Systems:
• Area will be connected to the existing fire alarm system, which was designed to include this work.
USDA, Recovery-Major Renovations, Phases 3-6 Page 7 of 13 Rev. 0 Section 01010, Summary of Work
Information Transport Systems:
• Demolish or relocate, as required, existing horizontal voice, data and REES Scientific system cabling and associated appurtenances in support of project construction.
• Install two new layers of “Basket style” cable tray to serve as primary conveyance of horizontal distribution cable. Cable trays to be covered and voice and data cables will be separated by trays.
Voice and data cables can share the final conduit from tray to outlet location only.
• Category 6 rated horizontal distribution cables for voice and/or data will be installed from each designated user outlet location to the existing ITS Room or zone distribution cabinet.
• Category 6 rated horizontal distribution cables for voice will be installed from each designated
SUFFIX 6
Architectural:
• All demolition, hazardous material abatement, and new construction necessary to build the areas listed above. The areas undergoing modernization should be isolated from the balance of the building and a strong coordination effort between the contracting team and USDA will be required to ensure a minimum of disruption. Temporary walls will be erected to maintain operational flexibility during demolition and construction.
• Special attention will be required regarding the abatement of hazardous materials in the building (lead-based paint, asbestos insulation, etc.).
• The First, Second and Third Floor existing wood on steel grating will be replaced with a new concrete floor. New floor, wall and ceiling coatings are planned for all three floors. New suspended acoustical tile ceiling system will be provided. First and Third Floor growth rooms will be demolished and replaced temporarily on the Third Floor South mezzanine with growth chambers. The balance of the First and Second Floor equipment will temporarily reside in RERA.
• The adjacent corridor will be repainted. The adjacent stair tower will be repainted and stairs provided with new safety treads and floor tile. Water infiltration into the basement floor of the stair tower will be resolved with waterproofing and a rework of the South entry canopy roof and gutter drainage system.
The existing basement to roof elevator will have the elevator call button and elevator control panel refitted to be ADA compliant.
• The greenhouse will, for safety, have all the plate glass replaced with tempered glass and door knobs replaced with ADA compliant levers. All of the greenhouse flashing, gutters and downspouts will be replaced.
• The existing IPL/FPL top-coated built-up roof will be repaired when penetrated by new rooftop support equipment. The entire roof is planned to be recoated with a white ‘energy star’ compliant topcoat. As a bid option the entire IPL/FPL roof will be removed to metal deck, corrosion in the deck replaced and a new single ply roof assembly installed.
• The South and West face are exposed to strong wind driven rain storms. Wind blown rain saturates the existing window and stucco system resulting in water into the building. From the stair elevator tower to the south wing’s north face, a new stucco/window system will be installed with a water barrier on the existing concrete and a drainage mat. The water barrier controls the secondary infiltration and the drainage mat controls air pressure differentials on the south and west face. The combined system forms a “rain screen” exterior concept providing a watertight envelope.
• New concrete floor infill at First, Second, and Third Floors , line 13 to 14.
• Underground pipe trench for re-routed steam and condensate lines, North yard.
USDA, Recovery-Major Renovations, Phases 3-6 Page 8 of 13 Rev. 0
Mechanical
HVAC
• Resize HVAC equipment to reflect decreased heat load due to removal of autoclaves.
• Add condenser water piping to support new growth/tissue culture and cold rooms.
• Add exhaust fan for elevator machine room
• Remove abandoned oil/water separator and appurtenances
• Replace all existing evaporative coolers with new
• Provide BAS temperature monitoring of the elevator machine room.
• Demolish BAS network to units being replaced and resized
• Install new BAS network to units being replaced and resized
• Demolish autoclaves and associated plumbing.
• Provide floor sinks for condensate in the two mechanical areas to support new growth chambers and cold rooms.
• Provide reduced pressure backflow preventer for main greenhouse water supply to isolate water.
• Replace existing roof drains and plumbing vents (roof replacement)
Fire Protection
• The fire protection for the stair tower next to the PGEC area upgraded per Albany Fire Department /
USDA agreement. Coordinate with existing site upgrade.
