ATT 4 - Functional Commissioning Reports

View the file

Other files for this federal contract opportunity

Other files attached to Bridger-Teton NF Supervisors/Jackson Ranger District Office Construction Project, newest first.
File Type Posted
Amend_0003-_AG-02NV-S-15-0024.pdf PDF
ATT_1_-_Amendment_3_-_Revised_ATT_9___B-T_Cost_Estimate_Breakdown.xlsx XLSX spreadsheet
ATT_2_-_Revised_Schedule_of_Items.pdf PDF
ATT_3_-_Revised_Drawings.pdf PDF
ATT_1_-_Correction_to_Amend_0001_-_AG-02NV-S-15-0024.pdf PDF
Amend_0002_-_AG-02NV-S-15-0024.pdf PDF
ATT_4_-_Revised_HVAC_Controls_and_Equipment_Drawings.pdf PDF
ATT_2_-PFC_Pre-Functional_Test_Log_B-T_Supervisr's_office_Jackson_Ranger_Dist-U....pdf PDF
ATT_3_-_5-7-15_Prebid_Conference_Attendees_List.pdf PDF
ATT_1_-_JacksonSOSheet5FoundationPlan.pdf PDF
Amend_001_-_AG-02NV-S-15-0024.pdf PDF
Informational_Only_5_-_Green.Globes.StrategyBridger-Teton_Supervisor_ _Jackson_Ranger_District_Office_4.10.15.pdf PDF
Informational_Only_3_-_Engineer's_Garage_Asb_Insp_Rpt.Final.pdf PDF
ATT_8_-_Past_Performance_Questionnaire.pdf PDF
Informational_Only_2_-_Supervisor's_Office_Asb_Insp_Rpt.Final.pdf PDF
ATT_1_-_Bridger-Teton.SO_SpecsFinal.pdf PDF
ATT_2_-_JACKSON.DRAWINGS.FINAL.4.5.2015.signed.pdf PDF
AG-02NV-S-15-0024_Jackson_SO_Office_Construction_Solicitation.pdf PDF
ATT_6_-_Geothermal_Boring_Soils_Report_-_232113.33_Attachment_Jackson_FS_Full_TC_Report_-spec.pdf PDF
Informational_Only_4_-_VIC_Asb_Insp_Rpt.Final.pdf PDF
ATT_3_-_Commissioning_Plan_-__Cx_Plan-final_20150330.pdf PDF
ATT_9_-__B-T_Supervisor-District_Ranger_Office_Building_Construction_Cost_Estimate_Breakdown.xlsx XLSX spreadsheet
ATT_5_-_Geotechnical_Report_-_Final_BTSO_Geotech_Report.pdf PDF
Informational_Only_1_-_Climate.Data.31.2014.pdf PDF
ATT_7_-_WD_-_WY17__-01-02-15.pdf PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRE-FUNCTIONAL TEST CHECKLIST REPORT LOG

Report ID: Component / System Description Test Date Accepted Remarks / Issues PFC-AS-1-Pump "AS-1" Air Separator

PFC-BSB-1-Thru BSB 17 Branch Selector Box "BSB-1 Thru BSB-17" Branch Selector Box

All Branch selectors need a Pre Function forms for each box

PFC - DX-1 Duct Free Split "DX-1" Duct Free Split

PFC - DX-2 Duct Free Split "DX-2" Duct Free Split

PFC-EWH-1 Electric Wall Heaters

"EWH-1" Electric Wall Heaters Stairs

PFC-EWH-2 Electric Wall Heaters

"EWH-2" Electric Wall Heaters Stairs

PFC-EWH-3 Electric Wall Heaters

"EWH-3" Electric Wall Heaters Stairs

PFC-EWH-4 Electric Wall Heaters

"EWH-4" Electric Wall Heaters Chase

PFC-FC-1 thru FC-24 Fan Coil Unit "FC-1 thru FC-24 " Fan Coil Units

All Fan coil units need an Pre Function form completed. Minimum of (4) Fan coils will be tested for Functional Testing

PFC-HR-1 Water Source Heat recovery Units "HR-1" Water Source Heat recovery Units

PFC-HR-2 Water Source Heat recovery Units "HR-2" Water Source Heat recovery Units

PFC-ERV-1 thru ERV-4 Energy Recovery Units "ERV-1 thru ERV-4" Energy Recovery Units

All ERV's need their own Pre‐Function form completed

PFC-P-1 Geo-Thermal Pumps "P-1" Geo-thermal Pumps

Project Title: Bridger Teton Supervisor and Jackson Ranger District Office SI Project #:J14-003A 1 of 2

AG-02NV-S-15-0024 Bridger-Teton SO/District Ranger Building Construction Project Attachment 4

PRE-FUNCTIONAL TEST CHECKLIST REPORT LOG

Report ID: Component / System Description Test Date Accepted Remarks / Issues

PFC-P-2 Geo-Thermal Pumps "P-2" Geo-thermal Pumps

PFC-P-3 Geo-Thermal Pumps "P-3" Geo-thermal Pumps

PFC-P-4 Geo-Thermal Pumps "P-4" Geo-thermal Pumps

PFC - BAS Building Automation System BAS Building Automation System

PFC - LC lighting Controls Lighting Controls

Project Title: Bridger Teton Supervisor and Jackson Ranger District Office SI Project #:J14-003A 2 of 2

PRE-FUNCTIONAL CHECKLIST

Project Title: B-T Supervisor's office Jackson Ranger Dist.

SI Project #: J14-003A Forest Service 1 of 3 Equipment ID: AS-1

PROJECT: EQUIPMENT ID:

PROJECT #: LOCATION:

REPORT ID:

1. Submittals and Approvals

Signature Signature

Printed Name Printed Name

Company Company

Date Date

Signature Signature

Printed Name Printed Name

Company Company

Date Date

Signature Signature

Printed Name Printed Name

Company Company

Date Date

Signature Signature

Printed Name Printed Name

Company Company

Date Date

B-T Supervisor's Office Jackson Ranger Dist AS-1

J14-003A Forest Service Geo-Thermal Loop Mech. Rm.

