26-8672_-_Bid_Schedule_R7.xlsx

XLSX spreadsheet 20 KB Posted

Attached to
Collier Senior Center Expansion Project
Solicitation number
26-8672
Issued by
Collier County, Florida

About this file

This is a bid schedule for ITB No. 26-8672, the Collier Senior Center Expansion Project, issued by Collier County Board of County Commissioners in Florida. The project encompasses three construction scopes: Scope A involves new construction of a 2,710 square-foot addition to the existing 7,120 square-foot Senior Center located at 4898 Coronado Parkway, Naples, Florida, including a conference room, IT room, storage, restrooms, office space, and advanced air-filtration mechanical systems; Scope B covers hardening of the existing building to achieve current code-required wind load resistance through roof replacement, impact-rated openings, wall reinforcement, HVAC upgrades, electrical work, fire suppression systems, and site improvements; and Scope C addresses relocation and storage services for Senior Center contents during construction. The bid schedule itemizes construction components under Scope A (building construction with 19 line items and site construction with 9 line items), Scope B (building construction with 17 line items and site construction with 8 line items), and Scope C (moving and relocation services including on-site and off-site storage, moving services, and unskilled labor for 1,540 hours). Sealed electronic bids were due August 31, 2026 at 3:00 p.m., with a non-mandatory pre-bid conference scheduled for July 28, 2026 at 11:00 a.m. Substantial completion is required within 456 calendar days from Notice to Proceed, with final completion within 30 calendar days thereafter.

The anticipated project budget is $5,600,000, with the project partially grant-funded through the Community Development Block Grant Mitigation Program (CDBG-MIT). Owner's Allowances have been allocated at $203,919.90 for Scope A and $300,685.80 for Scope B to address unforeseen conditions at the Owner's discretion through Change Order. A five-percent bid bond is required at submission, and upon award, the successful bidder must provide Payment and Performance Bonds at 100 percent of contract value within ten calendar days of Notice of Award. Contractors must be Florida State Certified General Contractors and hold all required licenses, with liquidated damages set at $1,839 per day for failure to achieve substantial completion. Federal provisions apply, including Davis-Bacon prevailing wage requirements, E-Verify compliance, Section 3 housing employment preferences, and participation goals of 17.1 percent for minority and 6.9 percent for female participation. A local-vendor preference utilizing Choice2 applies to this solicitation. Required insurance includes Worker's Compensation, Commercial General Liability ($1,000,000 single limit / $2,000,000 aggregate), Employer's Liability ($1,000,000), and Automobile Liability ($1,000,000). Bidders must provide five project references demonstrating similar experience within the last five years and identify key personnel including Construction Superintendent and Project Manager.

View the file

Other files

File Type Posted
26-8672_FPP_-_HUD_R2.9.25.26.pdf PDF
Addendum_9_EOR_NARRATIVE_09.25.2026.pdf PDF
26-8672_-_Exhibit_M_-_Senior_Center_Expansion_-_Construction_Plans_REV4.pdf PDF
26-8672_-_Exhibit_L_-_Scope_of_Work_Revised_09252026.pdf PDF
26-8672_-_Exhibit_J_-_Senior_Center_-_Specifications_REV5.pdf PDF
26-8672_Pre-Bid_and_Site-Visit_Sign-in_Sheet.pdf PDF
26-8672_Exhibit_-_Lenel_Card_Access_Requirements.pdf PDF
26-8672_Exhibit_-_GC_Staging_and_Parking_Maps.pdf PDF
26-8672_Exhibit_-_Avigilon_Camera_List.xlsx XLSX spreadsheet
26-8672_Addendum_3_EOR_Narrative_08.24.2026.pdf PDF
26-8672_-_SolicitationR1.pdf PDF
26-8672_Supplemental_Info_-_Geotechnical_Report.pdf PDF
26-8672_-_Solicitation_07.14.26.pdf PDF
26-8672_-_Bid_Schedule_R3.xlsx XLSX spreadsheet
Construction_Services_Agreement_2025_Template_ver_3_with_Exhibits.pdf PDF
26-8672_-_Exhibit_K_-_Site_Development_Plan_Amendment_(SDPA).pdf PDF
26-8672_FPP.pdf PDF
PO_Terms_and_Conditions_Rev.3.pdf PDF
26-8672_-_Exhibit_L_-_Scope_of_Work.pdf PDF
26-8672_-_Exhibit_J_-_Senior_Center_-_Specifications.pdf PDF
26-8672_-_Exhibit_N_-_EHS_Contractor_Requirements_Master_2021_rev.pdf PDF
26-8672_-_Exhibit_M_-_Senior_Center_Expansion_-_Construction_Plans.pdf PDF
Construction_Bid_Instructions_Version_1.pdf PDF
26-8672_-_Authorization_to_Advertise_-_2026_07-08.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

