About this file
This is a Site Development Plan Amendment (SDPA) approval letter issued by Collier County Growth Management Community Development in Naples, Florida, dated May 6, 2026, for the Collier Senior Center expansion project. The permit authorizes construction of water, sewer, paving, and drainage improvements for a 2,710 square foot expansion to the existing 7,120 square foot Senior Center located at 4898 Coronado Parkway, Naples, Florida 34116. The applicant, Pamela Wuster, must schedule a mandatory pre-construction meeting with Jason Tomassetti at least 48 hours before construction begins. Construction is limited to 6:30 a.m. to 7:00 p.m., Monday through Saturday, with no work permitted on Sundays or specified holidays. The project approval is valid for 36 months, expiring May 6, 2029. Additional pre-construction meetings are required for utility improvements, with at least 48 hours' notice. All inspections of water and sewer improvements must be requested at least 48 hours in advance.
The approval is conditioned upon compliance with multiple regulatory requirements including Collier County Land Development Code provisions, environmental permits from the Florida Department of Environmental Protection (FDEP), and South Florida Water Management District (SFWMD) permits. The applicant must obtain a County right-of-way (ROW) permit for work within public roadway right-of-way and submit a maintenance of traffic plan. A Traffic Impact Statement dated January 6, 2025, and revised August 20, 2025, has been approved for transportation concurrency, with an approved transportation deviation request for reduced corner offset distance and driveway throat length. The project is classified as a small development with fewer than 600 new vehicle trips per day. An Affidavit of Compliance is required prior to the pre-construction meeting, and the engineer of record must provide completion certificates and documentation of utility acceptance prior to issuance of a Certificate of Occupancy. The project is grant-funded and requires an expedited construction schedule.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Growth Management Community Development • Development Review 2800 North Horseshoe Drive • Naples, FL 34104 • 239-252-2400 • www.colliercountyfl.gov/
May 06, 2026
Pamela Wuster 3800 Via Del Rey Bonita Springs, FL 34134
Re: Site Development Plan Amendment Collier County Senior Center (SDPA) Project Number: PL20240004977
Dear Applicant:
THIS IS YOUR PERMIT AND MUST BE POSTED ONSITE.
The County has reviewed the Site Development Plan for the referenced project and has no objection to the construction of water, sewer, paving, and drainage aspects of the project subject to the following stipulations:
By receipt and acceptance of this approval, the petitioner acknowledges that a pre-construction meeting is required by code for this project. If the pre-construction meeting is not held prior to the beginning of construction, the project will be cited and shut down until the required meeting is held. Even with an Early Work Authorization (EWA) a pre-construction meeting is required.
General:
Please call Mr. Jason Tomassetti at (239) 252-2911 to schedule a pre–construction meeting a minimum of 48 hours prior to start of construction.
CHANGES IN USE AND/OR DESIGN OF THESE SITE AND ARCHITECTURAL PLANS ARE NOT
AUTHORIZED WITHOUT WRITTEN APPROVAL BY THE COUNTY. CHANGES SHALL
REQUIRE RE–REVIEW IN ACCORDANCE WITH ALL CURRENT COUNTY CODES INCLUDING
PARKING FACILITIES, UTILITIES, TRANSPORTATION, ENVIRONMENTAL REQUIREMENTS
AND THE LIKE.
A preliminary inspection and approval of the infrastructure for multi-family residential must be done by Engineering Inspections prior to any Certificate of Occupancy being granted.
Permits from other agencies having jurisdiction over this project shall be obtained prior to start of construction.
This site development plan is approved pursuant to the Certificate of Adequate Public Facilities which has been issued for this project.
All construction activities permitted by this letter shall only occur during the following times:
6:30 A.M. to 7:00 P.M., Monday through Saturday; no work is permitted on Sundays and the following holidays: New Year's Day, Memorial Day, 4th of July, Labor Day, Thanksgiving Day, Christmas Day.
The review and approval of these improvement plans does not authorize the construction of required improvements, which are inconsistent with easement of record.
http://www.colliercountyfl.gov/
Collier County
Growth Management Community Development • Development Review 2800 North Horseshoe Drive • Naples, FL 34104 • 239-252-2400 • www.colliercountyfl.gov/
Upon completion of the infrastructure improvements associated with a site development plan and prior to the issuance of a certificate of occupancy, the engineer shall provide a completion certificate as to the improvements, together with all applicable items referenced in Section 10.02.05 of this code including electronic format. Upon a satisfactory inspection of the improvements, a certificate of occupancy may then be issued.
Zoning:
SIGNAGE RESTRICTIONS: Please be advised that any permanent sign (wall, ground, monument, directory, etc.) requires a separate building permit and must meet the provisions of the Collier County Land Development Code, Section 5.06.00, and/or the applicable provisions of the governing Planned Unit Development (PUD) document, regardless of any sign placement, dimensions or color depicted on the site and/or architectural plans approved by this letter.
All PUD related stipulations shall apply to this project, as applicable.
Utility:
See Exhibit "A" & Utility Conveyance checklist in documents & images, if applicable.
Written confirmation that the water/sewer facilities have been accepted and placed in service must be provided prior to issuance of a Certificate of Occupancy.
APPROVAL OF THESE PLANS DOES NOT CONSTITUTE APPROVAL OF THE METER SIZE.
