This Addendum #3 document modifies the bidding requirements for ITB #25-213-PW, a concrete removal and replacement services solicitation issued by the Eugene Water & Electric Board (EWEB) for work within Eugene, Lane County, Oregon. The addendum corrects a transposition error in the Group B Bid Form (Section 00400-R) for large projects exceeding 100 square feet, revising Line 1 to reflect an estimated quantity of 1,500 cubic yards with a typical project size of 100 cubic yards (previously listed as 135 estimated quantity and 1,500 typical project size). Group A services address projects under 100 square feet and include 15 line items encompassing removal of cold patch and crushed rock, concrete cutting, residential and commercial sidewalk installation, driveway work, ADA ramps, truncated dome panels, curb and gutter replacement, dowels, reinforcing, plain concrete pavement, and high early strength concrete options. Group B services for larger projects contain the same 15 line item categories with significantly higher quantities. The bid closing date and time remain unchanged at January 13, 2026, at 2:00 PM PST, and acknowledgment of this material change must be documented by signature and return of the addendum with the bid response or by circling the addendum number on the bid form.
The revised bid form requires bidders to enter unit prices and calculate extended prices for each line item within both Group A and Group B categories, with separate subtotals for each group. This addendum constitutes a material change to the original bidding documents and supersedes previous versions of the bid form provided to prospective contractors. The correction ensures accurate quantity and project size information for bidders preparing their proposals for submission through the OregonBuys website by the specified deadline.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum 1~31.pdf | ||
| 00430-B First Tier Sub 10-5-22.docx | DOCX document | |
| 00400-R BID FORM - Revised~1.docx | DOCX document | |
| Addendum 5~7.pdf | ||
| Bid Tab 25-213-PW.pdf | ||
| Notice of Intent to Award-All Bidders~2.pdf | ||
| Addendum 2~23.pdf | ||
| Addendum 4~18.pdf | ||
| 00400 BID FORM - MS Word.docx | DOCX document | |
| 25-213-PW Concrete Removal RFP.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
January 8, 2026
ADDENDUM # 3
Concrete Removal & Replacement Services
ITB # 25-213-PW
This addendum modifies the bidding document(s) for work only to the extent indicated herein. All other areas not specifically mentioned or affected by this addendum shall remain in full force. This addendum shall be added as a part of the original bidding document and shall become part of the work required.
CORRECTION TO BID FORM for GROUP B
1. Line 1 of the Group B Bid Form was transposed and please note that the original 135 Estimated Qty on line #1 is now 100 Typical Project Size. (The original 1500 Typical Project Size is now 1500 Estimated Qty). A revised Bid Form (00400-R) is attached on the bid site in MS Word form and is shown below as well.
CLOSING DATE AND TIME
January 13, 2026; 2:00 PM PST / Remains unchanged.
This addendum constitutes a MATERIAL CHANGE to the bid. ITS RECEIPT BY THE BIDDER IS TO BE ACKNOWLEDGED BY A SIGNATURE AND RETURNING A COPY OF THE ADDENDUM WITH ITS RESPONSE OR
BY CIRCLING THE ADDENDUM NUMBER IN THE APPROPRIATE AREA ON THE BID FORM.
Addendum prepared by:
Sandra Hahn, Purchasing Contact
The undersigned hereby acknowledges receipt of this Addendum and agrees to be bound by the conditions therein.
Company Name:
Signature:
Date
Eugene Water & Electric Board Section 00400 - R
Rev. 8/17 Section 00400-R
BID TABLES
Company Name: ________________________________
Abbreviations: CF=Cubic Foot; SF = Square Foot; LF = Linear Foot
GROUP A - MOST FREQUENTLY NEEDED SERVICES (under 100 ft2)
Item No.
Description of Work Unit Typical Project Size
Estimated Quantity
Unit Price Extended Price
1 Removal of Cold Patch & Crushed Rock (6"- 9" typical) CY 2 225
2 Removal of Existing Concrete (4" -7" typical) CY 1 110
3 Concrete Cutting Inch- Ft 80 10000
4 Residential Sidewalk (4” Depth) SF 50 6700
5 Residential Driveways (5” typical Depth) CY 1 55
6 Commercial Sidewalks and Driveways (7” typical Depth) CY 2 55
7 ADA Ramps (4” Depth) SF 200 4500
8 Truncated Dome Panels SF 20 550
Curb and Gutter Replacement (13” depth, dowels not included)
LF 3 1100
5’ Wide Curb and Gutter Replacement (6” depth) – dowels not included
LF 3 225
11 Standard Curb (vertical curb), Dowels not included LF 3 225
12 Dowels EA 2 550
13 Reinforcing lb 20 1100
14 Plain Concrete Pavement CY 1 30
Additional Cost for High Early Strength Concrete (4000 psi in 24 hours)
CY 10 35
GROUP A SUBTOTAL:
Eugene Water & Electric Board Section 00400 - R
Rev. 8/17 Section 00400 -R
Company Name: ________________________________
Abbreviations: CF=Cubic Foot; SF = Square Foot; LF = Linear Foot
GROUP B – LARGE PROJECTS (GREATER THAN 100 FT)
Item No.
Description of Work Unit Typical Project Size
Estimated Quantity
Unit Price
Extended Price
1 Removal of Cold Patch & Crushed Rock (6"- 9" typical) CY 100 1500 1500 135
2 Removal of Existing Concrete (4" -7" typical) CY 135 500 500 135
Concrete Cutting
Inch -Ft 4600 10225
4 Residential Sidewalk (4” Depth) SF 750 1675
5 Residential Driveways (5” typical Depth) CY 2 5
6 Commercial Sidewalks and Driveways (7” typical Depth) CY 2 5
7 ADA Ramps (4” Depth) SF 100 225
8 Truncated Dome Panels SF 20 45
9 Curb and Gutter Replacement (13” depth, dowels not included) LF 90 135
10 5’ Wide Curb and Gutter Replacement (6” depth) – dowels not included
LF 30 70
11 Standard Curb (vertical curb), Dowels not included
LF 30 70
12 Dowels EA 110 245
13 Reinforcing lb 668 1335
14 Plain Concrete Pavement CY 100 110
15 Additional Cost for High Early Strength Concrete (4000 psi in 24 hours) CY 5 10
GROUP B SUB-TOTAL $
| ADDENDUM # 3 |
| Concrete Removal & Replacement Services ITB # 25-213-PW |
| CORRECTION TO BID FORM for GROUP B |
| CLOSING DATE AND TIME |
| Addendum prepared by: |