26-8672 BID SCHEDULE

COLLIER SENIOR CENTER EXPANSION PROJECT
NEW CONSTRUCTION - SCOPE A
CONSTRUCTION ITB NO. 26-8672
BID SCHEDULE
Vendor Name:
BUILDING CONSTRUCTION
ITEM NO.DESCRIPTIONQTYUNITUNIT COSTTOTAL
1General Requirements1LS$ - 0$ - 0
2Concrete1LS$ - 0$ - 0
3Masonry1LS$ - 0$ - 0
4Metals1LS$ - 0$ - 0
5Wood / Plastic / Composites1LS$ - 0$ - 0
6Thermal & Moisture Protection (Including Roofing)1LS$ - 0$ - 0
7Openings1LS$ - 0$ - 0
8Exterior Wall Finishes1LS$ - 0$ - 0
9Interior Finishes1LS$ - 0$ - 0
10Specialties1LS$ - 0$ - 0
11Line Item Removed - Do Not Calculate00$ - 0
12Window blinds1LS$ - 0$ - 0
13Fire Suppression System1LS$ - 0$ - 0
14Plumbing1LS$ - 0$ - 0
15HVAC1LS$ - 0$ - 0
16Electrical1LS$ - 0$ - 0
17Line Item Removed - Do Not Calculate1LS$ - 0$ - 0
18Technology Systems1LS$ - 0$ - 0
19Pole Exterior Lighting1LS$ - 0$ - 0
SCOPE A - TOTAL BUILDING CONSTRUCTION:$ - 0
SITE CONSTRUCTION
ITEM NO.DESCRIPTIONQTYUNITUNIT COSTTOTAL
20General Requirements1LS$ - 0$ - 0
21Earthwork1LS$ - 0$ - 0
22Exterior On Site Improvements1LS$ - 0$ - 0
23Landscape/Irrigation1LS$ - 0$ - 0
24Domestic Water1LS$ - 0$ - 0
25Sanitary1LS$ - 0$ - 0
26Line Item Removed - Do Not Calculate00$ - 0$ - 0
27Storm Drainage1LS$ - 0$ - 0
28Technology1LS$ - 0$ - 0
SCOPE A - TOTAL SITE CONSTRUCTION:$ - 0
SCOPE A - TOTAL CONSTRUCTION (BUILDING + SITE) BID AMOUNT:$ - 0
COLLIER SENIOR CENTER HARDENING & EXPANSION PROJECT
HARDENING EXISTING - SCOPE B
CONSTRUCTION ITB NO. 26-8672
BID SCHEDULE
BUILDING CONSTRUCTION
ITEM NO.DESCRIPTIONQTYUNITUNIT COSTTOTAL
29General Requirements1LS$ - 0$ - 0
30Existing Conditions1LS$ - 0$ - 0
31Concrete1LS$ - 0$ - 0
32Rebar install at exterior CMU (see note B. on drawing sheet S1.0)690LF$ - 0$ - 0
33Wood / Plastic / Composites1LS$ - 0$ - 0
34Thermal & Moisture Protection (including Roofing)1LS$ - 0$ - 0
35Openings1LS$ - 0$ - 0
36Exterior Wall Finishes1LS$ - 0$ - 0
37Interior Finishes1LS$ - 0$ - 0
37bRebar installation locations54EA$ - 0$ - 0
38Specialties1LS$ - 0$ - 0
39GPR scan of exterior CMU walls1LS$ - 0$ - 0
40Window blinds1LS$ - 0$ - 0
41Fire Suppression System1LS$ - 0$ - 0
42Plumbing1LS$ - 0$ - 0
43HVAC1LS$ - 0$ - 0
44Electrical/Emergency Power sys1LS$ - 0$ - 0
45Technology Systems1LS$ - 0$ - 0
SCOPE B - TOTAL BUILDING CONSTRUCTION:$ - 0
SITE CONSTRUCTION
ITEM NO.DESCRIPTIONQTYUNITUNIT COSTTOTAL
46General Requirements1LS$ - 0$ - 0
47Existing Conditions1LS$ - 0$ - 0
48Earthwork1LS$ - 0$ - 0
49Exterior On Site Improvements1LS$ - 0$ - 0
50Landscape/Irrigation1LS$ - 0$ - 0
51Domestic Water1LS$ - 0$ - 0
52Sanitary1LS$ - 0$ - 0
53Storm Drainage1LS$ - 0$ - 0
SCOPE B - TOTAL SITE CONSTRUCTION:$ - 0
SCOPE B TOTAL BASE (BUILDING + SITE CONSTRUCTION) BID AMOUNT:$ - 0
COLLIER SENIOR CENTER HARDENING & EXPANSION PROJECT
SCOPE C
CONSTRUCTION ITB NO. 26-8672
BID SCHEDULE
SCOPE C
ITEM NO.DESCRIPTION# OF UNITSUNITUNIT COSTTOTAL
54On-site Storage Container 16' X 8' X 8' (Quantity 1)1LS$ - 0$ - 0
55Off-site Storage Up to 400 Square Feet of Air Conditioned Storage1LS$ - 0$ - 0
56Movers for Relocation of Contents1LS$ - 0$ - 0
57Unskilled labor for daily senior center breakdown for temporary location1,540HR$ - 0$ - 0
SCOPE C - MOVING & RELOCATION AMOUNT:$ - 0
BID SUMMARY
SCOPE A - BID AMOUNT (BUILDING + SITE CONSTRUCTION):$ - 0
SCOPE B - BID AMOUNT (HARDENING EXISTING):$ - 0
SCOPE C - NON-GRANT MOVING & RELOCATION COSTS:$ - 0
GRAND TOTAL SCOPE A + SCOPE B + SCOPE C:$ - 0
Owner Allowance
Staff has allocated $203,919.90 in Owner's Allowance for Scope A - for Owners Use as Directed.

Staff has allocated $300,685.80 in Owner's Allowance for Scope B - for Owners Use as Directed.

These Allowances will be used only at the Owner's direction to accomplish work due to unforeseen conditions and/or as directed by the Owner. Inclusion of the Allowance as part of the Contract Price is not a guarantee that the Contractor will be paid any portion or the full amount of the Allowance. Expenditures of Owners Allowance will be made through Change Order with proper documentation of Time and Materials supporting the change.

NOTE: Contractors are responsible for reviewing all bid documents and providing qualified responses to be considered. Line items 11, 17 & 26 have been intentionally zero‑valued. Vendor should not add values to these lines.

File details come from the government source that posted it. Updated .