SIZING OF THE METER SHALL BE DONE WITH THE APPROVAL OF PUBLIC UTILITIES
ENGINEERING DIRECTOR OR DESIGNEE, BASED ON DOCUMENTATION RECEIVED FROM
THE ENGINEER OF RECORD. THE METER DETAIL SHALL BE SUBMITTED TO ENGINEERING
REVIEW FOR APPROVAL PRIOR TO INSTALLATION.
No water or sewer utility construction shall commence until proper DEP permits have been obtained.
Subdivision:
All work shall be in accordance with applicable Collier County ordinances and rules and regulations of other entities having jurisdiction over the project.
Environmental:
Site clearing is conditioned to the stipulations contained on the approved plans.
Required permits for listed species relocation must be provided to staff at the pre-construction meeting.
Silt fencing must be installed prior to any mechanical clearing.
Exotic vegetation must be removed prior to preliminary acceptance as required on the approved plans.
Water Management:
All work shall be in accordance with applicable State or Federal rules and regulations.
Work area shall be properly barricaded with hay bales and/or silt screens during the entire time of construction, to prevent any siltation during construction.
Separate excavation permit must be obtained.
Growth Management Community Development • Development Review 2800 North Horseshoe Drive • Naples, FL 34104 • 239-252-2400 • www.colliercountyfl.gov/
The engineer of record, prior to issuance of a Certificate of Occupancy, shall provide documentation from the stormwater maintenance entity that it has been provided information on how the stormwater system works and their responsibility to maintain the system.
This project shall be permitted by SFWMD.
Whether or not this project was permitted by SFWMD, dewatering shall not occur without a dewatering permit from the South Florida Water Management District.
Addressing:
Pursuant to Ordinance 2007-62, no proposed subdivision, street, building, condominium or development may utilize the same name or a similar sounding name as any existing subdivision, street, building, condominium or development, except that the major street within a subdivision may utilize the name of the subdivision. Any changes to the project name shall be reviewed and approved by Growth Management Community Development/Addressing Section.
Landscaping:
At the time of Preliminary Acceptance, the Landscape Architect shall certify that the landscaping has been installed in substantial accordance with the approved plans and specifications. The certification shall be in a form approved by the County Manager or designee.
Fire:
Please note that prior to the accumulation of combustible building materials on site, proposed fire hydrants must be operable with the minimum required fire flows and improved stabilized emergency apparatus access ways (min. 20' wide) must be available to within 100' of the structures.
All fire hydrants, fire department connections (FDC) and post-indicating valves (PIV) shall be visible and accessible; they shall not be obstructed visually or functionally by trees or landscaping.
Additional Stipulations:
Issuance of a development permit or development order by a county does not in any way create any rights on the part of the applicant to obtain a permit from a state or federal agency and does not create any liability on the part of the county for issuance of the permit if the applicant fails to obtain requisite approvals or fulfill the obligations imposed by a state or federal agency or undertakes actions that result in a violation of state or federal law. This permit is conditioned on all other applicable state or federal permits being obtained before commencement of the development.
Pursuant to F.S. 125.022, the Affidavit of Compliance will be required prior to the Pre-Construction Meeting. The document can be submitted through the portal.
Per Ordinance 2021-48, onsite processing of construction demolition debris and crushing of inert waste materials from an off-site location is prohibited unless allowed in a previously approved conditional use or Board of County Commissioners approved development order.
Planning - If an extension is needed, please upload an Extension Form to the Planning Extension Request Condition. Form available here: http://www.collier.gov/planningextension
Development Review - A utility pre-construction meeting is required prior to construction of water and/or sewer improvements. Contact Sparky (Mark) Briggs at (239) 380-5688 or Mark.Briggs@collier.gov http://www.collier.gov/planningextension
Growth Management Community Development • Development Review 2800 North Horseshoe Drive • Naples, FL 34104 • 239-252-2400 • www.colliercountyfl.gov/
All inspections of water and/or sewer improvements shall be requested at least 48 hours ahead of time. Contact Lucia Martin at (239) 252-2279, Lucia.Martin@collier.gov
Development Review - FDEP Permits must be submitted prior to scheduling the pre-construction meeting.
Transportation Planning - 10/13/2025 Informational Comment: TIS - The TIS titled “Traffic Impact Statement Collier Senior Center”, dated 01/06/2025, and revised 08/20/2025, is approved as the basis for transportation concurrency (adequacy of roadway capacity) and for trip banking (reservation of road capacity) for a 2,695 SF of Senior Center (Recreational Community Center) use, for a total of 9,762 SF.
Transportation Planning - 10/13/2025 Informational Comment: APPROVED TRANSPORTATION DEVIATION REQUEST – for reduced corner offset distance and reduced throat length for service driveway on Lucerne Road, dated 10/13/2025
Transportation Planning - 10/13/2025 Informational Comment: COUNTY ROW PERMIT - County ROW permit is required for any construction/maintenance work proposed within any County public roadway ROW. For the purpose of establishing County ROW permit fees, the project is considered a small development (less than 600 new vehicle trips per day). A maintenance of traffic (MOT) plan will be required with the ROW permit application. The estimated duration of sidewalk closure will be needed to determine ROW permit fees.
Your approved plans can be downloaded on the GMCD Portal.
Be advised that this approval automatically expires in thirty-six (36) months pursuant to Collier County Land Development Code Section 10.02.03.H.2. The expiration date is May 6, 2029.
Sincerely, Development Review Division