26-8672_-_Bid_Schedule_R3.xlsx

XLSX spreadsheet 20 KB Posted

Attached to
Collier Senior Center Expansion Project
Solicitation number
26-8672
Issued by
Collier County, Florida

About this file

This is a bid schedule for ITB No. 26-8672 for the Collier Senior Center Expansion Project in Naples, Florida, a project designed by PBK Architects that adds 2,710 square feet to the existing 7,120 square foot Senior Center. The project encompasses three distinct scopes: Scope A covers new construction for the building and site improvements; Scope B addresses hardening and weatherproofing of the existing facility; and Scope C includes moving and relocation costs. Scope A construction consists of 19 line items covering general requirements, concrete, masonry, metals, wood/plastic composites, thermal and moisture protection, openings, exterior and interior finishes, specialties, window blinds, fire suppression, plumbing, HVAC, electrical, technology systems, and exterior lighting for building construction, plus eight line items for site construction including earthwork, landscaping, irrigation, water, sanitary, storm drainage, and technology. Scope B contains 17 building construction line items including existing conditions assessment, concrete, rebar installation totaling 690 linear feet, thermal protection, openings, finishes, GPR scanning of exterior concrete masonry unit walls, systems for fire suppression, plumbing, HVAC, electrical and emergency power, and technology, along with eight site construction line items. Scope C includes provisions for on-site and off-site storage containers, movers for relocation of contents, and 192 hours of unskilled labor for senior center breakdown activities.

The bid schedule identifies all line items using lump sum (LS) pricing except for Scope B Item 32 (rebar installation) and Scope C Item 57 (labor) which employ unit-based pricing. Owner's Allowances of $203,919.90 for Scope A and $300,685.80 for Scope B have been allocated for use at the owner's direction to address unforeseen conditions, with expenditures managed through change orders with supporting documentation. The project is partially grant-funded and requires an expedited construction schedule with the Senior Center vacant during construction, while surrounding facilities including the Golden Gate Community Center, Golden Gate Public Library, Sheriff's office, Tax Collector, BMX/Skate Park, and Fire Rescue Station #70 remain operational. Line items 11 and 26 have been intentionally zero-valued and contractors are instructed not to assign values to these lines.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

26-8672 BID SCHEDULE

COLLIER SENIOR CENTER EXPANSION PROJECT
NEW CONSTRUCTION - SCOPE A
CONSTRUCTION ITB NO. 26-8672
BID SCHEDULE
Vendor Name:
BUILDING CONSTRUCTION
ITEM NO.DESCRIPTIONQTYUNITUNIT COSTTOTAL
1General Requirements1LS$ - 0
2Concrete1LS$ - 0
3Masonry1LS$ - 0
4Metals1LS$ - 0
5Wood / Plastic / Composites1LS$ - 0
6Thermal & Moisture Protection1LS$ - 0
7Openings1LS$ - 0
8Exterior Wall Finishes1LS$ - 0
9Interior Finishes1LS$ - 0
10Specialties1LS$ - 0
11Line Item Removed - Intentional Zero00$ - 0$ - 0
12Window blinds1LS$ - 0
13Fire Suppression System1LS$ - 0
14Plumbing1LS$ - 0
15HVAC1LS$ - 0
16Electrical1LS$ - 0
17Not Used1LS$ - 0
18Technology Systems1LS$ - 0
19Pole Exterior Lighting1LS$ - 0
SCOPE A - TOTAL BUILDING CONSTRUCTION:$ - 0
SITE CONSTRUCTION
ITEM NO.DESCRIPTIONQTYUNITUNIT COSTTOTAL
20General Requirements1LS$ - 0
21Earthwork1LS$ - 0
22Exterior On Site Improvements1LS$ - 0
23Landscape/Irrigation1LS$ - 0
24Domestic Water1LS$ - 0
25Sanitary1LS$ - 0
26Line Item Removed - Intentional Zero00$ - 0$ - 0
27Storm Drainage1LS$ - 0
28Technology1LS$ - 0
SCOPE A - TOTAL SITE CONSTRUCTION:$ - 0
SCOPE A - TOTAL CONSTRUCTION (BUILDING + SITE) BID AMOUNT:$ - 0
COLLIER SENIOR CENTER HARDENING & EXPANSION PROJECT
HARDENING EXISTING - SCOPE B
CONSTRUCTION ITB NO. 26-8672
BID SCHEDULE
BUILDING CONSTRUCTION
ITEM NO.DESCRIPTIONQTYUNITUNIT COSTTOTAL
29General Requirements1LS$ - 0
30Existing Conditions1LS$ - 0
31Concrete1LS$ - 0
32Rebar install at exterior CMU (see note B. on drawing sheet S1.0)690LF$ - 0
33Wood / Plastic / Composites1LS$ - 0
34Thermal & Moisture Protection1LS$ - 0
35Openings1LS$ - 0
36Exterior Wall Finishes1LS$ - 0
37Interior Finishes1LS$ - 0
38Specialties1LS$ - 0
39GPR scan of exterior CMU walls1LS$ - 0
40Window blinds1LS$ - 0
41Fire Suppression System1LS$ - 0
42Plumbing1LS$ - 0
43HVAC1LS$ - 0
44Electrical/Emergency Power sys1LS$ - 0
45Technology Systems1LS$ - 0
SCOPE B - TOTAL BUILDING CONSTRUCTION:$ - 0
SITE CONSTRUCTION
ITEM NO.DESCRIPTIONQTYUNITUNIT COSTTOTAL
46General Requirements1LS$ - 0
47Existing Conditions1LS$ - 0
48Earthwork1LS$ - 0
49Exterior On Site Improvements1LS$ - 0
50Landscape/Irrigation1LS$ - 0
51Domestic Water1LS$ - 0
52Sanitary1LS$ - 0
53Storm Drainage1LS$ - 0
SCOPE B - TOTAL SITE CONSTRUCTION:$ - 0
SCOPE B TOTAL BASE (BUILDING + SITE CONSTRUCTION) BID AMOUNT:$ - 0
COLLIER SENIOR CENTER HARDENING & EXPANSION PROJECT
SCOPE C
CONSTRUCTION ITB NO. 26-8672
BID SCHEDULE
SCOPE C
ITEM NO.DESCRIPTION# OF UNITSUNITUNIT COSTTOTAL
54On-site Storage Container 16' X 8' X 8' (Quantity 1)1LS$ - 0
55Off-site 10' X 10' Storage Unit1LS$ - 0
56Movers for Relocation of Contents1LS$ - 0
57Unskilled labor for daily senior center breakdown for temporary location192HR$ - 0
SCOPE C - MOVING & RELOCATION AMOUNT:$ - 0
BID SUMMARY
SCOPE A - BID AMOUNT (BUILDING + SITE CONSTRUCTION):$ - 0
SCOPE B - BID AMOUNT (HARDENING EXISTING):$ - 0
SCOPE C - NON-GRANT MOVING & RELOCATION COSTS:$ - 0
GRAND TOTAL SCOPE A + SCOPE B + SCOPE C:$ - 0
Owner Allowance
Staff has allocated $203,919.90 in Owner's Allowance for Scope A - for Owners Use as Directed.

Staff has allocated $300,685.80 in Owner's Allowance for Scope B - for Owners Use as Directed.

These Allowances will be used only at the Owner's direction to accomplish work due to unforeseen conditions and/or as directed by the Owner. Inclusion of the Allowance as part of the Contract Price is not a guarantee that the Contractor will be paid any portion or the full amount of the Allowance. Expenditures of Owners Allowance will be made through Change Order with proper documentation of Time and Materials supporting the change.