AG-0120-S-12-0011 Alaganik Slough Boat Ramp Project Drawings
View the file
Other files for this federal contract opportunity
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SURVEY REFERENCE MONUMENT (RM) CONTROL TABLE
POINT NORTHING EASTING ELEVATION DESCRIPTION BEARING & DISTANCE ROM
BASIS OF COORDS. (RM 5)
RM 1 49962.33 49962.18 57.42
2" ALCAP REFERENCE
MONUMENT ON 5
8" REBAR S45° 06' 36"W, 53.38'
RM 2 50125.89 50020.48 58.44
2" ALCAP REFERENCE
MONUMENT ON 5
8" REBAR N9°14' 32"E, 127.54'
RM 4 50171.62 50152.92 56.77
2" ALCAP REFERENCE
MONUMENT ON 5
8" REBAR
N41° 42' 09"E, 229.86'
RM 5 50000.00 50000.00 59.19 DRILLED HOLE IN BOULDER NA, BASIS OF COORDS.
TETRA TECH EC, INC.
19803 North Creek Parkway Bothell, WA 98011
CHUGACH NATIONAL FOREST
CORDOVA RANGER DISTRICT
ALAGANIK SLOUGH
BOAT RAMP REPLACEMENT
EXISTING CONDITIONS PLAN
BIS
BIS/AJL
RMC05/28/2010
05/28/2010
05/28/2010
1 inch = 50 feet
GRAPHIC SCALE
NOTES:
1. THE BASIS OF BEARING FOR THIS
PROJECT IS S64°50'39" E, DIST.
10881.95, BASED ON GPS
OBSERVATIONS BETWEEN MONUMENT
POINTS 12 AND 11:
MONUMENT#11: FOUND 3-1/2" ALCAP
ON ALUMINUM ROD NEXT TO SIGN
"ALAGANIK BOAT LAUNCH SITE"
SOUTHWESTERLY OF THE INTERSECTION
OF "COPPER RIVER HIGHWAY" AND
"ALAGANIK ROAD". N 63112.965, E
41246.844, ELEVATION 101.58.
MONUMENT#12: FOUND ALCAP ON 5/8"
REBAR ON THE NORTH SIDE OF "COPPER
RIVER HIGHWAY" 100' ± SOUTH OF THE
BRIDGE OVER GLACIER RIVER. N
67738.6825, E 31396.9926, ELEVATION 96.76.
2. ELEVATIONS ARE BASED ON THE
ELLIPSOIDAL HEIGHT 28.420 (METERS,
NAD83) AT FEDERAL BASE NETWORK
CONTROL STATION FOUND AT THE MERLE
K SMITH AIRPORT (CDV) AND STAMPED
“CORD”, PID UW 8134. LOCATED AT
60°29'37.36545" (N);
145°28'31.52355" (W).
3. SURVEY DATA COLLECTED SEPTEMBER
22, 2009 to SEPTEMBER 25, 2009 BY
LARSEN CONSULTING GROUP.
4. PREDICTED 50-YR HIGH FLOW
ELEVATION IS 56.4 FT. PREDICTED 6-MO.
LOW-TIDE ELEVATION IS 47.5 FT. THESE
PREDICTIONS ARE PROVIDED FOR
INFORMATION ONLY. CONTRACTOR
SHALL VERIFY EXPECTED RANGE OF
WATER ELEVATIONS DURING PERIOD OF
CONSTRUCTION.
LEGEND:
EDGE GRAVEL SURFACE
EXISTING BOAT RAMP
(TO BE REMOVED)
VISITOR KIOSK
PIT TOILET
TRUCK & TRAILER PARKING
PICNIC AREA
CULVERTBOARDWALK TO
VIEWING PLATFORM
ALAGANIK
SLOUGH
WASTE
RECEPTACLE
APPROXIMATE TOP
OF BANK AND 50-YR
HIGH WATER ELEV.
(SEE NOTE 4.)