PFC - AS-1- Air Separator DATE:

Approvals: This filled-out checklist has been reviewed. Its completion is approved with the exceptions noted.

Commissioning Authority Owner's Representative

The above equipment and systems integral to them are complete and ready for functional testing. The checklist items are complete and have been checked off only by parties having direct knowledge of the event, respective to each responsible contractor. This Pre-Functional Performance Checklist is submitted for approval, subject to an attached list of outstanding items yet to be completed. A Statement of Correction will be submitted upon completion of any outstanding areas. None of the outstanding items preclude safe and reliable functional tests being performed.

General Contractor Mechanical Contractor

Electrical Contractor TAB Contractor

Temperature Controls Contractor Certified Start-up Technician

SI Project #: J14-003A Forest Service 2 of 3 Equipment ID: AS-1

2. Documentation Verification Check each item as verified and initial. Explain deficiencies under Notes.

Y / N Contractor Initial Notes

3. Physical Installation and Inspection Checks Check each item as verified and initial. Explain deficiencies under Notes.

Y / N Contractor Initial Notes

Pre-functional checklist items are to be completed as part of startup & initial checkout, preparatory to functional testing.

· This checklist is not intended to take the place of the manufacturer’s recommended checkout and startup procedures or report.

· Items that do not apply shall be noted with the reasons on this form (N/A = not applicable, BO = by others).

· Contractors assigned responsibility for sections of the checklist shall be responsible to see that checklist items by their subcontractors are completed and checked off.

Check Manufacturer’s cut sheets Performance data (pump curves, coil data, etc.)

Installation and startup manual and plan Sequences and control strategies Operation & Maintenance manuals

Check General Installation Permanent labels affixed

Serial#:___________________

Manufacture:______________ Model Number:_____________

Pump & Plumbing Air Separator installed Correctly Strainers in place and clean if needed

Air Vent attached

Equipment Installed Per Specifications for given trade Drain / Hose bib attached per I.O.M.

Piping and Gaskets secure no leaks

Pipe fittings complete & pipes properly supported Pipes properly insulated All connections tight Shut off valves / Isolation valves in place Instrumentation installed according to specification (thermometers, pressure gages, etc.)

Pumps Installed Correctly Per Air-separator Instructions

SI Project #: J14-003A Forest Service 3 of 3 Equipment ID: AS-1

Y / N Contractor Initial Notes

4. Notes Refer to Notes under individual line items.

Note

Check

TAB

Installation of system and balancing devices allowed balancing to be completed following specified contract documents

Final Startup report completed with this checklist attached Safeties installed and safe operating ranges for this equipment provided to the commissioning agent

END OF CHECKLIST

Description

PROJECT: EQUIPMENT ID:

PROJECT #: LOCATION:

REPORT ID:

1. Submittals and Approvals

Signature Signature

Printed Name Printed Name

Company Company

Date Date

Signature Signature

Printed Name Printed Name

Company Company

Date Date

Signature Signature

Printed Name Printed Name

Company Company

Date Date

Signature Signature

Printed Name Printed Name

Company Company

Date Date

B-T Supervisor's Office Jackson Ranger Dist BAS

J14-003A Forest Service

PFC - BAS - Building Automation Sys. DATE:

Approvals: This filled-out checklist has been reviewed. Its completion is approved with the exceptions noted.

Commissioning Authority Owner's Representative

Pre-functional checklist items are to be completed as part of startup & initial checkout, preparatory to functional testing.

The above equipment and systems integral to them are complete and ready for functional testing. The checklist items are complete and have been checked off only by parties having direct knowledge of the event, respective to each responsible contractor. This Pre-Functional Performance Checklist is submitted for approval, subject to an attached list of outstanding items yet to be completed. A Statement of Correction will be submitted upon completion of any outstanding areas. None of the outstanding items preclude safe and reliable functional tests being performed.

General Contractor Mechanical Contractor

Electrical Contractor TAB Contractor

Temperature Controls Contractor Certified Start-up Technician

Project Title : B-T Supervisor's Office Jackson Ranger Dist.

SI Project No: J14-003A 1 of 3 Equipment ID: BAS

2. Documentation Verification Check each item as verified and initial. Explain deficiencies under Notes.

Y / N Contractor Initial Notes

3. Physical Installation and Inspection Checks Check each item as verified and initial. Explain deficiencies under Notes.

Y / N Contractor Initial Notes

All control actuator wires connected to existing control system

· This checklist is not intended to take the place of the manufacturer’s recommended checkout and startup procedures or report.

· Items that do not apply shall be noted with the reasons on this form (N/A = not applicable, BO = by others).

Operation & Maintenance manuals

· Contractors assigned responsibility for sections of the checklist shall be responsible to see that checklist items by their subcontractors are completed and checked off.

Check Manufacturer’s cut sheets Installation and startup manual and plan Sequences and control strategies

Valves, and Actuators

Maintenance access acceptable for unit and components

Clean up of equipment completed per contract documents

Check General Installation

Proper panel mountings

Panels properly grounded Battery backup in place and operable

All control valves wires connected to existing control system

All control actuators installed in ducts properly

General appearance good, no apparent damage

Layout and location of control panels matches drawings Wiring labeled inside panels (to controlled components) Controlled components labeled/tagged BAS connection made to labeled terminal(s) Shielded wiring used on electronic sensors 110 volt AC power available to panel

Environmental conditions according to manufacturer’s Date and time correct

Instrumentation installed according to specification Thermal insulation properly installed and according to specification

All control valves installed in piping properly That will be monitored

Project Title : B-T Supervisor's Office Jackson Ranger Dist.

SI Project No: J14-003A 2 of 3 Equipment ID: BAS

Y / N Contractor Initial Notes

4. Testing and Operational Checks Check each item as verified and initial. Explain deficiencies under Notes.

Y / N Contractor Initial Notes

5. Notes Refer to Notes under individual line items.

Note

Check

Power disconnects in place and labeled All electric connections tight Proper grounding installed for components and unit Safeties in place and operable All control devices and wiring complete

Solenoid control valves in place

Electrical and Controls Sensors are properly calibrated

Check General Installation

Verify all field wiring test clear of short circuits.

