Addendum_9_EOR_NARRATIVE_09.25.2026.pdf

PDF 263 KB Posted

Attached to
Collier Senior Center Expansion Project
Solicitation number
26-8672
Issued by
Collier County, Florida

About this file

This is an Addendum (No. 9, Revision 3 for MEP and Revision 4 for Architectural) to the contract documents for the Collier Senior Center Expansion Project located at 4898 Coronado Parkway, Naples, Florida 34116, issued on September 25, 2026 by PBK Architects, Inc. (PBK Project No. 23028.00). The addendum modifies the original drawings and specifications dated September 25, 2026, and all proposers are required to incorporate these modifications into their proposals, with the addendum provisions superseding conflicting language in the original contract documents. The addendum includes revisions across multiple drawing sheets and specification sections, including updates to the index, door schedules, elevations, electrical panels and circuits, site plans showing county fiber infrastructure, communications systems, and commissioning requirements for mechanical and electrical systems, as well as clarifications to definitions and corrections to specification sections related to direct digital controls, emergency generators, and optical fiber cabling systems.

The addendum addresses technical and administrative clarifications necessary for the project's execution, including revised electrical feeder sizing for Panel M (225 amperes), addition of blue box camera circuits and county infrastructure elements to the design documentation, and updates to specification sections addressing commissioning authority definitions, direct digital control systems, gaseous emergency engine generators, and optical fiber backbone and horizontal cabling communications systems. As part of a partially grant-funded project under the Community Development Block Grant Mitigation Program (CDBG-MIT) with an anticipated budget of $5,600,000, this addendum ensures all bidders possess current and complete information for the expedited construction schedule requiring substantial completion within 456 calendar days from Notice to Proceed.

View the file

Other files

File Type Posted
26-8672_FPP_-_HUD_R2.9.25.26.pdf PDF
26-8672_-_Bid_Schedule_R7.xlsx XLSX spreadsheet
26-8672_-_Exhibit_M_-_Senior_Center_Expansion_-_Construction_Plans_REV4.pdf PDF
26-8672_-_Exhibit_L_-_Scope_of_Work_Revised_09252026.pdf PDF
26-8672_-_Exhibit_J_-_Senior_Center_-_Specifications_REV5.pdf PDF
26-8672_Pre-Bid_and_Site-Visit_Sign-in_Sheet.pdf PDF
26-8672_Exhibit_-_Lenel_Card_Access_Requirements.pdf PDF
26-8672_Exhibit_-_GC_Staging_and_Parking_Maps.pdf PDF
26-8672_Exhibit_-_Avigilon_Camera_List.xlsx XLSX spreadsheet
26-8672_Addendum_3_EOR_Narrative_08.24.2026.pdf PDF
26-8672_-_SolicitationR1.pdf PDF
26-8672_Supplemental_Info_-_Geotechnical_Report.pdf PDF
26-8672_-_Solicitation_07.14.26.pdf PDF
26-8672_-_Bid_Schedule_R3.xlsx XLSX spreadsheet
Construction_Services_Agreement_2025_Template_ver_3_with_Exhibits.pdf PDF
26-8672_-_Exhibit_K_-_Site_Development_Plan_Amendment_(SDPA).pdf PDF
26-8672_FPP.pdf PDF
PO_Terms_and_Conditions_Rev.3.pdf PDF
26-8672_-_Exhibit_L_-_Scope_of_Work.pdf PDF
26-8672_-_Exhibit_J_-_Senior_Center_-_Specifications.pdf PDF
26-8672_-_Exhibit_N_-_EHS_Contractor_Requirements_Master_2021_rev.pdf PDF
26-8672_-_Exhibit_M_-_Senior_Center_Expansion_-_Construction_Plans.pdf PDF
Construction_Bid_Instructions_Version_1.pdf PDF
26-8672_-_Authorization_to_Advertise_-_2026_07-08.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ARCHITECTURE \\ ENGINEERING \\ PLANNING \\ TECHNOLOGY \\ FACILITY CONSULTING \\ BRANDING

ADDENDUM

Addendum No:

Project:

Rev.3 MEP

Rev.4 Architectural

Collier Senior Center 4898 Coronado Pkwy, Naples FL, 34116

Issue Date:

To Drawings + Specifications dated

09/25/2026

09/25/2026

Prepared By: PBK Architects, Inc.

12751 New Brittany Blvd.

Suite 401, Fort Myers, FL 33907

PBK Project No: 23028.00

PBK.com

NOTICE TO PROPOSERS

A. This Addendum forms part of the Contract documents for the above referenced project and shall be incorporated integrally therewith.

B. Each proposer shall make necessary adjustments and submit his proposal with full knowledge of all modifications, clarifications, and supplemental data included therein. Where provisions of the following supplemental data differ from those of the original Contract Documents, this Addendum shall govern.

ITEMS

SHEET COMMENT

G-000 Index revisions updated

AD-100 Revised note 17

A-100 Revised note 39

A-300 Revised note 4

A-601 Revised door schedule (door 106 glazing type)

A-610 Revised elevation A18 (added dimensions)

ED-101 Revise keynotes. County infrastructure.

E-201 Added junction box and circuit for Blue Box.

E-601 Revised feeder serving Panel M to 225A.

E-701 Added Blue Box circuit to Panel C.

T-010 Revise site plan to show county fiber.

T-101: Added model number for Blue Box Camera to table.

Added Keynote 4. Added keynote 4 to Blue Box symbol.

Added Fiber proposed extension layout.

SPECIFICATIONS:

00 01 02 Revised Table of contents.

01 14 00 Misspelling Meadows

ARCHITECTURE \\ ENGINEERING \\ PLANNING \\ TECHNOLOGY \\ FACILITY CONSULTING \\ BRANDING

ADDENDUM

Page | 2

PBK.com

01 42 16 Revised 1.02 Definitions C 7 Commissioning Authority.

07 27 26 Added missing section.

23 09 23 Direct Digital Control Systems

26 08 00 Commissioning o Electrical Systems.

26 32 13 Gaseous Emergency Engine Generators

27 13 23 Communications Optical Fiber Backbone Cabling

27 15 23 Communications Optical Fiber Horizontal Cabling

NOTICE TO PROPOSERS
ITEMS