APPROXIMATE
BOTTOM OF BANK
TURNAROUND
AREA
TP 1 SOIL TEST PIT
LOCATIONS
PROPOSED LOCATION
OF REPLACEMENT
BOAT RAMP (SEE SHEET 3)
WOODEN
BOLLARDS
BASIS OF COORDINATES
(DRILLED HOLE IN BOULDER)
BASIS OF
COORDINATES
RM 1
RM 5
REFERENCE
MONUMENT
FACILITY ENTRANCE
(3.2 MILES TO
COPPER RIVER HIGHWAY)
(direction of flow)
APPROXIMATE
6-MO. LOW WATER
ELEVATION
(SEE NOTE 4.)
at left
P
A l a g a n i k
B o a t
R a m p
C A D P R C N T F I N A L E x i s t C o n d d w g
A M
1 inch = 50 feet
GRAPHIC SCALE
NOTES:
1. STRIP EXISTING VEGETATION
AND SOIL TO 6-INCHES BELOW
GROUND SURFACE IN PARKING
AREA, AND TO 8-INCH DEPTH IN
BOAT RAMP APPROACH (STA.
0+37.18 TO 0+51.18) PER
PROFILE. PLACE GEOTEXTILE
SEPARATION LAYER AND TYPE D-1
CRUSHED AGGREGATE. SHAPE
AND COMPACT NEW MATERIAL TO
MATCH EXISTING PARKING GRADE
AND PROVIDE FOR POSITIVE
DRAINAGE.
2. BOARDWALK TO BE REMOVED
AND REPLACED UNDER SEPARATE
CONTRACT. CONTRACTOR TO
COORDINATE WITH ADJACENT
WORK ACTIVITIES.
3. REMOVE, PROTECT, AND
RE-INSTALL EXISTING SIGNS AS
REQUIRED.
4. BASE BID INCLUDES NEW RAMP
CONSTRUCTION ONLY. ADDITIVE
ITEMS INCLUDE PARKING LOT
WIDENING, BOULDERS, PLANTING,
AND ACCESSIBLE LOADING
PLATFORM. SEE BID FORM.
EDGE GRAVEL SURFACE
EXISTING VISITOR KIOSK EXISTING PIT TOILET
PICNIC AREA
TO REMAIN
BOARDWALK TO
VIEWING PLATFORM
(SEE NOTE 2)
APPROXIMATE
TOP OF BANK
APPROXIMATE
BOTTOM OF BANK
SEE NOTE 1
DISTURBED AREAS BETWEEN TOP OF
BANK AND GRAVEL LOT TO BE
REPLANTED WITH NATIVE PLANT
SPECIES (SEE DETAILS, SHEET 13)
ALAGANIK SLOUGH
0+37.18
BEGIN CONSTRUCTION
NORTHING: 50000.24
EASTING: 50076.15
LIMITS OF GRADING
AND RIPRAP
3:1 3:1
ALL EXISTING CONCRETE BOAT
RAMP PLANKS TO BE REMOVED
UPON COMPLETION OF NEW RAMP
A
SECTION ID.
SHEET NO.
TETRA TECH EC, INC.
19803 North Creek Parkway Bothell, WA 98011
CHUGACH NATIONAL FOREST
CORDOVA RANGER DISTRICT
ALAGANIK SLOUGH
BOAT RAMP REPLACEMENT
PROPOSED SITE PLAN
SFL
MJS
SO/REV09/07/2011
09/07/2011
09/07/2011
ACCESSIBLE
LOADING
PLATFORM
(SEE SHEET 6)
2+02.26
END CONSTRUCTION
NORTHING: 49837.84
EASTING: 50047.14
(direction of flow)
LEGEND:
POTENTIAL PICNIC SITE
(NOT IN CONTRACT)
PLACE 3'x3'x3' FLAT-BOTTOMED BOULDERS, SPACED 10' O.C. TYP., 69 TOTAL. SEE DETAIL, SHEET 9. CONTRACTING OFFICER TO APPROVE
FIELD LAYOUT PRIOR TO PLACEMENT.