Verify all field wiring test clear of earth grounds.

Verify panel trouble, supervisory, and alarm conditions Sensors are properly calibrated System voltage readings are correct

Verify all required I/O points function from the UMCS system

Final Startup report completed with this checklist attached Safeties installed and safe operating ranges for this equipment provided to the commissioning agent

END OF CHECKLIST

Description

Project Title : B-T Supervisor's Office Jackson Ranger Dist.

SI Project No: J14-003A 3 of 3 Equipment ID: BAS

Project Title: B-T Supervisor's Office Jackson Ranger Dist.

Project #:J14-003A Forest Service 1 of 3 Equipment ID:BSB-____

PROJECT: EQUIPMENT ID:

PROJECT #: LOCATION:

REPORT ID:

1. Submittals and Approvals

Signature Signature

Printed Name Printed Name

Company Company

Date Date

Signature Signature

Printed Name Printed Name

Company Company

Date Date

Signature Signature

Printed Name Printed Name

Company Company

Date Date

Signature Signature

Printed Name Printed Name

Company Company

Date Date

Temperature Controls Contractor Certified Start-up Technician

Approvals: This filled-out checklist has been reviewed. Its completion is approved with the exceptions noted.

Commissioning Authority Owner's Representative

The above equipment and systems integral to them are complete and ready for functional testing. The checklist items are complete and have been checked off only by parties having direct knowledge of the event, respective to each responsible contractor. This Pre-Functional Performance Checklist is submitted for approval, subject to an attached list of outstanding items yet to be completed. A Statement of Correction will be submitted upon completion of any outstanding areas. None of the outstanding items preclude safe and reliable functional tests being performed.

General Contractor Mechanical Contractor

Electrical Contractor TAB Contractor

B-T Supervisors Office Jackson Ranger Dist BSB-

J14-003A Forest Service

PFC -BSB- Branch Selector Boxes DATE:

Project #:J14-003A Forest Service 2 of 3 Equipment ID:BSB-____

2. Documentation Verification Check each item as verified and initial. Explain deficiencies under Notes.

Y / N Contractor Initial Notes

3. Physical Installation and Inspection Checks Check each item as verified and initial. Explain deficiencies under Notes.

Y / N Contractor Initial Notes

Casing condition good: no dents or leaks, Piping Connections between Branch selector are tight and in Maintenance access acceptable for unit and components Unit installed per manufactures recomendations

Serial #:____________________ Model #:_____________________ Manufacture:_________________

Instrumentation installed according to mnfg. specification Vibration isolation equipment installed & released from shipping locks

Check General Installation Permanent labels affixed

Sequences and control strategies

Pre-functional checklist items are to be completed as part of startup & initial checkout, preparatory to functional testing.

· This checklist is not intended to take the place of the manufacturer’s recommended checkout and startup procedures or report.

· Items that do not apply shall be noted with the reasons on this form (N/A = not applicable, BO = by others).

Operation & Maintenance manuals

Manufacturer’s cut sheets Performance data (fan curves, coil data, etc.)

Installation and startup manual and plan

· Contractors assigned responsibility for sections of the checklist shall be responsible to see that checklist items by their subcontractors are completed and checked off.

Check

Project #:J14-003A Forest Service 3 of 3 Equipment ID:BSB-____

Y / N Contractor Initial Notes

4. Notes Refer to Notes under individual line items.

Note

END OF CHECKLIST

Description

TAB

Installation of system and balancing devices allowed balancing to be completed following specified contract

Final Startup report completed with this checklist attached Safeties installed and safe operating ranges for this equipment provided to the commissioning agent

Electrical and Controls Check

Motor Voltage - Rated:________Actual:________ Motor Amps - Rated:________ Actual:________

Power disconnects in place and labeled All electric connections tight Proper grounding installed for components and unit Safeties in place and operable All control devices and wiring complete

SI Project #: J14-003A Forest Service 1 of 3 Equipment ID: DX-1

PROJECT: EQUIPMENT ID:

PROJECT #: LOCATION:

REPORT ID:

1. Submittals and Approvals

Signature Signature

Printed Name Printed Name

Company Company

Date Date

Signature Signature

Printed Name Printed Name

Company Company

Date Date

Signature Signature

Printed Name Printed Name

Company Company

Date Date

Signature Signature

Printed Name Printed Name

Company Company

Date Date

The above equipment and systems integral to them are complete and ready for functional testing. The checklist items are complete and have been checked off only by parties having direct knowledge of the event, respective to each responsible contractor. This Pre-Functional Performance Checklist is submitted for approval, subject to an attached list of outstanding items yet to be completed. A Statement of Correction will be submitted upon completion of any outstanding areas. None of the outstanding items preclude safe and reliable functional tests being performed.

General Contractor Mechanical Contractor

Electrical Contractor TAB Contractor

B-T Supervisor's Office Jackson Ranger Dist DX-1

J14-003A Forest Service Comm Room 127

PFC - DX-1 Duct Free Split DATE:

Temperature Controls Contractor Certified Start-up Technician

Approvals: This filled-out checklist has been reviewed. Its completion is approved with the exceptions noted.

Commissioning Authority Owner's Representative

SI Project #: J14-003A Forest Service 2 of 3 Equipment ID: DX-1

2. Documentation Verification Check each item as verified and initial. Explain deficiencies under Notes.

Y / N Contractor Initial Notes

3. Physical Installation and Inspection Checks Check each item as verified and initial. Explain deficiencies under Notes.

Y / N Contractor Initial Notes

Y / N Contractor Initial Notes

Manufacturer’s cut sheets Performance data (fan curves, coil data, etc.)

Installation and startup manual and plan

· Contractors assigned responsibility for sections of the checklist shall be responsible to see that checklist items by their subcontractors are completed and checked off.

Check

Sequences and control strategies

Pre-functional checklist items are to be completed as part of startup & initial checkout, preparatory to functional testing.

· This checklist is not intended to take the place of the manufacturer’s recommended checkout and startup procedures or report.

