Sections_CF_WageDet_Rev5July2012.pdf
PDF 222 KB Posted
- Attached to
- AlaganikSloughBoat Ramp Federal contract opportunity
- Solicitation number
- AG-0120-S-12-0011
About this file
Revised Sections C and F and Wage Determination dated 5 July 2012
View the file
Other files for this federal contract opportunity
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDA SHEET
PROJECT NAME: Alaganik Slough
Boat Ramp
REFERENCE NO. OF DOCUMENT BEING CONTINUED
Amendment 004, AG-0120-S-12-0011
REPLACEMENT PAGE, 5 July 2012
PAGE
OF
SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
REPLACEMENT PAGE – 5 JULY 2012
C.1 General Specifications: Summary of Work:
A. In summary, the project generally consists of the following:
1. Ensure site access is restricted to the public both the land-side and the water-side of the project.
2. Establish and maintain best management practices for site erosion and sediment control.
3. Isolate the in-stream portion of the site. Dewatering required.
4. Clear, grub, and grade subgrade for new boat ramp.
5. Provide and place geotextile, rip-rap, and crushed aggregates for new boat ramp.
6. Provide and place pre-cast concrete boat ramp planks, including anchoring system.
7. Construct an accessible boat loading platform, consisting of a cast-in-place concrete cantilever retaining wall, sidewalk, and handrail.
8. Clear, grub, and grade subgrade for new parking lot improvements.*
9. Provide and place geotextile and crushed aggregates for parking lot improvements.*
10. Install traffic control sign(s).*
11. Demolish the existing boat ramp. *
12. Re-plant disturbed areas.*
13. Provide and install timber curbs. *
14. Provide and place boulders in and around parking lot. *
* Note: these items are “optional” bid items.
B. Location: The Alaganik Slough Boat Ramp is located within the Alaganik Slough Day Use Area, 20 miles southeast of Cordova, Alaska, within the Copper River Delta. The Alaganik Slough Day Use
Area is accessed from Cordova via a gravel road intersecting the Copper River Highway at approximately milepost 17. Cordova may be accessed by daily Alaska Airlines jet service from
Anchorage and Juneau. It is also accessible by Alaska Marine Highway ferry service from Valdez and
Whittier on a daily basis.
C.2 AGAR 452.211-72 Statement of Work/Specifications (FEB 1988)
The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.
C.3 AGAR 452.211-73 Attachments to Statement of Work/Specifications (FEB 1988)
The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.
Boat Ramp
REFERENCE NO. OF DOCUMENT BEING CONTINUED
Amendment 004, AG-0120-S-12-0011
REPLACEMENT PAGE, 5 July 2012
PAGE
SECTION F--DELIVERIES OR PERFORMANCE
REPLACEMENT PAGE – 5 JULY 2012
F.1 FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
www.acquisition.gov/far/ www.usda.gov/procurement/policy/agar.html
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.242-14 Suspension of Work (APR 1984)
F.2 FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984)
Alternate I (APR 1984)
The Contractor shall be required to (a) commence work under this contract within (*see below) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 31 August 2013 for the base bid and all option items. The time stated for completion shall include final cleanup of the premises.
The completion date is based on the assumption that the successful offeror will receive the notice to proceed by
September 20, 2012. The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.
*All offerors shall submit a proposed schedule with the technical proposal for the government’s evaluation. The starting date will depend upon an acceptable schedule.
NOTES:
No vegetation clearing activities shall occur between May 01 and June 30 to avoid disturbance to nesting migratory birds and waterfowl. Other out-of-stream construction activities may be conducted during this nesting window and may continue through August 31, 2013 for the base bid items.
If the initial award consists of the base bid and any option items, all work must be completed prior to
August 31, 2013.
If the option items are not awarded prior to 30 September 2012 and FY2013 funds become available, it is the Government’s intention to award the option items, within the limits of the amount of funding available, prior to 1 April 2013.