• Standpipes are being designed and installed under a separate contract. Suffix 6 design to show standpipes as existing
• New fire zone (sprinklers) added to greenhouse.
Electrical:
• Demolition includes removal of the roof-mounted coolers, conduit and wire back to the panels or back to where the conduit is embedded into concrete and wire back to circuits which are to remain and be maintained. New construction consists of feeding new loads from the existing panels and switchboards.
All new steel in the area shall be bonded and grounded
• Fire alarm detection and notification to be added to the Suffix 6 area include smoke detection, tamper, flow switches (in stair tower) and horn strobe units as well as pull stations at exit doors. The elevator exhaust fan will be controlled by fire alarm control module. This will all be connected to the existing system along with programming and walk through with Government and fire marshal.
Information Transport Systems:
• Demo or relocate, as required, existing horizontal voice, data and REES Scientific system cabling and associated appurtenances in support of project construction.
• Install two new layers of “Basket style” cable tray to serve as primary conveyance of horizontal distribution cable. Cable trays to be covered and voice and data cables will be separated by trays.
Voice and data cables can share the final conduit from tray to outlet location only.
• Category 6 rated horizontal distribution cables for voice and/or data will be installed from each designated user outlet location to the existing ITS Room or zone distribution cabinet.
• Category 6 rated horizontal distribution cables for voice will be installed from each designated
USDA, Recovery-Major Renovations, Phases 3-6 Page 9 of 13 Rev. 0 Section 01010, Summary of Work
SUFFIX R (RERA [Renovated Equipment Relocation Area)
Structural:
• Foundation and pipe support for fluid cooler, courtyard.
Mechanical:
HVAC
• Demolish split system air conditioner (currently disconnected) and associated BAS controls. Replace with new heat pump unit sized to handle the Autoclave Room load.
• Provide ventilation only on back side of Autoclave Room. Install exhaust fan controlled by room temperature. Makeup air will be ducted through outside window opening.
• Re-duct existing unit supply air.
• Install new space temperature controlled water source heat pump air conditioning units. Ventilation and exhaust air ducting enters space through existing outside window openings.
• Demolish ceiling-mounted radiators, ancillary piping (back to main isolation valves), and controls as required, leaving enough radiators for freeze protection.
• Extend existing Trane BAS network to the new heat pump controller. Provide BAS control for the exhaust fans.
• Modify new steam piping and condensate coolers as required for new autoclaves.
• Install steam powered condensate pump (with sump pit) for autoclaves.
• Install packaged reverse osmosis (RO) water producing equipment with distribution piping to chambers having humidifiers.
• Install reduced pressure backflow preventer for packaged RO equipment.
• Connect icemaker to potable water.
• Install new fluid cooler outdoors on housekeeping pad in courtyard
• Install new condenser water piping loop for heat pumps and growth chambers
• Install new floor sink with floor drains, piping, and pumps.
Fire Protection
• The fire protection for the RERA and Autoclave Room to be upgraded per Albany Fire Department /
USDA agreement. Coordinate with existing site upgrade.
Electrical:
• Demolition includes; isolating cubicles and tagging as safe to remove, demolishing conduit and wire back to the panels or back to where the conduit is embedded into concrete and wire back to circuits which are to remain and be maintained. New construction consists of feeding new panels and loads from the existing panels and switchboards. These new loads are both in the RERA area and out in the yard adjacent to the building for a chiller and fluid cooling system. All new steel in the area shall be bonded and grounded.
• Fire alarm, both detection and notification to be added to the RERA area include smoke detection and horn strobe units. These will be connected to the existing system along with programming and walk through with fire marshal.
• Access control to be added to doors entering the RERA area. This includes key card access to match existing Lenel system. These will be connected to the existing system.
USDA, Recovery-Major Renovations, Phases 3-6 Page 10 of 13 Rev. 0 Section 01010, Summary of Work
Information Transport Systems:
• Demo or relocate, as required, existing horizontal voice, data and REES Scientific system cabling and associated appurtenances in support of project construction.