· Items that do not apply shall be noted with the reasons on this form (N/A = not applicable, BO = by others).

Operation & Maintenance manuals

Instrumentation installed according to specification

Piping hooked up and properly connected

Vibration isolation equipment installed & released from shipping locks

Check General Installation Permanent labels affixed

Indoor Unit to be mounted level

Piping insulation

Power disconnects in place and labeled All electric connections tight Proper grounding installed for components and unit Safeties in place and operable

Casing condition good: no dents or leaks, door gaskets Maintenance access acceptable for unit and components Clean up of equipment completed per contract documents

Low Ambient Control / Crank case Heater installed Dryer installed

All control devices and wiring complete

Wind Baffle Indoor unit condensate connection installed

Electrical and Controls Check

Serial #:_________________ Model #:_________________ Manufacture:______________

Motor Volts - Rated:________ Actual:_________ Motor Amps- Rated:________ Actual:_________

TAB

Installation of system and balancing devices allowed balancing to be completed following specified contract

Final

SI Project #: J14-003A Forest Service 3 of 3 Equipment ID: DX-1

4. Notes Refer to Notes under individual line items.

Note

Startup report completed with this checklist attached Safeties installed and safe operating ranges for this equipment provided to the commissioning agent

END OF CHECKLIST

SI Project #: J14-003A Forest Service 1 of 3 Equipment ID: DX-2

PROJECT: EQUIPMENT ID:

PROJECT #: LOCATION:

REPORT ID:

1. Submittals and Approvals

Signature Signature

Printed Name Printed Name

Company Company

Date Date

Signature Signature

Printed Name Printed Name

Company Company

Date Date

Signature Signature

Printed Name Printed Name

Company Company

Date Date

Signature Signature

Printed Name Printed Name

Company Company

Date Date

The above equipment and systems integral to them are complete and ready for functional testing. The checklist items are complete and have been checked off only by parties having direct knowledge of the event, respective to each responsible contractor. This Pre-Functional Performance Checklist is submitted for approval, subject to an attached list of outstanding items yet to be completed. A Statement of Correction will be submitted upon completion of any outstanding areas. None of the outstanding items preclude safe and reliable functional tests being performed.

General Contractor Mechanical Contractor

Electrical Contractor TAB Contractor

B-T Supervisor's Office Jackson Ranger Dist DX-2

J14-003A Forest Service Comm Room 213

PFC - DX-2 Duct Free Split DATE:

Temperature Controls Contractor Certified Start-up Technician

Approvals: This filled-out checklist has been reviewed. Its completion is approved with the exceptions noted.

Commissioning Authority Owner's Representative

SI Project #: J14-003A Forest Service 2 of 3 Equipment ID: DX-2

2. Documentation Verification Check each item as verified and initial. Explain deficiencies under Notes.

Y / N Contractor Initial Notes

3. Physical Installation and Inspection Checks Check each item as verified and initial. Explain deficiencies under Notes.

Y / N Contractor Initial Notes

Y / N Contractor Initial Notes

Manufacturer’s cut sheets Performance data (fan curves, coil data, etc.)

Installation and startup manual and plan

· Contractors assigned responsibility for sections of the checklist shall be responsible to see that checklist items by their subcontractors are completed and checked off.

Check

Sequences and control strategies

Pre-functional checklist items are to be completed as part of startup & initial checkout, preparatory to functional testing.

· This checklist is not intended to take the place of the manufacturer’s recommended checkout and startup procedures or report.

· Items that do not apply shall be noted with the reasons on this form (N/A = not applicable, BO = by others).

Operation & Maintenance manuals

Instrumentation installed according to specification

Piping hooked up and properly connected

Vibration isolation equipment installed & released from shipping locks

Check General Installation Permanent labels affixed

Indoor Unit to be mounted level

Piping insulation

Power disconnects in place and labeled All electric connections tight Proper grounding installed for components and unit Safeties in place and operable

Casing condition good: no dents or leaks, door gaskets Maintenance access acceptable for unit and components Clean up of equipment completed per contract documents

Low ambient Control / Crankcase heater installed Dryer installed

All control devices and wiring complete

Wind Baffle Indoor unit condensate connection installed

Electrical and Controls Check

Serial #:_________________ Model #:_________________ Manufacture:______________

Motor Volts - Rated:________ Actual:_________ Motor Amps- Rated:________ Actual:_________

TAB

Installation of system and balancing devices allowed balancing to be completed following specified contract

Final

SI Project #: J14-003A Forest Service 3 of 3 Equipment ID: DX-2

4. Notes Refer to Notes under individual line items.

Note

Startup report completed with this checklist attached Safeties installed and safe operating ranges for this equipment provided to the commissioning agent

END OF CHECKLIST

Project Title : B-T Supervisors Office Jackson Ranger District SI Project No: J14-003A Forest Service 1 of 3 Equipment ID#: EWH-1

PROJECT: EQUIPMENT ID:

PROJECT #: LOCATION:

REPORT ID:

1. Submittals and Approvals

Signature Signature

Printed Name Printed Name

Company Company

Date Date

Signature Signature

Printed Name Printed Name

Company Company

Date Date

Signature Signature

Printed Name Printed Name

Company Company

Date Date

Signature Signature

Printed Name Printed Name

Company Company

Date Date Pre-functional checklist items are to be completed as part of startup & initial checkout, preparatory to functional testing.

Temperature Controls Contractor Certified Start-up Technician

The above equipment and systems integral to them are complete and ready for functional testing. The checklist items are complete and have been checked off only by parties having direct knowledge of the event, respective to each responsible contractor. This Pre-Functional Performance Checklist is submitted for approval, subject to an attached list of outstanding items yet to be completed. A Statement of Correction will be submitted upon completion of any outstanding areas. None of the outstanding items preclude safe and reliable functional tests being performed.

General Contractor Mechanical Contractor

Electrical Contractor TAB Contractor

Approvals: This filled-out checklist has been reviewed. Its completion is approved with the exceptions noted.