F.3 AGAR 452.236-75 Maximum Workweek – Construction Schedule (NOV 1996)
Within 10 calendar days after receipt of a written request from the Contracting Officer, the Contractor must submit the following information in writing for approval:
(a) A schedule as required by FAR clause 52.236-15, Schedules for Construction Contracts, and
(b) The hours (including the daily starting and stopping times) and days of the week the Contractor proposed to carry out the work.
http://www.acquisition.gov/far/ http://www.usda.gov/procurement/policy/agar.html
Boat Ramp
REFERENCE NO. OF DOCUMENT BEING CONTINUED
Amendment 004, AG-0120-S-12-0011
REPLACEMENT PAGE, 5 July 2012
PAGE
The maximum workweek that will be approved will depend upon when the work is performed. See F.2 FAR
52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984) Alternate I (APR 1984) .
Boat Ramp
REFERENCE NO. OF DOCUMENT BEING CONTINUED
Amendment 004, AG-0120-S-12-0011
REPLACEMENT PAGE, 5 July 2012
PAGE
General Decision Number: AK120001 06/29/2012 AK1
Superseded General Decision Number: AK20100001
State: Alaska
Construction Types: Building and Heavy
Counties: Alaska Statewide.
BUILDING AND HEAVY CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories)
Modification Number Publication Date
0 01/06/2012
1 01/20/2012
2 02/03/2012
3 02/10/2012
4 02/17/2012
5 04/13/2012
6 04/20/2012
7 05/25/2012
8 06/29/2012
* ASBE0097-001 01/01/2012
Rates Fringes
Asbestos Workers/Insulator
(includes application of all insulating materials protective coverings, coatings and finishings to all types of mechanical systems).........................$ 33.58 17.92
* ASBE0097-002 01/01/2012
HAZARDOUS MATERIAL HANDLER
(includes preparation, wetting, stripping, removal scrapping, vacuuming, bagging, and disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems).........$ 33.58 17.92
BOIL0502-002 07/01/2011
BOILERMAKER......................$ 42.70 24.86
BRAK0001-002 07/01/2011
Bricklayer, Blocklayer, Stonemason, Marble Mason, Tile Setter, Terrazzo Worker.....$ 37.39 17.60
Tile & Terrazzo Finisher.........$ 31.78 17.60
CARP1501-001 09/01/2011
MILLWRIGHT.......................$ 33.89 18.23
Boat Ramp
REFERENCE NO. OF DOCUMENT BEING CONTINUED
Amendment 004, AG-0120-S-12-0011
REPLACEMENT PAGE, 5 July 2012
PAGE
CARP2520-003 07/01/2010
Diver
Stand-by....................$ 39.80 18.73
Tender......................$ 38.80 18.73
Working.....................$ 79.60 18.73
Piledriver
Carpenter...................$ 35.49 18.73
Piledriver; Skiff Operator and Rigger..................$ 34.49 18.73
Sheet Stabber...............$ 35.49 18.73
Welder......................$ 41.05 18.73
DEPTH PAY PREMIUM FOR DIVERS BELOW WATER SURFACE:
50-100 feet $1.00 per foot
101 feet and deeper $2.00 per foot
ENCLOSURE PAY PREMIUM WITH NO VERTICAL ASCENT:
5-50 FEET $1.00 PER FOOT/DAY
51-100 FEET $2.00 PER FOOT/DAY
101 FEET AND ABOVE $3.00 PER FOOT/DAY
SATURATION DIVING:
The standby rate applies until saturation starts. The saturation diving rate applies when divers are under pressure continuously until work task and decompression are complete. the diver rate shall be paid for all saturation hours.
WORK IN COMBINATION OF CLASSIFICATIONS:
Employees working in any combination of classifications within the diving crew
(except dive supervisor) in a shift are paid in the classification with the highest rate for that shift.