PROVIDE AND INSTALL STANDARD "KEEP
RIGHT" SIGN NO. R4-7 (18"X24") & POST
BEHIND BOULDER IN ACCORDANCE WITH
2009 MANUAL ON UNIFORM TRAFFIC
CONTROL DEVICES (MUTCD).
at left
DRAINAGE ARROW
CULVERT
TO REMAIN
PROPOSED BOAT RAMP
CENTERLINE
POTENTIAL KIOSK
(NOT IN CONTRACT)
PARKING LOT HORIZONTAL CONTROL TABLE
POINT POINT DESCRIPTION NORTHING EASTING
1 MATCH 49965.31 49957.17
2 1/4 Δ 49996.55 49966.81
3 1/2 Δ 50027.10 49978.41
4 3/4 Δ 50056.86 49991.93
5 MATCH 50085.71 50007.31
6 MATCH 49983.69 50089.88
7 1/4 Δ 50018.46 50108.15
8 1/2 Δ 50059.49 50116.78
9 3/4 Δ 50101.28 50113.51
10 MATCH 50135.23 50101.37
11 TRAFFIC DIVIDER BOULDER 50129.43 50070.60
12 TRAFFIC DIVIDER BOULDER 50105.31 50052.26
13 TRAFFIC DIVIDER BOULDER 50099.11 50075.47
TYPE D-1 CRUSHED AGREGATE
PRE-CAST CONCRETE BOAT RAMP PLANKS
CONCRETE SIDEWALK
REPLANTING AREA
RIP RAP
STA0+
STA
1+
1 inch = 20 feet
NOTES:
1. SUBGRADE SHALL BE
STRIPPED OF VEGETATION
AND ORGANICS AND
EXCAVATED TO THE
DESIGN SUBGRADE.
EXPOSED SUBGRADE
SHALL BE STABILIZED WITH
GEOTEXTILE, THEN
BACKFILLED WITH ROCK
BORROW MATERIAL TO
CREATE COMPETENT
SURFACE TO ACCEPT BASE
COURSE MATERIAL.
OBTAIN CONTRACTING
OFFICER'S ACCEPTANCE
OF SUBGRADE PRIOR TO
PLACING GEOTEXTILE AND
BACKFILL MATERIAL.
SURVEY SUBGRADE AND
BACKFILL MATERIALS PER
THE SPECIFICATIONS.
ANCHOR GEOTEXTILE PER
MANUFACTURER'S
RECOMMENDATIONS.
2. LOWEST THREE PLANKS
TO BE INSTALLED AT 1
(VERT) : 3 (HORIZ) SLOPE
AND BURIED WITH RIPRAP
AS SHOWN.
LEGEND:
2X VERTICAL EXAGGERATION (1"=10')
TETRA TECH EC, INC.
19803 North Creek Parkway Bothell, WA 98011
CHUGACH NATIONAL FOREST
CORDOVA RANGER DISTRICT
ALAGANIK SLOUGH
BOAT RAMP REPLACEMENT
PROPOSED BOAT RAMP PROFILE
SFL
MJS
SO/REV09/07/2011
09/07/2011
09/07/2011
-13.00 %
0%
LIMITS OF
GEOTEXTILE
PLACEMENT
(ALSO SEE
SHEET 5)
at left
1 inch = 10 feet
NOTES:
1. EXPOSED SUBGRADE SHALL BE
STABILIZED WITH GEOTEXTILE AND
BACKFILLED WITH 2' MIN. LAYER ROCK
BORROW MATERIAL, COMPACTED WITH
HEAVY CONSTRUCTION EQUIPMENT TO
CREATE COMPETENT STABLE SURFACE
IF DELETERIOUS MATERIALS (EG. PEAT
OR HIGHLY ORGANIC SILT OR CLAY) ARE
EXPOSED IN SUBGRADE, THEY SHALL BE
OVER-EXCAVATED AND REPLACED WITH
COMPACTED ROCK BORROW. ANCHOR
GEOTEXTILE AT TOP OF SLOPE PER
MANUFACTURER'S RECOMMENDATIONS.
