ATT_9_-__B-T_Supervisor-District_Ranger_Office_Building_Construction_Cost_Estimate_Breakdown.xlsx

XLSX spreadsheet 24 KB Posted

Attached to
Bridger-Teton NF Supervisors/Jackson Ranger District Office Construction Project Federal contract opportunity
Solicitation number
AG-02NV-S-15-0024
Issued by
Department of Agriculture Forest Service R4-Intermountain Region

About this file

ATT 9 - Cost Breakdown Spreadsheet

View the file

Other files for this federal contract opportunity

Other files attached to Bridger-Teton NF Supervisors/Jackson Ranger District Office Construction Project, newest first.
File Type Posted
Amend_0003-_AG-02NV-S-15-0024.pdf PDF
ATT_1_-_Amendment_3_-_Revised_ATT_9___B-T_Cost_Estimate_Breakdown.xlsx XLSX spreadsheet
ATT_2_-_Revised_Schedule_of_Items.pdf PDF
ATT_3_-_Revised_Drawings.pdf PDF
Amend_0002_-_AG-02NV-S-15-0024.pdf PDF
ATT_4_-_Revised_HVAC_Controls_and_Equipment_Drawings.pdf PDF
ATT_1_-_Correction_to_Amend_0001_-_AG-02NV-S-15-0024.pdf PDF
ATT_2_-PFC_Pre-Functional_Test_Log_B-T_Supervisr's_office_Jackson_Ranger_Dist-U....pdf PDF
ATT_3_-_5-7-15_Prebid_Conference_Attendees_List.pdf PDF
ATT_1_-_JacksonSOSheet5FoundationPlan.pdf PDF
Amend_001_-_AG-02NV-S-15-0024.pdf PDF
Informational_Only_5_-_Green.Globes.StrategyBridger-Teton_Supervisor_ _Jackson_Ranger_District_Office_4.10.15.pdf PDF
Informational_Only_3_-_Engineer's_Garage_Asb_Insp_Rpt.Final.pdf PDF
ATT_8_-_Past_Performance_Questionnaire.pdf PDF
ATT_4_-_Functional_Comissioning_Reports_-_Combined_Files_PDF_Pre_Function_03-30-15.pdf PDF
Informational_Only_2_-_Supervisor's_Office_Asb_Insp_Rpt.Final.pdf PDF
ATT_1_-_Bridger-Teton.SO_SpecsFinal.pdf PDF
ATT_2_-_JACKSON.DRAWINGS.FINAL.4.5.2015.signed.pdf PDF
AG-02NV-S-15-0024_Jackson_SO_Office_Construction_Solicitation.pdf PDF
ATT_5_-_Geotechnical_Report_-_Final_BTSO_Geotech_Report.pdf PDF
Informational_Only_1_-_Climate.Data.31.2014.pdf PDF
ATT_7_-_WD_-_WY17__-01-02-15.pdf PDF
ATT_6_-_Geothermal_Boring_Soils_Report_-_232113.33_Attachment_Jackson_FS_Full_TC_Report_-spec.pdf PDF
Informational_Only_4_-_VIC_Asb_Insp_Rpt.Final.pdf PDF
ATT_3_-_Commissioning_Plan_-__Cx_Plan-final_20150330.pdf PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACH 9 - Bridger-Teton SO/Ranger District Building Construction Project AG-0261-S-15-0024
CONSTRUCTION COST ESTIMATE BREAKDOWN

