ATT_8_-_Past_Performance_Questionnaire.pdf

PDF 76 KB Posted

Attached to
Bridger-Teton NF Supervisors/Jackson Ranger District Office Construction Project Federal contract opportunity
Solicitation number
AG-02NV-S-15-0024
Issued by
Department of Agriculture Forest Service R4-Intermountain Region

About this file

ATT 8 - Past Performance Questionnaire

View the file

Other files for this federal contract opportunity

Other files attached to Bridger-Teton NF Supervisors/Jackson Ranger District Office Construction Project, newest first.
File Type Posted
Amend_0003-_AG-02NV-S-15-0024.pdf PDF
ATT_1_-_Amendment_3_-_Revised_ATT_9___B-T_Cost_Estimate_Breakdown.xlsx XLSX spreadsheet
ATT_2_-_Revised_Schedule_of_Items.pdf PDF
ATT_3_-_Revised_Drawings.pdf PDF
Amend_0002_-_AG-02NV-S-15-0024.pdf PDF
ATT_4_-_Revised_HVAC_Controls_and_Equipment_Drawings.pdf PDF
ATT_1_-_Correction_to_Amend_0001_-_AG-02NV-S-15-0024.pdf PDF
ATT_2_-PFC_Pre-Functional_Test_Log_B-T_Supervisr's_office_Jackson_Ranger_Dist-U....pdf PDF
ATT_3_-_5-7-15_Prebid_Conference_Attendees_List.pdf PDF
ATT_1_-_JacksonSOSheet5FoundationPlan.pdf PDF
Amend_001_-_AG-02NV-S-15-0024.pdf PDF
Informational_Only_5_-_Green.Globes.StrategyBridger-Teton_Supervisor_ _Jackson_Ranger_District_Office_4.10.15.pdf PDF
Informational_Only_3_-_Engineer's_Garage_Asb_Insp_Rpt.Final.pdf PDF
ATT_4_-_Functional_Comissioning_Reports_-_Combined_Files_PDF_Pre_Function_03-30-15.pdf PDF
Informational_Only_2_-_Supervisor's_Office_Asb_Insp_Rpt.Final.pdf PDF
ATT_1_-_Bridger-Teton.SO_SpecsFinal.pdf PDF
ATT_2_-_JACKSON.DRAWINGS.FINAL.4.5.2015.signed.pdf PDF
AG-02NV-S-15-0024_Jackson_SO_Office_Construction_Solicitation.pdf PDF
ATT_9_-__B-T_Supervisor-District_Ranger_Office_Building_Construction_Cost_Estimate_Breakdown.xlsx XLSX spreadsheet
ATT_5_-_Geotechnical_Report_-_Final_BTSO_Geotech_Report.pdf PDF
Informational_Only_1_-_Climate.Data.31.2014.pdf PDF
ATT_7_-_WD_-_WY17__-01-02-15.pdf PDF
ATT_6_-_Geothermal_Boring_Soils_Report_-_232113.33_Attachment_Jackson_FS_Full_TC_Report_-spec.pdf PDF
Informational_Only_4_-_VIC_Asb_Insp_Rpt.Final.pdf PDF
ATT_3_-_Commissioning_Plan_-__Cx_Plan-final_20150330.pdf PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bridger-Teton NF Supervisor’s/Jackson Ranger District Office Construction Project Attachment 8 Solicitation No. AG-0261-S-15-0024

SOURCE SELECTION SENSITIVE WHEN COMPLETED

**NOT TO BE RELEASED OUTSIDE GOVERNMENT CHANNELS**

PAST PERFORMANCE QUESTIONNAIRE

US Department of Agriculture, US Forest Service, Region 4 – Bridger-Teton NF, Jackson, WY is considering the firm listed below. Your comments would be appreciated regarding this firm’s past performance.

Past Performance Information:

Name and Address of Firm Being Evaluated: _____________________________________________

Contract No.:________________________ Type of Contract:_______________________________ Project Title:_________________________ Date of Award:_______________________ Completion Date:_______________________________ Location:____________________________ Initial Amount:_______________________ Final Amount:__________________________________ Description:____________________________________________________________________________________

Evaluator: (The following information will assist in the analysis of the data)

Name of Evaluator:__________________________________________________________ Company/Agency Name:______________________________________________________ Address:___________________________________________________________________ Phone Number:_____________________________________________________________ Email Address:______________________________________________________________ Position Held or Function in Relation to Project:

Rating: If the rating is “Unacceptable”, please provide additional information in the appropriate block or in the remarks section of this form.

“O” Outstanding Performance greatly exceeded the contract requirements.

“G” Good Performance exceeded the contract requirements.

“A” Acceptable Performance met the contract requirements.

“M” Marginal Performance met the minimum contract requirements but some material aspects of the contractor’s performance were less than satisfactory.

“U” Unacceptable Performance was poor and/or did not satisfy contract requirements.

Please circle the appropriate rating and provide any supporting information for the following:

1 The relationship between the firm and client’s/customer’s contract team: O G A M U N/A 2 The firm’s management and coordination of subcontractors/consultants: O G A M U N/A 3 Overall corporate management, integrity, reasonableness and cooperative conduct:

O G A M U N/A

4 Timeliness and quality of reports, deliverables, and other required submittals and documents:

O G A M U N/A

5 The firm’s business integrity: O G A M U N/A 6 Responsiveness to client/customer’s requirements: O G A M U N/A 7 Ability to control costs and provide the required work at a reasonable total price: O G A M U N/A 8 Contract Compliance: O G A M U N/A 9 Contract Management: O G A M U N/A 10 Compliance with safety standards and/or number of safety related incidents, code compliance, as applicable:

O G A M U N/A

11 Performance of Public Relations related to construction: O G A M U N/A 12 Quality Control Procedures: O G A M U N/A 13 Experience with commercial office facilities: O G A M U N/A 14 Construction using rock columns or rammed aggregate piers in poor soils: O G A M U N/A 15 Commercial Landscaping, use of native plants and drip irrigation: O G A M U N/A 16 Experience with multiple combined materials such as steel, wood and concrete: O G A M U N/A 17 Installations of Variable Refrigerant Flow systems, Geothermal wells, sophisticated control systems:

O G A M U N/A

18 Experience with finish work including weathering steel, glue laminated wood, wood siding, tile and wood finish carpentry:

O G A M U N/A

19 Experience with installation commercial elevators: O G A M U N/A 20 Experience with lighting controls and sensors. O G A M U N/A 21 Experience working in cold weather conditions. O G A M U N/A 22 Experience with the commissioning process for mechanical and electrical systems: O G A M U N/A 23 Have any cure notices, show cause letters, letter of reprimand, suspension of payment, or termination been issued? If yes please explain:

Yes No

24 Would you award another contract to the firm being evaluated: If no, please explain:

25 Was the customer satisfied with the end product? If no, please explain:

26 Has the firm being evaluated been provided an opportunity to discuss or respond to any negative comments or performance ratings? If so, what were the results?

27 Additional Remarks:

28 Overall rating for this firm: O G A M U N/A

Printed Name of Evaluator

Signature of Evaluator Date

This questionnaire should be submitted to the US Forest Service via email to Marge Schafer at msschafer@fs.fed.us.

File details come from the government source that posted it. Updated .