2. SLOPE AREAS SHALL BE STRIPPED OF
LOOSE MATERIALS, VEGETATION AND
ORGANICS. SUBGRADE SHALL BE
STABILIZED WITH GEOTEXTILE PRIOR TO
PLACEMENT OF RIPRAP SLOPE
PROTECTION.
3. 2' LAYER BASE COURSE,
ENCAPSULATED WITH GEOTEXTILE. AT
CONTRACTING OFFICER'S DISCRETION,
THE TOP 3" OF BASE COURSE MAY BE
SUBSTITUTED WITH TYPE D-1 CRUSHED
AGGREGATE.
LEGEND:
2X VERTICAL EXAGGERATION (1"=5')
CL
CL
NOTE: FOR DETAILS NOT
SHOWN, SEE TYPICAL
SECTION A.
1.5
TETRA TECH EC, INC.
19803 North Creek Parkway Bothell, WA 98011
CHUGACH NATIONAL FOREST
CORDOVA RANGER DISTRICT
ALAGANIK SLOUGH
BOAT RAMP REPLACEMENT
TYPICAL RAMP SECTIONS
SFL
MJS
SO/REV09/07/2011
09/07/2011
09/07/2011
1 inch = 10 feet at left
TETRA TECH EC, INC.
19803 North Creek Parkway Bothell, WA 98011
CHUGACH NATIONAL FOREST
CORDOVA RANGER DISTRICT
ALAGANIK SLOUGH
BOAT RAMP REPLACEMENT
LOADING PLATFORM PLAN
SFL
MJS
SO/REV09/07/2011
09/07/2011
09/07/2011
TYPE D-1 CRUSHED AGREGATE
PRE-CAST CONCRETE BOAT RAMP PLANKS
CONCRETE SIDEWALK
LEGEND:
17'-2"
5' -6
8'-10"
9' -8
1' -4
26'-0"
5' -0
3" Ø DRAIN HOLE
AT BASE (SEE NOTE 1)
1' -0
W
A
LL
TH
IC
KN
ES
S (T
YP
HANDRAIL
SEE SHEETS 5 AND 6
FOR DETAILS
5'-0"1'-0"
1'-4"
5' -2
1' -2
1'-0"
#4 @18
EW
4'-2"
2"
CLEAR
COVER (TYP)
#5@24
(TYP)
#4 @36
R=9" #5@24
#5@24
3" C
LE
A R
C O
V
ER
(T
YP
1'-10" 11"
(TYP)
#4 (QTY 7)
RAMP
PLANK
V A
R
IE
S
5'-0"
5' -2
1'
-2
1'-0" #4 @18
EW
9'-8"
2"
CLEAR
COVER (TYP)
#5@24
(TYP)
#4 @36
R=9"
#5@24
#5@24
3" C
LE
A R
C O
V
ER
(T
YP
1'-4"
(TYP)
8"
(TYP)
#4@24
2' LAYER
ROCK BORROW
(TYP)
V A
R
IE
S
RAMP
PLANK
2' LAYER
ROCK BORROW
(TYP)
6" TYPE D-1
CRUSHED AGGREGATE
(TYP)
NOTES:
1. INSTALL (2) 3"Ø PVC
SCHEDULE 80 PIPE,
EXTEND THE PIPE UNDER
RAMP AT 1% SLOPE TO
DAYLIGHT IN RIPRAP.
COVER THE DRAIN HOLE
WITH GEOTEXTILE. EXTEND
GEOTEXTILE MINIMUM 1FT
AROUND OPENING.
4' -2
"1' -1
0" 1'
-4
FOREST SERVICE
R-10
ALASKA REGION
U.S. DEPARTMENT OF AGRICULTURE
TETRA TECH EC, INC.
19803 North Creek Parkway Bothell, WA 98011
CHUGACH NATIONAL FOREST
CORDOVA RANGER DISTRICT
ALAGANIK SLOUGH
BOAT RAMP REPLACEMENT
RETAINING WALL DETAILS (1)
SFL
MJS
SO/REV09/07/2011
09/07/2011
09/07/2011
13at left
HANDRAIL NOT SHOWN FOR CLARITY
CANTILEVER
RETAINING WALL
DETAILS
TETRA TECH EC, INC.