• Install two new layers of “Basket style” cable tray to serve as primary conveyance of horizontal distribution cable. Cable trays to be covered and voice and data cables will be separated by trays.
Voice and data cables can share the final conduit from tray to outlet location only.
• Category 6 rated horizontal distribution cables for voice and/or data will be installed from each designated user outlet location to the existing ITS Room or zone distribution cabinet.
• Category 6 rated horizontal distribution cables for voice will be installed from each designated
SUFFIX S (Spare Electrical Capacity Upgrade)
Spare Electrical Capacity Upgrade:
• Demolition and removal of conduit and wire between switchboard G-208-SB1 and transformer G-
225N-XFMR1 and from switchboard DP1 to switchboard DP2.
• Refeed both G-225N-XFMR1 and DP2 from switchboard MS-1.
• All new steel in the area shall be bonded and grounded.
SUFFIX T (Steam & Condensate Trench)
• Underground pipe trench for re-routed steam and condensate lines, North yard.
Mechanical
• Replace existing steam and condensate pipe located above grade with new pipe in trench.
• Refer to Feasibility Study for additional details.
• Steam and condensate line commissioning between the West Annex Building (WAB) and WRRC
Service Building (boilerhouse). This will include condensate booster pumps and sump pumps located within the trench.
SUFFIX BH (Biosolvent Hood)
• Upgrade the Biosolvent fume hood with new utilities/hardware as described in the Feasibility Study.
• Commissioning of the fume hood monitoring controls, utilities, AHU and exhaust system.
Electrical (Smart Gas Metering)
• Natural gas smart flowmeter for monitoring the gas usage in the South wing (FPL and IPL). A mass flowmeter (or temperature pressure correction) will be used to accurately monitor gas flow. The flow will be totalized and input into the BMS for energy usage monitoring of daily, weekly, monthly, and annual totals.
USDA, Recovery-Major Renovations, Phases 3-6 Page 11 of 13 Rev. 0 Section 01010, Summary of Work
SUFFIX OP (Overpass Building)
Architectural
• Add eleven 8' x 4'x 12' pallet racks, bolted to the concrete slab to the building perimeter to receive surplus equipment as described in the Feasibility Study.
Mechanical
• Upgrade existing fire protection sprinkler for above mezzanine area, open bay, and below mezzanine area to meet ordinary Hazard Group 2 with Class 2 and 3 commodities in accordance with NFPA 13.
SUFFIX C (Commissioning)
• Commission the FPL and IPL and Suffix R HVAC system, heating and cooling water, and air-side systems. Sequencing of commissioning will be addressed in the Detailed Design documents.
• This will include all pumps, chillers, exhaust fans, air handling units, humidifiers, fan coil units, heat exchangers, controls and all associated valves.
• Specialty fume hoods (including the new fume hood recently installed by USDA in the FPL) will need to be commissioned from a certified third party: one walk-in fume hood and two bench hoods.
• FPL walk-in cold rooms are not included in this commissioning scope.
1.6 USE OF PREMISES
A. Limit use of the premises to construction activities in the areas indicated. The Government will occupy portions of the existing building during construction.
1. Limit use of the premises for work, storage and access. Confine operations to areas within the phase work boundary as indicated on the contract drawings. Do not disturb portions of the site beyond the limits of construction. Any work that is required to be performed outside the phase work boundary requires prior approval from the Government or his designee.
2. Coordinate use of premises by all subcontractors.
3. Move stored products that interfere with the operations of the Government or other contractors.
4. Obtain and pay for use of additional storage or work areas needed for operations under this Contract.
5. Keep driveways and entrances serving the premises clear and available for Government operations and Government employees at all times. Do not use these areas for parking or storage of materials.
B. There is an existing exit stair and elevator in the South Wing. The contractor is responsible for maintaining the exit stair and elevator accessible for the South Wing's occupant at all times during the construction. When the construction is required to close the exit stair & elevator, Contractor shall submit a proposal indicating dates when stair and/or elevator is closed and alternate routes for the occupants, 15 days before the construction for
USDA, Recovery-Major Renovations, Phases 3-6 Page 12 of 13 Rev. 0 Section 01010, Summary of Work
Government approval. In all cases, the exit stair shall remain unobstructed for emergency exit. Use of the elevator shall be restricted to personnel only. Prior approval must be obtained from the Government or his designee for non-personnel use of the elevator.