CARP4059-001 09/01/2011
CARPENTER
Carpenter...................$ 35.49 20.38
Lather/Drywall Applicator...$ 35.49 20.38
ELEC1547-004 04/01/2012
CABLE SPLICER....................$ 39.77 3%+$21.93
Electrician; Technician..........$ 38.02 3%+$21.93
ELEC1547-005 04/01/2012
Line Construction
CABLE SPLICER....................$ 49.92 3%+$24.08
Linemen (Including Equipment
Operators, Technician)...........$ 48.17 3%+24.08
Powderman........................$ 46.17 3%+$24.08
Boat Ramp
REFERENCE NO. OF DOCUMENT BEING CONTINUED
Amendment 004, AG-0120-S-12-0011
REPLACEMENT PAGE, 5 July 2012
PAGE
TREE TRIMMER.....................$ 33.62 3%+$18.58
ELEV0019-002 01/01/2012
ELEVATOR MECHANIC................$ 49.035 23.535+a+b
FOOTNOTE:
a. Employer contributes 8% of the basic hourly rate for over 5 year's service and
6% of the basic hourly rate for 6 months to 5 years' of service as vacation paid credit.
b. Eight paid holidays: New Year's Day; Memorial Day; Independence Day; Labor Day;
Veteran's Day; Thanksgiving Day; Friday after Thanksgiving and Christmas Day
ENGI0302-002 01/01/2012
Power equipment operators:
GROUP 1.....................$ 37.43 19.00
GROUP 1A....................$ 39.19 19.00
GROUP 2.....................$ 36.66 19.00
GROUP 3.....................$ 35.94 19.00
GROUP 4.....................$ 29.73 19.00
TUNNEL WORK
GROUP 1....................$ 41.17 19.00
GROUP 1A...................$ 43.11 19.00
GROUP 2....................$ 40.33 19.00
GROUP 3....................$ 39.53 19.00
GROUP 4....................$ 32.70 19.00
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Asphalt Roller; Back Filler; Barrier Machine (Zipper); Batch Plant
Operator: Batch and Mixer over 200 yds.; Beltcrete with power pack and similar conveyors; Bending Machine; Boat Coxwains; Bulldozers; Cableways, Highlines and
Cablecars; Cleaning Machine; Coating Machine; Concrete Hydro Blaster; Cranes-45 tons and under or 150 foot boom and under (including jib and attachments):
(a) Shovels, Backhoes, excavators with all attachments, Draglines, Clamshells;
Gradalls-3 yards and under;
(b) Hydralifts or Transporters, all track or truck type,
(c) Derricks; Crushers; Deck Winches-Double Drum; Ditching or Trenching Machine (16 inch or over); Drilling Machines, core, cable, rotary and exploration; Finishing
Machine Operator, concrete paving, Laser Screed, sidewalk, curb and gutter machine;
Helicopters; Hover Craft, Flex Craft, Loadmaster, Air Cushion, All Terrain Vehicle, Rollagon, Bargecable, Nodwell Sno Cat; Hydro Ax: Feller Buncher and similar;
Loaders: Forklifts with power boom and swing attachment, Overhead and front end, 2
1/2 yards through 5 yards, Loaders with forks or pipe clamps, Loaders, elevating belt type, Euclid and similar types; Mechanics, Bodyman; Micro Tunneling Machine;
Mixers: Mobile type w/hoist combination; Motor Patrol Grader; Mucking Machines:
Mole, Tunnel Drill, Horizontal/Directional Drill Operator, and/or Shield; Operator on Dredges; Piledriver Engineers, L. B. Foster, Puller or similar Paving Breaker;
Power Plant, Turbine Operator, 200 k.w. and over (power plants or combination of power units over 300 k.w.); Sauerman-Bagley; Scrapers-through 40 yards; Service
Oiler/Service Engineer; Sidebooms-under 45 tons; Shot Blast Machine; Spreaders, Blaw Knox, Cedarapids, Barber Greene, Slurry Machine; Sub-grader (Gurries, C.M.I.
and C.M.I. Roto Mills and similar types); Tack tractor; Truck mounted Concrete
Pumps, Conveyor, Creter; Water Kote Machine; Unlicensed off road hauler; Welder;
Electrical Mechanic, Camp Maintenance Engineer
Boat Ramp
REFERENCE NO. OF DOCUMENT BEING CONTINUED
Amendment 004, AG-0120-S-12-0011
REPLACEMENT PAGE, 5 July 2012
PAGE
GROUP 1A: Cranes-over 45 tons or 150 foot (including jib and attachments):
(a) Shovels, backhoes,excavators with all attachments, draglines, clamshells-over 3 yards,
(b) Tower cranes;Licensed Water/Waste Water Treatment Operator; Loaders over 5 yds.;Certified Welder, Electrical Mechanic, Camp Maintenance Engineer, Mechanic
(over 10,000 hours); Motor Patrol Grader, Dozer, Grade Tractor (finish: when finishing to final grade and/or to hubs, or for asphalt); Power Plants: 1000 k.w.
and over; Quad; Screed; Sidebooms over 45 tons; Slip Form Paver C.M.I. and similar types; Scrapers over 40 yards; Camera/Tool/Video Operator (Slipline).