Commissioning Authority Owner's Representative

B-T Supervisor's Office Jackson Ranger Dist EWH-1

J14-003A Forest Service Stairs 111

PFC - EWH-1 Electric Wall Heaters DATE:

SI Project No: J14-003A Forest Service 2 of 3 Equipment ID#: EWH-1

2. Documentation Verification Check each item as verified and initial. Explain deficiencies under Notes.

Y / N Contractor Initial Notes

3. Physical Installation and Inspection Checks Check each item as verified and initial. Explain deficiencies under Notes.

Y / N Contractor Initial Notes

Casing condition good: no dents or leaks, door gaskets Maintenance access acceptable for unit and components Clean up of equipment completed per contract documents Instrumentation installed according to specification Vibration isolation equipment installed & released from shipping locks

Check General Installation Permanent labels affixed

Sequences and control strategies

· This checklist is not intended to take the place of the manufacturer’s recommended checkout and startup procedures or report.

· Items that do not apply shall be noted with the reasons on this form (N/A = not applicable, BO = by others).

Operation & Maintenance manuals

Manufacturer’s cut sheets Performance data (fan curves, coil data, etc.)

Installation and startup manual and plan

· Contractors assigned responsibility for sections of the checklist shall be responsible to see that checklist items by their subcontractors are completed and checked off.

SI Project No: J14-003A Forest Service 3 of 3 Equipment ID#: EWH-1

Y / N Contractor Initial Notes

4. Notes Refer to Notes under individual line items.

Note

END OF CHECKLIST

Description

TAB

Installation of system and balancing devices allowed balancing to be completed following specified contract

Final Startup report completed with this checklist attached Safeties installed and safe operating ranges for this equipment provided to the commissioning agent

Proper grounding installed for components and unit Safeties in place and operable All control devices and wiring complete

Electrical and Controls Check

Power disconnects in place and labeled All electric connections tight

SI Project No: J14-003A Forest Service 1 of 3 Equipment ID#: EWH-2

PROJECT: EQUIPMENT ID:

PROJECT #: LOCATION:

REPORT ID:

1. Submittals and Approvals

Signature Signature

Printed Name Printed Name

Company Company

Date Date

Signature Signature

Printed Name Printed Name

Company Company

Date Date

Signature Signature

Printed Name Printed Name

Company Company

Date Date

Signature Signature

Printed Name Printed Name

Company Company

Date Date

B-T Supervisor's Office Jackson Ranger Dist EWH-2

J14-003A Forest Service Stairs 130

PFC - EWH-2 Electric Wall Heaters DATE:

The above equipment and systems integral to them are complete and ready for functional testing. The checklist items are complete and have been checked off only by parties having direct knowledge of the event, respective to each responsible contractor. This Pre-Functional Performance Checklist is submitted for approval, subject to an attached list of outstanding items yet to be completed. A Statement of Correction will be submitted upon completion of any outstanding areas. None of the outstanding items preclude safe and reliable functional tests being performed.

General Contractor Mechanical Contractor

Electrical Contractor TAB Contractor

Temperature Controls Contractor Certified Start-up Technician

Approvals: This filled-out checklist has been reviewed. Its completion is approved with the exceptions noted.

Commissioning Authority Owner's Representative

Pre-functional checklist items are to be completed as part of startup & initial checkout, preparatory to functional testing.

SI Project No: J14-003A Forest Service 2 of 3 Equipment ID#: EWH-2

2. Documentation Verification Check each item as verified and initial. Explain deficiencies under Notes.

Y / N Contractor Initial Notes

3. Physical Installation and Inspection Checks Check each item as verified and initial. Explain deficiencies under Notes.

Y / N Contractor Initial Notes

Manufacturer’s cut sheets Performance data (fan curves, coil data, etc.)

Installation and startup manual and plan

· Contractors assigned responsibility for sections of the checklist shall be responsible to see that checklist items by their subcontractors are completed and checked off.

Check

Sequences and control strategies

· This checklist is not intended to take the place of the manufacturer’s recommended checkout and startup procedures or report.

· Items that do not apply shall be noted with the reasons on this form (N/A = not applicable, BO = by others).

Operation & Maintenance manuals

Check General Installation Permanent labels affixed

Instrumentation installed according to specification Vibration isolation equipment installed & released from shipping locks

Casing condition good: no dents or leaks, door gaskets Maintenance access acceptable for unit and components Clean up of equipment completed per contract documents

SI Project No: J14-003A Forest Service 3 of 3 Equipment ID#: EWH-2

Y / N Contractor Initial Notes

4. Notes Refer to Notes under individual line items.

Note

Power disconnects in place and labeled All electric connections tight Proper grounding installed for components and unit Safeties in place and operable All control devices and wiring complete

Electrical and Controls Check

TAB

Installation of system and balancing devices allowed balancing to be completed following specified contract

Final Startup report completed with this checklist attached Safeties installed and safe operating ranges for this equipment provided to the commissioning agent

END OF CHECKLIST

SI Project No: J14-003A Forest Service 1 of 3 Equipment ID#: EWH-3

PROJECT: EQUIPMENT ID:

PROJECT #: LOCATION:

REPORT ID:

1. Submittals and Approvals

Signature Signature

Printed Name Printed Name

Company Company

Date Date

Signature Signature

Printed Name Printed Name

Company Company

Date Date

Signature Signature

Printed Name Printed Name

Company Company

Date Date

Signature Signature

Printed Name Printed Name

Company Company

Date Date Pre-functional checklist items are to be completed as part of startup & initial checkout, preparatory to functional testing.

Temperature Controls Contractor Certified Start-up Technician

Approvals: This filled-out checklist has been reviewed. Its completion is approved with the exceptions noted.

Commissioning Authority Owner's Representative

The above equipment and systems integral to them are complete and ready for functional testing. The checklist items are complete and have been checked off only by parties having direct knowledge of the event, respective to each responsible contractor. This Pre-Functional Performance Checklist is submitted for approval, subject to an attached list of outstanding items yet to be completed. A Statement of Correction will be submitted upon completion of any outstanding areas. None of the outstanding items preclude safe and reliable functional tests being performed.