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED CONTRACT PRICE

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

MATERIAL COSTLABOR COSTS
UNITOTHER
LINEITEMOFQUANTITYUNITTOTALMANHOURAVERAGETOTALDIRECTLINE
NOMEASUREMANDAYSRATECOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
501Office BuildingLS1
11900MobilizationLS1
10250Construction StakingLS1
017320-1Site DemolitionLS1
017320-2Removal of the Cache Creek Live CulvertLS1
23701Sedimentation and Erosion ControlLS1
24230Hazardous Materials AbatementLS1
24116Removal, Disposal, Salvage, and Recycling of Three Existing StructuresLS1
033545-1Concrete Curb & Gutter – 30” WideLF750
033545-24” concrete – Sidewalks, Slabs; Includes Aggregate Base MaterialSF2500
033545-3Concrete Accessible RampEA2
101400Exterior Signs (Aluminum on Galv. Steel Tube Posts)EA8
101420Administrative Identification Sign - AS (HDPE)LS1
1014253-Panel Bulletin board/Log StanchionLS1
107516Ground-Set Flag PoleLS1
129300-1Site Furnishings (Picnic Tables)EA4
129300-2Site Furnishings (Bike Racks)EA3
221100-1Pipeline, 2" HDPE, Including Trench and FittingsLF340
221100-2Pipeline, 6" PVC, C900, Including Trench and FittingsLF200
221100-3Pipeline, 8" PVC, C900, Including Trench and FittingsLF340
221100-2Connection to Existing Water MainLS2
221102-1Curb Valve and Box - 2-Inch MetalEA1
221102-2Curb Valve and Box - 6-Inch Cast IronEA1
221102-3Curb Valve and Box - 8-Inch Cast IronEA2
221300-1Sewerline - Gravity, 6-Inch PVC, SDR 35, Including Trench and FittingsLF80
232113Geothermal Wells Systems and Piping to BuildingLS1
260500-1Site Electrical – Lighting and Electrical Distribution SystemLS1
260500-2Radio TowerLS1
312100Project Site Preparation and Grading (Excludes All Work within 5' of the Building Roof Line)LS1
316613Soil Improvement- Vibro-displacement Rock ColumnsLS1
321200-1Hot Mix Asphalt PavementTon630
321204-1Crushed Aggregate Base Course - Grading "C" (For Under Roadways)CY650
321204-2Structural Fill Material for PavementsCY1,260
322640-1Pavement Markings - Parking Stall Lines 4" Solid Yellow Non ReflectiveLF3,200
OPTIONAL ITEMS322640-2Pavement Markings - Accessible Parking SymbolEA4
322706-1Pulverize Asphalt Pavement and Reuse - Area for Building ConstructionCY300
328000Irrigation SystemLS1
329206SeedingLS1
329310-1Exterior Plants, Decorative Boulders and TopsoilLS1
329310-2Drystack Flagstone Retaining WallsLF240
329310-3GroundcoverSF4,350
329400Landscape Stone, Flagstone Steppers, Wood Mulch, Weed Barrier & Bender Board EdgingLS1
332228-1Culvert - 18-inch Galv. Corrugated Metal Pipe (16 Gauge, 2 2/3"x1/2" Corrugations)LF185
332228-2Culvert - 42-inch CMP (Cache Creek Diversion)LF430
332228-3Storm Sewer ManholeEA3
332228-4Concrete Inlet BoxLS1
332228-5Outlet Control Structure - Storm Water SystemLS1
INSTRUCTIONS FOR COMPLETING CONSTRUCTION COST ESTIMATE BREAKDOWN
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit
itemizing of all direct costs.
Col 2 Units of Measure. Description of the unit in which each item is to be estimated (examples - square yards - SY, cubic yards - CY, square feet - SF,
linear feet - LF, board feet - BF, each - EA, pound - LB).
Col 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 2). Items and units of measure will be furnished by the
Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise,
the contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of the material to be supplied and total cost (col 5); for item listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract and of
significant dollar value.
Col 10 Line Total. Self-explanatory.
NOTE:In addition to other totals derived on various pages, the grand total of column 10, plus overhead and profit will be shown on the last
page as follows
TOTAL MATERIAL COSTS$

TOTAL LABOR COSTS $

TOTAL OTHER DIRECT COSTS $

TOTAL DIRECT COSTS $

OVERHEAD % $

SUBTOTAL $

PROFIT % $

TOTAL PRICE $

DATE FIRM NAME

TITLEBY
(Signature)
INSTRUCTIONS TO OFFERORS
1.The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and
estimated costs (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from
this proposal the offeror may be required to submit a certificate of current cost or pricing data
2.In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit with this
form any additional data, supporting schedules, or substantiation which are reasonable required for the conduct of an appropriate review and
analysis in the light of the specific facets of this procurement. For effective negotiations, it is essential that there be a clear understanding of
a.The existing, verifiable data.
b.The judgmental factors applied in projecting from known data to the estimate, and
c.The contingencies used by the offeror in his proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3.When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate),
and made available to the contracting officer his authorized representative upon request.
4.By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the
purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate
evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection
with any negotiations prior to contract award.

Sheet1

File details come from the government source that posted it. Updated .