GROUP 2: Batch Plant Operators: Batch and Mixer 200 yds. per hour and under;
Boiler-fireman; Cement Hog and Concrete Pump Operator; Conveyors (except as listed in group 1); Hoist on steel erection; Towermobiles and Air Tuggers;
Horizontal/Directional Drill Locator;Licensed Grade Technician; Loaders, Elevating
Grader, Dumor and similar; Locomotives: rod and geared engines; Mixers; Screening, Washing Plant; Sideboom (cradling rock drill regardless of size); Skidder; Trencing
Machine under 16 inches; Waste/ Waste Water Treatment Operator.
GROUP 3: "A" Frame Trucks, Deck Winches: single power drum; Bombardier (tack or tow rig); Boring Machine; Brooms-power; Bump Cutter; Compressor; Farm tractor;
Forklift, industrial type; Gin Truck or Winch Truck with poles when used for hoisting; Grade Checker and Stake Hopper; Hoist, Air Tuggers, Elevators; Loaders:
(a) Elevating-Athey, Barber Green and similar types
(b) Forklifts or Lumber Carrier (on construction job site)
(c) Forklifts with Tower
(d) Overhead and Front-end, under 2 1/2 yds. Locomotives: Dinkey (air, steam, gas and electric) Speeders; Mechanics (light duty); Mixers: Concrete Mixers and Batch
200 yds. per hour and under; Oil, Blower Distribution; Post Hole Diggers, mechanical; Pot Fireman (power agitated); Power Plant, Turbine Operator, under 300 k.w.; Pumps-water; Roller-other than Plantmix; Saws, concrete; Skid Steer with all attachments; Straightening Machine; Tow Tractor
GROUP 4: Rig Oiler/Assistant Engineer (if over 85 tons or 100 ft. boom);Parts and Equipment Coordinator; Swamper (on trenching machines or shovel type equipment); Spotter; Steam Cleaner; Drill Helper.
FOOTNOTE: Groups 1-4 receive 10% premium while performing tunnel or underground work. Rig Oiler/Assistant Engineer shall be required on cranes over
85 tons or over 100 feet of boom.
IRON0751-003 08/01/2011
Ironworkers:
BRIDGE, STRUCTURAL,
ORNAMENTAL, REINFORCING
MACHINERY MOVER, RIGGER,
SHEETER, STAGE RIGGER,
BENDER OPERATOR.............$ 33.40 23.16
FENCE, BARRIER AND
GUARDRAIL INSTALLERS........$ 29.90 23.16
GUARDRAIL LAYOUT MAN........$ 30.64 23.16
HELICOPTER, TOWER...........$ 34.40 23.16
LABO0341-005 07/01/2011
Boat Ramp
REFERENCE NO. OF DOCUMENT BEING CONTINUED
Amendment 004, AG-0120-S-12-0011
REPLACEMENT PAGE, 5 July 2012
PAGE
Laborers: North of the 63rd
Parallel & East of Longitude
138 Degrees
GROUP 1.....................$ 29.00 20.02
GROUP 2.....................$ 30.00 20.02
GROUP 3.....................$ 30.90 20.02
GROUP 3A....................$ 34.18 20.02
GROUP 3B....................$ 35.01 20.02
GROUP 4.....................$ 18.57 20.02
TUNNELS, SHAFTS, AND RAISES
GROUP 1....................$ 31.90 20.02
GROUP 2....................$ 33.00 20.02
GROUP 3....................$ 33.99 20.02
GROUP 3A...................$ 37.60 20.02
GROUP 3B...................$ 38.51 20.02
Laborers: South of the 63rd
Parallel & West of Longitude
138 Degrees
GROUP 1.....................$ 29.00 20.02
GROUP 2.....................$ 30.00 20.02
GROUP 3.....................$ 30.90 20.02
GROUP 3A....................$ 34.18 20.02
GROUP 3B....................$ 35.01 20.02
GROUP 4.....................$ 18.57 20.02
TUNNELS, SHAFTS, AND RAISES
GROUP 1....................$ 31.90 20.02