General Contractor Mechanical Contractor

Electrical Contractor TAB Contractor

B-T Supervisor's Office Jackson Ranger Dist EWH-3

J14-003A Forest Service Stairs 141

PFC - EWH-3 Electric Wall Heaters DATE:

SI Project No: J14-003A Forest Service 2 of 3 Equipment ID#: EWH-3

2. Documentation Verification Check each item as verified and initial. Explain deficiencies under Notes.

Y / N Contractor Initial Notes

3. Physical Installation and Inspection Checks Check each item as verified and initial. Explain deficiencies under Notes.

Y / N Contractor Initial Notes

Casing condition good: no dents or leaks, door gaskets Maintenance access acceptable for unit and components Clean up of equipment completed per contract documents Instrumentation installed according to specification Vibration isolation equipment installed & released from shipping locks

Check General Installation Permanent labels affixed

Sequences and control strategies

· This checklist is not intended to take the place of the manufacturer’s recommended checkout and startup procedures or report.

· Items that do not apply shall be noted with the reasons on this form (N/A = not applicable, BO = by others).

Operation & Maintenance manuals

Manufacturer’s cut sheets Performance data (fan curves, coil data, etc.)

Installation and startup manual and plan

· Contractors assigned responsibility for sections of the checklist shall be responsible to see that checklist items by their subcontractors are completed and checked off.

SI Project No: J14-003A Forest Service 3 of 3 Equipment ID#: EWH-3

Y / N Contractor Initial Notes

4. Notes Refer to Notes under individual line items.

Note

END OF CHECKLIST

Description

TAB

Installation of system and balancing devices allowed balancing to be completed following specified contract

Final Startup report completed with this checklist attached Safeties installed and safe operating ranges for this equipment provided to the commissioning agent

Proper grounding installed for components and unit Safeties in place and operable All control devices and wiring complete

Electrical and Controls Check

Power disconnects in place and labeled All electric connections tight

SI Project No: J14-003A Forest Service 1 of 3 Equipment ID#: EWH-4

PROJECT: EQUIPMENT ID:

PROJECT #: LOCATION:

REPORT ID:

1. Submittals and Approvals

Signature Signature

Printed Name Printed Name

Company Company

Date Date

Signature Signature

Printed Name Printed Name

Company Company

Date Date

Signature Signature

Printed Name Printed Name

Company Company

Date Date

Signature Signature

Printed Name Printed Name

Company Company

Date Date

B-T Supervisor's Office Jackson Ranger Dist EWH-4

J14-003A Forest Service Chase 239

PFC - EWH-4 Electric Wall Heaters DATE:

The above equipment and systems integral to them are complete and ready for functional testing. The checklist items are complete and have been checked off only by parties having direct knowledge of the event, respective to each responsible contractor. This Pre-Functional Performance Checklist is submitted for approval, subject to an attached list of outstanding items yet to be completed. A Statement of Correction will be submitted upon completion of any outstanding areas. None of the outstanding items preclude safe and reliable functional tests being performed.

General Contractor Mechanical Contractor

Electrical Contractor TAB Contractor

Temperature Controls Contractor Certified Start-up Technician

Approvals: This filled-out checklist has been reviewed. Its completion is approved with the exceptions noted.

Commissioning Authority Owner's Representative

Pre-functional checklist items are to be completed as part of startup & initial checkout, preparatory to functional testing.

SI Project No: J14-003A Forest Service 2 of 3 Equipment ID#: EWH-4

2. Documentation Verification Check each item as verified and initial. Explain deficiencies under Notes.

Y / N Contractor Initial Notes

3. Physical Installation and Inspection Checks Check each item as verified and initial. Explain deficiencies under Notes.

Y / N Contractor Initial Notes

Manufacturer’s cut sheets Performance data (fan curves, coil data, etc.)

Installation and startup manual and plan

· Contractors assigned responsibility for sections of the checklist shall be responsible to see that checklist items by their subcontractors are completed and checked off.

Check

Sequences and control strategies

· This checklist is not intended to take the place of the manufacturer’s recommended checkout and startup procedures or report.

· Items that do not apply shall be noted with the reasons on this form (N/A = not applicable, BO = by others).

Operation & Maintenance manuals

Check General Installation Permanent labels affixed

Instrumentation installed according to specification Vibration isolation equipment installed & released from shipping locks

Casing condition good: no dents or leaks, door gaskets Maintenance access acceptable for unit and components Clean up of equipment completed per contract documents

SI Project No: J14-003A Forest Service 3 of 3 Equipment ID#: EWH-4

Y / N Contractor Initial Notes

4. Notes Refer to Notes under individual line items.

Note

Power disconnects in place and labeled All electric connections tight Proper grounding installed for components and unit Safeties in place and operable All control devices and wiring complete

Electrical and Controls Check

TAB

Installation of system and balancing devices allowed balancing to be completed following specified contract

Final Startup report completed with this checklist attached Safeties installed and safe operating ranges for this equipment provided to the commissioning agent

END OF CHECKLIST

Project #:J14-003A Forest Service 1 of 3 Equipment ID:FCU-

PROJECT: EQUIPMENT ID:

PROJECT #: LOCATION:

REPORT ID:

1. Submittals and Approvals

Signature Signature

Printed Name Printed Name

Company Company

Date Date

Signature Signature

Printed Name Printed Name

Company Company

Date Date

Signature Signature

Printed Name Printed Name

Company Company

Date Date

Signature Signature

Printed Name Printed Name

Company Company

Date Date

B-T Supervisors Office Jackson Ranger Dist FCU -

J14-003A Forest Service

PFC -FCU-** Fan Coil Unit DATE:

Approvals: This filled-out checklist has been reviewed. Its completion is approved with the exceptions noted.

Commissioning Authority Owner's Representative

The above equipment and systems integral to them are complete and ready for functional testing. The checklist items are complete and have been checked off only by parties having direct knowledge of the event, respective to each responsible contractor. This Pre-Functional Performance Checklist is submitted for approval, subject to an attached list of outstanding items yet to be completed. A Statement of Correction will be submitted upon completion of any outstanding areas. None of the outstanding items preclude safe and reliable functional tests being performed.

