ATT_2_-PFC_Pre-Functional_Test_Log_B-T_Supervisr's_office_Jackson_Ranger_Dist-U....pdf
PDF 586 KB Posted
- Attached to
- Bridger-Teton NF Supervisors/Jackson Ranger District Office Construction Project Federal contract opportunity
- Solicitation number
- AG-02NV-S-15-0024
About this file
ATT 2
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRE-FUNCTIONAL TEST CHECKLIST REPORT LOG
Report ID: Component / System Description Test Date Accepted Remarks / Issues PFC-AS-1-Pump "AS-1" Air Separator
PFC-BSB-1-Thru BSB 17 Branch Selector Box "BSB-1 Thru BSB-17" Branch Selector Box
All Branch selectors need a Pre Function forms for each box
PFC - DX-1 Duct Free Split "DX-1" Duct Free Split
PFC - DX-2 Duct Free Split "DX-2" Duct Free Split
PFC-EWH-1 Electric Wall Heaters
"EWH-1" Electric Wall Heaters Stairs
PFC-EWH-2 Electric Wall Heaters
"EWH-2" Electric Wall Heaters Stairs
PFC-EWH-3 Electric Wall Heaters
"EWH-3" Electric Wall Heaters Stairs
PFC-EWH-4 Electric Wall Heaters
"EWH-4" Electric Wall Heaters Chase
PFC-FC-1 thru FC-24 Fan Coil Unit "FC-1 thru FC-24 " Fan Coil Units
All Fan coil units need an Pre Function form completed. Minimum of (4) Fan coils will be tested for Functional Testing
PFC-HR-1 Water Source Heat recovery Units "HR-1" Water Source Heat recovery Units
PFC-HR-2 Water Source Heat recovery Units "HR-2" Water Source Heat recovery Units
PFC-ERV-1 thru ERV-4 Energy Recovery Units "ERV-1 thru ERV-4" Energy Recovery Units
All ERV's need their own Pre‐Function form completed
PFC-P-1 Geo-Thermal Pumps "P-1" Geo-thermal Pumps
Project Title: Bridger Teton Supervisor and Jackson Ranger District Office SI Project #:J14-003A 1 of 3
RFP AG-02NV-S-15-0024 Amendment 0001 ATTACHMENT 2
PFC-P-2 Geo-Thermal Pumps "P-2" Geo-thermal Pumps
PFC-P-3 Geo-Thermal Pumps "P-3" Geo-thermal Pumps
PFC-P-4 Geo-Thermal Pumps "P-4" Geo-thermal Pumps
PFC - BAS Building Automation System BAS Building Automation System
PFC - LC lighting Controls Lighting Controls
PFC-PF Plumbing Fixtures
PFC-WSP Water Supply Piping
PFC-SP Sewer Piping
PFC-LLL Lights and Lighting Levels
PFC-BG Building Grounding
PFC-EDC Equipment Disconnects
PFC-EP Electrical Panels
PFC-EC Electrical Clearances
PFC-CS Communication/Intercom System
PFC-FA Fire Alarm
PFC-EV Elevator
PFC-W Windows
Project Title: Bridger Teton Supervisor and Jackson Ranger District Office SI Project #:J14-003A 2 of 3
PFC-D Doors
PFC-R Roof
PFC-WSV Wall/Siding/Veneer
Project Title: Bridger Teton Supervisor and Jackson Ranger District Office SI Project #:J14-003A 3 of 3