1.7 WORK UNDER OTHER CONTRACTS
A. Separate Contract: Government may award a separate contract for performance of certain construction operations at Project site.
B. Cooperate fully with separate contractors so work on those contracts may be carried out smoothly, without interfering with or delaying work under this Contract.
1.8 SPECIFICATION FORMATS AND CONVENTIONS
A. Specification Format: The Specifications are organized into Divisions and Sections using the 16-division format and CSI/CSC's Master Format numbering system.
B. Section Identification: The Specifications use section numbers and titles to help cross-referencing in the Contract Documents. Sections in the Specifications are in numeric sequence; however, the sequence is incomplete. Consult the table of contents at the beginning of the Specifications to determine numbers and names of sections in the Contract Documents.
C. Specification Content: The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations. These conventions are as follows:
1. Abbreviated Language: Language used in the Specifications and other Contract
Documents is abbreviated. Words and meanings shall be interpreted as appropriate.
Words implied, but not stated, shall be inferred as the sense requires. Singular words shall be interpreted as plural and plural words shall be interpreted as singular where applicable as the context of the Contract Documents indicates.
2. Imperative mood and streamlined language are generally used in the Specifications.
Requirements expressed in the imperative mood are to be performed by Contractor.
Occasionally, the indicative or subjunctive mood may be used in the Section Text for clarity to describe responsibilities that must be fulfilled indirectly by Contractor or by others when so noted.
a. The words "shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:) is used within a sentence or phrase.
1.9 DESIGN UNITS AND CONVENTIONS
A. This project is designed using inch-pound (English) measurements as the basis for design and construction. The existing facility construction is based on inch-pound (English) units of measure. Any metric units provided are for informational purposes only.
USDA, Recovery-Major Renovations, Phases 3-6 Page 13 of 13 Rev. 0
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
END OF SECTION 01010
USDA, Recovery-Major Renovations, Phases 3-6 Page 1 of 3 Rev. 0 Section 01016, Safety During Construction
SECTION 01016
SAFETY DURING CONSTRUCTION
1.1 SUMMARY
A. This Section provides specific additional information to augment the general requirements of the Contract regarding safety during construction and start-up of the Work under this Contract defined by the General and Supplementary Conditions.
B. Refer to Section 01105, Special Conditions for information relating to this Section.
1.2 RESPONSIBILITY FOR SAFETY
A. The Contractor shall do all work necessary to comply with all applicable safety requirements for the duration of the Contract and is solely responsible for conditions at the job site, including safety of all persons and property during the Contract period. This requirement shall apply continuously and not be limited to normal working hours.
1.3 FEDERAL, STATE, AND LOCAL SAFETY REQUIREMENTS
A. Safety provisions shall conform to the Federal and State Departments of Labor, Occupational Safety and Health Act (OSHA), and all other applicable federal, state, and local laws, ordinances, codes, the requirements of this section, and any regulations that may be specified elsewhere in these Contract Documents. Where any of these are in conflict, the more stringent requirement shall be followed. The Contractor's failure to thoroughly familiarize himself with the specified safety provisions shall not relieve him from compliance with the obligations or relieve him of the penalties described in these documents.
B. It is recognized that OSHA Standard 1919:1200, "Hazard Communication Standard" does apply to the construction industry and adherence to this standard is required on this jobsite.
1.4 CONSTRUCTION SAFETY PROGRAM
A. The Contractor shall appoint, for the duration of this Contract, a qualified supervisory employee to develop and/or supervise a Contractor's job safety program that shall effectively implement the required safety provisions. The Contractor shall submit to the Government, within 10 working days after the start of construction, four copies of the job safety program adopted and to be enforced by the Contractor during the performance of the work. The Government is not responsible for safety enforcement, precautions and programs in connection with the construction work.