19803 North Creek Parkway Bothell, WA 98011
CHUGACH NATIONAL FOREST
CORDOVA RANGER DISTRICT
ALAGANIK SLOUGH
BOAT RAMP REPLACEMENT
RETAINING WALL DETAILS (2)
BIS
AJL
RMC05/28/2010
05/28/2010
05/28/2010
GRAPHIC SCALE: NOT TO SCALE
NOTE:
ALASKA DEPARTMENT OF
TRANSPORTATION AND
PUBLIC FACILITIES DETAIL
PROVIDED FOR
REFERENCE ONLY.
CONFIRM LATEST VERSION
IS USED FOR
CONSTRUCTION.
at left
P
A l a g a n i k
B o a t
R a m p
C A D P R C N T F I N A L D e t a i l s R e t a i n i n g W a l l d w g
4" WIDE, SMOOTH
TROWELED PERIMETER
3/8" TO
1/2" R.
3/8" TO
1/2" R.
EXPANSION JOINT IN
SIDEWALK (E)
CONTRACTION JOINT
IN SIDEWALK (C)
PREMOLDED
JOINT FILLER
M
IN
" M
IN
3'X3'X3' FLAT-BOTTOMED
BOULDER, TYP.
TYPE D-1 CRUSHED
AGGREGATE
ROAD OR PARKING
LOT SURFACING
FINISH
GRADE
10' ON CENTER
TYP.
TETRA TECH EC, INC.
19803 North Creek Parkway Bothell, WA 98011
CHUGACH NATIONAL FOREST
CORDOVA RANGER DISTRICT
ALAGANIK SLOUGH
BOAT RAMP REPLACEMENT
SIDEWALK AND BOULDER DETAILS
BIS
AJL
RMC05/28/2010
05/28/2010
05/28/2010
GRAPHIC SCALE: NOT TO SCALE
at left
CONCRETE SIDEWALK DETAILS
BOULDER DETAILS
SECTION VIEW
P
A l a g a n i k
B o a t
R a m p
C A D P R C N T F I N A L D e t a i l s S i d e w a l k a n d
B o u l d e r s d w g
CORNER
POST
END
POST
FINISH
GRADE
FRONT VIEW
RAIL
RAIL
DIMENSION AS SHOWN
ON PLAN (TYP.)
THREE RAIL
HANDRAIL
WELD (SEE GENERAL
NOTE 2)
BOLT DOWN CONNECTION
(SEE SIDE VIEW)
FINISH GRADE
(SIDEWALK)
BOLT DOWN
CONNECTION. MOUNT
SYMMETRICALLY ON TOP
OF WALL.
(SEE SHEET 11)
SIDE VIEW
(ON STRUCTURE)
NOTES:
2% MAX. 4"
CANTILEVER
RETAINING
WALL
1. HANDRAIL DETAILS ARE BASED ON UNITED STATES ACCESS BOARD (AND
FOREST SERVICE OUTDOOR RECREATION ACCESSIBILITY GUIDELINES)
STANDARDS.
2. SEE SHEET 11 FOR WELD DETAILS.
3. SEE SHEET 11 FOR ANCHOR PLATE FOR BOLT DOWN CONNECTION DETAILS.
4. HOT-DIP GALVANIZE ALL PARTS AFTER FABRICATION.
5. SEE SHEET 11 FOR APPROVED POST AND RAIL MATERIALS.
RAIL 6" RADIUS
TETRA TECH EC, INC.
19803 North Creek Parkway Bothell, WA 98011
CHUGACH NATIONAL FOREST
CORDOVA RANGER DISTRICT
ALAGANIK SLOUGH
BOAT RAMP REPLACEMENT
HANDRAIL DETAILS (1)
BIS
AJL
RMC05/28/2010
05/28/2010
05/28/2010
GRAPHIC SCALE: NOT TO SCALE
at left
P
A l a g a n i k
B o a t
R a m p
C A D P R C N T F I N A L D e t a i l s H a n d R a i l d w g
ANCHOR PLATE FOR BOLT DOWN CONNECTION
TETRA TECH EC, INC.