GROUP 2....................$ 33.00 20.02
GROUP 3....................$ 33.99 20.02
GROUP 3A...................$ 37.60 20.02
GROUP 3B...................$ 38.51 20.02
LABORERS CLASSIFICATIONS
GROUP 1: Asphalt Workers (shovelman, plant crew); Brush Cutters; Camp
Maintenance Laborer; Carpenter Tenders; Choke Setters, Hook Tender, Rigger, Signalman; Concrete Laborer(curb and gutter, chute handler, grouting, curing, screeding); Crusher Plant Laborer; Demolition Laborer; Ditch Diggers; Dump Man;
Environmental Laborer (asbestos (limited to nonmechanical systems), hazardous and toxic waste, oil spill); Fence Installer; Fire Watch Laborer; Flagman; Form
Strippers; General Laborer; Guardrail Laborer, Bridge Rail Installers; Hydro-Seeder
Nozzleman; Laborers (building); Landscape or Planter; Laying of Decorative Block
(retaining walls, flowered decorative block 4 feet and below); Material Handlers;
Pneumatic or Power Tools; Portable or Chemical Toilet Serviceman; Pump Man or Mixer
Man; Railroad Track Laborer; Sandblast, Pot Tender; Saw Tenders; Scaffold Building and Erecting; Slurry Work; Stake Hopper; Steam Point or Water Jet Operator; Steam
Cleaner Operator; Tank Cleaning; Utiliwalk, Utilidor Laborer and Conduit Installer;
Watchman (construction projects); Window Cleaner
GROUP 2: Burning and Cutting Torch; Cement or Lime Dumper or Handler (sack or bulk); Choker Splicer; Chucktender (wagon, airtrack and hydraulic drills); Concrete
Laborers (power buggy, concrete saws, pumpcrete nozzleman, vibratorman); Culvert
Pipe Laborer; Cured in place Pipelayer; Environmental Laborer (marine work, oil spill skimmer operator, small boat operator); Foam Gun or Foam Machine Operator;
Green Cutter (dam work); Gunnite Operator; Hod Carriers; Jackhammer or Pavement
Breakers (more than 45 pounds);Laying of Decorative Block (retaining walls, flowered decorative block above 4 feet); Mason Tender and Mud Mixer (sewer work);
Pilot Car; Plasterer, Bricklayer and Cement Finisher Tenders; Power Saw Operator;
Railroad Switch Layout Laborer; Sandblaster; Sewer Caulkers; Sewer Plant
Maintenance Man; Thermal Plastic Applicator; Timber Faller, chain saw operator, filer; Timberman GROUP 3: Alarm Installer; Bit Grinder; Guardrail Machine
Boat Ramp
REFERENCE NO. OF DOCUMENT BEING CONTINUED
Amendment 004, AG-0120-S-12-0011
REPLACEMENT PAGE, 5 July 2012
PAGE
Operator; High Rigger and tree topper; High Scaler; Multiplate; Slurry Seal
Squeegee Man
GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills;
hydraulic drills); Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers
GROUP 3B: Grade checker (setting or transferring of grade marks, line and grade)
GROUP 4: Final Building Cleanup
TUNNELS, SHAFTS, AND RAISES CLASSIFICATIONS
GROUP 1: Brakeman; Muckers; Nippers; Topman and Bull Gang; Tunnel Track Laborer
GROUP 2: Burning and Cutting Torch; Concrete Laborers; Jackhammers; Nozzleman, Pumpcrete or Shotcrete.
GROUP 3: Miner; Retimberman
GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills;
hydraulic drills); Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers.
GROUP 3B: Grade checker (setting or transferring of grade marks, line and grade)
Tunnel shaft and raise rates only apply to workers regularly employed inside a tunnel portal or shaft collar.