USDA, Recovery-Major Renovations, Phases 3-6 Page 2 of 3 Rev. 0 Section 01016, Safety During Construction
1.5 ACCIDENT REPORTS
A. If death or serious injuries or serious damages are caused, the accident shall be reported immediately by telephone or messenger to the Government. In addition, the Contractor shall promptly report in writing to the Government all accidents in connection with the work, giving full details, names, and statements of witnesses. This reporting requirement is in addition to all normally required reports by federal, state, and local agencies and organizations.
B. If a claim is made by anyone against the Contractor or any subcontractor on account of any accident, the Contractor shall promptly report the facts in writing to the Government, giving full details of the claim.
1.6 FIRE PREVENTION AND PROTECTION
A. Contractor shall execute all work in a fire-safe manner. Provide and maintain on the site adequate fire-fighting equipment capable of extinguishing incipient fires. Contractor shall comply with applicable federal, state, and local fire-prevention regulations. Where these regulations do not apply, applicable parts of the National Fire Prevention Standard for Safeguarding Building Construction Operations (NFPA No. 241) shall be followed.
B. For hot work operations, the Contractor shall obtain a burn permit from the Facilities
Engineer (Tom Moreno, 510-559-5622). All hot work operations shall be under the supervision of a competent person, who will be identified as the Fire Prevention Program Manager. Permits shall be available for inspection by the Government. Fire watches shall be assigned no other duties. A permit shall not be issued until:
1. It has been determined that hot work can be safely conducted at the desired location.
2. Combustibles have been moved away or covered by an approved tarpaulin.
3. The atmosphere is not flammable.
4. A fire watch (with dedicated extinguisher) is posted for the duration of the work and for 60 minutes thereafter (120 minutes for torch-applied roofing operations to ensure that sparks or drops of hot metal do not start fires. All cracks or openings in floors shall be safely covered or closed.
C. All gas-cutting and welding equipment and operations shall be in accordance with the applicable sections of NFPA 51, "Standard for the Design and Installation of Oxygen-Fuel Gas Systems for Welding, Cutting and Allied Processes," and NFPA 51B, "Standard for Fire Prevention in Use of Cutting and Welding Processes."
D. Smoking inside the building (including attic and roof) is strictly prohibited. Smoking is permitted outdoors, except where specifically prohibited, or within 25 feet of a doorway, operable window, vent, or outside air intake. Contractor shall designate outdoor smoking areas for use by project personnel, and provide safe receptacles for disposal of smoking materials at those locations. The Contractor is advised that combustible, volatile substances are stored and utilized at the project site, and the presence of such substances may not be readily apparently to Contractor personnel.
USDA, Recovery-Major Renovations, Phases 3-6 Page 3 of 3 Rev. 0 Section 01016, Safety During Construction
E. Contractor will remove accumulations of combustible waste material, dust, and debris from the structure and its immediate vicinity at the end of each work shift or more frequently as necessary for safe operations. Rubbish shall not be burned. Materials susceptible to spontaneous ignition, such as oily rags, shall be appropriately stored.
F. Temporary lights shall be equipped with guards to prevent accidental contact with the bulb. Temporary lighting fixtures that operate at temperatures capable of igniting ordinary combustibles shall be fastened securely so they will not come in contact with combustible materials. Temporary lights shall be equipped with heavy-duty electrical cords with connections and insulation maintained in safe condition. Temporary lights shall not be suspended by their electrical cords. Splices shall have insulation equivalent to that of the cable. Temporary wiring shall be removed immediately upon the completion of the construction or purpose for which the wiring was installed.
G. There shall be a readily available means to notify the Albany Fire Department of a fire or injury. Generally, this can include a fire alarm box connected to the temporary smoke detector system or telephones near the facility. The Contractor will immediately notify the fire department in case of fire.
H. At least one stairway in usable condition shall be provided at all times (in structures over one story). This stairway shall be extended upward as each floor is installed in new construction and maintained for each floor still remaining during demolition. The stairway shall be lighted. During construction, the stairway shall be enclosed where the building exterior walls are in place.