19803 North Creek Parkway Bothell, WA 98011
CHUGACH NATIONAL FOREST
CORDOVA RANGER DISTRICT
ALAGANIK SLOUGH
BOAT RAMP REPLACEMENT
HANDRAIL DETAILS (2)
SFL
MJS
SO/REV09/07/2011
09/07/2011
09/07/2011
GRAPHIC SCALE: NOT TO SCALE
at left
ALL HANDRAIL (POSTS, RAILS) SHALL BE 1 1/2"Ø PIPE SCHEDULE 40
8"
CL
TETRA TECH EC, INC.
19803 North Creek Parkway Bothell, WA 98011
CHUGACH NATIONAL FOREST
CORDOVA RANGER DISTRICT
ALAGANIK SLOUGH
BOAT RAMP REPLACEMENT
CONCRETE BOAT RAMP PLANK DETAILS
SFL
MJS
SO/REV09/07/2011
09/07/2011
09/07/2011
GRAPHIC SCALE: NOT TO SCALE
4" CHAMFER (TYP)
STIRRUPS AND REBAR SPACED PER
MANUFACTURER'S
RECOMMENDATIONS FOR PLANK
DIMENSIONS (TYP)
8"X8" ALASKA YELLOW CEDAR
CURB, 3" GAP BETWEEN TIMBER
AND TOP OF PLANK (TYP)
SUBGRADE PREPARED IN
ACCORDANCE WITH SHEETS 4&5
AND THE CONTRACT SPECIFICATIONS
SIDE-VIEW
STAINLESS STUD END
FITTING (FOR CABLE
TERMINATION)
4"x4"x1/4" STAINLESS
STEEL PLATE WITH
1"-DIAMETER HOLE
DRILLED IN CENTER
1" THICK X 6" X 6" SQUARE
SKIRTBOARD RUBBER SPACER
WITH 3/4" DIAMETER HOLE
DRILLED IN CENTER FOR WIRE
ROPE
5/8" DIAMETER 6 X 19
TYPE 304 STAINLESS
STEEL WIRE ROPE
1 1/2" DIAMETER PVC
PIPE SLEEVE FOR
ROUTING WIRE ROPE
16'
8"X8" ALASKA
YELLOW CEDAR
CURB (TYP)
4' (TYP)
1 1/2" PVC PIPE
SLEEVE FOR
ROUTING WIRE
ROPE
1'-11" (TYP)
11-1/2" (TYP)
60°
PLAN-VIEW
3" X 6" x 8" ALASKA YELLOW
CEDAR SPACER
90°
1" (TYP)
TYPICAL
V-GROOVE
DETAIL
V-GROOVE
5/8" HOT-DIP GALVANIZED BOLTS, COUNTERSUNK
IN WOOD AND CONCRETE PLANKS.
THE 58" Ø ANCHORS MAY BE PRECAST INTO THE
PLANKS OR POST-INSTALLED CONCRETE ANCHORS
MAY BE USED (ALL THREAD)
at left
GEOTEXTILE (SEE SHEETS 4 & 5)
LAP SPLICE (TYP) BETWEEN
ADJACENT TIMBERS AS
NEEDED.
8" TYP
4" (TYP)
FOR LIMITS OF CURBING, SEE
TYPICAL SECTION A, SHEET 5.