PAIN1959-001 07/01/2011
NORTH OF THE 63RD PARALLEL
PAINTER
BRUSH/ROLLER PAINT OR WALL
COVERER.....................$ 29.17 18.47
TAPING, TEXTURING,
STRUCTURAL PAINTING,
SANDBLASTING, POT TENDER,
FINISH METAL, SPRAY,
BUFFER OPERATOR, RADON
MITIGATION, LEAD BASED
PAINT ABATEMENT, HAZARDOUS
MATERIAL HANDLER............$ 29.67 18.47
PAIN1959-002 07/01/2011
SOUTH OF THE 63RD PARALLEL
Painters:
Brush, Roller, Sign, Paper and Vinyl, Swing Stage, Hand Taper/Drywall, Structural Steel, and
Boat Ramp
REFERENCE NO. OF DOCUMENT BEING CONTINUED
Amendment 004, AG-0120-S-12-0011
REPLACEMENT PAGE, 5 July 2012
PAGE
Commercial Spray............$ 26.98 18.22
Machine Taper/Drywall.......$ 28.18 18.22
Spray-Sand/Blast, Epoxy and Tar Applicator..........$ 29.48 16.22
PAIN1959-003 07/01/2011
NORTH OF THE 63RD PARALLEL
GLAZIER..........................$ 34.09 17.28
PAIN1959-004 07/01/2011
FLOOR LAYER: Carpet.............$ 30.52 12.39
PAIN1959-006 07/01/2011
SOUTH OF THE 63RD PARALLEL
GLAZIER..........................$ 34.09 17.23
PLAS0867-001 02/01/2012
PLASTERER
North of the 63rd parallel..$ 33.93 19.07
South of the 63rd parallel..$ 33.68 19.07
PLAS0867-004 02/01/2012
CEMENT MASON/CONCRETE FINISHER
North of the 63rd parallel..$ 33.68 19.07
South of the 63rd parallel..$ 33.43 19.07
PLUM0262-002 01/01/2012
East of the 141st Meridian
Plumber; Steamfitter.............$ 36.02 23.82
PLUM0367-002 07/01/2011
South of the 63rd Parallel
Plumber; Steamfitter.............$ 36.98 18.72
PLUM0375-002 07/01/2011
Boat Ramp
REFERENCE NO. OF DOCUMENT BEING CONTINUED
Amendment 004, AG-0120-S-12-0011
REPLACEMENT PAGE, 5 July 2012
PAGE
North of the 63rd Parallel
Plumber; Steamfitter.............$ 39.71 18.45
PLUM0669-002 04/01/2012
SPRINKLER FITTER.................$ 41.23 21.52
ROOF0190-002 06/01/2011
ROOFER
NORTH OF THE 63RD PARALLEL..$ 28.50 2.44 + a
SOUTH OF THE 63RD PARALLEL..$ 28.50 2.44 + a
FOOTNOTE:
a. Employers are to supply employees with comprehensive medical insurance.
Employer is responsible to cover, at minimum one-half (1/2) of the individual premium. The individual will be responsible for the remaining premium.
