ATT_2_-PFC_Pre-Functional_Test_Log_B-T_Supervisr's_office_Jackson_Ranger_Dist-U....pdf

PDF 586 KB Posted

Attached to
Bridger-Teton NF Supervisors/Jackson Ranger District Office Construction Project Federal contract opportunity
Solicitation number
AG-02NV-S-15-0024
Issued by
Department of Agriculture Forest Service R4-Intermountain Region

About this file

ATT 2

View the file

Other files for this federal contract opportunity

Other files attached to Bridger-Teton NF Supervisors/Jackson Ranger District Office Construction Project, newest first.
File Type Posted
Amend_0003-_AG-02NV-S-15-0024.pdf PDF
ATT_1_-_Amendment_3_-_Revised_ATT_9___B-T_Cost_Estimate_Breakdown.xlsx XLSX spreadsheet
ATT_2_-_Revised_Schedule_of_Items.pdf PDF
ATT_1_-_Correction_to_Amend_0001_-_AG-02NV-S-15-0024.pdf PDF
Amend_0002_-_AG-02NV-S-15-0024.pdf PDF
ATT_4_-_Revised_HVAC_Controls_and_Equipment_Drawings.pdf PDF
ATT_3_-_Revised_Drawings.pdf PDF
ATT_3_-_5-7-15_Prebid_Conference_Attendees_List.pdf PDF
ATT_1_-_JacksonSOSheet5FoundationPlan.pdf PDF
Amend_001_-_AG-02NV-S-15-0024.pdf PDF
Informational_Only_5_-_Green.Globes.StrategyBridger-Teton_Supervisor_ _Jackson_Ranger_District_Office_4.10.15.pdf PDF
Informational_Only_3_-_Engineer's_Garage_Asb_Insp_Rpt.Final.pdf PDF
ATT_6_-_Geothermal_Boring_Soils_Report_-_232113.33_Attachment_Jackson_FS_Full_TC_Report_-spec.pdf PDF
Informational_Only_4_-_VIC_Asb_Insp_Rpt.Final.pdf PDF
ATT_3_-_Commissioning_Plan_-__Cx_Plan-final_20150330.pdf PDF
ATT_9_-__B-T_Supervisor-District_Ranger_Office_Building_Construction_Cost_Estimate_Breakdown.xlsx XLSX spreadsheet
ATT_5_-_Geotechnical_Report_-_Final_BTSO_Geotech_Report.pdf PDF
Informational_Only_1_-_Climate.Data.31.2014.pdf PDF
ATT_7_-_WD_-_WY17__-01-02-15.pdf PDF
ATT_8_-_Past_Performance_Questionnaire.pdf PDF
ATT_4_-_Functional_Comissioning_Reports_-_Combined_Files_PDF_Pre_Function_03-30-15.pdf PDF
Informational_Only_2_-_Supervisor's_Office_Asb_Insp_Rpt.Final.pdf PDF
ATT_1_-_Bridger-Teton.SO_SpecsFinal.pdf PDF
ATT_2_-_JACKSON.DRAWINGS.FINAL.4.5.2015.signed.pdf PDF
AG-02NV-S-15-0024_Jackson_SO_Office_Construction_Solicitation.pdf PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRE-FUNCTIONAL TEST CHECKLIST REPORT LOG

Report ID: Component / System Description Test Date Accepted Remarks / Issues PFC-AS-1-Pump "AS-1" Air Separator

PFC-BSB-1-Thru BSB 17 Branch Selector Box "BSB-1 Thru BSB-17" Branch Selector Box

All Branch selectors need a Pre Function forms for each box

PFC - DX-1 Duct Free Split "DX-1" Duct Free Split

PFC - DX-2 Duct Free Split "DX-2" Duct Free Split

PFC-EWH-1 Electric Wall Heaters

"EWH-1" Electric Wall Heaters Stairs

PFC-EWH-2 Electric Wall Heaters

"EWH-2" Electric Wall Heaters Stairs

PFC-EWH-3 Electric Wall Heaters

"EWH-3" Electric Wall Heaters Stairs

PFC-EWH-4 Electric Wall Heaters

"EWH-4" Electric Wall Heaters Chase

PFC-FC-1 thru FC-24 Fan Coil Unit "FC-1 thru FC-24 " Fan Coil Units

All Fan coil units need an Pre Function form completed. Minimum of (4) Fan coils will be tested for Functional Testing

PFC-HR-1 Water Source Heat recovery Units "HR-1" Water Source Heat recovery Units

PFC-HR-2 Water Source Heat recovery Units "HR-2" Water Source Heat recovery Units

PFC-ERV-1 thru ERV-4 Energy Recovery Units "ERV-1 thru ERV-4" Energy Recovery Units

All ERV's need their own Pre‐Function form completed

PFC-P-1 Geo-Thermal Pumps "P-1" Geo-thermal Pumps

Project Title: Bridger Teton Supervisor and Jackson Ranger District Office SI Project #:J14-003A 1 of 3

RFP AG-02NV-S-15-0024 Amendment 0001 ATTACHMENT 2

PFC-P-2 Geo-Thermal Pumps "P-2" Geo-thermal Pumps

PFC-P-3 Geo-Thermal Pumps "P-3" Geo-thermal Pumps

PFC-P-4 Geo-Thermal Pumps "P-4" Geo-thermal Pumps

PFC - BAS Building Automation System BAS Building Automation System

PFC - LC lighting Controls Lighting Controls

PFC-PF Plumbing Fixtures

PFC-WSP Water Supply Piping

PFC-SP Sewer Piping

PFC-LLL Lights and Lighting Levels

PFC-BG Building Grounding

PFC-EDC Equipment Disconnects

PFC-EP Electrical Panels

PFC-EC Electrical Clearances

PFC-CS Communication/Intercom System

PFC-FA Fire Alarm

PFC-EV Elevator

PFC-W Windows

Project Title: Bridger Teton Supervisor and Jackson Ranger District Office SI Project #:J14-003A 2 of 3

PFC-D Doors

PFC-R Roof

PFC-WSV Wall/Siding/Veneer

Project Title: Bridger Teton Supervisor and Jackson Ranger District Office SI Project #:J14-003A 3 of 3

File details come from the government source that posted it. Updated .