PRE-CAST
CONCRETE
PLANK
SHRUB, TREE, AND GROUND COVER PLANTING DETAIL
BACKFILL WITH TOPSOIL
SEE NOTE
SPREAD ROOTS OUT
EMERGENT PLANTING DETAIL
PLANTING HOLE 3 TIMES
THE ROOT SPREAD
BREAK UP ROOTBALL OF CONTAINER PLANTS,
INCLUDING PLUGS PRUNE CIRCLING ROOTS
3 TIMES
THE ROOT SPREAD
ROOT
DEPTH
UPPERMOST ROOT SHALL BE NO MORE THAN
1" BELOW SOIL SURFACE
MOUND SOIL TO FORM WATERING WELL AT
DRIPLINE OF EACH PLANT
NON-SYNTHETIC FIBER JUTE MAT (OR CLEAN WOOD
MULCH) AS APPROVED BY THE OWNER TO PROVIDE
TEMPORARY EROSION AND SEDIMENT CONTROL
DURING PLANT ESTABLISHMENT. MULCH MATERIALS, IF
USED, SHALL BE FEATHERED TO BASE OF PLANT.
INSTALL PLANT
VERTICALLY
EXISTING SOIL
EXISTING SOIL
UPPERMOST ROOT SHALL BE NO MORE
THAN 1" BELOW SOIL SURFACE
BREAK UP ROOTBALL OF CONTAINER
PLANTS, PRUNE CIRCLING ROOTS
TETRA TECH EC, INC.
19803 North Creek Parkway Bothell, WA 98011
CHUGACH NATIONAL FOREST
CORDOVA RANGER DISTRICT
ALAGANIK SLOUGH
BOAT RAMP REPLACEMENT
PLANTING DETAILS
BIS/WDB
BIS/JBC
RMC05/28/2010
05/28/2010
05/28/2010
13at left
PLANT MATERIAL SCHEDULE
COMMON
NAME SCIENTIFIC NAME PERCENT
COMPOSITION
DENSITY PER AREA
REVEGETATED *
TOTAL PLANTS
NEEDED
SITKA SPRUCE PICEA SITCHENSIS 8 1 1
SITKA ALDER
ALNUS CRISPA
SSP. SINUATA 17 2 2
WILLOWS
SALIXSPP. (AS
AVAILABLE) 50 6 5
SWEETGALE MYRICA GALE 25 3 2
TREE/SHRUB TOTAL 100 12 12
* APPROXIMATELY 500 SQUARE FEET
SEED MIX AND APPLICATION RATES
COMMON
NAME
SCIENTIFIC NAME PERCENT
COMPOSITION
POUNDS PER AREA
REVEGETATED *
TOTAL POUNDS
NEEDED
BLUEJOINT
REEDGRASS
CALAMAGROSTIS
CANADENSIS 67 0.2 0.2
SITKA SEDGE CAREX SITCHENSIS 33 0.1 0.1
TOTAL 100 0.3 0.3
* APPROXIMATELY 500 SQUARE FEET
NOTES:
1. TREES AND SHRUBS SHALL BE PLANTED AT APPROXIMATELY 8 FEET ON CENTER.
2. SEED MIXTURES SHALL BE APPLIED TO BARE SOIL AT A RATE OF 30 POUNDS
PER ACRE.
3. SEED MIXTURES SHALL BE CERTIFIED “WEED-FREE.”
4. THE USE OF MULCH, FERTILIZER, ORGANIC SOIL TACKIFIERS, OR THE METHODS
THAT WOULD BE USED TO APPLY SEED MIXTURES SHALL BE APPROVED BY THE
FOREST SERVICE PRIOR TO USE.
P
A l a g a n i k
B o a t
R a m p
C A D P R C N T F I N A L D e t a i l s P l a n t i n g s d w g
| Signed.01_Title and Index |
| 02_ORIGINAL_EXISTCOND Extract |
| 03_SitePlan-R1-Proposed Site Plan |
| 04_Profile-R1-Profile |
| 05_Section-R1-Section |
| 06_Load Platform Plan-R1-Section |
| 07_details-R1-Layout1 |
| 08_ORIGINAL_DETAILS_RETAININGWALL(2) Extract |
| 09_ORIGINAL_DETAILS_SIDEWALK AND BOULDERS Extract |
| 10_ORIGINAL_DETAILS_HANDRAIL(1) Extract |
| 11_Details_HandRail-R1-Layout1 |
| 12_Details_Planks-R1-Layout1 |
| 13_ORIGINAL_DETAILS_PLANTINGS Extract |
File details come from the government source that posted it. Updated .