General Contractor Mechanical Contractor

Electrical Contractor TAB Contractor

Project #:J14-003A Forest Service 2 of 3 Equipment ID:FCU-

2. Documentation Verification Check each item as verified and initial. Explain deficiencies under Notes.

Y / N Contractor Initial Notes

3. Physical Installation and Inspection Checks Check each item as verified and initial. Explain deficiencies under Notes.

Y / N Contractor Initial Notes

Ducts (preliminary check) Duct joint sealant properly installed No apparent severe duct restrictions Duct connected into roof vent Duct cleaned as per specifications Unit Duct Flex Connections installed properly

Digital Wall Humidistat installed per Manufactures Recommendations

Vibration isolation equipment installed & released from shipping locks

Casing condition good: no dents or leaks, Piping Connections between Fan Coil Units are tight and in Maintenance access acceptable for unit and components Unit installed per manufactures recomendations

Serial #:____________________ Model #:_____________________ Manufacture:_________________

Instrumentation installed according to mnfg. specification

Condensate Lines attached Per Manufactures Specifications

Check General Installation Permanent labels affixed

Operation & Maintenance manuals

Manufacturer’s cut sheets Performance data (fan curves, coil data, etc.)

Installation and startup manual and plan Sequences and control strategies

Pre-functional checklist items are to be completed as part of startup & initial checkout, preparatory to functional testing.

· This checklist is not intended to take the place of the manufacturer’s recommended checkout and startup procedures or report.

· Items that do not apply shall be noted with the reasons on this form (N/A = not applicable, BO = by others).

· Contractors assigned responsibility for sections of the checklist shall be responsible to see that checklist items by their subcontractors are completed and checked off.

Project #:J14-003A Forest Service 3 of 3 Equipment ID:FCU-

Y / N Contractor Initial Notes

4. Notes Refer to Notes under individual line items.

Note

END OF CHECKLIST

Description

TAB

Installation of system and balancing devices allowed balancing to be completed following specified contract

Final Startup report completed with this checklist attached Safeties installed and safe operating ranges for this equipment provided to the commissioning agent

Power disconnects in place and labeled All electric connections tight Proper grounding installed for components and unit Safeties in place and operable All control devices and wiring complete

Electrical and Controls Check

Motor Voltage - Rated:________Actual:________ Motor Amps - Rated:________ Actual:________

Project Title: B-T Supervisors Office Jackson Ranger Dist.

Project #:J14-003A Forest Service 1 of 3 Equipment ID:HR-1

PROJECT: EQUIPMENT ID:

PROJECT #: LOCATION:

REPORT ID:

1. Submittals and Approvals

Signature Signature

Printed Name Printed Name

Company Company

Date Date

Signature Signature

Printed Name Printed Name

Company Company

Date Date

Signature Signature

Printed Name Printed Name

Company Company

Date Date

Signature Signature

Printed Name Printed Name

Company Company

Date Date

B-T Supervisor's Office Jackson Ranger Dist HR-1

J14-003A Forest Service

PFC-HR-1 Water Source Heat Recovery Unit DATE:

Approvals: This filled-out checklist has been reviewed. Its completion is approved with the exceptions noted.

Commissioning Authority Owner's Representative

The above equipment and systems integral to them are complete and ready for functional testing. The checklist items are complete and have been checked off only by parties having direct knowledge of the event, respective to each responsible contractor. This Pre-Functional Performance Checklist is submitted for approval, subject to an attached list of outstanding items yet to be completed. A Statement of Correction will be submitted upon completion of any outstanding areas. None of the outstanding items preclude safe and reliable functional tests being performed.

General Contractor Mechanical Contractor

Electrical Contractor TAB Contractor

Project #:J14-003A Forest Service 2 of 3 Equipment ID:HR-1

2. Documentation Verification Check each item as verified and initial. Explain deficiencies under Notes.

Y / N Contractor Initial Notes

3. Physical Installation and Inspection Checks Check each item as verified and initial. Explain deficiencies under Notes.

Y / N Contractor Initial Notes

Ducts (preliminary check) Duct joint sealant properly installed No apparent severe duct restrictions Duct connected into roof vent Duct cleaned as per specifications

Unit Duct Flex Connections installed properly

Spare belt present All bearings and bushings greased to mfg. recommendations

Digital Wall Humidistat installed per Manufactures Recommendations

Vibration isolation equipment installed & released from shipping locks

Low Ambient Kit installed per mnfg. Specifications

Casing condition good: no dents or leaks, door gaskets Boots between ducts and unit tight and in good condition Maintenance access acceptable for unit and components Unit installed per manufactures recomendations

Serial #:____________________ Model #:_____________________ Manufacture:_________________

Instrumentation installed according to mnfg. specification

Wind Baffle installed per mnfg. Specifications

Check General Installation Permanent labels affixed

Operation & Maintenance manuals

Manufacturer’s cut sheets Performance data (fan curves, coil data, etc.)

Installation and startup manual and plan Sequences and control strategies

Pre-functional checklist items are to be completed as part of startup & initial checkout, preparatory to functional testing.

· This checklist is not intended to take the place of the manufacturer’s recommended checkout and startup procedures or report.

· Items that do not apply shall be noted with the reasons on this form (N/A = not applicable, BO = by others).

· Contractors assigned responsibility for sections of the checklist shall be responsible to see that checklist items by their subcontractors are completed and checked off.

