About this file

Hazardous Materials Briefing

View the file

Other files

File Type Posted
01310 Progress Schedules_Rev2_w-Bar.pdf PDF
Clarifications.xlsx XLSX spreadsheet
13040 Plant Growth Chambers Growth Rms Tissue Culture R .pdf PDF
Geotechnical Report_Sept 15-2000.pdf PDF
01805 Commissioning of Mech Systems_Rev1_changes w-Bar.pdf PDF
SF 30 Amendment 00005.pdf PDF
sample_bid_format —
SF 30 - Amend 00004.pdf PDF
Sf1442 WRRC Rev 1.docx DOCX document
Q007-REV2.pdf PDF
Q006-REV2.pdf PDF
Drawing Changes List.docx DOCX document
Bidders Questions_2-19-10 —
01310 Progress Schedules_Rev1.pdf PDF
Q302-3 REV2.pdf PDF
Q004-REV2.pdf PDF
_All Rev Drawing PDFs WRRC Rev1 12-10-10.pdf PDF
SF 30 - Amend 00003.pdf PDF
WRRC Pre-Proposal Briefing 1-27-10.ppt PPT presentation
Jacobs Pre-proposal Brief 1-27-10.pptx PPTX presentation
PN-020_Pre-Bid Conf_01-27-10 —
SF 30 - Amend 00002.pdf PDF
SF 30.pdf PDF
TELECOMMUNICATIONS.pdf PDF
FIRE PROTECTION.pdf PDF
_Index sht-USDA-IFB 12-16-09.xls XLS spreadsheet
CALCS.pdf PDF
EQUIPMENT-GPR.pdf PDF
ENVIRONMENTAL.pdf PDF
STRUCTURAL.pdf PDF
ARCHITECTURAL.pdf PDF
PLUMBING.pdf PDF
MECHANICAL.pdf PDF
ELECTRICAL.pdf PDF
_Index sht-USDA-IFB 12-16-09.xls XLS spreadsheet
Ars371.pdf PDF
sf25a Payment Bond.pdf PDF
SPECS.pdf PDF
CALCS.pdf PDF
Wage Determination.pdf PDF
SUMMARY DWGS.pdf PDF
RFP AG-3K15-S-10-0005 Sections B-M —
SF 24 Bid Bond.pdf PDF
SF 1442 Solicitation AG-3K15-S-10-0010 —
Ars372.pdf PDF
SF 1420 Performance Evaluation.pdf PDF
sf25 Performance Bond.pdf PDF
TOC AG-3K15-S-10-0005 —
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Albany, California Facility Hazardous Materials Work Presented by: Eloy F. Cisneros, CMC, CAC, CLIA Director of Industrial Hygiene

Notes:

Hazardous Materials:

Asbestos containing materials Lead containing paints and coatings Universal wastes PCB ballasts Mercury tubes

Albany, CA Facility

Hazardous Materials:

Pre-construction submittals Work plan Disposal plan Certifications/licenses

Asbestos Regulations:

The handling, disturbance, removal and disposal of asbestos is regulated by the EPA and OSHA.

EPA:

BAAQMD – NESHAP Regulation CAL-EPA DTSC – Hazardous Waste

OSHA

DOSH (Cal-OSHA) – Construction Standard

Asbestos On-Site:

Identified materials:

Textured Flooring Pipe Insulation Materials 2” to 8” diameter Wallboard and Joint Compound TransiteTM Fume Hoods Cold Room Insulation Coatings (Various) Autoclave Insulation Additional suspect materials in un-surveyed/ un-impacted areas

All construction-impacted materials will be removed.

Asbestos Controls:

Strict Specifications and Strict Enforcement Restricted work areas Signs Barriers Negative-Pressure Containments Glove-bags Decontamination units

Asbestos Work Practices:

Challenge tested H.E.P.A. Filtration Certified Asbestos Workers Competent Person Wet Methods (Surfactants) Prompt Cleanup Continuous Project Oversight and Air Monitoring

Asbestos Monitoring:

Inspect/Smoke Test Containment Verify Negative-Pressure Continually Coordinate with W.R.R.C. Facilities’ Staff Third-Party Oversight of Procedures CAC/SST with “Stop-Work Authority” Daily Perimeter PCM Air Monitoring On-Site Reading of Perimeter Samples Visual Inspection and PCM Clearances

Lead Regulations:

The handling, disturbance, removal and disposal of lead is regulated by the EPA and OSHA.

EPA:

DPH – Lead Hazards CAL-EPA DTSC – Hazardous Waste

OSHA

DOSH (Cal-OSHA) – Construction Standard

Lead On-Site:

All Coatings Tested had Detectable Lead LBP is > 5000 PPM or >1.0mg/cm2 Paint Chip Samples Ranged 114 ppm to 176,000 ppm XRF Samples Ranged from below detectable limit to >9.9 mg/cm2 Additional suspect materials in un-surveyed/ un-impacted areas

All construction-impacted coatings will be removed.

Lead Controls/Work Practices:

Strict Specifications and Strict Enforcement Restricted work areas Signs Barriers Containments Decontamination units Challenge Tested HEPA Filtration Continuous Project Oversight and Monitoring

Lead Monitoring:

Inspect Containment Third-Party Oversight of Procedures DPH I/A or PM with “Stop-Work Authority” Daily Perimeter Monitoring Quick Laboratory Turn-Arounds Visual Inspection and Wipe-Sample Clearances

Thank You !