This document is a contract amendment for Solicitation Number ACQR6043431, "UTILITY SYSTEMS RESILIENCY REPAIRS AND UPGRADES". The amendment provides responses to a Request for Information (RFI), revises the Time for Completion to 820 calendar days after award, and includes various attachments such as the RFI form, geotechnical report, and environmental permits. The solicitation is for an Indefinite Delivery Quantity (IDQ) contract under the Department of the Navy Naval Facilities Engineering Command. The amendment modifies the terms of the original solicitation, but does not introduce any new product or service requirements. Offerors must acknowledge receipt of this amendment in their proposal submissions.

View the file

Other files

File Type Posted
AMD0006_ACQR6043431 UTILITY SYSTEMS RESILIENCY REPAIRS AND UPGRADES.pdf PDF
AMD0007_ACQR6043431 UTILITY SYSTEMS RESILIENCY REPAIRS AND UPGRADES.pdf PDF
Attachment D - ACQR6043431 Price Schedule_rev 8.19.24.docx DOCX document
ACQR6043431 Request for Information Form_8.14.24.pdf PDF
CLIN0002D Note P3 Comments.pdf PDF
AMD0005_ACQR6043431 UTILITY SYSTEMS RESILIENCY REPAIRS AND UPGRADES.pdf PDF
ACQR6043431 Request for Information Form_8.6.24.pdf PDF
Attachment D - ACQR6043431 Price Schedule_rev 8.6.24.docx DOCX document
AMD0004_ACQR6043431 UTILITY SYSTEMS RESILIENCY REPAIRS AND UPGRADES.pdf PDF
USACE_JPA License NAB-2023-61614-M55.pdf PDF
MDE_JPA License 23-WL-1046.pdf PDF
MDE_ESC-SWM Approval Letter 23-SF-0174.pdf PDF
ACQR6043431 Request for Information Form.pdf PDF
KGSUB - Geotechnical Engineering Report.pdf PDF
USCG Bridge Permit Waiver Approval Letter.pdf PDF
AMD0002_ACQR6043431 UTILITY SYSTEMS RESILIENCY REPAIRS AND UPGRADES.pdf PDF
252.215-7009 Proposal Adequacy Checklist.pdf PDF
Certificate of Current Cost or Pricing Data.docx DOCX document
AMD0001_ACQR6043431 UTILITY SYSTEMS RESILIENCY REPAIRS AND UPGRADES.pdf PDF
ACQR6043431 RFP Utility System Resiliency and Upgrades_rev 6.28.24.pdf PDF
Attachment D - ACQR6043431 Price Schedule.docx DOCX document
Attachment F - Certificate of Non-Disclosure.docx DOCX document
ACQR6043431 RFP Utility System Resiliency and Upgrades.pdf PDF
Attachment B - WD MD20240012 06.14.24.pdf PDF
Attachment C - Request for Information Form.xlsx XLSX spreadsheet
Attachment E - Small Business Subcontracting Plan.docx DOCX document
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NSN 754-01-152-8070 STANDARD FORM 30 (REV. 10-83

PREVIOUS EDITIONS UNUSABLE Prescribed by GSA Page 1 of 2 FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES 1 2

2. AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

29-JUL-2024

4. REQUISITION /PURCHASE REQ. NO.

6043431

5. PROJECT NO. (if applicable)

6. ISSUED BY CODE N40080 7. ADMINISTERED BY (If other than Item 6) CODE

Public Works Department/FEAD 181 Wainwright Road USNA, Halligan Hall, Stop 21A Annapolis, MD 21402-5013

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) X 9A. AMENDMENT OF SOLICITATION NO.

ACQR6043431

9B. DATED (see item 11)

10A. MODIFICATION OF CONTRACT NO.

DUNS NO. TIN# 10B. DATED (see item 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, x is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning one copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or © By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATION OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGE SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, X is required to sign this document and return 1 Copy to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section heading, including solicitation/contract subject matter where feasible).

LP MACC - ACQR6043431 UTILITY SYSTEMS RESILIENCY REPAIRS AND UPGRADES

See page 2 for details.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A as heretofore changed, remains unchanged and in full force and effect.

15A NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

JENNIFER GALGANO / CONTRACTING OFFICER

TEL: 410-293-3188 EMAIL: jennifer.m.galgano.civ@us.navy.mil

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

BY__________________

(Signature of Contracting Officer)

16C. DATE SIGNED

29-JUL-2024

NSN 754-01-152-8070 STANDARD FORM 30 (REV. 10-83

PREVIOUS EDITIONS UNUSABLE Prescribed by GSA Page 2 of 2 FAR (48 CFR) 53.243

The purpose of this Amendment is to:

1. Provide RFI responses.

2. Revise Time for Completion provided in the Request for Proposal to read as follows:

a. Time for Completion: In accordance with FAR 52.211-10 Commencement, Prosecution, and Completion of Work, the Government desires completion of construction within 820 calendar days after award (includes 15 calendar days for submission and approval of bonds and insurance).

3. Provide the following attachments:

a. ACQR6043431 Request for Information Form

b. KGSUB – Geotechnical Engineering Report

c. MDE_ESC+SWM Approval Letter 23-SF-0174

d. MDE_JPA License 23-WL-1046

e. USACE_JPA License NAB-2023-61614-M55

f. USCG Bridge Permit Waiver Approval Letter