Project #:J14-003A Forest Service 3 of 3 Equipment ID:HR-1

Y / N Contractor Initial Notes

4. Notes Refer to Notes under individual line items.

Note

END OF CHECKLIST

Description

TAB

Installation of system and balancing devices allowed balancing to be completed following specified contract

Final Startup report completed with this checklist attached Safeties installed and safe operating ranges for this equipment provided to the commissioning agent

Power disconnects in place and labeled All electric connections tight Proper grounding installed for components and unit Safeties in place and operable All control devices and wiring complete

Electrical and Controls Check

Motor Voltage - Rated:________Actual:________

Project #:J14-003A Forest Service 1 of 3 Equipment ID:HR-2

PROJECT: EQUIPMENT ID:

PROJECT #: LOCATION:

REPORT ID:

1. Submittals and Approvals

Signature Signature

Printed Name Printed Name

Company Company

Date Date

Signature Signature

Printed Name Printed Name

Company Company

Date Date

Signature Signature

Printed Name Printed Name

Company Company

Date Date

Signature Signature

Printed Name Printed Name

Company Company

Date Date

B-T Supervisor's Office Jackson Ranger Dist HR-2

J14-003A Forest Service

PFC-HR-2 Water Source Heat Recovery Unit DATE:

Approvals: This filled-out checklist has been reviewed. Its completion is approved with the exceptions noted.

Commissioning Authority Owner's Representative

The above equipment and systems integral to them are complete and ready for functional testing. The checklist items are complete and have been checked off only by parties having direct knowledge of the event, respective to each responsible contractor. This Pre-Functional Performance Checklist is submitted for approval, subject to an attached list of outstanding items yet to be completed. A Statement of Correction will be submitted upon completion of any outstanding areas. None of the outstanding items preclude safe and reliable functional tests being performed.

General Contractor Mechanical Contractor

Electrical Contractor TAB Contractor

Project #:J14-003A Forest Service 2 of 3 Equipment ID:HR-2

2. Documentation Verification Check each item as verified and initial. Explain deficiencies under Notes.

Y / N Contractor Initial Notes

3. Physical Installation and Inspection Checks Check each item as verified and initial. Explain deficiencies under Notes.

Y / N Contractor Initial Notes

Ducts (preliminary check) Duct joint sealant properly installed No apparent severe duct restrictions Duct connected into roof vent Duct cleaned as per specifications

Unit Duct Flex Connections installed properly

Spare belt present All bearings and bushings greased to mfg. recommendations

Digital Wall Humidistat installed per Manufactures Recommendations

Vibration isolation equipment installed & released from shipping locks

Low Ambient Kit installed per mnfg. Specifications

Casing condition good: no dents or leaks, door gaskets Boots between ducts and unit tight and in good condition Maintenance access acceptable for unit and components Unit installed per manufactures recomendations

Serial #:____________________ Model #:_____________________ Manufacture:_________________

Instrumentation installed according to mnfg. specification

Wind Baffle installed per mnfg. Specifications

Check General Installation Permanent labels affixed

Operation & Maintenance manuals

Manufacturer’s cut sheets Performance data (fan curves, coil data, etc.)

Installation and startup manual and plan Sequences and control strategies

Pre-functional checklist items are to be completed as part of startup & initial checkout, preparatory to functional testing.

· This checklist is not intended to take the place of the manufacturer’s recommended checkout and startup procedures or report.

· Items that do not apply shall be noted with the reasons on this form (N/A = not applicable, BO = by others).

· Contractors assigned responsibility for sections of the checklist shall be responsible to see that checklist items by their subcontractors are completed and checked off.

Project #:J14-003A Forest Service 3 of 3 Equipment ID:HR-2

Y / N Contractor Initial Notes

4. Notes Refer to Notes under individual line items.

Note

END OF CHECKLIST

Description

TAB

Installation of system and balancing devices allowed balancing to be completed following specified contract

Final Startup report completed with this checklist attached Safeties installed and safe operating ranges for this equipment provided to the commissioning agent

Power disconnects in place and labeled All electric connections tight Proper grounding installed for components and unit Safeties in place and operable All control devices and wiring complete

Electrical and Controls Check

Motor Voltage - Rated:________Actual:________

SI Project #: J14-003A Forest Service 1 of 3 Equipment ID: P-1

PROJECT: EQUIPMENT ID:

PROJECT #: LOCATION:

REPORT ID:

1. Submittals and Approvals

Signature Signature

Printed Name Printed Name

Company Company

Date Date

Signature Signature

Printed Name Printed Name

Company Company

Date Date

Signature Signature

Printed Name Printed Name

Company Company

Date Date

Signature Signature

Printed Name Printed Name

Company Company

Date Date

B-T Supervisor's Office Jackson Ranger Dist P-1

J14-003A Forest Service Geo-Thermal Loop Mech. Rm.

PFC - P-1- Pump DATE:

Approvals: This filled-out checklist has been reviewed. Its completion is approved with the exceptions noted.

Commissioning Authority Owner's Representative

The above equipment and systems integral to them are complete and ready for functional testing. The checklist items are complete and have been checked off only by parties having direct knowledge of the event, respective to each responsible contractor. This Pre-Functional Performance Checklist is submitted for approval, subject to an attached list of outstanding items yet to be completed. A Statement of Correction will be submitted upon completion of any outstanding areas. None of the outstanding items preclude safe and reliable functional tests being performed.

General Contractor Mechanical Contractor

Electrical Contractor TAB Contractor

SI Project #: J14-003A Forest Service 2 of 3 Equipment ID: P-1

2. Documentation Verification Check each item as verified and initial. Explain deficiencies under Notes.

Y / N Contractor Initial Notes

3. Physical Installation and Inspection Checks Check each item as verified and initial. Explain deficiencies under Notes.

Y / N Contractor Initial Notes

Manufacture:______________ Model Number:_____________

Power disconnects in place and labeled All electric connections tight Proper grounding installed for components and unit

Pump & Plumbing Pump Lubricated Strainers in place and clean Verifiy proper rotation

Field alignment complete Instrumentation installed according to specification (thermometers, pressure gages, etc.)

Safeties in place and operable All control devices and wiring complete

Serial#:___________________

Electrical and Controls

Motor Volts - Rated:_____ Actual:_______ Motor Amps - Rated:_____ Actual:_______

Pipe fittings complete & pipes properly supported Pipes properly insulated All connections tight Shut off valves / Isolation valves in place

GPM:_________

Equipment Installed Per Specifications for given trade

Head ft.:_________ Motor Efficiency:_________

Voltage:_________, Phase:__________

RPM:_________

Check General Installation Permanent labels affixed

Operation & Maintenance manuals

Manufacturer’s cut sheets…