SHEE0023-003 06/01/2010
South of the 63rd Parallel
Sheet Metal Worker...............$ 38.84 18.35
SHEE0023-004 07/02/2010
North of the 63rd Parallel
Sheet Metal Worker...............$ 42.98 18.56
TEAM0959-003 09/01/2011
TRUCK DRIVER
GROUP 1.....................$ 37.77 16.43
GROUP 1A....................$ 39.04 16.43
GROUP 2.....................$ 36.51 16.43
GROUP 3.....................$ 35.69 16.43
GROUP 4.....................$ 35.11 16.43
GROUP 5.....................$ 34.35 16.43
GROUP 1: Semi with Double Box Mixer; Dump Trucks (including rockbuggy and trucks with pups) over 40 yards up to and including 60 yards; Deltas, Commanders, Rollogans and similar equipment when pulling sleds, trailers or similar equipment;
Boat Coxswain; Lowboys including attached trailers and jeeps, up to and including
12 axles; Ready-mix over 12 yards up to and including 15 yards); Water Wagon (250
Bbls and above); Tireman, Heavy Duty/Fueler GROUP 1A: Dump Trucks (including
Boat Ramp
REFERENCE NO. OF DOCUMENT BEING CONTINUED
Amendment 004, AG-0120-S-12-0011
REPLACEMENT PAGE, 5 July 2012
PAGE
Rockbuggy and Trucks with pups) over 60 yards up to and including 100 yards; Jeeps
(driver under load)
GROUP 2: Turn-O-Wagon or DW-10 not self-loading; All Deltas, Commanders, Rollogans, and similar equipment; Mechanics; Dump Trucks (including Rockbuggy and
Trucks with pups) over 20 yards up to and including 40 yards; Lowboys including attached trailers and jeeps up to and including 8 axles; Super vac truck/cacasco truck/heat stress truck; Ready-mix over 7 yards up to and including 12 yards;
GROUP 3: Dump Trucks (including Rockbuggy and Trucks with pups) over 10 yards up to and including 20 yards; batch trucks 8 yards and up; Oil distributor drivers;
Partsman; Oil Distributor Drivers; Trucks/Jeeps (push or pull); Traffic Control
Technician
GROUP 4: Buggymobile; Semi or Truck and trailer; Dumpster; Tireman (light duty);
Dump Trucks (including Rockbuggy and Truck with pups) up to and including 10 yards;
Track Truck Equipment; Stringing Truck; Grease Truck; Flat Beds, dual rear axle;
Hyster Operators (handling bulk aggregate); Lumber Carrier; Water Wagon, semi;
Water Truck, dual axle; Gin Pole Truck, Winch Truck, Wrecker, Truck Mounted "A"
Frame manufactured rating over 5 tons; Bull Lifts and Fork Lifts with Power Boom and Swing attachments, over 5 tons; Front End Loader with Forks; Bus Operator over
30 passengers; All Terrain Vehicles; Boom Truck/Knuckle Truck over 5 tons; Foam
Distributor Truck/dual axle; Hydro-seeders, dual axle; Vacuum Trucks, Truck Vacuum
Sweepers; Loadmaster (air and water); Air Cushion or similar type vehicle; Fire
Truck/Ambulance Driver; Combination Truck-fuel and grease; Compactor (when pulled by rubber tired equipment); Rigger (air/water/oilfield); Ready Mix, up to and including 7 yards;
GROUP 5: Gravel Spreader Box Operator on Truck; Flat Beds, single rear axle; Boom
Truck/Knuckle Truck up to and including 5 tons; Pickups (Pilot Cars and all light duty vehicles); Water Wagon (Below 250 Bbls); Gin Pole Truck, Winch Truck, Wrecker, Truck Mounted "A" Frame, manufactured rating 5 tons and under; Bull Lifts and Fork
Lifts (fork lifts with power broom and swing attachments up to and including 5 tons); Buffer Truck; Tack Truck; Farm type Rubber Tired Tractor (when material handling or pulling wagons on a construction project); Foam Distributor, single axle; Hydro-Seeders, single axle; Team Drivers (horses, mules and similar equipment); Fuel Handler (station/bulk attendant); Batch Truck, up to and including
7 yards; Gear/Supply Truck; Bus Operator, Up to 30 Passengers; Rigger/Swamper
WELDERS - Receive rate prescribed for craft performing peration to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union.
Union Identifiers
Boat Ramp
REFERENCE NO. OF DOCUMENT BEING CONTINUED
Amendment 004, AG-0120-S-12-0011
REPLACEMENT PAGE, 5 July 2012
PAGE
An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification.
Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers
Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example.
Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rate.
Non-Union Identifiers
Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example:
SULA2004-007 5/13/2010. SU indicates the rates are not union rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a
General Wage Determination on that date.
Survey wage rates will remain in effect and will not change until a new survey is conducted.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations.
Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and
Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Boat Ramp
REFERENCE NO. OF DOCUMENT BEING CONTINUED
Amendment 004, AG-0120-S-12-0011
REPLACEMENT PAGE, 5 July 2012
PAGE
Wage and Hour Administrator
U.S. Department of Labor
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals
Board). Write to:
Administrative Review Board
U.S. Department of Labor
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
File details come from the government source that posted it. Updated .