I. Contractor will provide and maintain at all times first aid equipment.
J. If standpipes are required; standpipes shall be maintained in conformity with the progress of building construction in such a manner that they are always ready for use. Where underground water mains and hydrants are to be provided, they shall be installed, completed, and in service prior to construction work.
K. Fire walls and exit stairways shall be given construction priority for installation. Fire doors with approved closing devices and hardware shall be installed as soon as is practicable and preferably before combustible material is introduced.
L. The Contractor shall develop a written fire prevention, fire suppression, and emergency evacuation plan. The Government will be provided a copy of the plan. The Contractor will ensure that all personnel are trained in emergency and evacuation procedures.
END OF SECTION 01016
USDA, Recovery-Major Renovations, Phases 3-6 Page 1 of 8 Rev. 0 Section 01040, Project Coordination
SECTION 01040
PROJECT COORDINATION
1.1 CORRESPONDENCE
A. Contractor shall be responsible for all postage and handling of all correspondence generated by the Contractor. The Government will not be responsible for distributing Contractor correspondence.
B. Contractor shall be responsible for all applications and associated fees required for this project construction, by state and local governing authorities, Fire Marshal, individual utility companies having jurisdictions at the jobsite.
1.2 COORDINATION DRAWINGS
A. The Contractor shall submit minimum 1/4-inch scale coordination drawings showing coordination of mechanical and electrical work with civil, structural and architectural work. The composite drawings shall be in detail to show overall dimensions of ductwork, piping, conduit and related items and clearances between structural members, lighting, ceilings, and related architectural features. The Drawings shall indicate any conflicts or clearance problems between the various trades. Installation of any work prior to submission of these drawings or failure to indicate conflicts or clearance problems on these drawings shall be at the Contractor's risk. Coordination drawings shall be submitted for the following:
1. Mechanical equipment rooms, rooftop mechanical equipment areas and yard mechanical equipment pad
2. Mechanical chases and shafts
3. Electrical equipment rooms
B. The approval of coordination drawings will be general, but do not construe approval as permitting any departure from the contract requirements, or as relieving the Contractor of the responsibility for any errors, including details, dimensions, materials, etc.
C. Any required offsets or changes in direction for mechanical, electrical, plumbing, or fire protection work shall be accomplished at no added cost to the Government.
1.3 COORDINATION
A. Coordinate construction operations included in various Sections of these specifications to ensure efficient and orderly installation of each part of the Work. Coordinate construction operations included under different Sections that depend on each other for proper installation, connection and operation.
USDA, Recovery-Major Renovations, Phases 3-6 Page 2 of 8 Rev. 0
1. Schedule construction operations in the sequence required to obtain the best results where installation of one part of the Work depends on installation of other components, before or after its own installation.
2. Coordinate installation of different components to ensure maximum accessibility for required maintenance, service and repair.
3. Make provisions to accommodate items scheduled for later installation.
B. Verify that utility requirement characteristics of operating equipment are compatible with building utilities. Coordinate work of various Sections having interdependent responsibilities for installing, connecting to and placing in service such equipment.
C. Coordinate space requirements and installation of mechanical and electrical work, which are indicated diagrammatically on Drawings. Follow routing shown for pipes, ducts and conduit, as closely as practicable; place runs parallel with line of building. Utilize spaces efficiently to maximize accessibility for other installation for maintenance and for repairs.
D. In finished areas except as otherwise indicated, conceal pipes, ducts and wiring within the construction. Coordinate locations of fixtures and outlets with finish elements.
E. Execute cutting and patching to integrate elements of Work, uncover ill-timed, defective and non-conforming Work. Provide openings for penetrations of existing surfaces and provide samples for testing. Seal penetrations through floors, walls and ceilings.
F. Where necessary, prepare memoranda for distribution to each party involved, outlining special procedures required for coordination. Include such items as required notices, reports, and attendance at meetings.
1. Prepare similar memoranda for the Government and separate contractors where coordination of their work is required.
G. Administrative Procedures: Coordinate scheduling and timing of required…